ML19336A220: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 19: Line 19:
8
8
       .. c
       .. c
          *
            ''
            -
                   . Edward Mines gm    rf Y .
                   . Edward Mines gm    rf Y .
  --
ASSis!801 V<e Pfe54 dent
ASSis!801 V<e Pfe54 dent
                     . ouai.ty Assurance
                     . ouai.ty Assurance
               ~
               ~
                   - 2000 Second A sum memnu a y sw
                   - 2000 Second A sum memnu a y sw son gvenue September 2, 1980 i-                                                                    EF2-49,839 l                    Mr. James G. Keppler l                  -Regional Director.
                                                                  ..
L                  .U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137                                                                    i
son gvenue
;
September 2, 1980 i-                                                                    EF2-49,839 l                    Mr. James G. Keppler l                  -Regional Director.
L                  .U.S. Nuclear Regulatory Commission
'
Region III 799 Roosevelt Road
,
Glen Ellyn, Illinois 60137                                                                    i
!
,
,


==Reference:==
==Reference:==
Enrico Fermi Power Plant, Unit 2                        ~
Enrico Fermi Power Plant, Unit 2                        ~
USNRC Licensina Docket: 50-341
USNRC Licensina Docket: 50-341 USNRC IE Bulletin 80-19 (7-31-80)
'
USNRC IE Bulletin 80-19 (7-31-80)
USNRC IE Bulletin 80-19, Rev. 1 (8-15-80)
USNRC IE Bulletin 80-19, Rev. 1 (8-15-80)


==Subject:==
==Subject:==
Detroit Edison Response to NRC IE Bulletin 80-19, Rev. 1
Detroit Edison Response to NRC IE Bulletin 80-19, Rev. 1
.


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
Line 61: Line 43:
                     . corrective action is necessary.
                     . corrective action is necessary.
!                    Should you require additional information from Detroit Edison L                    in this matter, please advise us.
!                    Should you require additional information from Detroit Edison L                    in this matter, please advise us.
!
                                                                       'Very truly yours, l                                                                                  <. MW j.
                                                                       'Very truly yours, l                                                                                  <. MW j.
                                                                                                                      '
L                  ;EH/JDR/Im 1
L                  ;EH/JDR/Im 1
80102novgg                                                    g 1 s 99
80102novgg                                                    g 1 s 99
                -
_                  .    .
                                                      .                .    .-.                    _ _ . . -  _.


  ,,              .--          - ~.          .                        . .-        . - .
  ,,              .--          - ~.          .                        . .-        . - .
                      ...
:,
                                  "
'~*
'~*
c.n*-                                            ,
c.n*-                                            ,
Line 80: Line 54:
Division of Reactor Operations Inspection Office of: Inspection and Enforcenent U.S. Nuclear Regulatory. Commission Washington, D.C. 20555 Director
Division of Reactor Operations Inspection Office of: Inspection and Enforcenent U.S. Nuclear Regulatory. Commission Washington, D.C. 20555 Director
                           - Division of Operating Reactors Office of Nuclear. Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450-North Dixie Highway
                           - Division of Operating Reactors Office of Nuclear. Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450-North Dixie Highway
                           -Newport, Michigan. 48166-
                           -Newport, Michigan. 48166-l
                                                                                          !
                                                                                         'l m
l
e}}
_
                                                                                         'l
                                      .
m e}}

Latest revision as of 10:55, 18 February 2020

Responds to IE Bulletin 80-19,Revision 1, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by C-E. Mercury- Wetted Relays Are Not Used at Facility
ML19336A220
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/02/1980
From: Hines E
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
EF2-49-839, IEB-80-19, NUDOCS 8010220059
Download: ML19336A220 (3)


Text

. . - - .- - .

8

.. c

. Edward Mines gm rf Y .

ASSis!801 V<e Pfe54 dent

. ouai.ty Assurance

~

- 2000 Second A sum memnu a y sw son gvenue September 2, 1980 i- EF2-49,839 l Mr. James G. Keppler l -Regional Director.

L .U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 i

Reference:

Enrico Fermi Power Plant, Unit 2 ~

USNRC Licensina Docket: 50-341 USNRC IE Bulletin 80-19 (7-31-80)

USNRC IE Bulletin 80-19, Rev. 1 (8-15-80)

Subject:

Detroit Edison Response to NRC IE Bulletin 80-19, Rev. 1

Dear Mr. Keppler:

I

-The Project Engineering Organization for Enrico Fermi Power

-Plant,. Unit 2 has reviewed the Reactor Protective Systems for applications of the C. P. Clare Model.HG2X-1011 mercury -

wetted matrix relays as directed in the subject Bulletin.

The review determined that the C. P. Clare Model HG2X-1011 mercury - wetted relays are not used in the logic matrix of L the- Enrico Fermi 2 Reactor Protective Systems; hence, no )

. corrective action is necessary.

! Should you require additional information from Detroit Edison L in this matter, please advise us.

'Very truly yours, l <. MW j.

L ;EH/JDR/Im 1

80102novgg g 1 s 99

,, .-- - ~. . . .- . - .

'~*

c.n*- ,

Mr.' James G. Keppler. . September 2,-1980 J; _ Page 2: .EF2-49,839 cc: . Director-Divisiorior Reactor Construction: Inspection Office of- Inspection and Enforcement -

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Director.

Division of Reactor Operations Inspection Office of: Inspection and Enforcenent U.S. Nuclear Regulatory. Commission Washington, D.C. 20555 Director

- Division of Operating Reactors Office of Nuclear. Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450-North Dixie Highway

-Newport, Michigan. 48166-l

'l m