ML20207Q029: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
| page count = 3
| project = TAC:62879
| stage = Supplement
}}
}}



Latest revision as of 16:30, 5 December 2021

Forwards Beaver Valley Power Station Unit 2 Dcrdr Supplemental Summary Rept. Rept Documents Continuation of Dcrdr & Responds to NRC Audit Conducted on 860211 & 12
ML20207Q029
Person / Time
Site: Beaver Valley
Issue date: 01/08/1987
From: Carey J
DUQUESNE LIGHT CO.
To: Harold Denton, Tam P
Office of Nuclear Reactor Regulation
Shared Package
ML20207Q030 List:
References
RTR-NUREG-0700, RTR-NUREG-0737, RTR-NUREG-0801, RTR-NUREG-700, RTR-NUREG-737, RTR-NUREG-801, TASK-1.D.1, TASK-TM 2NRC-7-005, 2NRC-7-5, GL-82-33, TAC-62879, NUDOCS 8701210123
Download: ML20207Q029 (3)


Text

'A@

2NRC-7-005 Beaver Valley No. 2 Unit Project organization Telecopy 41 )64 Ext.160 S.E.G. Building P.O. Box 328 January 8, 1987 Shippingport PA 15077 Mr. Harold R. Denton, Director Of fice of Nuclear Reaction Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATENTION: Mr. Peter Tan, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Detailed Control Roan Design Review -- Supplenental Summary Report Gentlemen:

Attached are three (3) signed original letters and 3 copies of the Supplenental Summary Report which describes the methodology, findings, assess-ment and implenentation schedule of the Beaver Valley Power Station Unit No. 2 (BVPS-2) Control Roan Design Review (CRDR). The review was a continuation of the CRUR documented in the Summary Report submitted to the NRC on Decenber 2, 1985. The review was conoucted to ensure that the control roon and the ener-gency and alternate snutdown panels would support operation during energency conditions and to satisfy tne guidance of Iten I.D,1 of Supplenent 1 to NUREG-0737 published by Generic Letter 82-33. Tne review was also conducted using the guidance of NUREGs 0700, and 0801.

The Supplenental Summary Report is being provided to document the continu-ation of the Detailed CRDR and in response to the NRC's audit of the CRDR Pro-gran conducted on February 11, and 12,1986. The results of this audit are documented in the NRC Detailed Control Room Design Review Interim Safety Evalu-ation Report received by DLC in July 1986.

The attached Supplenental Summary Report also includes the Human Engineer-ing Discrepancies - HEDs ( Appendix A).

Two copies of the Supplenental Summary Report have been forwarded directly to the NRC staff reviewer, Mr. R. Eckenrode.

The Chapter 18.0, " Human Factors" of the BVPS Final Safety Analysis Report will be anended to reference the supplenental CRDR effort.

03 8

8701210123 870108 ka%

J J PDR ADOCK 05000412 A PDR

United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director Detailed Control Room Design Review -- Summary Report Page 2 If there are any questions in this regard, please contact Mr. E. T.

Eilmann at (412) 393-7895.

DUQUESNE LIGHT COMPANY By W. Ji/Carey Gr Sr. Vice President JGP/iJ r NR/DCRDR/ SUM Attachments AR$

cc: Mr. J. Beall, NRC Sr. Resident Inspector (w/a)

INPO Records Center (w/o/a)

NRC Document Control Desk (w/o/a) k e -,_,m. -- -r .., -w- . . - -,,,r-. ,, - . - ,.e .,- - . - ---y.4.-----m--.. , ,e, -wr,---g,- . - * . - , ~ - - + - - - - - - - - ,

r_.-

Unit;d Stat:s Nuclear Regulatory Commission i Mr. Harold R. Denton, Director Detailed Control Room Design Review -- Sunmary Report Page 3 COMMONWEALTH OF PENNSYLVANIA )

) SS:

COUNTY OF BEAVER )

On this [ day of/ h sff<- ,

/[/[7, before me, a Notary Public in and for sai/ Commonwealth nd County, personally appeared J. J. Carey, who being duly sworn, deposed and said that (1) he is Senior Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and '(3) the statenents set forth in the Submittal are true and correct to the best of his knowledge, f/ Oftu k) l$UEA6W Notary Public re 7 h " * ~*nca.au r n emism, m...,, u,,...a..,,,

fn.

en n. ns