ML20102A672: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| document type = DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21), TEXT-SAFETY REPORT
| page count = 1
| page count = 1
| project = TAC:56817, TAC:59555
| stage = Other
}}
}}



Latest revision as of 22:08, 23 September 2022

Part 21 Rept Re Failure of post-tensioned Tendon on Plant. Investigation Revealed Another Tendon Anchor Cracked But Not Failed.Anchorages Furnished to Inryco by Western Concrete of California.Further Info Forthcoming W/Util Investigation
ML20102A672
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/04/1985
From: Matykiewicz C, Waitkus D
PRECISION SURVEILLANCE CORP. (FORMERLY INRYCO, INC.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-85-106-000 PT21-85-106, PT21-85-106-000, TAC-56817, TAC-59555, NUDOCS 8502080505
Download: ML20102A672 (1)


Text

. INRYCO. Inc.

- Cancret2 Systims Division 7200 S. N;rrig nsett Av:nu2 Bedf:rd Pzrk Chicago, Illinois 60638-6087 312 585 7300 Chicago 50~564 312 594 7300 Suburban TLX-72-1497 BDPK FAX: Ext. 202 WO February 4, 1985 United States Nuclear Regulatory Conunission 799 Roosevelt Road Glen Ellyn, IL 60137 1

Attention: Director, Regional Office

SUBJECT:

Alabama Power Company Joseph Farley Nuclear Plant - Unit 2 Compliance with 10CFR Part 21 Gentlemen:

On January 28, 1985-the Alabama Power company reported an apparent failure of a post tensioned tendon on the subject plant. A subsequent investigation revealed that another tendon anchor from the same heat had cracked but has not failed.

Inryco is participating in an investigation to determine the cause of the anchor failure. Meanwhile,-in keeping with 10CFR21. Inryeo is alerting you of its involvement with the problem.

The anchorages that failed or cracked were furnished to Inryco by Western Concrete of Gardena, California. Further information will be forthcoming in conjunction with the Alabama Power investigation.

INRYCO, INC.

Are 7d7daMa

~ Donald W. Waitkus ff Supervisor, Quality Assurance f Chester'E. Matykfewicz /

Responsible Officer igw 8502000505 850204 \ A-

%W PDR ADOCK 05000364 FEB 5 1905

. an inland Steel company j