QVs

'Af M 2NRC-7-100 Beaver Valley No. 2 Unit Project Organization Telecopy ( 1 64 Ext.160 h.h. s'oxi2Y April 30, 1987 Shippingport, PA 15077 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Beaver Valley Power Station Unit No. 2 Docket No. 50-412 Detailed Control Room Design Review HED Resolution Schedule

REFERENCE:

DLC Letter 2NRC-7-005 dated January 8,1987 Gentlemen:

Section 6.0 of the Detailed Control Room Design Review (DCRDR) Supplement-al Summary Report (SSR) indicated that the resolution to all HEDs generated during the DCRDR would be implemented prior to April 30, 1987. The following schedule changes are necessary:

1. The resolution to 2CIC-5107 will be implemented by 12/31/87. A review by DLC operations has determined that although the abbrevia-tions on the pushbuttons are not completely consistent with the dis-plays, they are understandable and easily related to one another.

BVPS-2 plant operation will not be affected.

2. The resolution to 2CIC-5129 will be implemented by 12/31/87. The CRTs have been adjusted and will be maintained as the need is identi-fied. Periodic adjustments will be made upon request. The CRTs will be maintained and the plant operation will not be affected.
3. The resolution to 2CIC-5138 will be implemented by 5/29/87 which is 8 days after the current scheduled fuel load date. During that time access to the plant computer system P& ids should be minimal. DLC operations has indicated that the schedule is acceptable and that there will be no impact to plant operation.

Do h $h$$$ &

m 9

United States Nuclear Regulatory Commission Detailed Control Room Design Review - HED Resolution Schedule Page 2

4. The resolution to 2CIC-5139 will be implemented by 5/29/87. DLC oper-ations finds the schedule acceptable for the same reasons indicated above for 2CIC-5138.
5. The resolution to 2CIC-5208 will be implemented prior to start-up following the first refueling outage. DLC operations has determined this schedule to be acceptable for the same reasons presented for 2CIC-5107. Additionally, the ERFCS is not normally accessed by the control room operators during normal plant operation.
6. The resolution to 2CIC-5209 will be implemented prior to start-up following the first refueling outage. DLC operations has indicated that the excessive decimal places on numerical values should have minimal or no affect on plant operation as the ERFCS data is not normally accessed in the control room. This change will be implemen-ted to maintain consistency between the plant computer system and the ERF. DLC operations has determined that the schedule is acceptable.
7. The resolution to 2CIC-5501 will be implemented by 12/31/87. DLC operations has reviewed the abbreviations used on the DRMS and although not completely consistent with the BV-2 standards, the abbreviations and acronyms used are understandable and not confusing.

CLC operations has determined the schedule to be acceptable and that there will be no impact on plant operation.

8. The resolution to 2MCR-2018 will be implemented prior to the current scheduled fuel load date of 5/21/87.

Additionally the resolution to the following HEDs have been revised and the final dispositions no longer require changes for the reasons provided on the attached HED Recommendation Revision Forms.

2CIC-5220 2CIC-5302 2CIC-5304 2CIC-5308 Finally Section 6.0 of the DCRDR SSR also indicated that the Work Space Survey and Emergency Equipment Survey would be initiated prior to 4/30/87. The performance of both surveys were indicated to be contingent upon the removal of the existing wall seperating the Unit 1 and Unit 2 sections of the Control Room i

< United States Nuclear Regulatory Connission Detailed Control Room Design Review - HED Resolution Schedule "

Page 3 i ,

l and installation of the partition (scheduled at that time to begin in mid-March

, 1987). The temporary wall removal and partition installation is scheduled to

be complete prior to the current scheduled BV-2 fuel load date of 5/21/87.

1 These surveys will be initiated after fuel load and completed, including imple- '

mentation of resolution to all resulting HEDs, prior to the start-up following the first refueling outage.

If you have any questions please contact Mr. R. E. Martin, Manager - DLC j Regulatory Affairs Department at (412) 393-7713.

DUQUESNE LIGHT COMPANY

{

<ld I',L l g J. D. Sieber i V Vice President 4 Nuclear JGP/1jr i NR/JGP/HED l Attachment '

AR/NAR ,

cc: Mr. P. Tam, Project Mana.or (w/a)

Mr. J. Beall, NRC Sr. Resident Inspector (w/a)

Mr. L. Prividy, NRC Resident Inspector (w/a)

INPO Records Center (w/o/a) l J

1

HED RECOMMENDATION REVISION FORM a) ,

k PLA/IT/ UNIT b) HED NUMBER: 1.Cl C 67 M REV: I c)_ DATE: N'l'%7

~

d) RECOMMENDAT10N:{SAME AS DAlqld4tNED BAcesea>ov of T!!E DEMx DtB S f.S ll/E WH(76 TEAT CA ) AfD

~

/ DEA 31 CAL. Td rf/E M4trE ON RED USEp TO Defter A ARMCow/TronIS av OwEe-DtShmts. StalcE 7//E DEHu)c DS'PL49.5 A&E AJELESS R)L.

OPEenfo2S TSE USE OF 4Al 4GELAMT/t./E ccha2s.

Sfht)Lo BE int /Es779ATED

,\ ret /iEu) % /2EccHAteuch; &M 79/hwi Efaan<s . Ab CME Oh [)

5ced is ws<skt %2vl h fI2m6< >

wt%,(gjufo( foog gh g - DL iECHNIC 4lD k]

vent y ie cea p g,y,L.s.

COORDINA TOR '

PO4'/< dFF.Me(c( [ re2A,,)

,g g._.g/D pp, W&. mt &

d6 -fM64c (Md.

1 or6 ULC RE MEW TEAM LEADER

/J/k DATE N

7l HUMAN [ACTORSSPECIALI5T DE MhMCdl5fd6 ope r. 00 Pt e { I)s cwd AtotIJcrMal/I u s) h da gs awas a tae.c.axs3 MM Cok!L i.o w%.Wu.

eu sc afez<xce sawwounsapyau%I e y emsystau<.

H ED 2cJc-5127 OkiCQtvb CQ LdM (.Mifiabd. A&ocutaest<fric) -F6r c Ye<.e.OlylayS as to wi// y%,

belkuu. Aurfau<. @vsist'eayhd 4(alr7

' DL~C REGUE TORY AFF R5' MANAGERDA TE ~

4 a no cuage emsaso DLC -Nga,Na -aER E 2/)1f7

$ CsaD Y/zsk)

Ox DLC OPERATIONS MANAGER DATE

HED RECOMMENDATION REVZSION FORM 4

a) 3VPS '2_

PLANT / UNIT b) HED NUMBER: ACIC- NO2 REV: I c) DATE:_ 4' 5/67 (PsM5) /

d) RECOMMENDATION: ASSRe.Ut ATt 001 USED od THE PSM6 iMOULD

[ '

GE. CoMSISrEur LderM COOTROL i%:0M 4MD THE

~

coMSTEMOED A5 IT t s DetletopeC LAA)quA6E w M8Geeutarlbds ptcrtoog gn veer ceo a v> +a[5ANe. Psus suppt.w AS Occ OEucqiOAt-

.aet na 14E.

cpraecus, pcIsceoe.( rosicad. h mied hcctras%'tb P5d -Ges to .es%tosk cecounsuAed es . Thc ccms<iteuc7 ccitI cesutt w. st9&c mT Psss is a. s%&.rc) s ew w#JA. % neey sbs+mi m cc or BV-2. put 6pmWc (

were hwd cud i e. ccmddyQ8(y k. AbbcevicctAs v 3e d tu. % 2. tu.d . rame< otC cnNIcA c00R0iNaiuR 9/r 23/g7 h a. 30-1. Spa.c6K dicttcN phie of terHs DLC,cper% .

par aaes2 hy>e. ceoau>ed AL.s.chspI dtcpaver g

atvIewian gj f

a 14 9ddw<wed.Vxt fed /S i/ cxack'fS7 sdor

%a.'O3d cu 9&f4 4- /k){ t5% FAcIOR5 HLy\Ap dn/97 5P

'( DATE f 'Y g ffnhl9 ri

?"' " *D ' * 'Y zu. J- A wj& a5A na* .

$ % ~' h / A y A Armr  %* A g ~f4 ^"A

,, o psaw a f.

c yA 42n OLc REGULAFORY AFFAIR 5 MANAGERDATE pC ENGINt~tRING lh M9fAGEW hU

' 0 ATE I Gk XO m rAv' yh>lr7 DLC OPERATIONS MANAGER DATE

{

t

HED RECOMMENDATION REVIS10N FORM a) hub -

PLANT / UNIT b) HED NUMBER: E lC.,-5304- REV: [ c) DATE: Y 3!8s7 d) RECOMMENDATION: //

ESrABusti Coto$(STEM BEFuE63 FU0cIlod key LAEELs Ad

~

.D d5Pt.g ( ZTLES (5 AWE As otatqidA-L HED #

RT: FurtAcc redea>

  • aen_ wo Iabus aosa9 Ink DLCOppatE(s f+ersa

$ f . < c s a re. c a.o'. i s sre6Ld n et so & cm.ae&arwod a w+ cetp co4ustA. tsue is c6se- Cor re exdo se  % e N A r w N Udu(

% ,;3 G TECHNIC L ORDINAIDR f/7</84 ceuumake) . < DgW DLC REVIEW FEAM LEADER

<// 093 +

DATE G(d/~Yihss N/zv/07 fMAhFfCTIJR5 SPECIALIST [DATE [

e) DISPOSITION: )

I b0 h .& m t WM su S/

~

h.a/6,ao a Q w, w Lak .A, A p, ras y,ata, 1 Wen su y-t

[8Aod 4ds/o DLC REGULAl"JRY AFFAIRS MANAGER ~ DATE b- YdYY DLC ENGINttRING MANAGER DE L90 m 7~P^/ 4, a l+ 2 DLC OPERATIONS PMNAGER DATE

HED RECOMMENDAT10N REVISZON FORM

.) __ 3VP5 - 2_.

PLANT / UNIT b) HED NUMBER:

1C ( C - $306 REY: ( c) DATE: _ h[I3 8[

//

d) RECOMMENDATION:

HOD(F Q($pt 5 $ O T H /\ T w g e (c ,q L V& LUES Af_ (M &L bidT AUqMQ RT : Fuh recieto' uscan.s ca Lu. 2c.ic. - s 30 2 , ucs,Bearim

-tc)

Psus f<cn uns.a. uAR csudt G< s k;Gcaa:t systew lc %D . es.

6 Ht+ei) MQ24.0 LMStCvD4 abt dec.AM0 i

~

s

%z, wo dtspt &do. c<re- eJ:Ft~ aie ned disa deme 6 ic .

Dtc ga4% .wel hee-t00t ibzc: %.e 'i A ~ m a PRSedec) U Gel idre g g gg ,

pgLC A D DINATUR V/23/67

/ DFTE No drOMc 0 (6 @?C* M6Mb8S Q S p ; 4 g 4 g $ t t- g ,[ l fo t .

ULC REVIEW REAM LtAUER 3h DATE ved c)6P/n /J6ss Wzr(p HfN fpTDRS SPECIALIST e) DISPOSITION:

$ hese er W^L ' 4 ff ~ ~" ~

4, & c4 u.,, n & A tazc.-556z a .aw swsgEs~AA" g,p a/Ja.y.

0A A E A

DL

'DATE

/g REGULAff Y AFFAIR 5 MANA'.iE Yb VF7 DLC ENGINEERING MNAGER /

'D E t

T-s tLY Eb k ']

DLC DPERATIONS MNAGER DATE