ML111441016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/24/2011
| issue date = 05/24/2011
| title = Summary of Susquehanna Annual Assessment Meeting, May 19, 2011
| title = Summary of Susquehanna Annual Assessment Meeting, May 19, 2011
| author name = Krohn P G
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000387, 05000388
| docket = 05000387, 05000388
| license number = NPF-014, NPF-022
| license number = NPF-014, NPF-022
| contact person = Krohn P G
| contact person = Krohn P
| document type = Memoranda
| document type = Memoranda
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:May 24, 2011 LICENSEE:      PPL SUSQUEHANNA, LLC.
FACILITY:      SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
==SUBJECT:==
==SUMMARY==
OF MAY 19, 2011, ANNUAL ASSESSMENT MEETING WITH PPL SUSQUEHANNA, LLC.
On May 19, from 1:00 pm to 2:00 pm, an Annual Assessment Meeting was conducted at the Susquehanna Steam Electric Station in Berwick, Pennsylvania, between the U. S. Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC. (PPL). The NRC requested the meeting with PPL management to discuss the NRC=s assessment of the safety performance of their Susquehanna Steam Electric Station (Susquehanna) Units 1 and 2 for the calendar year 2010. The NRC also conducted an Annual Assessment meeting with the public at the Eagle Building in Berwick, Pennsylvania from 3:30 pm to 5:30 pm the same day.
The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2010. The meetings also discussed the Assessment Follow up Letter for Susquehanna Unit 1 issued on May 3, 2011 (ML111230066). The NRC presentation included information on the Reactor Oversight Process (ROP), the results of NRC=s performance assessment for Susquehanna Units 1 and 2, and a presentation about United States nuclear plant safety in light of recent events in Japan.
Public attendees were offered the opportunity to communicate with the NRC regarding PPL=s performance at Susquehanna and the role of the agency in ensuring safe plant operations.
Questions from the public were addressed by the NRC.
The NRC=s assessment letter can be found in ADAMS under Accession Number ML110620317.
The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML111120313. The NRC slides can be located in ADAMS under Accession Number ML111440709. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
                                                          /RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects
==Enclosures:==
Public Meeting Sign in Sheet
2 Name                                  Organization Paul Krohn                        Nuclear Regulatory Commission (NRC)
Patrick Finney                    Nuclear Regulatory Commission (NRC)
Jonathan Greives                  Nuclear Regulatory Commission (NRC)
Andrew Rosebrook                  Nuclear Regulatory Commission (NRC)
Edgardo Torres                    Nuclear Regulatory Commission (NRC)
Neil Sheehan                      Nuclear Regulatory Commission (NRC)
Members of the Public on Sign-in Sheet
LICENSEE:              PPL SUSQUEHANNA, LLC.
FACILITY:              SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
==SUBJECT:==
==SUMMARY==
OF MAY 19, 2011, ANNUAL ASSESSMENT MEETING WITH PPL SUSQUEHANNA, LLC.
On May 19, from 1:00 pm to 2:00 pm, an Annual Assessment Meeting was conducted at the Susquehanna Steam Electric Station in Berwick, Pennsylvania, between the U. S. Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC. (PPL). The NRC requested the meeting with PPL management to discuss the NRC=s assessment of the safety performance of their Susquehanna Steam Electric Station (Susquehanna)
Units 1 and 2 for the calendar year 2010. The NRC also conducted an Annual Assessment meeting with the public at the Eagle Building in Berwick, Pennsylvania from 3:30 pm to 5:30 pm the same day.
The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2010. The meetings also discussed the Assessment Follow up Letter for Susquehanna Unit 1 issued on May 3, 2011 (ML111230066). The NRC presentation included information on the Reactor Oversight Process (ROP), the results of NRC=s performance assessment for Susquehanna Units 1 and 2 and a presentation about United States nuclear plant safety in light of recent events in Japan.
Public attendees were offered the opportunity to communicate with the NRC regarding PPL=s performance at Susquehanna and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.
The NRC=s assessment letter can be found in ADAMS under Accession Number ML110620317. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML111120313. The NRC slides can be located in ADAMS under Accession Number ML111440709. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
                                                                                                /RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution                                          J. Clifford, DRP                                      P. Finney, DRP, SRI W. Dean, RA                                          P. Krohn, DRP                                          J. Greives, DRP, RI D. Lew, DRA                                          W. Schmidt, DRS                                        S. Farrell, DRP, OA D. Roberts, DRP                                      A. Rosebrook, DRP                                      E. Torres, DRP SUNSI Review Complete:                        AAR            (Reviewer=s Initials)
DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 11\2010 EOC\AAM NOTICES\SQ 2010\
SSES 2010 AAM
==SUMMARY==
.DOCX After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE mmt                R1/DRP                                  R1/DRP NAME                      ARosebrook/ AAR                          PKrohn/ PGK DATE                      05/24/11                                05/ 24/11 OFFICIAL RECORD COPY}}

Latest revision as of 22:33, 10 March 2020

Summary of Susquehanna Annual Assessment Meeting, May 19, 2011
ML111441016
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/24/2011
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
Krohn P
References
Download: ML111441016 (3)


Text

May 24, 2011 LICENSEE: PPL SUSQUEHANNA, LLC.

FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MAY 19, 2011, ANNUAL ASSESSMENT MEETING WITH PPL SUSQUEHANNA, LLC.

On May 19, from 1:00 pm to 2:00 pm, an Annual Assessment Meeting was conducted at the Susquehanna Steam Electric Station in Berwick, Pennsylvania, between the U. S. Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC. (PPL). The NRC requested the meeting with PPL management to discuss the NRC=s assessment of the safety performance of their Susquehanna Steam Electric Station (Susquehanna) Units 1 and 2 for the calendar year 2010. The NRC also conducted an Annual Assessment meeting with the public at the Eagle Building in Berwick, Pennsylvania from 3:30 pm to 5:30 pm the same day.

The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2010. The meetings also discussed the Assessment Follow up Letter for Susquehanna Unit 1 issued on May 3, 2011 (ML111230066). The NRC presentation included information on the Reactor Oversight Process (ROP), the results of NRC=s performance assessment for Susquehanna Units 1 and 2, and a presentation about United States nuclear plant safety in light of recent events in Japan.

Public attendees were offered the opportunity to communicate with the NRC regarding PPL=s performance at Susquehanna and the role of the agency in ensuring safe plant operations.

Questions from the public were addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS under Accession Number ML110620317.

The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML111120313. The NRC slides can be located in ADAMS under Accession Number ML111440709. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet

2 Name Organization Paul Krohn Nuclear Regulatory Commission (NRC)

Patrick Finney Nuclear Regulatory Commission (NRC)

Jonathan Greives Nuclear Regulatory Commission (NRC)

Andrew Rosebrook Nuclear Regulatory Commission (NRC)

Edgardo Torres Nuclear Regulatory Commission (NRC)

Neil Sheehan Nuclear Regulatory Commission (NRC)

Members of the Public on Sign-in Sheet

LICENSEE: PPL SUSQUEHANNA, LLC.

FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MAY 19, 2011, ANNUAL ASSESSMENT MEETING WITH PPL SUSQUEHANNA, LLC.

On May 19, from 1:00 pm to 2:00 pm, an Annual Assessment Meeting was conducted at the Susquehanna Steam Electric Station in Berwick, Pennsylvania, between the U. S. Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC. (PPL). The NRC requested the meeting with PPL management to discuss the NRC=s assessment of the safety performance of their Susquehanna Steam Electric Station (Susquehanna)

Units 1 and 2 for the calendar year 2010. The NRC also conducted an Annual Assessment meeting with the public at the Eagle Building in Berwick, Pennsylvania from 3:30 pm to 5:30 pm the same day.

The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2010. The meetings also discussed the Assessment Follow up Letter for Susquehanna Unit 1 issued on May 3, 2011 (ML111230066). The NRC presentation included information on the Reactor Oversight Process (ROP), the results of NRC=s performance assessment for Susquehanna Units 1 and 2 and a presentation about United States nuclear plant safety in light of recent events in Japan.

Public attendees were offered the opportunity to communicate with the NRC regarding PPL=s performance at Susquehanna and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS under Accession Number ML110620317. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML111120313. The NRC slides can be located in ADAMS under Accession Number ML111440709. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution J. Clifford, DRP P. Finney, DRP, SRI W. Dean, RA P. Krohn, DRP J. Greives, DRP, RI D. Lew, DRA W. Schmidt, DRS S. Farrell, DRP, OA D. Roberts, DRP A. Rosebrook, DRP E. Torres, DRP SUNSI Review Complete: AAR (Reviewer=s Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 11\2010 EOC\AAM NOTICES\SQ 2010\

SSES 2010 AAM

SUMMARY

.DOCX After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE mmt R1/DRP R1/DRP NAME ARosebrook/ AAR PKrohn/ PGK DATE 05/24/11 05/ 24/11 OFFICIAL RECORD COPY