{{#Wiki_filter:GE   Hitachi Nuclear             Energy
{{#Wiki_filter:GE Hitachi Nuclear Energy
* H       ITACHI Scott P. Murray Manager,     Facility Licensing
* H ITACHI Scott P. Murray Manager, Facility Licensing


3901 Castle Hayne                         Road P.O. Box   780 M240052                                                                                                                       Wilmington,                   NC 28402 USA March                 15, 2024                                                                                               T (910) 819-5950 scott.murray@ge.com U.S.     Nuclear           Regulatory           Commission Attn: Document                   Control         Desk Washington,                                             D. C. 20555-001 10 CFR       50.90
3901 Castle Hayne Road P.O. Box 780 M240052 Wilmington, NC 28402 USA March 15, 2024 T (910) 819-5950 scott.murray@ge.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001 10 CFR 50.90


==Subject:==
==Subject:==
GEHA/NorthStar Response                     to NRC Request   for Additional Information Regarding Direct Transfer of R-33   NTR     License
GEHA/NorthStar Response to NRC Request for Additional Information Regarding Direct Transfer of R-33 NTR License


==References:==
==References:==
: 1) Application for Conse                   n         t to   Direct Transfers of Control of Licenses   and       Related Conforming                             License   Amendments,                                   9/1/23     (M   l23244A246,     ML23244A247)
: 1) Application for Conse n t to Direct Transfers of Control of Licenses and Related Conforming License Amendments, 9/1/23 (M l23244A246, ML23244A247)
: 2) NRC License       R-33,     Docket                       0500073,     General       Electric Hitachi (GEH)                                 Nuclear         Test Reactor                 (NTR),   Amendment                                     26 Issued 2/28/24
: 2) NRC License R-33, Docket 0500073, General Electric Hitachi (GEH) Nuclear Test Reactor (NTR), Amendment 26 Issued 2/28/24
: 3) Telecom,                   Chris Allen (NRC) with Scott P.       Murray                     (GEH), "Request for Additional Information             Regarding       the Direct Transfer of VNC                                 Licenses,"   3/12/24
: 3) Telecom, Chris Allen (NRC) with Scott P. Murray (GEH), "Request for Additional Information Regarding the Direct Transfer of VNC Licenses," 3/12/24


On     September             1,     2023,   GE   Hitachi Nuclear                     Energy               Americas,     LLC   ("GEHA") and                         NorthStar Vallecitos, LLC ("NorthStar Vallecitos") (together, "A pplicants") submitted a         request for the direct transfers of control                   of GEHA's Vallecitos Nu         clear Center (VNC)                   NRC     licenses in Sunol,                   CA (Reference           1).
On September 1, 2023, GE Hitachi Nuclear Energy Americas, LLC ("GEHA") and NorthStar Vallecitos, LLC ("NorthStar Vallecitos") (together, "A pplicants") submitted a request for the direct transfers of control of GEHA's Vallecitos Nu clear Center (VNC) NRC licenses in Sunol, CA (Reference 1).


GEHA     and                       NorthStar hereby                   respond               to the NRC request for additional information                 as         we         discussed on                       March                   12, 2024 (Reference       3).
GEHA and NorthStar hereby respond to the NRC request for additional information as we discussed on March 12, 2024 (Reference 3).
provides a             red line draft of R-33   Amendment                                       27   and                     Attachment           2 provides a             red line draft of the R-33 Technical                           Specifications, Rev     9.
provides a red line draft of R-33 Amendment 27 and Attachment 2 provides a red line draft of the R-33 Technical Specifications, Rev 9.


I declare under                 penalty         of perjury that the foregoing         is true an~                             correct.
I declare under penalty of perjury that the foregoing is true an~ correct.
Sincerely,
Sincerely,


ForGE             Hitachi Nuclear               Energy                 Americas,     LLC A_t~~f                                                                                                                         /(1                               7 Scott P.       Murray                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       -
ForGE Hitachi Nuclear Energy Americas, LLC A_t~~f /(1 7 Scott P. Murray -
Facility Licensing,     Manager GE   Hitachi Nuclear                   Energy                 Americas,     LLC M240052 U.S. NRC March 15, 2024 Page 2 of 2
Facility Licensing, Manager GE Hitachi Nuclear Energy Americas, LLC M240052 U.S. NRC March 15, 2024 Page 2 of 2


For the NorthStar Companies:
For the NorthStar Companies:
Line 46: Line 46:
Gregory G. DiCarlo Vice President, General Counsel & Secretary NorthStar Group Services, Inc.
Gregory G. DiCarlo Vice President, General Counsel & Secretary NorthStar Group Services, Inc.


Attachments                             1) R-33 Amendment 27 Draft Redline Mark Up
Attachments 1) R-33 Amendment 27 Draft Redline Mark Up
: 2) R-33 Technical Specifications Revision 9 Draft Redline Mark Up
: 2) R-33 Technical Specifications Revision 9 Draft Redline Mark Up


cc: NRC Region IV Administrator J. D. Parrott, USNRC/NMSS/DUWP/RDB J                     . M. Borromeo,                                           Branch Chief, USNRC/NRR/DANU/UNPL G. A. Wertz, USNRC/NRR/DANU/UNPL SPM                       24-019 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555-0001
cc: NRC Region IV Administrator J. D. Parrott, USNRC/NMSS/DUWP/RDB J. M. Borromeo, Branch Chief, USNRC/NRR/DANU/UNPL G. A. Wertz, USNRC/NRR/DANU/UNPL SPM 24-019 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555-0001


GE-HITACHI NUCLEAR ENERGY AMERICAS, LLC NORTHSTAR VALLECITOS, LLC
GE-HITACHI NUCLEAR ENERGY AMERICAS, LLC NORTHSTAR VALLECITOS, LLC
Line 72: Line 72:
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public;
D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public;


E.                                                             This issuance of this amendment is in accordance with 10 CFR Part 51, "Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions," of the Commission's regulations, and all applicable requirements have been satisfied; and
E. This issuance of this amendment is in accordance with 10 CFR Part 51, "Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions," of the Commission's regulations, and all applicable requirements have been satisfied; and


F. Prior notice of this amendment was not required by 10 CFR 2.105, "Notice of proposed action," and publication of a notice of issuance for this amendment is not required by 10 CFR 2.106, "Notice of issuance.
F. Prior notice of this amendment was not required by 10 CFR 2.105, "Notice of proposed action," and publication of a notice of issuance for this amendment is not required by 10 CFR 2.106, "Notice of issuance.
* This License was transferred from GE-Hitachi Nuclear Energy Americas, LLC to NorthStar Vallecitos, LLC, in accordance with the Order for this Amendment.


*This License was transferred from GE-Hitachi Nuclear Energy Americas, LLC to NorthStar Vallecitos, LLC, in accordance with the Order for this Amendment.
G The receipt, possession, and use of byproduct and special nuclear materials as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Part 30, "Rules of General Applicability to Domestic Licensing of Byproduct Material," and 10 CFR Part 70, "Domestic Licensing of Special Nuclear Material."
 
G   The receipt, possession, and use of byproduct and special nuclear materials as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Part 30, "Rules of General Applicability to Domestic Licensing of Byproduct Material," and 10 CFR Part 70, "Domestic Licensing of Special Nuclear Material."
: 2. Accordingly, Facility Operating License No. R-33 is hereby amended renewed in its entirety to read as follows:
: 2. Accordingly, Facility Operating License No. R-33 is hereby amended renewed in its entirety to read as follows:


Line 87: Line 86:
(1) Pursuant to Section 104c of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," to possess the reactor at the designated location in Alameda County, California, in accordance with the procedures and limitations described in the application and set forth in this license.
(1) Pursuant to Section 104c of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," to possess the reactor at the designated location in Alameda County, California, in accordance with the procedures and limitations described in the application and set forth in this license.


(2) Pursuant to the Act and 10       CFR Part 70, to possess,   but not separate:
(2) Pursuant to the Act and 10 CFR Part 70, to possess, but not separate:
: a. up to 4 kilograms of contained uranium-235 of an enrichment of 20 percent or greater in the isotope uranium-235, in the form of in-core reactor fuel; and
: a. up to 4 kilograms of contained uranium-235 of an enrichment of 20 percent or greater in the isotope uranium-235, in the form of in-core reactor fuel; and
: b. such special nuclear material as may have been produced by the operation of the reactor.
: b. such special nuclear material as may have been produced by the operation of the reactor.


(3) Pursuant to the Act and 10 CFR Part 30, to       possess:
(3) Pursuant to the Act and 10 CFR Part 30, to possess:
: a. up to 0.2-curie radium-beryllium sealed startup source, and up to 0.03 curies of byproduct materials, in the form of sealed sources, for instrument calibration and source checks; and
: a. up to 0.2-curie radium-beryllium sealed startup source, and up to 0.03 curies of byproduct materials, in the form of sealed sources, for instrument calibration and source checks; and
: b. but not to separate, such byproduct material as may have been produced by the operation of the reactor.
: b. but not to separate, such byproduct material as may have been produced by the operation of the reactor.
Line 98: Line 97:


2627 February 28April
2627 February 28April
                                                                      - 3   -
- 3 -


C.           This license shall be         deemed to   contain and           is subject to the       conditions specified in 10       CFR       Parts 20,       30,       50,       51,       55,       70,       and 73       of the         Commissions regulations; is subject to     all applicable provisions of the         Act,   and           to   the         rules, regulations, and           orders of the Commission now,       or   hereafter in eff ect, and         to   the         additional conditions specified below:
C. This license shall be deemed to contain and is subject to the conditions specified in 10 CFR Parts 20, 30, 50, 51, 55, 70, and 73 of the Commissions regulations; is subject to all applicable provisions of the Act, and to the rules, regulations, and orders of the Commission now, or hereafter in eff ect, and to the additional conditions specified below:


(1)         Maximum Power   Level
(1) Maximum Power Level


The         licensee is not     authorized to   operate the       reactor at     any         power           level.
The licensee is not authorized to operate the reactor at any power level.


(2)   Technical Specifications
(2) Technical Specifications


The   Technical Specifications contained in Attachment A,     as   revised by Amendment       No.       2             6             2             7,     are   hereby   incorporated   in   their   entirety   in the           license.
The Technical Specifications contained in Attachment A, as revised by Amendment No. 2 6 2 7, are hereby incorporated in their entirety in the license.
The         licensee shall maintain the       facility in accordance with the       Technical Specifications.
The licensee shall maintain the facility in accordance with the Technical Specifications.


(3)         Physical Security Plan
(3) Physical Security Plan


The         licensee shall fully     implement and           maintain in effect all provisions of the Commission-approved physical security plan, including amendments and changes   made pursuant to   the         authority of   10     CFR       50.54,   Conditions of licenses, paragraph   (p). The         approved physical security plan, entitled VNC Site Physical Security Plan, dated April   4,     2022, consists of documents w ithheld from public disclosure pursuant to   10     CFR       73.21,   Protection   of Safeguards Information: Performance requirements.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security plan, including amendments and changes made pursuant to the authority of 10 CFR 50.54, Conditions of licenses, paragraph (p). The approved physical security plan, entitled VNC Site Physical Security Plan, dated April 4, 2022, consists of documents w ithheld from public disclosure pursuant to 10 CFR 73.21, Protection of Safeguards Information: Performance requirements.


(4)   GE-Hitachi Nuclear Energy     Americas, LLCNorthStar   Vallecitos, LLC, as stated in the                                       General Electric Companys (GEs)NorthStar Vallecitos, LLC application dated J                                                                                 a                                                                               n                                                                               u                                                                                 a                                                                             r                                                                               y                                                                                 19,       2007September 1,     2023,                               a                       n                       d                                                                                 as supplemented   by     letters dated September 5,     2023,   October 19,       2023,   November 1,     2023, and           January 22, 2024on January 25, 2007, February 23, 2007, March 2, 2007, March 26, 2007, May   16, (4)   2007, May   18,       2007, June 4,     2007,   July 6,     2007, and           August 9,     2007, will   abide by   all commitments and           representations previously made by   GE     with respect to the         license. These include,   but       are not     limited to,     maintaining decommissioning records,   implementing decontamination activities, and           eventually decommissioning the         facility.
(4) GE-Hitachi Nuclear Energy Americas, LLCNorthStar Vallecitos, LLC, as stated in the General Electric Companys (GEs)NorthStar Vallecitos, LLC application dated J a n u a r y 19, 2007September 1, 2023, a n d as supplemented by letters dated September 5, 2023, October 19, 2023, November 1, 2023, and January 22, 2024on January 25, 2007, February 23, 2007, March 2, 2007, March 26, 2007, May 16, (4) 2007, May 18, 2007, June 4, 2007, July 6, 2007, and August 9, 2007, will abide by all commitments and representations previously made by GE with respect to the license. These include, but are not limited to, maintaining decommissioning records, implementing decontamination activities, and eventually decommissioning the facility.


(5)   The         Manager   of the         Vallecitos Nuclear Center, the         Vice-President,   Reactor Facility Saf ety and           Security of     GE-Hitachi Nuclear Energy   AmericasNorthStar Vallecitos, LLC, and           the       Manager of     GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC shall be       U.S.       citizens. These individuals shall have   the         responsibility and   exclusive authority to   ensure and           shall ensure that the business and           activities of   GE-Hitachi Nuclear Energy   AmericasNorthStar Vallecitos, LLC, with respect to   this license, are         at       all times conduct ed in a manner con sistent with the         protection of the         public health and           safety and           the common def ense and           security.
(5) The Manager of the Vallecitos Nuclear Center, the Vice-President, Reactor Facility Saf ety and Security of GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC, and the Manager of GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC shall be U.S. citizens. These individuals shall have the responsibility and exclusive authority to ensure and shall ensure that the business and activities of GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC, with respect to this license, are at all times conduct ed in a manner con sistent with the protection of the public health and safety and the common def ense and security.


Amendment   27 April   XX, 2024
Amendment 27 April XX, 2024
                                                                        - 4   -
- 4 -


(6)     The       commitments/representations made in t he                                                               GEs NorthStar   Vallecitos, LLCs application dated September 1,     2023, as supplemented by   letters dated   September 5, 2023, October 19,       2023,           November 1,     2023,   and         Jan uary 22,       2024 January 19,       2007,                                                   a                                           n                                           d                                                       supplemented on     January 25,       2007, February 23,       2007, March       2,     2007, March       26,       2007, May   16,       2007, May   18,       2007,   June 4,     2007, (6)         July 6,     2007, and           August 9,     2007,           regarding reporting relationships and           authority over safety and           security issues and compliance with NRC     requirements shall be         adhered   to and           not     be         modified without the         prior written consent from the     Director, Office of Nuclear   Reactor RegulationM aterial Safety and Saf eguards, or     designee.
(6) The commitments/representations made in t he GEs NorthStar Vallecitos, LLCs application dated September 1, 2023, as supplemented by letters dated September 5, 2023, October 19, 2023, November 1, 2023, and Jan uary 22, 2024 January 19, 2007, a n d supplemented on January 25, 2007, February 23, 2007, March 2, 2007, March 26, 2007, May 16, 2007, May 18, 2007, June 4, 2007, (6) July 6, 2007, and August 9, 2007, regarding reporting relationships and authority over safety and security issues and compliance with NRC requirements shall be adhered to and not be modified without the prior written consent from the Director, Office of Nuclear Reactor RegulationM aterial Safety and Saf eguards, or designee.


(7)     GE-Hitachi Nuclear Energy   AmericasNorthStar Vallecitos , LLC shall cause to be       transmitted to   the         Director, O ffice of   Nuclear Reactor   RegulationMaterial Saf ety and           Safeguards within 30     days of   filing   w ith the U.S.         Securities and           Exchange   Commission (SEC), any         schedule 13D   or   13G filed pursuant to   the       Securities Exchange   Act of 1934           that       discloses beneficial ownership of a     registered class of General Electric stock.
(7) GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC shall cause to be transmitted to the Director, O ffice of Nuclear Reactor RegulationMaterial Saf ety and Safeguards within 30 days of filing w ith the U.S. Securities and Exchange Commission (SEC), any schedule 13D or 13G filed pursuant to the Securities Exchange Act of 1934 that discloses beneficial ownership of a registered class of General Electric stock.


D.       The         license is effective as of the       date   of its issuance and           until the       Commission notifies the         licensee in writing that         the         license is terminated.
D. The license is effective as of the date of its issuance and until the Commission notifies the licensee in writing that the license is terminated.


FOR       THE   NUCLEAR   REGULATORY     COMMISSION
FOR THE NUCLEAR REGULATORY COMMISSION


                                                                /original signed by   Andrea   D. Veil/
/original signed by Andrea D. Veil/


Andrea   D. VeilJohn W. Lubinski, Director Office of Nuclear Reactor   RegulationM aterial Safety and Saf eguards
Andrea D. VeilJohn W. Lubinski, Director Office of Nuclear Reactor RegulationM aterial Safety and Saf eguards


==Attachment:==
==Attachment:==
Appendix A, Technical Specifications
Appendix A, Technical Specifications


Amendment   27 April   XX, 2024 GE HITACHI NUCLEAR ENERGY
Amendment 27 April XX, 2024 GE HITACHI NUCLEAR ENERGY


NEDO 32765 Revision 98 January April XX, 2024
NEDO 32765 Revision 98 January April XX, 2024
Line 152: Line 150:
Copyright © 2023, GE-Hitachi Nuclear Energy Americas LLC All Rights Reserved
Copyright © 2023, GE-Hitachi Nuclear Energy Americas LLC All Rights Reserved


                          ~ j~
~ j~


Amendment 27 April XX, 2024 1   INTRODUCTION
Amendment 27 April XX, 2024 1 INTRODUCTION


This document constitutes the Technical Specifications for the GEH NorthStar Vallecitos, LLC Nuclear Test Reactor as required by 10 CFR 50.36 and supersedes all prior Technical Specifications. This document includes the "basis" to support the selection and significance of the specifications. The Technical Specifications are based on the guidance provided in American National Standards Institute/ American Nuclear Society (ANSI/ANS) 15.1-2007, "The Development of Technical Specifications for Research Reactors" as modified by NUREG-1537, Part 1, Appendix 14.1, "Format and Content of Technical Specifications for Non-Power Reactors."
This document constitutes the Technical Specifications for the GEH NorthStar Vallecitos, LLC Nuclear Test Reactor as required by 10 CFR 50.36 and supersedes all prior Technical Specifications. This document includes the "basis" to support the selection and significance of the specifications. The Technical Specifications are based on the guidance provided in American National Standards Institute/ American Nuclear Society (ANSI/ANS) 15.1-2007, "The Development of Technical Specifications for Research Reactors" as modified by NUREG-1537, Part 1, Appendix 14.1, "Format and Content of Technical Specifications for Non-Power Reactors."
Line 174: Line 172:


A comparison and/or an adjustment of the CHANNEL so that its output corresponds with acceptable accuracy to known values of the parameter which the CHANNEL measures.
A comparison and/or an adjustment of the CHANNEL so that its output corresponds with acceptable accuracy to known values of the parameter which the CHANNEL measures.
Calibration SHALL encompass the entire CHANNEL, including equipment actuation, alarm, or trip test and SHALL include the   CHANNEL TEST.
Calibration SHALL encompass the entire CHANNEL, including equipment actuation, alarm, or trip test and SHALL include the CHANNEL TEST.


CHANNEL CHECK:
CHANNEL CHECK:

Latest revision as of 13:17, 5 October 2024

Geha/Northstar Response to NRC Request for Additional Information Regarding Direct Transfer of R-33 Ntr License
ML24075A277
Person / Time
Site: Vallecitos Nuclear Center
Issue date: 03/15/2024
From: Murray S
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
M240052
Download: ML24075A277 (1)


Text

GE Hitachi Nuclear Energy

  • H ITACHI Scott P. Murray Manager, Facility Licensing

3901 Castle Hayne Road P.O. Box 780 M240052 Wilmington, NC 28402 USA March 15, 2024 T (910) 819-5950 scott.murray@ge.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001 10 CFR 50.90

Subject:

GEHA/NorthStar Response to NRC Request for Additional Information Regarding Direct Transfer of R-33 NTR License

References:

1) Application for Conse n t to Direct Transfers of Control of Licenses and Related Conforming License Amendments, 9/1/23 (M l23244A246, ML23244A247)
2) NRC License R-33, Docket 0500073, General Electric Hitachi (GEH) Nuclear Test Reactor (NTR), Amendment 26 Issued 2/28/24
3) Telecom, Chris Allen (NRC) with Scott P. Murray (GEH), "Request for Additional Information Regarding the Direct Transfer of VNC Licenses," 3/12/24

On September 1, 2023, GE Hitachi Nuclear Energy Americas, LLC ("GEHA") and NorthStar Vallecitos, LLC ("NorthStar Vallecitos") (together, "A pplicants") submitted a request for the direct transfers of control of GEHA's Vallecitos Nu clear Center (VNC) NRC licenses in Sunol, CA (Reference 1).

GEHA and NorthStar hereby respond to the NRC request for additional information as we discussed on March 12, 2024 (Reference 3).

provides a red line draft of R-33 Amendment 27 and Attachment 2 provides a red line draft of the R-33 Technical Specifications, Rev 9.

I declare under penalty of perjury that the foregoing is true an~ correct.

Sincerely,

ForGE Hitachi Nuclear Energy Americas, LLC A_t~~f /(1 7 Scott P. Murray -

Facility Licensing, Manager GE Hitachi Nuclear Energy Americas, LLC M240052 U.S. NRC March 15, 2024 Page 2 of 2

For the NorthStar Companies:

Gregory G. DiCarlo Vice President, General Counsel & Secretary NorthStar Group Services, Inc.

Attachments 1) R-33 Amendment 27 Draft Redline Mark Up

2) R-33 Technical Specifications Revision 9 Draft Redline Mark Up

cc: NRC Region IV Administrator J. D. Parrott, USNRC/NMSS/DUWP/RDB J. M. Borromeo, Branch Chief, USNRC/NRR/DANU/UNPL G. A. Wertz, USNRC/NRR/DANU/UNPL SPM 24-019 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555-0001

GE-HITACHI NUCLEAR ENERGY AMERICAS, LLC NORTHSTAR VALLECITOS, LLC

DOCKET NO. 50-73

NUCLEAR TEST REACTOR

AMENDMENT TO RENEWED FACILITY OPERATING LICENSE

Amendment No. 276 License No. R-33

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment to Renewed Facility Operating License No. R-33, filed by GE-Hitachi Nuclear Energy Americas, LLC (the licensee) on October 6, 2023, as supplemented by letters dated December 15, 2023, and

A. January 26, February 12, and February 23, 2024NorthStar Vallecitos, LLC* dated September 1, 2023, as supplemented on September 5, 2023, October 19, 2023, November 1, 2023 and January 22, 2024, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR) Chapter I;

B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;

C. There is reasonable assurance that (i) the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) such activities will be conducted in compliance with the Commission's regulations;

D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public;

E. This issuance of this amendment is in accordance with 10 CFR Part 51, "Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions," of the Commission's regulations, and all applicable requirements have been satisfied; and

F. Prior notice of this amendment was not required by 10 CFR 2.105, "Notice of proposed action," and publication of a notice of issuance for this amendment is not required by 10 CFR 2.106, "Notice of issuance.

  • This License was transferred from GE-Hitachi Nuclear Energy Americas, LLC to NorthStar Vallecitos, LLC, in accordance with the Order for this Amendment.

G The receipt, possession, and use of byproduct and special nuclear materials as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Part 30, "Rules of General Applicability to Domestic Licensing of Byproduct Material," and 10 CFR Part 70, "Domestic Licensing of Special Nuclear Material."

2. Accordingly, Facility Operating License No. R-33 is hereby amended renewed in its entirety to read as follows:

A. This license applies to the NTR, which is owned by GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC and located at its Vallecitos Nuclear Center in Alameda County, California, and described in the application for license renewal dated November 19, 2020, as supplemented.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC:

(1) Pursuant to Section 104c of the Act and 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," to possess the reactor at the designated location in Alameda County, California, in accordance with the procedures and limitations described in the application and set forth in this license.

(2) Pursuant to the Act and 10 CFR Part 70, to possess, but not separate:

a. up to 4 kilograms of contained uranium-235 of an enrichment of 20 percent or greater in the isotope uranium-235, in the form of in-core reactor fuel; and
b. such special nuclear material as may have been produced by the operation of the reactor.

(3) Pursuant to the Act and 10 CFR Part 30, to possess:

a. up to 0.2-curie radium-beryllium sealed startup source, and up to 0.03 curies of byproduct materials, in the form of sealed sources, for instrument calibration and source checks; and
b. but not to separate, such byproduct material as may have been produced by the operation of the reactor.

Amendment No.

2627 February 28April

- 3 -

C. This license shall be deemed to contain and is subject to the conditions specified in 10 CFR Parts 20, 30, 50, 51, 55, 70, and 73 of the Commissions regulations; is subject to all applicable provisions of the Act, and to the rules, regulations, and orders of the Commission now, or hereafter in eff ect, and to the additional conditions specified below:

(1) Maximum Power Level

The licensee is not authorized to operate the reactor at any power level.

(2) Technical Specifications

The Technical Specifications contained in Attachment A, as revised by Amendment No. 2 6 2 7, are hereby incorporated in their entirety in the license.

The licensee shall maintain the facility in accordance with the Technical Specifications.

(3) Physical Security Plan

The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security plan, including amendments and changes made pursuant to the authority of 10 CFR 50.54, Conditions of licenses, paragraph (p). The approved physical security plan, entitled VNC Site Physical Security Plan, dated April 4, 2022, consists of documents w ithheld from public disclosure pursuant to 10 CFR 73.21, Protection of Safeguards Information: Performance requirements.

(4) GE-Hitachi Nuclear Energy Americas, LLCNorthStar Vallecitos, LLC, as stated in the General Electric Companys (GEs)NorthStar Vallecitos, LLC application dated J a n u a r y 19, 2007September 1, 2023, a n d as supplemented by letters dated September 5, 2023, October 19, 2023, November 1, 2023, and January 22, 2024on January 25, 2007, February 23, 2007, March 2, 2007, March 26, 2007, May 16, (4) 2007, May 18, 2007, June 4, 2007, July 6, 2007, and August 9, 2007, will abide by all commitments and representations previously made by GE with respect to the license. These include, but are not limited to, maintaining decommissioning records, implementing decontamination activities, and eventually decommissioning the facility.

(5) The Manager of the Vallecitos Nuclear Center, the Vice-President, Reactor Facility Saf ety and Security of GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC, and the Manager of GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC shall be U.S. citizens. These individuals shall have the responsibility and exclusive authority to ensure and shall ensure that the business and activities of GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC, with respect to this license, are at all times conduct ed in a manner con sistent with the protection of the public health and safety and the common def ense and security.

Amendment 27 April XX, 2024

- 4 -

(6) The commitments/representations made in t he GEs NorthStar Vallecitos, LLCs application dated September 1, 2023, as supplemented by letters dated September 5, 2023, October 19, 2023, November 1, 2023, and Jan uary 22, 2024 January 19, 2007, a n d supplemented on January 25, 2007, February 23, 2007, March 2, 2007, March 26, 2007, May 16, 2007, May 18, 2007, June 4, 2007, (6) July 6, 2007, and August 9, 2007, regarding reporting relationships and authority over safety and security issues and compliance with NRC requirements shall be adhered to and not be modified without the prior written consent from the Director, Office of Nuclear Reactor RegulationM aterial Safety and Saf eguards, or designee.

(7) GE-Hitachi Nuclear Energy AmericasNorthStar Vallecitos, LLC shall cause to be transmitted to the Director, O ffice of Nuclear Reactor RegulationMaterial Saf ety and Safeguards within 30 days of filing w ith the U.S. Securities and Exchange Commission (SEC), any schedule 13D or 13G filed pursuant to the Securities Exchange Act of 1934 that discloses beneficial ownership of a registered class of General Electric stock.

D. The license is effective as of the date of its issuance and until the Commission notifies the licensee in writing that the license is terminated.

FOR THE NUCLEAR REGULATORY COMMISSION

/original signed by Andrea D. Veil/

Andrea D. VeilJohn W. Lubinski, Director Office of Nuclear Reactor RegulationM aterial Safety and Saf eguards

Attachment:

Appendix A, Technical Specifications

Amendment 27 April XX, 2024 GE HITACHI NUCLEAR ENERGY

NEDO 32765 Revision 98 January April XX, 2024

TECHNICAL SPECIFICATIONS FOR

THE

NUCLEAR TEST REACTOR FACILITY

LICENSE R-33

Copyright © 2023, GE-Hitachi Nuclear Energy Americas LLC All Rights Reserved

~ j~

Amendment 27 April XX, 2024 1 INTRODUCTION

This document constitutes the Technical Specifications for the GEH NorthStar Vallecitos, LLC Nuclear Test Reactor as required by 10 CFR 50.36 and supersedes all prior Technical Specifications. This document includes the "basis" to support the selection and significance of the specifications. The Technical Specifications are based on the guidance provided in American National Standards Institute/ American Nuclear Society (ANSI/ANS) 15.1-2007, "The Development of Technical Specifications for Research Reactors" as modified by NUREG-1537, Part 1, Appendix 14.1, "Format and Content of Technical Specifications for Non-Power Reactors."

These Technical Specifications provide limits that assure reactor-related activity will be controlled in a way that protects the health and safety of the public, the environment, and on-SITE personnel. Areas addressed are Definitions, Limiting Conditions for POLSC (LCP),

Surveillance Requirements, Design Features, and Administrative Controls.

1.1 DEFINITIONS

ADMINISTRATIVE CHANGE(S):

An editorial, non-technical change, which does not affect nuclear safety, personnel safety, security, quality, or change the intent of the document being changed.

CHANNEL(S):

The combination of sensors, lines, amplifiers, and output devices which are connected for the purpose of measuring the value of a parameter.

CHANNEL CAL/BRATION:

A comparison and/or an adjustment of the CHANNEL so that its output corresponds with acceptable accuracy to known values of the parameter which the CHANNEL measures.

Calibration SHALL encompass the entire CHANNEL, including equipment actuation, alarm, or trip test and SHALL include the CHANNEL TEST.

CHANNEL CHECK:

A qualitative verification of acceptable performance by observation of CHANNEL behavior. This verification where possible SHALL include comparison of the CHANNEL with other independent CHANNELS or systems measuring the same parameter.

CHANNEL TEST:

The introduction of a signal into the CHANNEL to verify that it is OPERABLE.

Amendment 27 April XX, 2024