Annual Assessment Meeting June 3, 2020 Slides
ML20161A081
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 06/03/2020
From: Brett Klukan
Division Reactor Projects I
To:
References
MN 20-002
Download: ML20161A081 (21)


Text

2019 Annual Assessment of Seabrook Station Welcome!

This webinar will start in a few moments Call in using the phone number below:

Dial-in Number: 1 (888) 790-3561 Participant passcode: 2067991#

Webinar Event Number: 904 473 576

Seabrook Annual Assessment Meeting Reactor Oversight Process - 2019 Nuclear Regulatory Commission - Region I King of Prussia, PA June 3, 2020

Seabrook Annual Assessment Meeting Meeting Facilitator Brett Klukan Regional Counsel, Region I 3

Meeting Conduct

  • Please respect other members of the public
  • Please be conscious of your speaking time
  • Consider asking your questions in the Webex Q&A box 4

How To Ask Question

  • TYPE in your question at any time using the WebEx app. Questions will be addressed during the Question-and-Answer session following the presentation

- or -

  • VERBALLY ask your question during the the Question-and-Answer session following the presentation 5

Agenda - Seabrook Dan Collins, Director, DRP, Region I Lead Panelist

  • Opening Remarks
  • 2019 ROP Assessment Summary
  • Oversight of ASR Management
  • NRC Response to COVID - 19
  • Public Question and Answer 6

NRC Panelists Paul Cataldo Travis Daun Brice Bickett Sr. Resident Inspector Resident Inspector Branch Chief Mel Gray Justin Poole Diane Screnci Sr. PAO Engineering Branch Chief Project Manager 7

Seabrook Plant Performance Assessment

  • Seabrook operated safely in 2019
  • Findings: all very low safety significance
  • Performance indicators: all green
  • The plant will receive the baseline level of inspection in 2020 8

NRC Independent Safety Inspections Reactor Oversight Process

  • NRC inspectors have unfettered access to all plant activities related to nuclear safety and security
  • Full-time NRC resident inspectors
  • NRC specialists conduct additional inspections at each nuclear plant 9

2019 NRC Inspection Activities at Seabrook

  • 5225 hours0.0605 days <br />1.451 hours <br />0.00864 weeks <br />0.00199 months <br /> of inspection and related activities

- Examples of Resident Inspections

  • maintenance activities
  • surveillance tests
  • preparations for adverse weather
  • operator performance in the simulator

- 2019 Team Inspections

  • Access Authorization & Control
  • Safeguards Information Control
  • Design Bases Assurance 10

NRC Oversight of ASR Management

  • March 2019 license amendment - reconciled the licensing design basis of concrete structures impacted by ASR
  • The NRC continues to independently inspect and assess NextEras activities related to managing the effects of ASR using the ROP baseline inspection program
  • Resident and specialty inspectors continue to independently review ASR-related activities and routinely walk down impacted structures.

11

NRC Actions in Response to Covid-19

  • Monitoring plant activities through inspections and oversight (remote and on-site)
  • Risk-informing eyes-on inspections through residents and regional inspections
  • Increased resident coverage during the refueling outage and increased risk activities
  • Maintaining emergency response capabilities at Regions and HQ 12

NRC Relief/Exemption Due to COVID-19

  • Temporary flexibility that maintains continued safe and secure operation, while supporting the national priority of reducing the spread of COVID-19

Seabrook Annual Assessment Meeting Closing Remarks 14

Office of Public Affairs Diane Screnci Neil Sheehan diane.screnci@nrc.gov neil.sheehan@nrc.gov 610-337-5330 610-337-5331 15

NRC Social Media Channels

  • Flickr: www.flickr.com/photos/nrcgov
  • Facebook: www.facebook.com/nrcgov
  • Twitter: twitter.com/#!/nrcgov
  • YouTube: www.youtube.com/user/NRCgov
  • LinkedIn: www.linkedin.com/company/u-s--nuclear-regulatory-commission 16

For Additional Information

  • NRC website:

www.nrc.gov

  • Inspection reports:

www.nrc.gov/reactors/operating/oversight/listofrpts-body.html

www.nrc.gov/reading-rm/doc-collections/faq/coronavirus.html 17

Annual Assessment Meeting Feedback

1. Mail in NRC 2. Scan QR Code on feedback form that - OR - back of form with will be emailed to smart device all attendees

- OR -

3. At any computer, go to the Public Meeting Schedule and press the Meeting Feedback link for this meeting - or - press the [more] link for this meeting and then press the Meeting Feedback link on the 18 Meeting Details page.

18

How To Ask a Question

  • You can type in your question at any time using the Q&A section of WebEx OR
  • You can ask your question verbally by pressing *1 (star one) and ensuring your phone is not muted

- The moderator will open your line so that you can ask your question 19

Question & Answer Session Question & Answer Session 20

Thank you for your participation