| ==1.0 INTRODUCTION== | | ==1.0 INTRODUCTION== |
| I I' | | I I' |
| By letter dated February 24, 1997, PECO Nuclear Unit of the PECO Energy I i | | By {{letter dated|date=February 24, 1997|text=letter dated February 24, 1997}}, PECO Nuclear Unit of the PECO Energy I i |
| Company (PECO) transmitted a proposed' revision to Revision 13 of the Peach Bottom Atomic Power Station Quality Assurance Program Description in ; | | Company (PECO) transmitted a proposed' revision to Revision 13 of the Peach Bottom Atomic Power Station Quality Assurance Program Description in ; |
| accordance with 50.54(a). The staff has reviewed the submittal in accordance i with 50.54(a) and determined that the change to the quality assurance program ; | | accordance with 50.54(a). The staff has reviewed the submittal in accordance i with 50.54(a) and determined that the change to the quality assurance program ; |
|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20198L3331997-12-18018 December 1997 Safety Evaluation Supporting Approval of Proposed Merger of Atlantic Energy,Inc,& Delmarva Power & Light Co ML20212G8301997-10-24024 October 1997 Safety Evaluation Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively ML20198S2161997-10-24024 October 1997 Safety Evaluation Accepting Proposed Change to Provisions Identified in Rev 14 of PBAPS QAP Description Re Nuclear Review Board Meeting Frequency ML20217J5631997-10-0909 October 1997 Safety Evaluation Supporting Amend 225 to License DPR-56 ML20217J6161997-10-0707 October 1997 Safety Evaluation Re Alternative to Reactor Pressure Vessel Circumferential Weld Insps for Plant,Unit 3 ML20211L6241997-10-0303 October 1997 Safety Evaluation Authorizing Licensee Proposed Use of Code Case N-516-1 to Weld Modified Suction Strainer in Suppression Chamber at Plant ML20217D8161997-09-30030 September 1997 Safety Evaluation Supporting Amend 224 to License DPR-56 ML20211D6201997-09-17017 September 1997 SER Accepting VT-2 Examiner Qualification Request for PECO Energy Company,Peach Bottom Atomic Power Station,Units 2 & 3 ML20216G5601997-09-0404 September 1997 Safety Evaluation Supporting Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively ML20217M8001997-08-19019 August 1997 Safety Evaluation Supporting Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively ML20149L2841997-07-23023 July 1997 Safety Evaluation Accepting Licensee Relief Request RR-22 for Plant,Units 2 & 3 ISI Program ML20140B0371997-05-30030 May 1997 Safety Evaluation Accepting QAP Description Change ML20135B4111997-02-19019 February 1997 Safety Evaluation Supporting Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively ML20149L8681996-11-15015 November 1996 SER Accepting Core Spray Piping Insp & Flaw Evaluation for Plant,Unit 2 ML20149L2441996-01-29029 January 1996 Safety Evaluation Accepting Insp & Evaluation Methodology for Operation of Unit 3 Core Shroud for Duration of Current Operating Cycle,Performed in Response to GL 94-03 ML20058F5641993-11-19019 November 1993 SE Accepting Util 930305 Response to NRC Bulletin 90-01, Suppl 1, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20057B6441993-09-16016 September 1993 SER Concluding That Safe Shutdown Capability at Plant, Satisfies Requirements of Section Iii.G & Iii.L of App R to 10CFR50 ML20126H9031992-12-23023 December 1992 Safety Evaluation Granting Relief from Inservice Insp Requirements for Facilities ML20127N4941992-11-17017 November 1992 Safety Evaluation Accepting Util 120-day Response to Suppl 1 to GL 87-02 ML20062C7501990-10-26026 October 1990 Safety Evaluation Re Evaluation of Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow ML20246E0331989-08-21021 August 1989 SER Supporting Util Response to Generic Ltr 83-28,Item 2,1 (Parts 1 & 2).Programs Exist for Identifying safety-related Components Required for Reactor Trip Function & Vendor Interface W/Nmss Vendor for Required Components ML20205A8801988-10-31031 October 1988 Safety Evaluation of Util Plan for Restart of Peach Bottom Atomic Power Station ML20148P3351988-04-0101 April 1988 SER Accepting Util Responses to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification Program for All safety-related Components ML20148E6301988-01-15015 January 1988 SER Accepting Util 840116,0927 & 850805 Responses to Generic Ltr 82-33,Item 6 Re Compliance w/post-accident Monitoring Instrumentation Guidelines of Reg Guide 1.97 Concerning Emergency Response Facilities ML20236D0541987-10-22022 October 1987 Safety Evaluation Supporting Util Repts on Computer Program Analyses Methods Intended for Use in Part of Plant Core Reload Analyses ML20235D2431987-09-22022 September 1987 Safety Evaluation Re Proposed Onsite Storage of Liquid Oxygen & Hydrogen for Implementation of Hydrogen Water Chemistry.Permanent Hydrogen Water Installation Acceptable ML20209H0201987-04-24024 April 1987 Safety Evaluation Supporting Util Re Torus Attached Piping Mods - Mark I Program ML20204C1001986-07-24024 July 1986 Safety Evaluation Supporting Listed Util Responses & Actions Reviewed During Insp on 840913-19 Re Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 ML20141F6071986-04-0808 April 1986 Safety Evaluation Granting Util Requests for Relief from Inservice Insp Requirements of ASME Code,Section XI ML20209C3141986-03-20020 March 1986 Safety Evaluation Supporting Shroud Head Connection Replacement at Facility,Per Util 860107 Submittal 1999-09-24
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237B9531998-08-10010 August 1998 Specification for ISI Program Third Interval,Not Including Class Mc,Primary Containment for Bpaps Units 2 & 3 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20249C4791998-06-0202 June 1998 Rev 6 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20249C4751998-05-0707 May 1998 Rev 5 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 1999-09-30
[Table view] |
Text
- _ _ .. - -- - - . _ - . - .. _ . - .. - -. .. .
>"s o p *, UNITED STATES a
ia s* j NUCLEAR REGULATORY COMMIS810N i i WASHINGTON, D.C. 30008 4001
I SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ;
1
- -0UALITY ASSURANCE PROGRAM DESCRIPTION CHANGE f
PECO ENERGY COMPANY 5 PUBLIC SERVICE ELECTRIC AND GAS COMPANY !
DELMARVA POWER AND LIGHT COMPANY !
ATLANTIC CITY ELECTRIC COMPANY '
i 4
PEACH BOTTOM ATOMIC POWER STATION. UNITS 2 AND 3 !
3- !
- . DOCKET NOS. 50-277 AND 50-278 jJ .
I
1.0 INTRODUCTION
I I'
By letter dated February 24, 1997, PECO Nuclear Unit of the PECO Energy I i
Company (PECO) transmitted a proposed' revision to Revision 13 of the Peach Bottom Atomic Power Station Quality Assurance Program Description in ;
accordance with 50.54(a). The staff has reviewed the submittal in accordance i with 50.54(a) and determined that the change to the quality assurance program ;
j is acceptable in that the quality assurance prooram continues to meet the i j requirements of Appendix B to 10 CFR Part 50 J meets the additional :
i requirements of 50.34(B)(6)(ii) by discussing how the applicable requirements ;
j of Appendix B will be satisfied. .
j This safety evaluation describes the staff's analysis of the proposed i i alternative to previously approved provisions for the lead auditor !
j qualifications. j 1- 2.0 EVALUATION OF PROPOSED ALTERNATIVE FOR THE LEAD AUDITOR OVALIFICATION
- PROCESS
(
) 2.1 Lead Auditor Qualification Process i
The licensee's Quality Assurance program description is contained in Appendix D of the Peach Bottom Updated Final Safety Analysis Report. The licensee is presently committed in its quality assurance program to Section 2.3.4, " Audit Participation," of ANSI N45.2.23-1978, " Qualification of QA Program Audit Personnel for Nuclear Power Plants," as endorsed by Regulatory Guide 1.146,
" Qualification of Quality Assurance Audit Personnel for Nuclear Power Plants,"
dated August 1980. Section 2.3.4 states the following:
The prospective Lead Auditor shall have participated in a minimum of five (5) quality assurance audits within a period of time not to' exceed three (3) years prior to the date of qualification, one audit of which shall be a nuclear quality ,
assurance audit within the year prior to the individual's '
qualification.
Q60y0Q $$ 7
t As described in the February 24, 1997, submittal, the licensee has proposed the following alternative to the provisions contained in Section 2.3.4 of ANSI N45.2.23-1978:
" Prospective Lead Auditors shall demonstrate their ability to effectively implement the audit process and effectively lead an audit team. This process is described in written procedures which provide for evaluation and documentation of the results of this demonstration. A prospective Lead Auditor shall have participated in at least one nuclear quality assurance audit within the year preceding the individual's effective date of qualification. Upon successful demonstration of the ability to effectively implement the audit process and effectively lead audits, and having met the other provisions of Section 2.3 of ANSI /ASME N45.2.23-1978, the individual may be certified as being qualified to lead audits."
The staff conducted its review in accordance with the guidance in Section 17.2, " Quality Assurance During the Operational Phase," of NUREG-0800,
" Standard Review Plan" (SRP 17.2). The introduction paragraph of Section II, i
" Acceptance Criteria," of SRP 17.2 contains provisions for the use of alternatives to the acceptance criteria contained in SRP 17.2 provided they are evaluated by the staff and are considered to be in compliance with pertinent NRC regulations.
Based on the staff's review it was determined that the alternative for lead auditor qualification proposed by the licensee represents an acceptable alternative to Item 1883 of SRP 17.1 which is referenced in the criteria for audits in SRP 17.2. This determination was based on the licensee's quality assurance program controls which require that 1) prospective lead auditors effectively demonstrate their ability to implement the audit process and lead an audit team, 2) this demonstration process be described in written procedures or instructions, 3) the results of the demonstration be evaluated and documented, and 4) regardless of the methods used for the demonstration, the prospective lead auditor shall have participated in at least one nuclear '
quality assurance audit within the year preceding the individual's effective date of qualification. The alternative also contains provisions that upon successful demonstration of the ability to effectively implement the audit process and effectively lead audits, and having met the other provisions of 1 Section 2.3 of ANSI N45.2.23-1978, the individual may be certified as being i qualified to lead audits.
- 3. CONCLUSION The staff has also determined that the proposed alternatives to provisions l identified in Revision 13 of the Peach Bottom Atomic Station's Quality J Assurance Program Description, related to lead auditor qualification, I represent an acceptable alternative to the review criteria contained in '
Section 17.2 of NUREG-0800 and that these changes are acceptable and continue to meet the pertinent requirements of Appendix B to 10 CFR Part 50.
Principal Contributor: L. Campbell Date: May 30, 1997