{{#Wiki_filter:}}
{{#Wiki_filter:_-    ..            .      _. _ . _        _ - _ _ - - --                -  -.    --.- _          .-    .. -.
i    -          -
i e
* k APPENDIX B                                          [
NOTICE OF DEVIATION Omaha Public Power District                                Docket:      50-285                  l Fort Calhoun Station                                        Operating License:  OPR-40            :
:                                                                                                                        t j                                                                                                                        i
:                      Based on the results of an NRC inspection conducted on September 12-16, 1988,                    i j                      deviations from your comitments to the NRC were identified. The deviations                        i i                      consisted of failure to :omplete an engineering guide and to fully reradiograph                  j l
the repair welds made to the emergency feedwater tank. In accordance with the                    i "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR                  !
Part 2. Appendix C (1988), the deviations are ' listed below:                                    l l                      A.      In a response dated June 30, 1987, to Violation 285/8713-01, concerning 1                              failure to qualify a weld procedure, the licensee comitted to the                        f completion of an engineering guide for preparation of welding procedures, 1
and procedure review by January 1988.                                                    l
]
,                                                                                                                        r i                              In deviation from the above, the engineering guide has been prepared and                  j i                                                                                                        16, 1988,      i l                              designated    as Engineering it has not been  issued.            (Manual CEl-6; however, as of September 285/8831-01)                                          i
(
B.      In a response dated June 29, 1987, to Violation 285/8714-01, concerning
!                              the radiographic technique used on two of the emergency feedwater tank welds, the licensee stated that the reradiography of emergency feedwater j                              tank girth welds G1 and G2 using source side penetrameters was complete.
!                              In deviation from the above, reradiography of girth welds G1 and G2 was                  l I
established during this inspection to be incomplete as a result of the                    !
l                              radiographic film not encompassing all repaired areas. (285/8831-02)
Omaha Public Power District is hereby requested to submit a written statement or explanation to this Office within 30 days of the date of the letter                            ;
transmitting this Notice. This reply, should include for each deviation:                          r a                      (1) the reason for the deviation if admitted, (2) the corrective steps that
{
bave been taken and the results achieved. (3) the corrective steps that will be i                      taken to avoid further deviations, and (4) the date when full compliance will                    !
be achieved. Where good cause is shown, consideration will be given to extending the response time.
t I
!                      Dated at Arlington, Texas.
this                day of                    1988 i
l t
8910270006 631019 PDR          ADOCK 05000280 0                          PDC I -}}

Latest revision as of 02:32, 30 December 2020

Notice of Deviation from Insp on 880912-16.Deviations Noted: Failure to Issue Engineering Guide Prepared & Designated as Engineering Manual CEI-6 & Failure of Reradiography of Girth Welds G1 & G2 to Encompass All Repaired Areas
ML20205C858
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/19/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20205C847 List:
References
50-285-88-31, NUDOCS 8810270006
Download: ML20205C858 (1)


Text

_- .. . _. _ . _ _ - _ _ - - -- - -. --.- _ .- .. -.

i - -

i e

  • k APPENDIX B [

NOTICE OF DEVIATION Omaha Public Power District Docket: 50-285 l Fort Calhoun Station Operating License: OPR-40  :

t j i
Based on the results of an NRC inspection conducted on September 12-16, 1988, i j deviations from your comitments to the NRC were identified. The deviations i i consisted of failure to :omplete an engineering guide and to fully reradiograph j l

the repair welds made to the emergency feedwater tank. In accordance with the i "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR  !

Part 2. Appendix C (1988), the deviations are ' listed below: l l A. In a response dated June 30, 1987, to Violation 285/8713-01, concerning 1 failure to qualify a weld procedure, the licensee comitted to the f completion of an engineering guide for preparation of welding procedures, 1

and procedure review by January 1988. l

]

, r i In deviation from the above, the engineering guide has been prepared and j i 16, 1988, i l designated as Engineering it has not been issued. (Manual CEl-6; however, as of September 285/8831-01) i

(

B. In a response dated June 29, 1987, to Violation 285/8714-01, concerning

! the radiographic technique used on two of the emergency feedwater tank welds, the licensee stated that the reradiography of emergency feedwater j tank girth welds G1 and G2 using source side penetrameters was complete.

! In deviation from the above, reradiography of girth welds G1 and G2 was l I

established during this inspection to be incomplete as a result of the  !

l radiographic film not encompassing all repaired areas. (285/8831-02)

Omaha Public Power District is hereby requested to submit a written statement or explanation to this Office within 30 days of the date of the letter  ;

transmitting this Notice. This reply, should include for each deviation: r a (1) the reason for the deviation if admitted, (2) the corrective steps that

{

bave been taken and the results achieved. (3) the corrective steps that will be i taken to avoid further deviations, and (4) the date when full compliance will  !

be achieved. Where good cause is shown, consideration will be given to extending the response time.

t I

! Dated at Arlington, Texas.

this day of 1988 i

l t

8910270006 631019 PDR ADOCK 05000280 0 PDC I -