IR 05000445/1987034
| ML20148K113 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/21/1988 |
| From: | Kelley D, Warnick R NRC OFFICE OF SPECIAL PROJECTS |
| To: | |
| Shared Package | |
| ML20148K101 | List: |
| References | |
| 50-445-87-34, NUDOCS 8801270553 | |
| Download: ML20148K113 (4) | |
Text
- - - _ _ _ _ _ _ _
.
'
.
.
U.
S. NUCLEAR REGULATORY COMMISSION OFFICE OF SPECIAL PROJECTS NRC Inspection Report:
50-445/87-34 Permit: CPPR-126 Docket: 50-445 Category: A2 Construction Permit Expiration Date:
Unit 1: August 1, 1988 Applicant:
TU Electric Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Facility Name:
Comanche Peak Steam Electric Station (CPSES),
Unit 1 Inspection At:
Comanche Peak Site, Glen Rose, Texas Inspection conducted:
December 2, 1987, through January 5, 1988 Inspector:
)$7A 1xxA\\
.
h k
( 2I l853 v
,
D.
C7'K611ey, senio Ide nspe'btor,
/Date Operations Reviewed by:
R Fldad lla.il tsr R.
F. Warnick, Assistant Director IDafe for Inspection Programs Comanche Peak Project Division Office of Special Projects i
8801270553 880121" PDR ADOCK 05000445
>
G PDR
--
--
.-
...
.
.
.-
--.
-
-
-.. -
.
b
'
.
.
Inspection Summary
'
Inspection Conducted: December 2, 1987, through January 5, 1988 (Report 50-445/87-34)
Areas Inspected:
Routine, unannounced safety inspection consisting of plant tours.
Results:
Within the area inspected, no violations or deviations were identified.
l l
,
5 i
!
a l
-
- - - - - -
-
,. _ _ -..,..,, _
,. - _,
.
.
'
.
.-
DETAILS 1.
Persons Contacted
- W.
H. Benkert, Staff Assistant-Manager, Operations Quality Assurance (QA), TU Electric-
- R.
D. Best, Nuclear Operations Inspection Report Item Coordinator, TU Electric
- M. R. Blevins, Manager, Technical Support, TU Electric
- M.
D. Gaden, CPRT, IT Corporation
- P.
E. Halstead, Manager, Quality Control (QC), TU Electric
- T.
L.
Heatherly, EA Regulatory Compliance Engineer, TU Electric
- O.
W.
Lowe, Director of Engineering, TU Electric
- L.
D. Nace, Vice President, Engineering & Construction, TU Electric
- D.
E. Noss, QA Issue Interface Coordinator, TU Electric
- D.
M. Reynerson, Director of Construction, TU Electric
- M.
J. Riggs, Plant Evaluation Manager, Operations, TU Electric
- A.
B. Scott, Vice President, Nuclear Operations, TU Electric
- C.
E. Scott, Manager, Startup, TU Electric
- C.
R. Smaney, Unit 1 Assistant Project Manager, TU Electric
- M.
R.
Steelman, CPRT, TU Electric
- P.
B.
Stevens, Manager, Electrical Engineering, TU. Electric
- B.
B. Taylor, Nuclear Operations, Maintenance Manager, TU Electric The NRC inspector also interviewed other applicant employees during this inspection period.
- Denotes personnel present at the January 5, 1988, exit interview.
2.
Plant Tours (71302)
The NRC inspector performed frequent tours of Unit 1 and common plant areas during this inspection period.
In addition to the general housekeeping activities and general cleanliness of the facility, specific attention was given to areas where safety-related equipment was installed and where activities were in progress involving safety-related equipment.
These areas were inspected to ensure that:
Work in progress was being accomplished using approved
.
procedures.
Special precautions for protection of equipment were
.
implemented and additional cleanliness requirements were being adhered to for maintenance and welding actjvitie,
-.
.
.
.
-.
Installed safety-related equipment and components were
.
being pretected and maintained to prevent damage or deterioration.
The NRC inspector also observed control activities including operator response to alarms, control of maintenance and tagging activities and the general demeanor of the plant operations.
No violations or deviations were identified.
3.
Exit Interview (30703)
An exit interview was conducted on January 5,.1988, with the applicant's representatives identified in paragraph ~1 of this report.
During this interview, the NRC inspector summarized the scope of the inspection.
l l
l
,
__ J