ML20202H901: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:MA4135, TAC:MA4136
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.            - , ,        ..-  . . . .      ..  . - _ .  .            .      _  _ _ . . . _ _        .
(s# Lt%c
      ~p I                            UNITED STATES g
f j            NUCLEAR REGULATORY COMMISSION WA8HINGTON, D.C. 20065-0001
                      /
February 3,1999 MEMORANDUM FOR:'                  Docket File FROM:
Peter  S. Tam, Senior Project Managy Project Directorate Il-2                          ]
Division of Reactor Projects - t/11                  %
Office of Nuclear Reactor Regulatio
 
==SUBJECT:==
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -
IMPLEMENTATION OF AMENDMENTS 174 and 166 TO OPERATING LICENSES (TAC MA4135 AND MA4136)
The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.174 (for Unit 1) and 166 (for Unit 2),
regarding the Containment Pressure Control System on January 16,1999, Docket Numbers 50-413 and 50-414 Distribution Docket file PUBLIC I
H. Berkow
                                                                                                            \
                                                                                                          \    ;
9902090002 990203 PDR P
ADOCK 05000413 PDR tFSC E1
 
                                      ^ ~ ~        ~ ~ ~ " ~            ~
02/Cf/99 ~ WED 15:15'FAI                                                                                                  fd OO3 s  e      J                                                                                                                    j Nuclear Policy Manual- Volume 2                                        NSD Appendix D. 221. Implementation Sheet l
APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET EVC S O MNS O ONS UNIT NO. D4 dO 3 TS NO. /Tr Mr S. 6,II, !f. 6./l>7DATE RECEIVED /ff                            47
                                              /                                    '
AMENDMENT. NO. M!/ 66 -                              DESCRIPTION /hvr5T sv"Rv: ;tLAvde RE'dw/EMGwtr FCK CPCT To RR196 wTo emJYstMtT9 vtr7u r/rrcM Qs-secu _
I. IMPLEMENTATION DATES A. NRC ISSUE DATE (Date of NRC Cover letter):                        /!l  77~
l B. NRC IMPLENEhTATION DATE (From Text of NRd le'tter):INaraw/crioA> mnTH iTS l          C. STATION IMPLEAENTATION DATE fra CNJV!Cnav wiTM tr t l              (No later than NRC Implementation Date):
: 2. PLANT NOTIFICATION                                                                                                I initiah t{ ate
(/b / //thlVia E-Mail Distribution; Include Site Technical Contacts
: 3. RGC TECHNICAL CONTENT REVIEW CRTTERIA O A. All Discrepancies Have Been Resolved Via NRC Interface.
V B. No Inadvertent Changes Were Made To TS Sheets Involved.
VC. TS ChanEe Was Issued As eg                        ed By DPC.
TECHNICAL REVIEWER:                                                                  /,/
(List Discrepancih On Attache P              )                                      Date CHECKED BY:                    NA            .  .
I!/Ff//*l (List Discrepancies On Attached Page)                                                Date
: 4. PIP NUMBER (If generated):                      0-C98      3T<f 0
: 5. [ALL APPLICABLE CpOCTIVE ACDONS FROM ASSIGNED PIP COMPLETED VERIFIED BY:                    4 An                                                  /[/h77 Compliance                                Date
: 6. [ALL PRF-DIPLEMENTA ON ITEMS (FTEMS I-5) COMPLETT.D VERIFIED BY:
                                              ~ Lt/ V
                                                                  -                                      /!/
                                                                                                        '/'
Regulatory Compliance                                      Date
: 7. FINAL DIPLEMENTATION APPROVAL ultr                                                                  v/k Manager,            atory Compliance                                                  Date Manager, Safety Assurance                                                        T Date
* Approval may be waived (see 221.8 Item 6).
(30 SEPT 1998)                                                                                          D-221-33}}

Latest revision as of 17:03, 7 December 2021

Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116
ML20202H901
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/03/1999
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-MA4135, TAC-MA4136, NUDOCS 9902090002
Download: ML20202H901 (2)


Text

. - , , ..- . . . . .. . - _ . . . _ _ _ . . . _ _ .

(s# Lt%c

~p I UNITED STATES g

f j NUCLEAR REGULATORY COMMISSION WA8HINGTON, D.C. 20065-0001

/

February 3,1999 MEMORANDUM FOR:' Docket File FROM:

Peter S. Tam, Senior Project Managy Project Directorate Il-2 ]

Division of Reactor Projects - t/11  %

Office of Nuclear Reactor Regulatio

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 -

IMPLEMENTATION OF AMENDMENTS 174 and 166 TO OPERATING LICENSES (TAC MA4135 AND MA4136)

The attached document, transmitted by fax from Duke Energy Corporation, signifies the implementation of operating license Amendment Nos.174 (for Unit 1) and 166 (for Unit 2),

regarding the Containment Pressure Control System on January 16,1999, Docket Numbers 50-413 and 50-414 Distribution Docket file PUBLIC I

H. Berkow

\

\  ;

9902090002 990203 PDR P

ADOCK 05000413 PDR tFSC E1

^ ~ ~ ~ ~ ~ " ~ ~

02/Cf/99 ~ WED 15:15'FAI fd OO3 s e J j Nuclear Policy Manual- Volume 2 NSD Appendix D. 221. Implementation Sheet l

APPENDIX D. 221. FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATIONS AMENDMENT IMPLEMENTATION SHEET EVC S O MNS O ONS UNIT NO. D4 dO 3 TS NO. /Tr Mr S. 6,II, !f. 6./l>7DATE RECEIVED /ff 47

/ '

AMENDMENT. NO. M!/ 66 - DESCRIPTION /hvr5T sv"Rv: ;tLAvde RE'dw/EMGwtr FCK CPCT To RR196 wTo emJYstMtT9 vtr7u r/rrcM Qs-secu _

I. IMPLEMENTATION DATES A. NRC ISSUE DATE (Date of NRC Cover letter): /!l 77~

l B. NRC IMPLENEhTATION DATE (From Text of NRd le'tter):INaraw/crioA> mnTH iTS l C. STATION IMPLEAENTATION DATE fra CNJV!Cnav wiTM tr t l (No later than NRC Implementation Date):

2. PLANT NOTIFICATION I initiah t{ ate

(/b / //thlVia E-Mail Distribution; Include Site Technical Contacts

3. RGC TECHNICAL CONTENT REVIEW CRTTERIA O A. All Discrepancies Have Been Resolved Via NRC Interface.

V B. No Inadvertent Changes Were Made To TS Sheets Involved.

VC. TS ChanEe Was Issued As eg ed By DPC.

TECHNICAL REVIEWER: /,/

(List Discrepancih On Attache P ) Date CHECKED BY: NA . .

I!/Ff//*l (List Discrepancies On Attached Page) Date

4. PIP NUMBER (If generated): 0-C98 3T<f 0
5. [ALL APPLICABLE CpOCTIVE ACDONS FROM ASSIGNED PIP COMPLETED VERIFIED BY: 4 An /[/h77 Compliance Date
6. [ALL PRF-DIPLEMENTA ON ITEMS (FTEMS I-5) COMPLETT.D VERIFIED BY:

~ Lt/ V

- /!/

'/'

Regulatory Compliance Date

7. FINAL DIPLEMENTATION APPROVAL ultr v/k Manager, atory Compliance Date Manager, Safety Assurance T Date
  • Approval may be waived (see 221.8 Item 6).

(30 SEPT 1998) D-221-33