ML23011A282: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000254/2023401]]
{{Adams
| number = ML23011A282
| issue date = 01/11/2023
| title = Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000254/2023401; 05000265/2023401
| author name = Gilliam J
| author affiliation = NRC/RGN-III/DORS/EB2
| addressee name = Rhoades D
| addressee affiliation = Constellation Energy Generation, LLC, Constellation Nuclear
| docket = 05000254, 05000265
| license number = DPR-029, DPR-030
| contact person =
| document report number = IR 2023401
| document type = Inspection Plan, Letter
| page count = 1
}}
See also: [[see also::IR 05000254/2023401]]
 
=Text=
{{#Wiki_filter:January 11, 2023
David P. Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2- INFORMATION
              REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION,
              NOTIFICATION TO PERFORM INSPECTION 05000254/2023401;
              05000265/2023401
Dear David Rhoades:
On May 15, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0
at your Quad Cities Station. The inspection will be performed to evaluate and verify your ability
to meet the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,
Section 54, Protection of Digital Computer and Communication Systems and Networks. The
onsite portion of the inspection will take place May 15-19, 2023.
Experience has shown that baseline inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should
be made available electronically no later than March 18, 2023. The inspection team will review
this information and, by April 1, 2023, will request the specific items that should be provided for
review.
The second group of additional requested documents will assist the inspection team in the
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,
and the areas of the licensees Cyber Security Plan (CSP) selected for the cyber-security
inspection. This information will be requested for review in the regional office prior to the
inspection by May 01, 2023, as identified above.
The third group of requested documents consists of those items that the inspection team will
review, or need access to, during the inspection. Please have this information available by the
first day of the onsite inspection, May 15, 2023.
 
D. Rhoades                                        -2-
The fourth group of information is necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Jasmine Gilliam. We understand that our regulatory
contact for this inspection is Richard Swart of your organization. If there are any questions about
the inspection or the material requested, please contact the lead inspector at 630-829-9831 or
via email at Jasmine.Gilliam@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                                        Signed by Gilliam, Jasmine
                                                                          on 01/11/23
                                                  Jasmine Gilliam, Senior Reactor Inspector
                                                  Engineering Branch 2
                                                  Division of Operating Reactor Safety
Docket Nos. 50-254 and 50-265
License Nos. DPR-29 and DPR-30
Enclosure:
Cyber-Security Inspection
Document Request
cc w/encl: Distribution via LISTSERV
 
D. Rhoades                                  -3-
Letter to David Rhoades from Jasmine Gilliam dated January 11, 2023.
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2- INFORMATION
            REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION,
            NOTIFICATION TO PERFORM INSPECTION 05000254/2023401;
            05000265/2023401
DISTRIBUTION:
Jessie Quichocho
Marc Ferdas
RidsNrrDorlLpl3
RidsNrrPMQuadCities Resource
RidsNrrDroIrib Resource
John Giessner
Julio Lara
Diana Betancourt-Roldan
Allan Barker
R3-DORS
ADAMS Accession Number: ML23011A282
    Publicly Available      Non-Publicly Available        Sensitive  Non-Sensitive
OFFICE      RIII
NAME        JGilliam:gam
DATE        01/11/2023
                                OFFICIAL RECORD COPY
 
                  CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Inspection Report:            05000254/2023401 and 05000265/2023401
Inspection Dates:              May 15-19, 2023
Inspection Procedure:          IP 71130.10, Cyber-Security, Revision 0
NRC Inspectors:                Jasmine Gilliam, Lead                    Alan Dahbur
                              630-829-9831                            630-829-9810
                              Jasmine.Gilliam@nrc.gov                  Alan.Dahbur@nrc.gov
NRC Contractors:              Balla Barro                              Alan Konkal
                              Balla.Barro@nrc.gov                      Alan.Konkal@nrc.gov
I.    Information Requested for In-Office Preparation
      The initial request for information (i.e., first RFI) concentrates on providing the inspection
      team with the general information necessary to select appropriate components and
      Cyber Security Plan (CSP) elements to develop a site-specific inspection plan. The first
      RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs)
      plus operational and management (O&M) security control portions of the CSP to be
      chosen as the sample set required to be inspected by the cyber-security IP. The first
      RFIs requested information is specified below in Table RFI #1. The Table RFI #1
      information is requested to be provided to the regional office by March 18, 2023, or
      sooner, to facilitate the selection of the specific items that will be reviewed during the
      onsite inspection weeks.
      The inspection team will examine the returned documentation from the first RFI and
      identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
      focused follow-up request to develop the second RFI. The inspection team will submit
      the specific systems and equipment list to your staff by April 01, 2023, which will identify
      the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
      defensive architecture, and the areas of the licensees CSP selected for the
      cyber-security inspection. We request that the additional information provided from the
      second RFI be made available to the regional office prior to the inspection by
      May 01, 2023.
      The required Table RFI #1 information shall be provided electronically to the lead
      inspector by March 18, 2023. If a compact disk (CD) is provided, please provide four
      copies (one for each inspector/contactor). The preferred file format for all lists is a
      searchable Excel spreadsheet file. These files should be indexed and hyper-linked to
      facilitate ease of use. If you have any questions regarding this information, please call
      the inspection team leader as soon as possible.
                                                                                            Enclosure
 
          CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                    Table RFI #1
Request:                                                                  IP Ref
    A list of all Identified CSs/CDAs-highlight/note any additions,
    deletions, reclassifications due to new guidance from white papers,
1                                                                        Overall
    changes to NEI 10-04, 13-10, etc., since the last cyber-security
    inspection
    A list of Emergency Preparedness and Security onsite and offsite
2                                                                        Overall
    digital communication systems
    Network Topology Diagrams to include information and data flow for
3                                                                        Overall
    critical systems in Levels 2, 3 and 4 (If available)
4  Ongoing Monitoring and Assessment program documentation              03.01(a)
    The most recent effectiveness analysis of the Cyber-Security
5                                                                        03.01(b)
    Program
6  Vulnerability screening/assessment and scan program documentation    03.01(c)
    Cyber-Security Incident response documentation, including incident
    detection, response, and recovery documentation as well as            03.02(a)
7 contingency plan development, implementation and including any            and
    program documentation that requires testing of security boundary      03.04(b)
    device functionality
8 Device Access and Key Control documentation                            03.02(c)
9  Password/Authenticator documentation                                  03.02(c)
10  User Account/Credential documentation                                03.02(d)
    Portable Media and Mobile Device control documentation, including
11                                                                        03.02(e)
    kiosk security control assessment/documentation
    Design change/modification program documentation and a list of all
    design changes that affected CDAs that have been installed and
12 completed since the last cyber-security inspection, including either a 03.03(a)
    summary of the design change or the 50.59 documentation of the
    change
                                                                          03.03(a)
    Supply Chain Management documentation including any security
13                                                                        , (b) and
    impact analysis for new acquisitions
                                                                              (c)
    Configuration Management documentation including any security
                                                                          03.03(a)
14 impact analysis performed due to configuration changes since the last
                                                                          and (b)
    inspection
                                        2
 
                CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                            Table RFI #1
    Request:                                                                            IP Ref
            Cyber-Security Plan and any 50.54(p) analysis to support changes to
      15                                                                                03.04(a)
          the plan since the last inspection
                                                                                          03.06
      16    Cyber-Security Metrics tracked (if applicable)
                                                                                          (b)
            Provide documentation describing any cyber-security changes to the
      17                                                                                Overall
          access authorization program since the last cyber-security inspection
            Provide a list of all procedures and policies provided to the NRC with
      18                                                                                Overall
          their descriptive name and associated number (if available)
                                                                                          03.06
      19    Performance testing report (if applicable)
                                                                                          (a)
    In addition to the above information please provide the following:
    (1)      Electronic copy of the Updated Final Safety Analysis Report (UFSAR) and
            technical specifications.
    (2)      Name(s) and phone numbers for the regulatory and technical contacts.
    (3)      Current management and engineering organizational charts.
    Based on this information, the inspection team will identify and select specific systems
    and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
    submit a list of specific systems and equipment to your staff by April 01, 2023, for the
    second RFI (i.e., RFI #2).
II. Additional Information Requested to be Available Prior to Inspection
    As stated in Section I above, the inspection team will examine the returned
    documentation requested from Table RFI #1 and submit the list of specific systems and
    equipment to your staff by April 01, 2023, for the second RFI (i.e., RFI #2). The second
    RFI will request additional information required to evaluate the CSs/CDAs, defensive
    architecture, and the areas of the licensees CSP selected for the cyber-security
    inspection. The additional information requested for the specific systems and equipment
    is identified in Table RFI #2.
    The Table RFI #2 information shall be provided electronically to the lead inspector by
    May 01, 2023. If a CD is provided, please provide four copies (one for each
    inspector/contactor). The preferred file format for all lists is a searchable Excel
    spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of
    use. If you have any questions regarding this information, please call the inspection
    team leader as soon as possible.
                                              3
 
        CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                      Table RFI #2
Request
                                                                            Items
    For the system(s) chosen for inspection provide:
    Ongoing Monitoring and Assessment activity performed on the
1                                                                          03.01(a)
    system(s)
2 All Security Control Assessments for the selected system(s)              03.01(a)
    All vulnerability screenings/assessments associated with or scans
3 performed on the selected system(s) since the last cyber-security        03.01(c)
    inspection
    Documentation (including configuration files and rules sets) for
    Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
4 Host-based Intrusion Detection Systems (HIDS), and Security              03.02(b)
    Information and Event Management (SIEM) systems for system(s)
    chosen for inspection)
    Documentation (including configuration files and rule sets) for
5 intra-security level firewalls and boundary devices used to protect      03.02(c)
    the selected system(s)
    Copies of all periodic reviews of the access authorization list for the
6 selected systems since the last inspection                              03.02(d)
7 Baseline configuration data sheets for the selected CDAs                03.03(a)
    Documentation on any changes, including Security Impact Analyses,
8 performed on the selected system(s) since the last inspection            03.03(b)
    Copies of the purchase order documentation for any new equipment
9 purchased for the selected systems since the last inspection            03.03(c)
    Copies of any cyber-security drills performed since the last            03.02(a)
10 inspection, along with any reports or assessments generated              03.04(b)
    Copy of the individual recovery plan(s) for the selected system(s)
                                                                            03.02(a)
11 including documentation of the results the last time the backups        03.04(b)
    were executed
    Corrective actions taken as a result of cyber-security
12 incidents/issues to include previous NRC violations and Licensee        03.04(d)
    Identified Violations since the last cyber-security inspection
                                        4
 
                CYBER-SECURITY INSPECTION DOCUMENT REQUEST
III. Information Requested to be Available on First Day of Inspection
    For the specific systems and equipment identified in Section II above, provide the
    following RFI (i.e., Table 1ST Week Onsite) electronically by May 15, 2023, the first day
    of the inspection.
                                        Table 1ST Week Onsite
      Request:                                                                        Items
            Any cyber-security event reports submitted in accordance with
        1                                                                          03.04(a)
            10 CFR 73.77 since the last cyber-security inspection
            Updated Copies of corrective actions taken as a result of
            cyber-security incidents/issues, to include previous NRC violations
        2                                                                          03.04(d)
            and Licensee Identified Violations since the last cyber-security
            inspection, as well as vulnerability-related corrective actions
    In addition to the above information please provide the following:
    (1)    Copies of the following documents do not need to be solely available to the
            inspection team as long as the inspectors have easy and unrestrained access to
            them.
            a. UFSAR, if not previously provided;
            b. Original Final Safety Analysis Report (FSAR) Volumes;
            c. Original Safety Evaluation Report (SER) and Supplements;
            d. FSAR Question and Answers;
            e. Quality Assurance (QA) Plan;
            f.  Technical Specifications, if not previously provided; and
            g. Latest Individual Plant Examination and Probabilistic Risk Assessment
                (IPE/PRA) Report.
    (2)    Vendor Manuals, Assessment and Corrective Actions:
            a. The most recent Cyber-Security QA audit and/or self-assessment; and
            b. Corrective action documents (e.g., condition reports, including status of
                corrective actions) generate as a result of the most recent Cyber-Security QA
                audit and/or self-assessment.
                                                5
 
                  CYBER-SECURITY INSPECTION DOCUMENT REQUEST
IV.    Information Requested to be Provided Throughout the Inspection
            (1) Copies of any corrective action documents generated as a result of the
                inspection teams questions or queries during the inspection.
            (2) Copies of the list of questions submitted by the inspection team members and
                the status/resolution of the information requested (provided daily during the
                inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
                                                  6
}}

Latest revision as of 14:21, 17 July 2023

Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000254/2023401; 05000265/2023401
ML23011A282
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 01/11/2023
From: Jasmine Gilliam
NRC/RGN-III/DORS/EB2
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023401
Download: ML23011A282 (1)


See also: IR 05000254/2023401

Text

January 11, 2023

David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2- INFORMATION

REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION,

NOTIFICATION TO PERFORM INSPECTION 05000254/2023401;

05000265/2023401

Dear David Rhoades:

On May 15, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0

at your Quad Cities Station. The inspection will be performed to evaluate and verify your ability

to meet the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,

Section 54, Protection of Digital Computer and Communication Systems and Networks. The

onsite portion of the inspection will take place May 15-19, 2023.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should

be made available electronically no later than March 18, 2023. The inspection team will review

this information and, by April 1, 2023, will request the specific items that should be provided for

review.

The second group of additional requested documents will assist the inspection team in the

evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,

and the areas of the licensees Cyber Security Plan (CSP) selected for the cyber-security

inspection. This information will be requested for review in the regional office prior to the

inspection by May 01, 2023, as identified above.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, May 15, 2023.

D. Rhoades -2-

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Jasmine Gilliam. We understand that our regulatory

contact for this inspection is Richard Swart of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at 630-829-9831 or

via email at Jasmine.Gilliam@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Signed by Gilliam, Jasmine

on 01/11/23

Jasmine Gilliam, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket Nos. 50-254 and 50-265

License Nos. DPR-29 and DPR-30

Enclosure:

Cyber-Security Inspection

Document Request

cc w/encl: Distribution via LISTSERV

D. Rhoades -3-

Letter to David Rhoades from Jasmine Gilliam dated January 11, 2023.

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2- INFORMATION

REQUEST FOR THE CYBER-SECURITY BASELINE INSPECTION,

NOTIFICATION TO PERFORM INSPECTION 05000254/2023401;

05000265/2023401

DISTRIBUTION:

Jessie Quichocho

Marc Ferdas

RidsNrrDorlLpl3

RidsNrrPMQuadCities Resource

RidsNrrDroIrib Resource

John Giessner

Julio Lara

Diana Betancourt-Roldan

Allan Barker

R3-DORS

ADAMS Accession Number: ML23011A282

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME JGilliam:gam

DATE 01/11/2023

OFFICIAL RECORD COPY

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Inspection Report: 05000254/2023401 and 05000265/2023401

Inspection Dates: May 15-19, 2023

Inspection Procedure: IP 71130.10, Cyber-Security, Revision 0

NRC Inspectors: Jasmine Gilliam, Lead Alan Dahbur

630-829-9831 630-829-9810

Jasmine.Gilliam@nrc.gov Alan.Dahbur@nrc.gov

NRC Contractors: Balla Barro Alan Konkal

Balla.Barro@nrc.gov Alan.Konkal@nrc.gov

I. Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and

Cyber Security Plan (CSP) elements to develop a site-specific inspection plan. The first

RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs)

plus operational and management (O&M) security control portions of the CSP to be

chosen as the sample set required to be inspected by the cyber-security IP. The first

RFIs requested information is specified below in Table RFI #1. The Table RFI #1

information is requested to be provided to the regional office by March 18, 2023, or

sooner, to facilitate the selection of the specific items that will be reviewed during the

onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by April 01, 2023, which will identify

the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the

cyber-security inspection. We request that the additional information provided from the

second RFI be made available to the regional office prior to the inspection by

May 01, 2023.

The required Table RFI #1 information shall be provided electronically to the lead

inspector by March 18, 2023. If a compact disk (CD) is provided, please provide four

copies (one for each inspector/contactor). The preferred file format for all lists is a

searchable Excel spreadsheet file. These files should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

Enclosure

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #1

Request: IP Ref

A list of all Identified CSs/CDAs-highlight/note any additions,

deletions, reclassifications due to new guidance from white papers,

1 Overall

changes to NEI 10-04, 13-10, etc., since the last cyber-security

inspection

A list of Emergency Preparedness and Security onsite and offsite

2 Overall

digital communication systems

Network Topology Diagrams to include information and data flow for

3 Overall

critical systems in Levels 2, 3 and 4 (If available)

4 Ongoing Monitoring and Assessment program documentation 03.01(a)

The most recent effectiveness analysis of the Cyber-Security

5 03.01(b)

Program

6 Vulnerability screening/assessment and scan program documentation 03.01(c)

Cyber-Security Incident response documentation, including incident

detection, response, and recovery documentation as well as 03.02(a)

7 contingency plan development, implementation and including any and

program documentation that requires testing of security boundary 03.04(b)

device functionality

8 Device Access and Key Control documentation 03.02(c)

9 Password/Authenticator documentation 03.02(c)

10 User Account/Credential documentation 03.02(d)

Portable Media and Mobile Device control documentation, including

11 03.02(e)

kiosk security control assessment/documentation

Design change/modification program documentation and a list of all

design changes that affected CDAs that have been installed and

12 completed since the last cyber-security inspection, including either a 03.03(a)

summary of the design change or the 50.59 documentation of the

change

03.03(a)

Supply Chain Management documentation including any security

13 , (b) and

impact analysis for new acquisitions

(c)

Configuration Management documentation including any security

03.03(a)

14 impact analysis performed due to configuration changes since the last

and (b)

inspection

2

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #1

Request: IP Ref

Cyber-Security Plan and any 50.54(p) analysis to support changes to

15 03.04(a)

the plan since the last inspection

03.06

16 Cyber-Security Metrics tracked (if applicable)

(b)

Provide documentation describing any cyber-security changes to the

17 Overall

access authorization program since the last cyber-security inspection

Provide a list of all procedures and policies provided to the NRC with

18 Overall

their descriptive name and associated number (if available)

03.06

19 Performance testing report (if applicable)

(a)

In addition to the above information please provide the following:

(1) Electronic copy of the Updated Final Safety Analysis Report (UFSAR) and

technical specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by April 01, 2023, for the

second RFI (i.e., RFI #2).

II. Additional Information Requested to be Available Prior to Inspection

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by April 01, 2023, for the second RFI (i.e., RFI #2). The second

RFI will request additional information required to evaluate the CSs/CDAs, defensive

architecture, and the areas of the licensees CSP selected for the cyber-security

inspection. The additional information requested for the specific systems and equipment

is identified in Table RFI #2.

The Table RFI #2 information shall be provided electronically to the lead inspector by

May 01, 2023. If a CD is provided, please provide four copies (one for each

inspector/contactor). The preferred file format for all lists is a searchable Excel

spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

3

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2

Request

Items

For the system(s) chosen for inspection provide:

Ongoing Monitoring and Assessment activity performed on the

1 03.01(a)

system(s)

2 All Security Control Assessments for the selected system(s) 03.01(a)

All vulnerability screenings/assessments associated with or scans

3 performed on the selected system(s) since the last cyber-security 03.01(c)

inspection

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

4 Host-based Intrusion Detection Systems (HIDS), and Security 03.02(b)

Information and Event Management (SIEM) systems for system(s)

chosen for inspection)

Documentation (including configuration files and rule sets) for

5 intra-security level firewalls and boundary devices used to protect 03.02(c)

the selected system(s)

Copies of all periodic reviews of the access authorization list for the

6 selected systems since the last inspection 03.02(d)

7 Baseline configuration data sheets for the selected CDAs 03.03(a)

Documentation on any changes, including Security Impact Analyses,

8 performed on the selected system(s) since the last inspection 03.03(b)

Copies of the purchase order documentation for any new equipment

9 purchased for the selected systems since the last inspection 03.03(c)

Copies of any cyber-security drills performed since the last 03.02(a)

10 inspection, along with any reports or assessments generated 03.04(b)

Copy of the individual recovery plan(s) for the selected system(s)

03.02(a)

11 including documentation of the results the last time the backups 03.04(b)

were executed

Corrective actions taken as a result of cyber-security

12 incidents/issues to include previous NRC violations and Licensee 03.04(d)

Identified Violations since the last cyber-security inspection

4

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table 1ST Week Onsite) electronically by May 15, 2023, the first day

of the inspection.

Table 1ST Week Onsite

Request: Items

Any cyber-security event reports submitted in accordance with

1 03.04(a)

10 CFR 73.77 since the last cyber-security inspection

Updated Copies of corrective actions taken as a result of

cyber-security incidents/issues, to include previous NRC violations

2 03.04(d)

and Licensee Identified Violations since the last cyber-security

inspection, as well as vulnerability-related corrective actions

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access to

them.

a. UFSAR, if not previously provided;

b. Original Final Safety Analysis Report (FSAR) Volumes;

c. Original Safety Evaluation Report (SER) and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance (QA) Plan;

f. Technical Specifications, if not previously provided; and

g. Latest Individual Plant Examination and Probabilistic Risk Assessment

(IPE/PRA) Report.

(2) Vendor Manuals, Assessment and Corrective Actions:

a. The most recent Cyber-Security QA audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber-Security QA

audit and/or self-assessment.

5

CYBER-SECURITY INSPECTION DOCUMENT REQUEST

IV. Information Requested to be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

6