IR 05000445/1987034

From kanterella
Jump to navigation Jump to search
Safety Insp Rept 50-445/87-34 on 871202-880105.No Violations or Deviations Noted.Major Areas Inspected:Plant Tours
ML20148K113
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/21/1988
From: Kelley D, Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20148K101 List:
References
50-445-87-34, NUDOCS 8801270553
Download: ML20148K113 (4)


Text

- - - _ _ _ _ _ _ _

.

'

.

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF SPECIAL PROJECTS NRC Inspection Report: 50-445/87-34 Permit: CPPR-126 Docket: 50-445 Category: A2 Construction Permit Expiration Date:

Unit 1: August 1, 1988 Applicant: TU Electric Skyway Tower 400 North Olive Street Lock Box 81 Dallas, Texas 75201 Facility Name: Comanche Peak Steam Electric Station (CPSES),

Unit 1 Inspection At: Comanche Peak Site, Glen Rose, Texas Inspection conducted: December 2, 1987, through January 5, 1988 v

Inspector: , )$7A 1xxA\

D. C7'K611ey, senio

. h Ide k nspe'btor, ( 2I l853

/Date Operations Reviewed by: R Fldad R. F. Warnick, Assistant Director lla.il tsr IDafe for Inspection Programs Comanche Peak Project Division Office of Special Projects i 8801270553 880121"

>

PDR ADOCK 05000445 G PDR

-- --

.- . . . . . .- --. - - - . . -

.

b

'

.

.

Inspection Summary

'

Inspection Conducted: December 2, 1987, through January 5, 1988 (Report 50-445/87-34)

Areas Inspected: Routine, unannounced safety inspection consisting of plant tour Results: Within the area inspected, no violations or deviations were identifie I l

!

l l

l

,

5 i

l l

!

a l

- - - - - - - - , . _ _ - . . , . . , , _ , . - _ ,

.

.

'

.

.-

DETAILS Persons Contacted

  • W. H. Benkert, Staff Assistant-Manager, Operations Quality Assurance (QA), TU Electric-
  • R. D. Best, Nuclear Operations Inspection Report Item Coordinator, TU Electric
  • D. N. Bize,'EA Regulatory Compliance Supervisor, TU Electric
  • M. R. Blevins, Manager, Technical Support, TU Electric
  • M. D. Gaden, CPRT, IT Corporation
  • P. E. Halstead, Manager, Quality Control (QC), TU Electric
  • T. L. Heatherly, EA Regulatory Compliance Engineer, TU Electric
  • O. W. Lowe, Director of Engineering, TU Electric
  • L. D. Nace, Vice President, Engineering & Construction, TU Electric
  • D. E. Noss, QA Issue Interface Coordinator, TU Electric
  • D. M. Reynerson, Director of Construction, TU Electric
  • M. J. Riggs, Plant Evaluation Manager, Operations, TU Electric
  • A. B. Scott, Vice President, Nuclear Operations, TU Electric
  • C. E. Scott, Manager, Startup, TU Electric
  • C. R. Smaney, Unit 1 Assistant Project Manager, TU Electric
  • M. R. Steelman, CPRT, TU Electric
  • P. B. Stevens, Manager, Electrical Engineering, TU. Electric
  • B. B. Taylor, Nuclear Operations, Maintenance Manager, TU Electric The NRC inspector also interviewed other applicant employees during this inspection perio * Denotes personnel present at the January 5, 1988, exit intervie . Plant Tours (71302)

The NRC inspector performed frequent tours of Unit 1 and common plant areas during this inspection perio In addition to the general housekeeping activities and general cleanliness of the facility, specific attention was given to areas where safety-related equipment was installed and where activities were in progress involving safety-related equipment. These areas were inspected to ensure that:

. Work in progress was being accomplished using approved procedure . Special precautions for protection of equipment were implemented and additional cleanliness requirements were being adhered to for maintenance and welding actjvitie ,

-.

.

.

. 4

- .

. Installed safety-related equipment and components were being pretected and maintained to prevent damage or

deterioratio The NRC inspector also observed control activities including operator response to alarms, control of maintenance and tagging activities and the general demeanor of the plant operation No violations or deviations were identifie . Exit Interview (30703)

An exit interview was conducted on January 5,.1988, with the applicant's representatives identified in paragraph ~1 of this repor During this interview, the NRC inspector summarized the scope of the inspectio l l