ML18051A790

From kanterella
Jump to navigation Jump to search
Forwards Reactor Internals Noise Monitoring Tests, 1983. Results Demonstrate That Reactor Core Barrel Tightly Clamped W/No Other Anomalous Vibrations Occurring During Testing Period
ML18051A790
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/06/1984
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18051A791 List:
References
NUDOCS 8402150297
Download: ML18051A790 (1)


Text

  • e

~

  • "-"'../

\E FILE COPY consumers Power company General Offices: 1945 West Parnall Raad, Jackson, Ml 49201 * (517) 7$8-0550 February 6, 1984 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT - REACTOR INTERNALS NOISE MONITORING TESTS Palisades Plant Technical Specification 4.13.D.3 requires the results of the Reactor Internals Noise Monitoring Tests to be submitted to the NRG Region III Office on an annual basis.

The results of the test demonstrates that the reactor core barrel is tightly clamped with no other anomalous vibrations occurring during the testing period. The attached test fulfills the requirements of the subject Technical Specification.

Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRG Resident Inspector - Palisades Attachment I 8402150297 840206 PDR ADOCK 05000255 R PDR OC0284-0002A-NL02