ML11178A068: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11178A068
| number = ML11178A068
| issue date = 06/23/2011
| issue date = 06/23/2011
| title = 06/23/11-Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting
| title = Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting
| author name =  
| author name =  
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
| addressee name = Paige J C
| addressee name = Paige J
| addressee affiliation = NRC/NRR/DORL/LPLII-2
| addressee affiliation = NRC/NRR/DORL/LPLII-2
| docket = 05000250, 05000251
| docket = 05000250, 05000251
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Agenda
* Opening
* Purpose
* EPU License Amendment Request (LAR) Review Summary
* Proposed Technical Specification Changes
* Mechanical and Civil Outstanding Questions
* Nuclear Performance and Code Review
    - Boron Precipitation Analysis Discussion
* Containment and Ventilation EPITOME Analysis
* Reactor Systems Branch Questions
* Questions
* Closing 2                                                -I=PL.
 
Turkey Point -- Opening
* Appreciate the Staff's support and participation today
* Significant progress made to date
* FPL seeks clarification and understanding of remaining Staff questions
* Encourage open and active dialogue to address open items from the Staff's review 3                                                  -a=pL.
 
Turkey Point -- Purpose
* Review status of Requests for Additional Information (RAls)
* Discuss remaining questions and/or open items
* Discuss "to go" plan for final draft safety evaluation (SE) to Advisory Committee on Reactor Safeguards (ACRS) 4 8 I=PL.
 
EPU LAR Review Summary
* 6 draft SEs are complete for the 17 branches
* 4 draft SEs are in branch concurrence
* Draft Environmental Assessment scheduled for 7/15/1
* Focus today is to resolve any questions and/or open items remaining
    - Technical Specifications - Confirm no questions or comments on proposed Technical Specifications
    - Mechanical and Civil Engineering - Follow-up questions
    - Nuclear Performance and Code - PHOENIX-P/ANC benchmarking and boron precipitation
    - Containment and Ventilation - EPITOME issue
    - Reactor Systems - outstanding RAls and RETRAN deck 5                                                          -F=PL,
 
e:
°--ca
+'
U II U
(1),...
c.:::::s UJO
_-C cue:
ucu
-c    J:
.c:(1)
(.)(1)
(1)UJ
~I
-C (l)Q) tn tnc) 0e:
c.cu eJ:
D..O        <0
 
Mechanical and Civil Engineering
* Received 6 follow-up RAls on 6/20/11
  - Spent Fuel Pool Cooling and Component Cooling Water modification design information
  - Normal containment cooler modification design information
  - Containment penetration anchor margins
  - Use of actual material properties for reactor vessel supports
  - Allowable stresses for control rod drive mechanisms
  - Steam Generator fluid steam mixture velocity information
* Clarification discussion today
* Preparing responses with a target of mid July 2011 7                                                          - I=PL.
 
Nuclear Performance and Code Review
* Providing additional information regarding PHOENIX-PlANe benchmarking - Target early July
* Boric Acid Precipitation
  - Status of NRC confirmatory analysis
  - Discuss and reach agreement on anticipated FPL actions based on lessons learned from the Point Beach EPU
      -- Summarize conservatisms in the analysis
      -- Provide additional discussion on operational considerations for small break LOCAs
      -- Confirmation that charging pumps trip on safety injection
      -- Provide at least 1 hour of margin between lineup for hot leg injection and the onset of boron precipitation
      -- Other actions?
8                                                            -FPL.
 
Nuclear Performance and Code Review Boric Acid Precipitation Timeline Injection Mode 1 RHR Pump, 2 HHSI Pumps
              /
                      .j Injection Mode 2 HHSI Pumps                                          1 hour and 10 minutes
:s::
a u..
Cf)
Cold Leg Red ,,"',,'oO Mode 2 HHSI Pumps I..
1*1            Hot Leg Recircu ation Mode 2 HHSI Pumps H                  Time After LOCA L
DelaY 1 T z - RWST Low Low Level Delay z l  T. - Incipient Boric Acid Precipitation Without Hot Leg Recirculation T3 - HLSO Initiation Tl - RWST Low Level        To - Event Initiation Tl - 15 minutes T z - 45 minutes To- Event Initation                  T3 - 5 hours, 30 minutes T. - 6 hours, 40 minutes DelaYl - 2 minutes (EPU)
Delay z - 3 minutes (EPU) 9                                                                                                                              I=PL.
 
Containment and Ventilation - EPITOME Analysis
* EPITOME code error involves LOCA mass and energy release calculation
* Turkey Point containment analysis is impacted
* Plant operability has been addressed
* EPU LOCA and MSLB analyses performed
    - EPITOME code error correction
    - Range for containment free volume
* Technical specification change proposed to lower limit on normal operating containment pressure from 3 psig to .
1 psig
    - Include ITS improvement for administrative control of instrument air bleed 10                                                                - I=PL.
 
Containment and Ventilation - EPITOME Analysis
* Other changes
    - Modify the Emergency Containment Cooler (ECC) Start Logic to ensure 2 ECCs operate (new commitment)
    - Reduce upper operating band on Tav9 from 3&deg;F to 1.soF
    - Other input changes
* Draft Results 11                                                            - I=PL.
 
Containment and Ventilation - EPITOME LOCA Draft Results
  - - - Containment Pressure. OEPS MINSI                                                                                                        Contoinment Temperature. OEPS MINSI
  ----- Containment Pressure, OEPS MINSI Rev ised                                                                        ----- Containment Temperoture, OEPS MINSI Revised OO~I----------------------------------~                                                                                      jOO~I------------------------------------~
5{)                  . . . .. :. .. .// .-:\\ ... ... :........ :..... .. . :... ..... :. ... .. . .
                                                    *\                                                                                                                                  ~
r--...
                                                    *\
l.L 2-.IlJ 1;/\              * * . . .. .* **.* ** ..* * **. . **\.
d 40 .. .... .*....... .. :.. .. .... :.l.\            ... :... .... .:...... ..:........ :...... . .
                                                                                                                    '---"'                                                                  'f 40
.Q'                                                                                                                                                                                                ~
(f)                                              * \                                                                  ~
D..                                              :  \                                                                ~                                                                        .
"-/                                                                                                                  ..2                                .              .            .              . , .
                                                          \
  ~ YJ .....*.. :... .... . :........ :.... '\i ' ~:' .\' .. .:..... ... :... ... ..:.. ..... .                          ~ 200              1. ....*........... . ..... .... . .. . . ... .. .. ..~~ . ... .. . : ..... , . . : .. . ....*
:J
                                                                ...                                                      ~                            . . . . .                                                        .,
D1 IJ)                                                            "
OJ          ..*.... .. .. .. . .. .... .. ... ... ... .. . . :.. \, ' .'\:. .. .....    :... .... . :. . ..... .        E n=20                                                                    ,  \ .
f-OJ 150- .. ... ........ ........ .. , ............ ........ ...... ..-........... .... .. .
1Q1' ..... .. ......... .... ........... ........ ... :...            . \ ,,,X ***** ** ***.*** ** ** *
                                                                                      ~
oI      1111111,    11  11 1",    I! II''',    I I ""'I    'I ""',    ! '"111 1      f IIII!I, 111""1 100 I  11111111 I
1111111 I
1111111 I
1111111 I
11111111 I
11111111 I
11111111 I
11111111
            ~          1              2            J            ~          5            ~              7        8                        ~            1              2          j              4          ~          6          7            a 10        10              10          10            10          10          10              10      10                        10          10              10          10            10          10        10        10            10 Time (3)                                                                                                                          Time (s) 12                                                                                                                                                                                                                        -      FPL.
 
Containment and Ventilation - EPITOME MSLB Draft Results Containment Pressure . 1*0 sq    ft Split                            Con tai nmen t Temperature. 30 % Power DER MSCV
  - - - - . Co n tainment Pressure. 1.0 sq      ft Split Revised        - - - - . Containment Temperature. HZP DER MSCV Revised 60-'-'- - - - - - - - - - - - - - - - - - - - ,
3511 ~\
50                                                                    300
~                                                                      /"'.
LL 250
.12' 40                                                                '--"
(J)
                                                                          ~ 200 Q
'---./
:::J
  ~ 30
                                                                        +-'
0
:::::s                                                                  L
                                                                          ~ 150 (J)
(J)
Q)
E ct      20                                                              Q)
I    100 10 50 O +I~~~~~~~~~~~-L~~~~_.~--L-~
0 o          200      400          600        800      1000            0          200        400        600      BOD      1000 Transient Time (sec)                                                    Transient Time (sec) 13
                                                                                                                                -  FPL.
 
Containment and Ventilation - EPITOME
* Areas requiring revised analysis (applicable LAR sections in parentheses)
    - Component Cooling Water Systems (2 .5.4.3)
    - Primary Containment Functional Design (2.6.1)
    - Mass and Energy Release (2 .6.3)
    - Containment Heat Removal (2.6.5)
* Determined to be acceptable 14                                                  -FPL.
 
Containment and Ventilation - EPITOME
* Other areas reviewed and determined no impact (applicable LAR sections in parentheses)
    - Protective Coating Systems (2 .1.7)
    - Balance of Plant Piping, Components and Supports (2 .2.2.2)
    - Safety-Related Valves and Pumps (2.2.4)
    - Environmental Qualification of Electrical Equipment (2 .3.1)
    - Pressure Analysis for ECCS Performance Capability (2.6 .6)
    - Containment Ventilation System (2 .7.7)
    - ECCS and Loss-of-Coolant Accidents (2 .8.5.6.3)
    - Radiological Consequences Analyses Using AST (2.9.2)
* No change to LAR section conclusions for impact of EPU 15                                                                -FPL.
 
j w
:E ea 0
I a..
w      .....::l I
0 c:    "'C c:
.....0
--        ca
        .c:
-.....CO (1)
(1)
(f) c:        I (1)      L.
(1)
(1)
-c      ..J c:      (1) ca      tn c:
..... 0 c.
c      tn (1)      (1) a::::
E      'to c        0
--ca (1)
..... . t:
c: -.....::l 0      0 0          *
                  ..<D
 
Reactor Systems Branch Questions
* Received 31 non-LOCA RAls on 6/10/11
    - Conducted clarification call on 6/20/11
    - Preparing responses with a target issue of mid-July 2011
* Further discussion on the following:
    - NUREG 0800 requirement regarding credited reactor trips for loss of load analysis
    - Analysis of credible main steam line breaks
    - eves malfunction in    Modes 3, 4, and 5 (j
17                                                            I=PL.
 
Reactor Systems Branch Questions
* Received additional RAls:
    - 10on6/14/11
    - 7on6/17/11
    - Anticipate remaining questions by 6/23/11
    - Clarification discussion today
    - Preparing responses with a target of mid July 2011
* Further discussion on the following:
    - Inadvertent opening of a PORV
    - Additional information regarding LBLOCA nodalization 18                                                        -FPL..
 
Reactor Systems Branch Questions
* RETRAN Deck
    - Modified Turkey Point base deck to be compatible with RETRAN3D
    - Westinghouse transmitted to NRC on 6/21/11
    - Personnel available today to assist the Staff with running RETRAN with the modified base deck to ensure its compatibility with Staff software 19                                                            - F=PL.
 
3:
Cl)
Cl)
Cl)
        ..s::
0 0
tn      tn C      Cl)
.-...,0 tn
        ~
(J c
G)    ''"
:s ..cCl)'-
a      ...
        .c
...,I      0 E
c
.-o ....s-0
: n. tn      c
  ~      0 G)
        .... tn
(""'-
~
:s  Oca tn",
Cl)Cl)
::s '
~
0 N
 
Turkey Point - Closing
* FPL respond to remaining RAls and clarification requests
* Staff to complete remaining draft SE input
* Draft SE to ACRS Subcommittee in August
* Prepare for ACRS Subcommittee meeting in September and ACRS Full Committee meeting in October 21                                              -I=PL.}}

Latest revision as of 20:08, 10 March 2020

Meeting Slides, Turkey Point Nuclear Plant, Units 3 and 4, Extended Power Uprate (Epu), NRC and FPL Public Meeting
ML11178A068
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/23/2011
From:
Florida Power & Light Co
To: Jason Paige
Plant Licensing Branch II
Shared Package
ML11195A170 List:
References
TAC ME4907, TAC ME4908
Download: ML11178A068 (21)


Text

Agenda

  • Opening
  • Purpose
  • EPU License Amendment Request (LAR) Review Summary
  • Proposed Technical Specification Changes
  • Mechanical and Civil Outstanding Questions
  • Nuclear Performance and Code Review

- Boron Precipitation Analysis Discussion

  • Containment and Ventilation EPITOME Analysis
  • Reactor Systems Branch Questions
  • Questions
  • Closing 2 -I=PL.

Turkey Point -- Opening

  • Appreciate the Staff's support and participation today
  • Significant progress made to date
  • FPL seeks clarification and understanding of remaining Staff questions
  • Encourage open and active dialogue to address open items from the Staff's review 3 -a=pL.

Turkey Point -- Purpose

  • Review status of Requests for Additional Information (RAls)
  • Discuss remaining questions and/or open items

EPU LAR Review Summary

  • 6 draft SEs are complete for the 17 branches
  • 4 draft SEs are in branch concurrence
  • Draft Environmental Assessment scheduled for 7/15/1
  • Focus today is to resolve any questions and/or open items remaining

- Technical Specifications - Confirm no questions or comments on proposed Technical Specifications

- Mechanical and Civil Engineering - Follow-up questions

- Nuclear Performance and Code - PHOENIX-P/ANC benchmarking and boron precipitation

- Containment and Ventilation - EPITOME issue

- Reactor Systems - outstanding RAls and RETRAN deck 5 -F=PL,

e:

°--ca

+'

U II U

(1),...

c.:::::s UJO

_-C cue:

ucu

-c J:

.c:(1)

(.)(1)

(1)UJ

~I

-C (l)Q) tn tnc) 0e:

c.cu eJ:

D..O <0

Mechanical and Civil Engineering

  • Received 6 follow-up RAls on 6/20/11

- Spent Fuel Pool Cooling and Component Cooling Water modification design information

- Normal containment cooler modification design information

- Containment penetration anchor margins

- Use of actual material properties for reactor vessel supports

- Allowable stresses for control rod drive mechanisms

- Steam Generator fluid steam mixture velocity information

  • Clarification discussion today
  • Preparing responses with a target of mid July 2011 7 - I=PL.

Nuclear Performance and Code Review

  • Providing additional information regarding PHOENIX-PlANe benchmarking - Target early July

- Status of NRC confirmatory analysis

- Discuss and reach agreement on anticipated FPL actions based on lessons learned from the Point Beach EPU

-- Summarize conservatisms in the analysis

-- Provide additional discussion on operational considerations for small break LOCAs

-- Confirmation that charging pumps trip on safety injection

-- Provide at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of margin between lineup for hot leg injection and the onset of boron precipitation

-- Other actions?

8 -FPL.

Nuclear Performance and Code Review Boric Acid Precipitation Timeline Injection Mode 1 RHR Pump, 2 HHSI Pumps

/

.j Injection Mode 2 HHSI Pumps 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 10 minutes

s::

a u..

Cf)

Cold Leg Red ,,"',,'oO Mode 2 HHSI Pumps I..

1*1 Hot Leg Recircu ation Mode 2 HHSI Pumps H Time After LOCA L

DelaY 1 T z - RWST Low Low Level Delay z l T. - Incipient Boric Acid Precipitation Without Hot Leg Recirculation T3 - HLSO Initiation Tl - RWST Low Level To - Event Initiation Tl - 15 minutes T z - 45 minutes To- Event Initation T3 - 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, 30 minutes T. - 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 40 minutes DelaYl - 2 minutes (EPU)

Delay z - 3 minutes (EPU) 9 I=PL.

Containment and Ventilation - EPITOME Analysis

  • EPITOME code error involves LOCA mass and energy release calculation
  • Turkey Point containment analysis is impacted
  • Plant operability has been addressed

- EPITOME code error correction

- Range for containment free volume

  • Technical specification change proposed to lower limit on normal operating containment pressure from 3 psig to .

1 psig

- Include ITS improvement for administrative control of instrument air bleed 10 - I=PL.

Containment and Ventilation - EPITOME Analysis

  • Other changes

- Modify the Emergency Containment Cooler (ECC) Start Logic to ensure 2 ECCs operate (new commitment)

- Reduce upper operating band on Tav9 from 3°F to 1.soF

- Other input changes

  • Draft Results 11 - I=PL.

Containment and Ventilation - EPITOME LOCA Draft Results

- - - Containment Pressure. OEPS MINSI Contoinment Temperature. OEPS MINSI


Containment Pressure, OEPS MINSI Rev ised ----- Containment Temperoture, OEPS MINSI Revised OO~I----------------------------------~ jOO~I------------------------------------~

5{) . . . .. :. .. .// .-:\\ ... ... :........ :..... .. . :... ..... :. ... .. . .

  • \ ~

r--...

  • \

l.L 2-.IlJ 1;/\ * * . . .. .* **.* ** ..* * **. . **\.

d 40 .. .... .*....... .. :.. .. .... :.l.\ ... :... .... .:...... ..:........ :...... . .

'---"' 'f 40

.Q' ~

(f) * \ ~

D..  : \ ~ .

"-/ ..2 . . . . , .

\

~ YJ .....*.. :... .... . :........ :.... '\i ' ~:' .\' .. .:..... ... :... ... ..:.. ..... . ~ 200 1. ....*........... . ..... .... . .. . . ... .. .. ..~~ . ... .. . : ..... , . . : .. . ....*

J

... ~ . . . . . .,

D1 IJ) "

OJ ..*.... .. .. .. . .. .... .. ... ... ... .. . . :.. \, ' .'\:. .. .....  :... .... . :. . ..... . E n=20 , \ .

f-OJ 150- .. ... ........ ........ .. , ............ ........ ...... ..-........... .... .. .

1Q1' ..... .. ......... .... ........... ........ ... :... . \ ,,,X ***** ** ***.*** ** ** *

~

oI 1111111, 11 11 1", I! II, I I ""'I 'I ""',  ! '"111 1 f IIII!I, 111""1 100 I 11111111 I

1111111 I

1111111 I

1111111 I

11111111 I

11111111 I

11111111 I

11111111

~ 1 2 J ~ 5 ~ 7 8 ~ 1 2 j 4 ~ 6 7 a 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Time (3) Time (s) 12 - FPL.

Containment and Ventilation - EPITOME MSLB Draft Results Containment Pressure . 1*0 sq ft Split Con tai nmen t Temperature. 30 % Power DER MSCV

- - - - . Co n tainment Pressure. 1.0 sq ft Split Revised - - - - . Containment Temperature. HZP DER MSCV Revised 60-'-'- - - - - - - - - - - - - - - - - - - - ,

3511 ~\

50 300

~ /"'.

LL 250

.12' 40 '--"

(J)

~ 200 Q

'---./

J

~ 30

+-'

0

s L

~ 150 (J)

(J)

Q)

E ct 20 Q)

I 100 10 50 O +I~~~~~~~~~~~-L~~~~_.~--L-~

0 o 200 400 600 800 1000 0 200 400 600 BOD 1000 Transient Time (sec) Transient Time (sec) 13

- FPL.

Containment and Ventilation - EPITOME

  • Areas requiring revised analysis (applicable LAR sections in parentheses)

- Component Cooling Water Systems (2 .5.4.3)

- Primary Containment Functional Design (2.6.1)

- Mass and Energy Release (2 .6.3)

- Containment Heat Removal (2.6.5)

  • Determined to be acceptable 14 -FPL.

Containment and Ventilation - EPITOME

  • Other areas reviewed and determined no impact (applicable LAR sections in parentheses)

- Protective Coating Systems (2 .1.7)

- Balance of Plant Piping, Components and Supports (2 .2.2.2)

- Safety-Related Valves and Pumps (2.2.4)

- Environmental Qualification of Electrical Equipment (2 .3.1)

- Pressure Analysis for ECCS Performance Capability (2.6 .6)

- Containment Ventilation System (2 .7.7)

- ECCS and Loss-of-Coolant Accidents (2 .8.5.6.3)

- Radiological Consequences Analyses Using AST (2.9.2)

  • No change to LAR section conclusions for impact of EPU 15 -FPL.

j w

E ea 0

I a..

w .....::l I

0 c: "'C c:

.....0

-- ca

.c:

-.....CO (1)

(1)

(f) c: I (1) L.

(1)

(1)

-c ..J c: (1) ca tn c:

..... 0 c.

c tn (1) (1) a::::

E 'to c 0

--ca (1)

..... . t:

c: -.....::l 0 0 0 *

..<D

Reactor Systems Branch Questions

  • Received 31 non-LOCA RAls on 6/10/11

- Conducted clarification call on 6/20/11

- Preparing responses with a target issue of mid-July 2011

  • Further discussion on the following:

- NUREG 0800 requirement regarding credited reactor trips for loss of load analysis

- Analysis of credible main steam line breaks

- eves malfunction in Modes 3, 4, and 5 (j

17 I=PL.

Reactor Systems Branch Questions

  • Received additional RAls:

- 10on6/14/11

- 7on6/17/11

- Anticipate remaining questions by 6/23/11

- Clarification discussion today

- Preparing responses with a target of mid July 2011

  • Further discussion on the following:

- Inadvertent opening of a PORV

- Additional information regarding LBLOCA nodalization 18 -FPL..

Reactor Systems Branch Questions

  • RETRAN Deck

- Modified Turkey Point base deck to be compatible with RETRAN3D

- Westinghouse transmitted to NRC on 6/21/11

- Personnel available today to assist the Staff with running RETRAN with the modified base deck to ensure its compatibility with Staff software 19 - F=PL.

3:

Cl)

Cl)

Cl)

..s::

0 0

tn tn C Cl)

.-...,0 tn

~

(J c

G) "

s ..cCl)'-

a ...

.c

...,I 0 E

c

.-o ....s-0

n. tn c

~ 0 G)

.... tn

(""'-

~

s Oca tn",

Cl)Cl)

s '

~

0 N

Turkey Point - Closing

  • FPL respond to remaining RAls and clarification requests
  • Staff to complete remaining draft SE input
  • Draft SE to ACRS Subcommittee in August
  • Prepare for ACRS Subcommittee meeting in September and ACRS Full Committee meeting in October 21 -I=PL.