ML111120313

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with PPL Susquehanna, LLC to Discuss the Nrc'S Assessment of Safety Performance at the Susquehanna Steam Electric Station for 2010
ML111120313
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/22/2011
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
Krohn P
References
MN-11-014
Download: ML111120313 (3)


Text

MN No.11-014 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING ApriI 22, 20ll Licensee: PPL Susquehanna, LLC Facilities: Susquehanna Steam Electric Station, Units 1 and2 Docket Nos: 50-387 and 50-388 Date/ Time: May 19,2011 from 3:30 p.m. to 5:30 p.m.

Location: Eagle Building 107 S. Market Street Benruick, PA 18603

Purpose:

The U. S. Nuclear Regulatory Commission (NRC) will-meet with the public to discuss the NRC's assessment of safety performance at the Susquehanna Steam Electric Station 'for 2010, as described in the annual assessment letter dated March 4,2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: D. Roberts, Director, Division of Reactor Projects P. Krohn, Chief, Division of Reactor Projects, Branch 4 P. Finney, Senior Resident Inspector, Susquehanna J. Greives, Resident Inspector, Susquehanna Public Participation: This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation' Meeting

Contact:

Paul G. Krohn, Chief, Projects Branch 4 61 0-337-51 20 E-mail: paul.krohn@nrc.qov The NRC's annual assessment letter regarding the Susquehanna Steam Electric Station performance during 2010 can be found in ADAMS with Accession Number ML110620317 '

ADAMS is accessible from the NRC website at: http://nrc.qov/readinq-rm/adams.html.

Additional information relative to the NRC's annual assessment process and the safety performance of the Susquehanna Steam Electric Station can be found on the NRC's website at:

http://www. nrc.qov/NRRyOVERSIGHT/ASSESS/lndex'html'

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28,2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 17,2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28,20A2, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readino-rm/doc-collections/commission/pqljsv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 17 ,2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution: (via email)

Executive Director for Operations, OEDO (RTDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RTDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RTDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Director, Division of Inspection and Regional Support, NRR/DIRS (RTDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RTDSNRRDORL)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

B. Dean, RA S. lbarrola, DRP K. Heater, DRP D. Lew, DRA P. Finney, DRP, SRI D. Bearde, DRS D. Roberts, DRP J. Greives, DRP, Rl T. Haverkamp, DNMS J. Clifford, DRP S. Farrell. Resident OA G. Matakas, ORA C. Miller, DRS D. Screnci, PAO RidsNrrPMLimerickResource P. Wilson, DRS N. Sheehan. PAO RidsNrrDorlLpll -1 Resource S. Bush-Goddard, Rl OEDO R. Barkley, ORA ROPReportsResource P. Krohn, DRP N. McNamara, SLO A. Rosebrook, DRP D. Tiffl, sLo E. Torres, DRP V. Lewis, Rl Receptionist SUNSI REVIEW COMPLETE: PGK Reviewer's Initials DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 1 1\201 0 EOC\AAM Notices\SQ 2010\SSES 2010 AAM Meeting Notice Rev2.docx MLl11120313 After declaring this document "An Official Agency Record" it will be released to the Public.

"N" = No copy To receive a copy of this document, indicate in the box: "C- = Copy without attachmenUenclosure "E" = Copy with attachmenUenclosurc

NRC's Annual Assessment Meeting Susquehanna Steam Electric Station May 19,2011 3:30 p.m. - 5:30 p.m.

Eagle Building 107 South Market Street Berwick, PA 18603 Formal Meetino lntroduction Discussion of Susquehanna Steam Electric Station performance in 2010....... (10 minutes)

Discussion of U.S. plant safe operation in light of events in Japan.... (10 minutes)

NRC to address public questions (as needed)

Closing Remarks ....... (5 minutes)