ML18051A790: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/06/1984
| issue date = 02/06/1984
| title = Forwards Reactor Internals Noise Monitoring Tests, 1983. Results Demonstrate That Reactor Core Barrel Tightly Clamped W/No Other Anomalous Vibrations Occurring During Testing Period
| title = Forwards Reactor Internals Noise Monitoring Tests, 1983. Results Demonstrate That Reactor Core Barrel Tightly Clamped W/No Other Anomalous Vibrations Occurring During Testing Period
| author name = JOHNSON B D
| author name = Johnson B
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name = KEPPLER J G
| addressee name = Keppler J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| docket = 05000255
| docket = 05000255
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,... ;., ' .
{{#Wiki_filter:*                                               e
* e \E FILE COPY *"-"'../ consumers Power company General Offices: 1945 West Parnall Raad, Jackson, Ml 49201 * (517) 7$8-0550 February 6, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 -LICENSE DPR-20 PALISADES PLANT -REACTOR INTERNALS NOISE MONITORING TESTS Palisades Plant Technical Specification 4.13.D.3 requires the results of the Reactor Internals Noise Monitoring Tests to be submitted to the NRG Region III Office on an annual basis. The results of the test demonstrates that the reactor core barrel is tightly clamped with no other anomalous vibrations occurring during the testing period. The attached test fulfills the requirements of the subject Technical Specification.
                ~
Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRG Resident Inspector  
    *"-"'../
-Palisades Attachment I 8402150297 840206 PDR ADOCK 05000255 R PDR OC0284-0002A-NL02}}
                                                                                      \E FILE COPY consumers Power company General Offices: 1945 West Parnall Raad, Jackson, Ml 49201 * (517) 7$8-0550 February 6, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT - REACTOR INTERNALS NOISE MONITORING TESTS Palisades Plant Technical Specification 4.13.D.3 requires the results of the Reactor Internals Noise Monitoring Tests to be submitted to the NRG Region III Office on an annual basis.
The results of the test demonstrates that the reactor core barrel is tightly clamped with no other anomalous vibrations occurring during the testing period. The attached test fulfills the requirements of the subject Technical Specification.
Brian D Johnson Staff Licensing Engineer CC   Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRG Resident Inspector - Palisades Attachment I   8402150297 840206 PDR ADOCK 05000255 R                           PDR OC0284-0002A-NL02}}

Latest revision as of 17:09, 23 February 2020

Forwards Reactor Internals Noise Monitoring Tests, 1983. Results Demonstrate That Reactor Core Barrel Tightly Clamped W/No Other Anomalous Vibrations Occurring During Testing Period
ML18051A790
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/06/1984
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18051A791 List:
References
NUDOCS 8402150297
Download: ML18051A790 (1)


Text

  • e

~

  • "-"'../

\E FILE COPY consumers Power company General Offices: 1945 West Parnall Raad, Jackson, Ml 49201 * (517) 7$8-0550 February 6, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT - REACTOR INTERNALS NOISE MONITORING TESTS Palisades Plant Technical Specification 4.13.D.3 requires the results of the Reactor Internals Noise Monitoring Tests to be submitted to the NRG Region III Office on an annual basis.

The results of the test demonstrates that the reactor core barrel is tightly clamped with no other anomalous vibrations occurring during the testing period. The attached test fulfills the requirements of the subject Technical Specification.

Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRG Resident Inspector - Palisades Attachment I 8402150297 840206 PDR ADOCK 05000255 R PDR OC0284-0002A-NL02