IR 05000445/1987034: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20148K096
| number = ML20148K113
| issue date = 01/21/1988
| issue date = 01/21/1988
| title = Forwards Insp Rept 50-445/87-34 on 871201-880105. No Violations or Deviations Noted
| title = Safety Insp Rept 50-445/87-34 on 871202-880105.No Violations or Deviations Noted.Major Areas Inspected:Plant Tours
| author name = Warnick R
| author name = Kelley D, Warnick R
| author affiliation = NRC OFFICE OF SPECIAL PROJECTS
| author affiliation = NRC OFFICE OF SPECIAL PROJECTS
| addressee name = Counsil W
| addressee name =  
| addressee affiliation = TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
| addressee affiliation =  
| docket = 05000445
| docket = 05000445
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8801270548
| document report number = 50-445-87-34, NUDOCS 8801270553
| package number = ML20148K101
| package number = ML20148K101
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 5
| page count = 4
}}
}}


Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:- - - _ _ _ _ _ _ _
.~ , a nc uq%,
.
  ",
  '
UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION WASHINGTON, D C. 20555 h 7 JAN 2l 1988 1.1.../
.
In Reply Refer To:
.
Docket: 50-445/87-34 TU Electric ATTN: Mr. W. G. Counsil Executive Vice President 400 North Olive Street, Lock Box 81
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF SPECIAL PROJECTS NRC Inspection Report: 50-445/87-34 Permit: CPPR-126 Docket: 50-445  Category: A2 Construction Permit Expiration Date:
' Dallas, Texas 75201 Gentlemen:
Unit 1: August 1, 1988 Applicant: TU Electric Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Facility Name: Comanche Peak Steam Electric Station (CPSES),
This refers to the inspection conducted by Mr. D. L. Kelley during the period December 2, 1987 through January 5, 1988, of activities authorized by NRC Construction Permit CPPR-126 for the Comanche Peak Steam Electric Station, Unit 1, and to the discussion of our findings with Messrs. L. D. Nace, A. B. Scott, and other members of your staff at the conclusion of the inspectio The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of selective examination of procedures and representative recorde, interviews with personnel, and observation by the inspector Within the scope of the inspection, no violations or deviations were identifie In accordance with 1C CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC Public Document Roo Should you have any questions concerning this inspection, we will be pleased to discuss them with yo
Unit 1 Inspection At: Comanche Peak Site, Glen Rose, Texas Inspection conducted: December 2, 1987, through January 5, 1988 v
Inspector: , )$7A 1xxA\
D. C7'K611ey, senio
    . h Ide k nspe'btor, ( 2I l853
    /Date Operations Reviewed by: R Fldad R. F. Warnick, Assistant Director lla.il tsr IDafe for Inspection Programs Comanche Peak Project Division Office of Special Projects i 8801270553 880121"
>
PDR ADOCK 05000445 G  PDR
    --  --


Sincerely, k
.- . . . . . .- --. -  - - . . -
R. F. Warnick, Assistant Director for Inspection Programs l Comanche Peak Project Division
      .
    . Office of Special Projects j Enclosure:    )
b
Inspection Report 50-445/87-34 cc: w/ enclosure See next page    ]
'
8801270548 880121 .
.
PDR ADOCK 05000445    j G  PDR    '
 
.
Inspection Summary
        '
Inspection Conducted: December 2, 1987, through January 5, 1988 (Report 50-445/87-34)
Areas Inspected: Routine, unannounced safety inspection consisting of plant tour Results: Within the area inspected, no violations or deviations were identifie I l
        !
l l
l
l
        ,


      .
5 i
  : %_ '
l l
_
!
e  :
a l
  ,-
JAN 2 l 1988
  .
In Reply Refer To:
    -Docket: 50-445/87-34 TU Electric
    . ATTN: Mr. W. G. Counsil Executive Vice President 400 North Olive Street, Lock Box 81 Dallas, Texas 75201 Gentlemen:
This refers to the inspection conducted by Mr. D. L. "elle during the period December'2, 1987, through January 5. 1988, of activities authorized by NRC Construction Permit CPPR-126 for the Comanche Peak Steam Electric Station, Unit 1, and to the discussion of our findings with Messrs. L. D. Nace, A. B. Scott, and other members of your staff at the conclusion of the inspection.


    - - - - - - - - , . _ _ - . . , . . , , _ , . - _ ,
.
.
'
'
The enclosed copy of our inspection report identifies areas .
  .
examined during the inspection. Within these areas, the inspection  *
consisted of selective examination of procedures and representative records, interviews with personnel, and observation by the
      .
inspector Within the scope of the inspection, no violations or deviations-were identifie In accordance with 10 CFR 2.790 of the Commission's regulations, a  ;
copy of this letter and the enclosed inspection report will be placed in the NRC Public Document Roo Should you have any questions concerning this inspection, we will
        '
be pleased to discuss them with yo ,


Sincerely, bRIGINI.L SIG'UED D7 R. F. Yl5EiNCE l
.-
R. F. Warnick, Assistant Director for Inspection Programs Comanche Peak Project Di"ision Office of Special Projects .
DETAILS Persons Contacted
Enclosure:
*W. H. Benkert, Staff Assistant-Manager, Operations Quality Assurance (QA), TU Electric-
Inspection Report 50-445/87-34    l cc: w/ enclosure-    i See next page    l SRI:IP:CfPD:OSP AD:IP:CPPD:OSP  i'
*R. D. Best, Nuclear Operations Inspection Report Item Coordinator, TU Electric
DKellep8 t/ RWarnick Ak/
*D. N. Bize,'EA Regulatory Compliance Supervisor, TU Electric
1/ tk /8 1/21/88    '
*M. R. Blevins, Manager, Technical Support, TU Electric
  . - - _ _ _ - _ _ _ _ _ _ _ _ _ - _ _    _ _ - _ . ._-
*M. D. Gaden, CPRT, IT Corporation
 
*P. E. Halstead, Manager, Quality Control (QC), TU Electric
    - _ _ _ _ _
*T. L. Heatherly, EA Regulatory Compliance Engineer, TU Electric
s o .
*O. W. Lowe, Director of Engineering, TU Electric
TU Elect 1-ic
*L. D. Nace, Vice President, Engineering & Construction, TU Electric
  -
*D. E. Noss, QA Issue Interface Coordinator, TU Electric
  *D. M. Reynerson, Director of Construction, TU Electric
*M. J. Riggs, Plant Evaluation Manager, Operations, TU Electric
*A. B. Scott, Vice President, Nuclear Operations, TU Electric
*C. E. Scott, Manager, Startup, TU Electric
*C. R. Smaney, Unit 1 Assistant Project Manager, TU Electric
  *M. R. Steelman, CPRT, TU Electric
  *P. B. Stevens, Manager, Electrical Engineering, TU. Electric
*B. B. Taylor, Nuclear Operations, Maintenance Manager, TU Electric The NRC inspector also interviewed other applicant employees during this inspection perio * Denotes personnel present at the January 5, 1988, exit intervie . Plant Tours (71302)
The NRC inspector performed frequent tours of Unit 1 and common plant areas during this inspection perio In addition to the general housekeeping activities and general cleanliness of the facility, specific attention was given to areas where safety-related equipment was installed and where activities were in progress involving safety-related equipment. These areas were inspected to ensure that:
. Work in progress was being accomplished using approved procedure . Special precautions for protection of equipment were implemented and additional cleanliness requirements were being adhered to for maintenance and welding actjvitie ,
-.
  .
*
  .
  .
cc w/ enclosure:
  . 4
Roger D. Walker  Bureau of Radiation Control l Manager, Nuclear Licensing State of Texas Texas Utilities Electric Company 1100 West 49th Street Skyway Tower Austin, TX 78756 400 North Olive Street, L.B. 81 Dallas, TX 75201  Nancy H. Williams CYGNA Energy Services Juanita Ellis Suite 390 President - CASE  2121 N. California Blvd 1426 South Polk Street Walnut Creek, CA 94596 Dallas, TX 75224 Thomas G. Dignan, J Renea Hicks, Es Ropes & Gray Assistant Attorney General 225 Franklin Street Environmental Protection Division Boston, MA 02110 P.O. Box 12548, Capitol Station Austin, TX 78711-2548 Robert A. Wooldridge, Es Worsham, Forsythe, Sampels Administrative Judge Peter Bloch and Wooldridge U.S. Nuclear Regulatory Commission 2001 Bryan Tower Washington, DC 20555 Suite 2500 Dallas, TX 75201 Elizabeth B. Johnson
  - .
' Administrative Judge Mr. Homer C. Schmidt Oak Ridge National Laboratory Director of Nuclear Post Office Box X, Building 3500 Services Oak Ridge, TN 37830  TU Electric Skyway Tower Dr. Kenneth A. McCollom 400 N. Olive St., L.B. 81 1107 West Knapp  Dallas, TX 75201 Stillwater, OK 74075 Mr. Robert E. Ballard, J Dr. Walter H. Jordan Director of Projects c/o Carib Terrace Motel Gibbs and Hill, In N. Ocean Boulevard 11 Penn Plaza Pompano Beach, Florida 33062 New York, NY 10001 Anthony Z. Roisman, Es Mr. R. S. Howard Suite 600  Westinghouse Electric 1401 New York Avenue, Corporation Washington, DC 20005 Post Office Box 355 Pittsburgh, PA 15230 Ms. Billie Pirner Garde, Es Government Accountability Project Lanny A. Sinkin Midwest Office  Christic Institute 104 East Wisconsin Avenue 1324 N. Capitol Street  i Appleton, WI 54911 Washington, DC 20002
  . Installed safety-related equipment and components were being pretected and maintained to prevent damage or
 
<
#
#
-
deterioratio The NRC inspector also observed control activities including operator response to alarms, control of maintenance and tagging activities and the general demeanor of the plant operation No violations or deviations were identifie . Exit Interview (30703)
TU Electric cc w/ enclosure: (continued)
An exit interview was conducted on January 5,.1988, with the applicant's representatives identified in paragraph ~1 of this repor During this interview, the NRC inspector summarized the scope of the inspectio l l
David R. Pigott, Es Jack R. Newman, Es Orrick, Herrington & Sutcliffe Newman & Holtzinger, Montgomery Street .1615 L Street, San Francisco, CA 94111 Washington, Robert Jablon Bonnie S. Blair Spiegel & McDiarmid 1350 New York Avenue, NW Washington, DC 20005-4798 George A. Parker, Chairman Public Utility Committee Senior Citizens Alliance of Tarrant County, In Wonder Drive '
Fort Worth, TX 76133 Joseph F. Fulbright Fulbright & Jaworski 1301 McKinney Street Houston, TX 77010 Mr. Jack Redding c/o Bethesda Licensing TU Electric 3 Metro Center, suite 610 Bethesda, MD 20814 William A. Burchette, Es Counsel for Tex-La Electric Cooperative of Texas Heron, Burchette, Ruckert &
Rothwell suite 700 1025 Thomas Jefferson St., NW Washington, DC 20007 James P. McGaughy, J GDS Associates, In ,
Suite 720 1850 Parkway Place Marietta, GA 30067 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suito 1000 Arlington, Texas 76011


--.
l l
w
l l
* .
l l
,
      ,
DISTRIBUTION:
__ J
!DocOtlFilesf( 50-445[445~)[.)
NRC PDR Local PDR OSP Reading CPPD-LA CPPD Reading (HQ)
* Site Reading
*CPRT Group  i
* SRI-OPS
* SRI-CONST AD for Projects
* MIS System, RIV
*RSTS Operator, RIV RPB, RIV RIV Docket File
*DWeiss, RM/ALF JTaylor SEbneter/JAxelrad CGrimes PMcKee JLyons AVietti-Cook MMalloy JMoore, OGC JGilliland, RIV FMiraglia EJordan JPartlow BHayes
*w/766
  . .
}}
}}

Latest revision as of 07:06, 27 October 2020

Safety Insp Rept 50-445/87-34 on 871202-880105.No Violations or Deviations Noted.Major Areas Inspected:Plant Tours
ML20148K113
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/21/1988
From: Kelley D, Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20148K101 List:
References
50-445-87-34, NUDOCS 8801270553
Download: ML20148K113 (4)


Text

- - - _ _ _ _ _ _ _

.

'

.

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF SPECIAL PROJECTS NRC Inspection Report: 50-445/87-34 Permit: CPPR-126 Docket: 50-445 Category: A2 Construction Permit Expiration Date:

Unit 1: August 1, 1988 Applicant: TU Electric Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Facility Name: Comanche Peak Steam Electric Station (CPSES),

Unit 1 Inspection At: Comanche Peak Site, Glen Rose, Texas Inspection conducted: December 2, 1987, through January 5, 1988 v

Inspector: , )$7A 1xxA\

D. C7'K611ey, senio

. h Ide k nspe'btor, ( 2I l853

/Date Operations Reviewed by: R Fldad R. F. Warnick, Assistant Director lla.il tsr IDafe for Inspection Programs Comanche Peak Project Division Office of Special Projects i 8801270553 880121"

>

PDR ADOCK 05000445 G PDR

-- --

.- . . . . . .- --. - - - . . -

.

b

'

.

.

Inspection Summary

'

Inspection Conducted: December 2, 1987, through January 5, 1988 (Report 50-445/87-34)

Areas Inspected: Routine, unannounced safety inspection consisting of plant tour Results: Within the area inspected, no violations or deviations were identifie I l

!

l l

l

,

5 i

l l

!

a l

- - - - - - - - , . _ _ - . . , . . , , _ , . - _ ,

.

.

'

.

.-

DETAILS Persons Contacted

  • W. H. Benkert, Staff Assistant-Manager, Operations Quality Assurance (QA), TU Electric-
  • R. D. Best, Nuclear Operations Inspection Report Item Coordinator, TU Electric
  • D. N. Bize,'EA Regulatory Compliance Supervisor, TU Electric
  • M. R. Blevins, Manager, Technical Support, TU Electric
  • M. D. Gaden, CPRT, IT Corporation
  • P. E. Halstead, Manager, Quality Control (QC), TU Electric
  • T. L. Heatherly, EA Regulatory Compliance Engineer, TU Electric
  • O. W. Lowe, Director of Engineering, TU Electric
  • L. D. Nace, Vice President, Engineering & Construction, TU Electric
  • D. E. Noss, QA Issue Interface Coordinator, TU Electric
  • D. M. Reynerson, Director of Construction, TU Electric
  • M. J. Riggs, Plant Evaluation Manager, Operations, TU Electric
  • A. B. Scott, Vice President, Nuclear Operations, TU Electric
  • C. E. Scott, Manager, Startup, TU Electric
  • C. R. Smaney, Unit 1 Assistant Project Manager, TU Electric
  • M. R. Steelman, CPRT, TU Electric
  • P. B. Stevens, Manager, Electrical Engineering, TU. Electric
  • B. B. Taylor, Nuclear Operations, Maintenance Manager, TU Electric The NRC inspector also interviewed other applicant employees during this inspection perio * Denotes personnel present at the January 5, 1988, exit intervie . Plant Tours (71302)

The NRC inspector performed frequent tours of Unit 1 and common plant areas during this inspection perio In addition to the general housekeeping activities and general cleanliness of the facility, specific attention was given to areas where safety-related equipment was installed and where activities were in progress involving safety-related equipment. These areas were inspected to ensure that:

. Work in progress was being accomplished using approved procedure . Special precautions for protection of equipment were implemented and additional cleanliness requirements were being adhered to for maintenance and welding actjvitie ,

-.

.

.

. 4

- .

. Installed safety-related equipment and components were being pretected and maintained to prevent damage or

deterioratio The NRC inspector also observed control activities including operator response to alarms, control of maintenance and tagging activities and the general demeanor of the plant operation No violations or deviations were identifie . Exit Interview (30703)

An exit interview was conducted on January 5,.1988, with the applicant's representatives identified in paragraph ~1 of this repor During this interview, the NRC inspector summarized the scope of the inspectio l l

l l

l l

l l

,

__ J