Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION |
| | |
| | ==REGION I== |
| | 475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406 1415 |
| | |
| | August 29, 2024 |
| | |
| | Charles McFeaters President and Chief Nuclear Officer PSEG Nuclear, LLC P.O. Box 236 Hancocks Bridge, NJ 08038 |
| | |
| | SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (REPORT 05000272/20240 05 AND 05000311/2024 005) |
| | |
| | ==Dear Charles McFeaters:== |
| | The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Salem Nuclear Generating Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. |
| | |
| | In addition to baseline inspections, the NRC plans to conduct Inspection Procedure 71003, Post -Approval Site Inspection for License Renewal, Phase 4 at your facility. |
| | |
| | This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in C. McFeaters 2 |
| | |
| | accordance with Title 10 of the Code of Federal Regulations 2.390, Public Ins pections, Exemptions, Requests for Withholding. |
| | |
| | Please contact me at (610) 337 -5312 with any questions yo u have r egarding this letter. |
| | |
| | Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety |
| | |
| | Docket Nos. 05000272 and 05000311 License Nos. DPR-70 and DPR-75 |
| | |
| | Enclosure: |
| | As stated |
| | |
| | cc w/encl: Distribution via ListServ C. McFeaters 3 |
| | |
| | SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (REPORTS 05000272/2024 005 AND 05000311/2024 005) DATED AUGUST 29, 2024 |
| | |
| | DISTRIBUTION: |
| | RLorson, RA (R1ORAMAIL RESOURCE) |
| | DCollins, DRA (R1ORAMAIL RESOURCE) |
| | BWelling, DORS (R1DORSMAIL RESOURCE) |
| | RMckinley DORS (R1DORSMAIL RESOURCE) |
| | PKrohn, DRSS (R1DRSSMAIL RESOURCE) |
| | JZimmerman, DRSS (R1DRSS MAIL RESOURCE) |
| | BBickett, DORS RClagg, DORS SQuiroga, DORS JPatel, DORS, SRI EGarcia, DORS, RI CFragman, DORS, AA MSimmons, RI OEDO RidsNrrPMSalem Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO ROPassessment Resource |
| | |
| | DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -25 Second Quarter Process/Branch 3/2QAL_SL_ROP25.docx ADAMS Accession No. ML24240A202 SUNSI Review n -Sensitive Publvlle Sensitive n -Publiclyvlable |
| | |
| | OFFICE RI/DORS RI/DORS ME RClagg BBickett TE 26/24 27/24 OFFIAL RERD CO Site Inspection Activity Plan Salem |
| | |
| | 07/01/2024 - 06/30/2026 |
| | |
| | Unit Start End Activity CAC Title Staff Count |
| | |
| | RP - 71124.03 Airborne and 71124.04 Dose - Salem 1 |
| | |
| | 1,2 7/22/2024 7/26/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation |
| | |
| | 1,2 7/22/2024 7/26/2024 IP 71124.04 000728 Occupational Dose Assessment |
| | |
| | Cyber Security - Salem 4 |
| | |
| | 1,2 8/5/2024 8/9/2024 IP 71130.10 000741 Cybersecurity |
| | |
| | 1,2 8/19/2024 8/23/2024 IP 71130.10 000741 Cybersecurity |
| | |
| | Access Control, Equipment Testing and Maintenance, Training, SPR 3 |
| | |
| | 1,2 8/26/2024 8/30/2024 IP 71130.02 000734 Access Control |
| | |
| | 1,2 8/26/2024 8/30/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance |
| | |
| | 1,2 8/26/2024 8/30/2024 IP 71130.07 000739 Security Training |
| | |
| | 1,2 8/26/2024 8/30/2024 IP 71130.09 001656 Security Plan Changes |
| | |
| | 1,2 8/26/2024 8/30/2024 IP 71151 001338 Performance Indicator Verification |
| | |
| | Inservice Inspection - Salem Unit 2 1 |
| | |
| | 2 10/7/2024 10/18/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | RP 71124.01 Rad Hazard Control - Salem 1 |
| | |
| | 1,2 10/14/2024 10/18/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 2025 Salem Initial License Examination 4 |
| | |
| | 1,2 12/1/2024 12/6/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) |
| | |
| | 1,2 1/12/2025 1/24/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD) |
| | |
| | RP 71151 PI Verification - Salem 1 |
| | |
| | 1,2 12/9/2024 12/13/2024 IP 71151 000746 Performance Indicator Verification |
| | |
| | RP Radwaste 71124.08 SAL 1 |
| | |
| | 1,2 2/3/2025 2/7/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation |
| | |
| | EP Program Inspection - Salem 2 |
| | |
| | 1,2 3/17/2025 3/21/2025 IP 71114.02 000717 Alert and Notification System Testing |
| | |
| | 1,2 3/17/2025 3/21/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System |
| | |
| | 1,2 3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes |
| | |
| | 1,2 3/17/2025 3/21/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness |
| | |
| | 1,2 3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification |
| | |
| | RP RETS 71124.06 SAL 1 |
| | |
| | 1,2 3/31/2025 4/4/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment |
| | |
| | Inservice Inspection - Salem Unit 1 1 |
| | |
| | Prepared on 8/20/2024 3:11:08 PM 1 of 3 Site Inspection Activity Plan |
| | |
| | 1 4/14/2025 4/25/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | RP Rad Hazard 71124.01 SAL 1 |
| | |
| | 1,2 4/21/2025 4/25/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | Access Control, Protective Strategy, TSR, SPR, PIs - Salem 4 |
| | |
| | 1,2 6/9/2025 6/13/2025 IP 71130.02 000734 Access Control |
| | |
| | 1,2 6/9/2025 6/13/2025 IP 71130.05 000737 Protective Strategy Evaluation |
| | |
| | 1,2 6/9/2025 6/13/2025 IP 71130.09 001656 Security Plan Changes |
| | |
| | 1,2 6/9/2025 6/13/2025 IP 71130.14 000743 Review of Power Reactor Target Sets |
| | |
| | 1,2 6/9/2025 6/13/2025 IP 71151 001338 Performance Indicator Verification |
| | |
| | PI&R BIENNIAL TEAM INSPECTION - SALEM 4 |
| | |
| | 1,2 6/9/2025 6/13/2025 IP 71152B 000747 Problem Identification and Resolution |
| | |
| | 1,2 6/23/2025 6/27/2025 IP 71152B 000747 Problem Identification and Resolution |
| | |
| | RP REMP 71124.07 SAL 1 |
| | |
| | 1,2 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program |
| | |
| | License Renewal Phase 4 - Salem Units 1 & 2 4 |
| | |
| | 1,2 8/11/2025 8/15/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal |
| | |
| | Salem Requal Inspection with P/F Results 2 |
| | |
| | 1,2 9/15/2025 9/19/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 9/15/2025 9/19/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance |
| | |
| | RP Instrumentation 71124.05 SAL 1 |
| | |
| | 1,2 11/10/2025 11/20/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation |
| | |
| | Age Related Degradation Inspection - Salem 3 |
| | |
| | 1,2 11/17/2025 11/21/2025 IP 71111.21N.04 001832 Age-Related Degradation |
| | |
| | 1,2 12/1/2025 12/5/2025 IP 71111.21N.04 001832 Age-Related Degradation |
| | |
| | RP PI Verification 71151 SAL 1 |
| | |
| | 1,2 11/17/2025 11/21/2025 IP 71151 000746 Performance Indicator Verification |
| | |
| | Commercial Grade Dedication - Salem 3 |
| | |
| | 1,2 1/12/2026 1/16/2026 IP 71111.21N.03 001808 Commercial Grade Dedication |
| | |
| | 1,2 1/26/2026 1/30/2026 IP 71111.21N.03 001808 Commercial Grade Dedication |
| | |
| | RP In Plant Airborne 71124.03 and Occupational Dose Assessment 71124.04 - Salem 1 |
| | |
| | 1,2 3/9/2026 3/13/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation |
| | |
| | 1,2 3/9/2026 3/13/2026 IP 71124.04 000728 Occupational Dose Assessment |
| | |
| | Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI Verification - Salem 3 |
| | |
| | 1,2 3/9/2026 3/13/2026 IP 71130.02 000734 Access Control |
| | |
| | 1,2 3/9/2026 3/13/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance |
| | |
| | Prepared on 8/20/2024 3:11:08 PM 2 of 3 Site Inspection Activity Plan |
| | |
| | 1,2 3/9/2026 3/13/2026 IP 71130.07 000739 Security Training |
| | |
| | 1,2 3/9/2026 3/13/2026 IP 71130.09 001656 Security Plan Changes |
| | |
| | 1,2 3/9/2026 3/13/2026 IP 71151 001338 Performance Indicator Verification |
| | |
| | Inservice Inspection - Salem Unit 2 1 |
| | |
| | 2 4/13/2026 4/24/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | RP Rad Hazard Assessment and Exposure Control 71124.01 - Salem 1 |
| | |
| | 2 4/13/2026 4/17/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 2026 Salem Initial Operator Licensing Exam 4 |
| | |
| | 1,2 5/11/2026 5/15/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) |
| | |
| | EP Exercise Inspection - Salem 5 |
| | |
| | 1,2 5/18/2026 5/22/2026 IP 71114.01 000716 Exercise Evaluation |
| | |
| | 1,2 5/18/2026 5/22/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes |
| | |
| | 1,2 5/18/2026 5/22/2026 IP 71151 001397 Performance Indicator Verification |
| | |
| | Cyber Security - Salem 2 |
| | |
| | 1,2 6/8/2026 6/12/2026 IP 71130.10 000741 Cybersecurity |
| | |
| | 1,2 6/22/2026 6/26/2026 IP 71130.10 000741 Cybersecurity |
| | |
| | Prepared on 8/20/2024 3:11:08 PM 3 of 3 |
| }} | | }} |
Similar Documents at Salem |
---|
Category:Inspection Plan
MONTHYEARIR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) ML22318A1062022-11-14014 November 2022 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) ML22234A0362022-08-22022 August 2022 Request for Information to Support Triennial Baseline Design - Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000272/2022011 and 05000311/2022011 ML22104A1762022-04-14014 April 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000272/2022402 and 05000311/2022402 IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) LR-N21-0014, Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 20302021-02-16016 February 2021 Snubber Program Plan, Fifth Ten-Year Inspection Interval, Effective from January 1, 2021 Through December 31, 2030 ML20281A5172020-10-13013 October 2020 Notification of Conduct of a Fire Protection Team Inspection IR 05000272/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000272/2020005 and 05000311/2020005) ML20077L3492020-03-20020 March 2020 Ti 2515/194 Inspection Documentation Request IR 05000272/20190062020-03-0303 March 2020 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2019006 and 05000311/2019006) IR 05000272/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000272/2019005 and 05000311/2019005) IR 05000272/20180062019-03-0404 March 2019 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2018006 and 05000311/2018006) IR 05000272/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Reports 05000272/2018005 and 05000311/2018005) IR 05000272/20170062018-02-28028 February 2018 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017006, 05000311/2017006, 05000272/2017402, 05000311/2017402, 05000272/2017501, and 05000311/2017501 IR 05000272/20170052017-08-28028 August 2017 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2017005 and 05000311/2017005) IR 05000272/20160062017-03-0101 March 2017 Annual Assessment Letter for Salem Nuclear Generating Station (Salem), Units 1 and 2 (Reports 05000272/2016006 and 05000311/2016006) IR 05000272/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station - Unit Nos. 1 and 2 (Report 05000272/2016005 and 05000311/2016005) IR 05000272/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 & 2 (Inspection Report 05000272/2015006 and 05000311/2015006) IR 05000272/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2015005 and 05000311/2015005) IR 05000272/20140012015-03-0404 March 2015 ROP-15 Annual Assessment Letter for Salem Nuclear Generating Station Units 1 and 2 (Report 05000272/2014001 and 05000311/2014001) IR 05000272/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2014006 and 05000311/2014006 IR 05000272/20130012014-03-0404 March 2014 ROP-14 2013 Salem Nuclear Generating Station Units 1 and 2, Annual Assessment Letter, Report 05000272-13-001 and 05000311-13-001),and Inspection Plan IR 05000272/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000272/2013006 and 05000311/2013006 IR 05000272/20120012013-03-0404 March 2013 Annual Assessment Letter for Salem Nuclear Generating Station, Unit 1 and 2 (Report 05000272/2012001 and 05000311/2012001) ML12248A0402012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20110012012-03-0505 March 2012 Annual Assessment Letter for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Report 05000272/2011001 and 05000311/2011001) ML1124112942011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Salem Nuclear Generating Station, Units 1 and 2 IR 05000272/20100012011-03-0404 March 2011 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001) ML1024403642010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Salem Nuclear Generating Station, Units 1 and 2 ML1029505872010-03-12012 March 2010 Email from Ohara, Timothy to Conte, Richard, FW: Salem U1 Inspection Plan. ML1006208082010-03-0303 March 2010 EOC Letter and Report 22 ML0924403092009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station, Unit Nos. 1 and 2 (September 1, 2009) IR 05000272/20090012009-03-0404 March 2009 Annual Assessment Letter - Salem Nuclear Generating Station, Units 1 and 2 (05000272-09-001 and 05000311-09-001) IR 05000272/20080012008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Salem Station (05000272-08-001, 05000311-08-001) ML0734706552007-12-13013 December 2007 ROP 8 - Salem - Change to Inspection Plan, 12/13/07 ML0724309472007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000272/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Salem Generating Station (Report 05000272-07-001, 05000311-07-001) ML0624306512006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Salem Nuclear Generating Station IR 07200200/19600012006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Salem Nuclear Generating Station (Report 05-272/2006001 and 05-311/2006001) ML0406307982004-03-0303 March 2004 2003-04 Annual Assessment Letter - Salem ML0323905112003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Salem Units 1 and 2 ML0306206932003-03-0303 March 2003 2003 Annual Assessment Letter - Salem Nuclear Generating Station ML0223500582002-08-23023 August 2002 2002 Mid-Cycle Performance Review and Inspection Plan - Salem Generating Station Units 1 & 2 2024-08-29
[Table view] Category:Inspection Report
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) IR 05000272/20220042023-01-31031 January 2023 Integrated Inspection Report 05000272/2022004 and 05000311/2022004 IR 05000272/20220112023-01-0606 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000272/2022011 and 05000311/2022011 IR 05000272/20220032022-11-0909 November 2022 Integrated Inspection Report 05000272/2022003 and 05000311/2022003 IR 05000272/20224022022-10-14014 October 2022 Cyber Security Report 05000272/2022402 and 05000311/2022402 - Cover Letter Only IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) IR 05000272/20220022022-08-0808 August 2022 Integrated Inspection Report 05000272/2022002 and 05000311/2022002 IR 05000272/20224012022-07-21021 July 2022 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only) IR 05000272/20225012022-06-14014 June 2022 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2022501, 05000272/2022501, and 05000311/2022501 IR 05000272/20220012022-05-0404 May 2022 Integrated Inspection Report 05000272/2022001 and 05000311/2022001 IR 05000272/20223012022-04-27027 April 2022 Initial Operator Licensing Examination Report 05000272/2022301 and 05000311/2022301 IR 05000272/20210132022-03-10010 March 2022 Evaluation of Changes, Tests, and Experiments Baseline IR 05000354/2021013, 05000272/2021013 and 05000311/2021013 & ISFSI IR 07200048/2021001 Related to PSEG Evals of Stations & Planned Wind Port Manufacturing Facility IR 05000272/20210062022-03-0202 March 2022 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2021006 and 05000311/2021006) IR 05000272/20210042022-02-10010 February 2022 Integrated Inspection Report 05000272/2021004 and 05000311/2021004 IR 05000272/20215012021-11-30030 November 2021 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2021501, 05000272/2021501 and 05000311/2021501 IR 05000272/20214022021-11-19019 November 2021 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2021402, 05000272/2021402 and 05000311/2021402 IR 05000272/20210032021-11-0202 November 2021 Integrated Inspection Report 05000272/2021003 and 05000311/2021003 IR 05000272/20214032021-10-28028 October 2021 and Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report (Security-Related Information) 05000354/2021403, 05000272/2021403 and 05000311/2021403 (Cover Letter Only IR 05000272/20210122021-10-28028 October 2021 and Salem Nuclear Generating Station, Units 1 and 2 - Biennial Problem Identification and Resolution Inspection Report 05000354/2021012, 05000272/2021012 and 05000311/2021012 IR 05000272/20210112021-09-30030 September 2021 Temporary Instruction 2515/194 Inspection Report 05000272/2021011 and 05000311/2021011 IR 05000272/20210052021-09-0101 September 2021 Updated Inspection Plan for the Salem Nuclear Generating Station (Report 05000272/2021005 and 05000311/2021005) IR 05000272/20210022021-08-18018 August 2021 Reissued Integrated Inspection Report 05000272/2021002 and 05000311/2021002 ML21222A1402021-08-11011 August 2021 Integrated Inspection Report 05000272/2021002 and 05000311/2021002 IR 05000272/20210012021-05-0505 May 2021 Integrated Inspection Report 05000272/2021001 and 05000311/2021001 IR 05000272/20210102021-03-0909 March 2021 Triennial Fire Protection Inspection Report 05000272/2021010 and 05000311/2021010 IR 05000272/20200062021-03-0303 March 2021 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2020006 and 05000311/2020006) IR 05000272/20214012021-02-23023 February 2021 and Salem Nuclear Generating Station, Units 1 and 2: Security Baseline Inspection Report 05000354/2021401, 05000272/2021401 and 05000311/2021401 (Letter Only) IR 05000272/20200042021-02-0909 February 2021 Generating Station, Units 1 and 2: Integrated Inspection Report 05000272/2020004 and 05000311/2020004 2024-09-25
[Table view] Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-25
[Table view] |
Inspection Report - Salem - 2024005 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406 1415
August 29, 2024
Charles McFeaters President and Chief Nuclear Officer PSEG Nuclear, LLC P.O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (REPORT 05000272/20240 05 AND 05000311/2024 005)
Dear Charles McFeaters:
The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Salem Nuclear Generating Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In addition to baseline inspections, the NRC plans to conduct Inspection Procedure 71003, Post -Approval Site Inspection for License Renewal, Phase 4 at your facility.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in C. McFeaters 2
accordance with Title 10 of the Code of Federal Regulations 2.390, Public Ins pections, Exemptions, Requests for Withholding.
Please contact me at (610) 337 -5312 with any questions yo u have r egarding this letter.
Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety
Docket Nos. 05000272 and 05000311 License Nos. DPR-70 and DPR-75
Enclosure:
As stated
cc w/encl: Distribution via ListServ C. McFeaters 3
SUBJECT: UPDATED INSPECTION PLAN FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (REPORTS 05000272/2024 005 AND 05000311/2024 005) DATED AUGUST 29, 2024
DISTRIBUTION:
RLorson, RA (R1ORAMAIL RESOURCE)
DCollins, DRA (R1ORAMAIL RESOURCE)
BWelling, DORS (R1DORSMAIL RESOURCE)
RMckinley DORS (R1DORSMAIL RESOURCE)
PKrohn, DRSS (R1DRSSMAIL RESOURCE)
JZimmerman, DRSS (R1DRSS MAIL RESOURCE)
BBickett, DORS RClagg, DORS SQuiroga, DORS JPatel, DORS, SRI EGarcia, DORS, RI CFragman, DORS, AA MSimmons, RI OEDO RidsNrrPMSalem Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO ROPassessment Resource
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -25 Second Quarter Process/Branch 3/2QAL_SL_ROP25.docx ADAMS Accession No. ML24240A202 SUNSI Review n -Sensitive Publvlle Sensitive n -Publiclyvlable
OFFICE RI/DORS RI/DORS ME RClagg BBickett TE 26/24 27/24 OFFIAL RERD CO Site Inspection Activity Plan Salem
07/01/2024 - 06/30/2026
Unit Start End Activity CAC Title Staff Count
RP - 71124.03 Airborne and 71124.04 Dose - Salem 1
1,2 7/22/2024 7/26/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1,2 7/22/2024 7/26/2024 IP 71124.04 000728 Occupational Dose Assessment
Cyber Security - Salem 4
1,2 8/5/2024 8/9/2024 IP 71130.10 000741 Cybersecurity
1,2 8/19/2024 8/23/2024 IP 71130.10 000741 Cybersecurity
Access Control, Equipment Testing and Maintenance, Training, SPR 3
1,2 8/26/2024 8/30/2024 IP 71130.02 000734 Access Control
1,2 8/26/2024 8/30/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1,2 8/26/2024 8/30/2024 IP 71130.07 000739 Security Training
1,2 8/26/2024 8/30/2024 IP 71130.09 001656 Security Plan Changes
1,2 8/26/2024 8/30/2024 IP 71151 001338 Performance Indicator Verification
Inservice Inspection - Salem Unit 2 1
2 10/7/2024 10/18/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP 71124.01 Rad Hazard Control - Salem 1
1,2 10/14/2024 10/18/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2025 Salem Initial License Examination 4
1,2 12/1/2024 12/6/2024 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1,2 1/12/2025 1/24/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
RP 71151 PI Verification - Salem 1
1,2 12/9/2024 12/13/2024 IP 71151 000746 Performance Indicator Verification
RP Radwaste 71124.08 SAL 1
1,2 2/3/2025 2/7/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
EP Program Inspection - Salem 2
1,2 3/17/2025 3/21/2025 IP 71114.02 000717 Alert and Notification System Testing
1,2 3/17/2025 3/21/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1,2 3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1,2 3/17/2025 3/21/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
1,2 3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification
RP RETS 71124.06 SAL 1
1,2 3/31/2025 4/4/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
Inservice Inspection - Salem Unit 1 1
Prepared on 8/20/2024 3:11:08 PM 1 of 3 Site Inspection Activity Plan
1 4/14/2025 4/25/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP Rad Hazard 71124.01 SAL 1
1,2 4/21/2025 4/25/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
Access Control, Protective Strategy, TSR, SPR, PIs - Salem 4
1,2 6/9/2025 6/13/2025 IP 71130.02 000734 Access Control
1,2 6/9/2025 6/13/2025 IP 71130.05 000737 Protective Strategy Evaluation
1,2 6/9/2025 6/13/2025 IP 71130.09 001656 Security Plan Changes
1,2 6/9/2025 6/13/2025 IP 71130.14 000743 Review of Power Reactor Target Sets
1,2 6/9/2025 6/13/2025 IP 71151 001338 Performance Indicator Verification
PI&R BIENNIAL TEAM INSPECTION - SALEM 4
1,2 6/9/2025 6/13/2025 IP 71152B 000747 Problem Identification and Resolution
1,2 6/23/2025 6/27/2025 IP 71152B 000747 Problem Identification and Resolution
RP REMP 71124.07 SAL 1
1,2 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program
License Renewal Phase 4 - Salem Units 1 & 2 4
1,2 8/11/2025 8/15/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal
Salem Requal Inspection with P/F Results 2
1,2 9/15/2025 9/19/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 9/15/2025 9/19/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
RP Instrumentation 71124.05 SAL 1
1,2 11/10/2025 11/20/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
Age Related Degradation Inspection - Salem 3
1,2 11/17/2025 11/21/2025 IP 71111.21N.04 001832 Age-Related Degradation
1,2 12/1/2025 12/5/2025 IP 71111.21N.04 001832 Age-Related Degradation
RP PI Verification 71151 SAL 1
1,2 11/17/2025 11/21/2025 IP 71151 000746 Performance Indicator Verification
Commercial Grade Dedication - Salem 3
1,2 1/12/2026 1/16/2026 IP 71111.21N.03 001808 Commercial Grade Dedication
1,2 1/26/2026 1/30/2026 IP 71111.21N.03 001808 Commercial Grade Dedication
RP In Plant Airborne 71124.03 and Occupational Dose Assessment 71124.04 - Salem 1
1,2 3/9/2026 3/13/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1,2 3/9/2026 3/13/2026 IP 71124.04 000728 Occupational Dose Assessment
Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI Verification - Salem 3
1,2 3/9/2026 3/13/2026 IP 71130.02 000734 Access Control
1,2 3/9/2026 3/13/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
Prepared on 8/20/2024 3:11:08 PM 2 of 3 Site Inspection Activity Plan
1,2 3/9/2026 3/13/2026 IP 71130.07 000739 Security Training
1,2 3/9/2026 3/13/2026 IP 71130.09 001656 Security Plan Changes
1,2 3/9/2026 3/13/2026 IP 71151 001338 Performance Indicator Verification
Inservice Inspection - Salem Unit 2 1
2 4/13/2026 4/24/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP Rad Hazard Assessment and Exposure Control 71124.01 - Salem 1
2 4/13/2026 4/17/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
2026 Salem Initial Operator Licensing Exam 4
1,2 5/11/2026 5/15/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
EP Exercise Inspection - Salem 5
1,2 5/18/2026 5/22/2026 IP 71114.01 000716 Exercise Evaluation
1,2 5/18/2026 5/22/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1,2 5/18/2026 5/22/2026 IP 71151 001397 Performance Indicator Verification
Cyber Security - Salem 2
1,2 6/8/2026 6/12/2026 IP 71130.10 000741 Cybersecurity
1,2 6/22/2026 6/26/2026 IP 71130.10 000741 Cybersecurity
Prepared on 8/20/2024 3:11:08 PM 3 of 3