{{#Wiki_filter:*
i
                  'Af M                                                            T.iephon. 9:2) m4ooo Nucl.u Group                                        January 29, 1988 l                  InSppYd,' ort.PA 15077 0004                        2NRC-8-002 U. S. Nuclear Regulatory Commission Attn:    Document Control Desk Washington, DC 20555
 
==Reference:==
Bcavor Valley Power Station Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 BVPS-2 FSAR Chapter 14, Test Change Status Report Gentiomen:
Forwarded        to NRC is the seventh status report identifying changes to  the      Initial Test Program as described in Chapter 14, of the FSAR.
These    changes      are made in accordance with the provisions of 10 CFR 50.59    and      reported to NRC in accordance with 50.59(b) within one month    of    initiating changes per BVPS-2 Facility Operating License condition C.(3).                                                                            ,
l l                                                                  Ve y truly yours, h                                i
                                                                    .  . Carey Senior Vice President                  i Nuclear Group                          '
1 Attachment cc:    Mr. J. Beall, Sr. Resident Inspector (Unit 2)
Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Project Manager INPO Records Conter l
l l
i 8002050162 ADOCK890129 OS000412 ,
i PDR                                                                                  1 P                      PDR t f        I W    !
_ - _ _ - _                                                                                            .1
 
n e
BVPS-2 FSAR CHAPTER 14 TEST CHANGE STATUS REPORT                                                                                                                          l
 
==References:==
(a)                                        DLC  Letter    2NRC-7-205 dated September 30, 1987, Mr. J.      J. Carcy to U. S. Nuclear Regulatory Commission (b): DLC                              Letter dated December 31,                                                                1987,  Mr.-J. D.
Sieber to U. S. Nuclear Regulatory Commission                                                                      '
FSAR SECTION                                                                                  TITLE
: 1)  14.2.12.48.01                                                      Main Plant Carbon Dioxide Protection System (SOV-2.33A.01)                                                      Test (SOV)                                                                                                    ;
Reference                                            (a)        identified          this testing was deferred until December 31, 1987 due to the inability to complete modifications on time.                                                    Compensatory measures were provided until the primary Carbon Dioxide System was successfully tested and placed in                                                                                                                      !
service by the scheduled date.                                                                            Reference (b) indicated the backup          CO2                                          storage    tank          which                          provides adequate reserve capacity has been installed.                                                              Final tecting for this backup                                                          !
supply system is expected to be completed by January 31, 1988.
: 2)  14.2.12.70.01                                                      Condensate Polishing Building Heating (SOV-2.44G.01)                                                      Ventilation and Air-Conditioning System Test (SOV)                                                                                                        '
This test was completed prior to commercial Operations, but high vibration and flow rate readings for the Process Air Filtration                                                                                                                  ,
Exhaust Fan did not meet the acceptance criteria. Evaluation of the deficiencies resulted in rework of the fan and recalibration of the flow indicator. These items have since been resolved.
b
: 3)  14.2.12.61.02                                                      Effluent Radiation Monitor Test (IST)
(IST-2.43.01)
This test was completed prior to Commercial Operations except for obtaining a representative grab sample from the Gaseous Waste                                                                                                                    '
Surge          Tank                                            Transfer      Monitor                                  to                            enable    grab    sample analysis / monitor                                                readout comparisons.                                                              The grab sampic has been      ,
obtained with satisfactory results.                                                                                                                                                1 I
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ .                    __ _ _          _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - - - _ - _                            _0}}

Revision as of 11:02, 13 November 2020

Fowards Seventh Status Rept Identifying Changes to Initial Test Program Described in Chapter 14 of Fsar.Changes Made in Accordance w/10CFR50.59 within 1 Month of Initiating Changes Per OL Condition C.(3)
ML20196A791
Person / Time
Site: Beaver Valley
Issue date: 01/29/1988
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
2NRC-8-002, 2NRC-8-2, TAC-63534, NUDOCS 8802050162
Download: ML20196A791 (2)


Text

i

'Af M T.iephon. 9:2) m4ooo Nucl.u Group January 29, 1988 l InSppYd,' ort.PA 15077 0004 2NRC-8-002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Reference:

Bcavor Valley Power Station Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 BVPS-2 FSAR Chapter 14, Test Change Status Report Gentiomen:

Forwarded to NRC is the seventh status report identifying changes to the Initial Test Program as described in Chapter 14, of the FSAR.

These changes are made in accordance with the provisions of 10 CFR 50.59 and reported to NRC in accordance with 50.59(b) within one month of initiating changes per BVPS-2 Facility Operating License condition C.(3). ,

l l Ve y truly yours, h i

. . Carey Senior Vice President i Nuclear Group '

1 Attachment cc: Mr. J. Beall, Sr. Resident Inspector (Unit 2)

Mr. W. T. Russell, NRC Region I Administrator Mr. P. Tam, Project Manager INPO Records Conter l

l l

i 8002050162 ADOCK890129 OS000412 ,

i PDR 1 P PDR t f I W  !

_ - _ _ - _ .1

n e

BVPS-2 FSAR CHAPTER 14 TEST CHANGE STATUS REPORT l

References:

(a) DLC Letter 2NRC-7-205 dated September 30, 1987, Mr. J. J. Carcy to U. S. Nuclear Regulatory Commission (b): DLC Letter dated December 31, 1987, Mr.-J. D.

Sieber to U. S. Nuclear Regulatory Commission '

FSAR SECTION TITLE

1) 14.2.12.48.01 Main Plant Carbon Dioxide Protection System (SOV-2.33A.01) Test (SOV)  ;

Reference (a) identified this testing was deferred until December 31, 1987 due to the inability to complete modifications on time. Compensatory measures were provided until the primary Carbon Dioxide System was successfully tested and placed in  !

service by the scheduled date. Reference (b) indicated the backup CO2 storage tank which provides adequate reserve capacity has been installed. Final tecting for this backup  !

supply system is expected to be completed by January 31, 1988.

2) 14.2.12.70.01 Condensate Polishing Building Heating (SOV-2.44G.01) Ventilation and Air-Conditioning System Test (SOV) '

This test was completed prior to commercial Operations, but high vibration and flow rate readings for the Process Air Filtration ,

Exhaust Fan did not meet the acceptance criteria. Evaluation of the deficiencies resulted in rework of the fan and recalibration of the flow indicator. These items have since been resolved.

b

3) 14.2.12.61.02 Effluent Radiation Monitor Test (IST)

(IST-2.43.01)

This test was completed prior to Commercial Operations except for obtaining a representative grab sample from the Gaseous Waste '

Surge Tank Transfer Monitor to enable grab sample analysis / monitor readout comparisons. The grab sampic has been ,

obtained with satisfactory results. 1 I