actuation circuitry (AMSAC) was automatically bypassed at a power                                    !
actuation circuitry (AMSAC) was automatically bypassed at a power                                    !
level greater than t'ne 40% power level required by the Technical Specifications.              A supplement to this report will be submitted at a                      ;
level greater than t'ne 40% power level required by the Technical Specifications.              A supplement to this report will be submitted at a                      ;
                                                                                                                          ;
later date.
later date.
If any further information is needed, please do not hesitate to                                      :
If any further information is needed, please do not hesitate to                                      :
Line 62: Line 61:
to ttal                    q as toenmH.i                        **,t.'
to ttal                    q as toenmH.i                        **,t.'
                 .                        se ass.inHe                        en asi.im
                 .                        se ass.inHe                        en asi.im
                                           = MittH88                          m mitiNI                            . 900Bl lt.e)                        .et . 8p sn I            l l W ,tesip Hu                          ge ttiniWHessH.I                  2,
                                           = MittH88                          m mitiNI                            . 900Bl lt.e)                        .et . 8p sn I            l l W ,tesip Hu                          ge ttiniWHessH.I                  2, i
      ; ;, -        ,
s
i s
                                 ,        m M Ht H.I                                                        _
                                 ,        m M Ht H.I                                                        _
         ,              Igj        _
         ,              Igj        _

Latest revision as of 17:03, 18 February 2020

LER 89-008-00:on 890910,ATWS Mitigating Actuation Circuitry Automatically Bypassed at About 42% Reactor Power, Disenabling Sys.Caused by High Tech Spec Setpoint.Enable/ Disable Setpoint Reset to 30%.W/891019 Ltr
ML19327B306
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/19/1989
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-130 LER-89-008, LER-89-8, VPNPD-89-550, NUDOCS 8910300134
Download: ML19327B306 (2)


Text

.

e

'O

3 ,

O W Powin COMpar  ?

, 231 w. MICHIGAN.F.o BOX 2046. MILWAUKEE.WI63201 914;pri.2345 plp

^'

VPNPD-89-550 10 CFR 50.73  ;

NRC-89-130 l October 19, 1989  ;

tc l U. S. NUCLEAR REGULATORY COMMISSION -

g '

Document Control Desk Mail Station P1-137 Washington, D. C. 20555 Gentlemen:

DOCKET 50-266 LICENSE EVENT REPORT 89-008-00 s AMSAC NOT ENABLED AS REQUIRED '

BY TECHNICAL SPECIFICATIONS  !

POINT BEACH NUCLEAR PLANT, UNIT 1 j Enclosed is Licensee Event Report 89-008-00 for Point Beach  !

~ Nuclear Plant, Unit.1. This report is provided in accordance with i 10 CFR 50.73(a)(2)(1)(B), "Any operation or condition prohibited l by the plant's Technical Specifications."  ;

r This report describes an event in which the ATWS mitigating system '

actuation circuitry (AMSAC) was automatically bypassed at a power  !

level greater than t'ne 40% power level required by the Technical Specifications. A supplement to this report will be submitted at a  ;

later date.

If any further information is needed, please do not hesitate to  :

contact us. ,

t Very truly yours, ,

s f ',

///  :

1 C. W. F l Vice President  !

Nuclear Power  :

1 L Enclosure l Copies to NRC Regional Administrator, Region III >

NRC Resident Inspector ,

l' f.gogic( 'O 'p i i u

s  :

- ._ . , _ _ _ _m ---

. 3y,,.== su e e .a 6 .. e===T vee ea.e s.w UCENSEE EVENT REPORT ILARI 6,,, n' ees e, mane. e. -

Point Beach Nuclear Plant, Unit 1 e is i o io l e 121616 1 loF}0 11

.- m AMSAC Not Enabled as Required by Technical Specifications evem en e, up. .u . ., n , u n i,i ., . . .. ..u 6v.. .,

amm. m, .. .. ggt-g, o., u, .... ...6..... noc ei .swe. ..

  1. illoicisi i i

- ~

0l9 1l0 89 8l9 0l0l8 0l 0 1l0 1l 9 8l 9 0 i lleloict I i

,, t=e ,eem m. so ,v., w mmew wc,.i,e

.= m au g ,8' tm a esseni se eeni.i m tensieHei _

to ttal q as toenmH.i **,t.'

. se ass.inHe en asi.im

= MittH88 m mitiNI . 900Bl lt.e) .et . 8p sn I l l W ,tesip Hu ge ttiniWHessH.I 2, i

s

, m M Ht H.I _

, Igj _

m eninHtitel gelteniguel 30 ,6.iW He.14l v m e. in H.i e n. .H n a n.ien.i

6. ceases ca. .c, t ,me 6.. nas

,8 6 0 *s >el hs H.

.e.est

..t. c000 C. W. Fay, Vice President - Nuclear Power 4l114 21211 1 - l 218 i 11 1

,6...6..-.-..6u.........,n.,

uom ......, .. o 13;;c- atr,A1;* c v.. . . . . . , c- n, 13;te atr,Ay;a - .

B , , , , , , , , , , , , , , ,

I l l I I I I i 1 l 1 i i 1 wmewmu .. , ceeo n.. i.e.,- o., ,p.

~~') ,n t,,,. - e m cree si ,u,a u re, 7one, 112 013 81 9 awe e, ,6 . . ... .- ,, . .i On September 10, 1989, Point Beach Nuclear Plant Unit 1 was decreasing power from greater than 40% to less than 40%. At somewhat less than 40% power, the ATWS mitigating actuation circuitry (AMSAC) is designed l

to be bypassed automatically based upon first-stage turbine pressure.

Power as indicated by first-stage pressure at this power level during power decreases is less than reactor power. In fact, the AMSAC was cutomatical).y bypassed at about 42% reactor power. Technical Specificati ms require the AMSAC system to be enabled at greater than 40% reactol Dower. Power was reduced to 38% and held until the bistable cc.t .d be reset. The enable / disable bistable setpoint was reset to 300 to ensure the operation of the system at less than 40%

reactor power. A revision to the Technical Specifications will be oubmitted to the NRC to clarify that turbine power of greater than 40%

is the power level at which AMSAC is required.

l l

OfJ"" "'