Responds to IE Bulletin 80-19,Revision 1, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by C-E. Mercury- Wetted Relays Are Not Used at Facility
ML19336A220
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/02/1980
From: Hines E
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
EF2-49-839, IEB-80-19, NUDOCS 8010220059
Download: ML19336A220 (3)


Text

.

rf Y.

gm

.. c

. Edward Mines 8

ASSis!801 V<e Pfe54 dent

. ouai.ty Assurance

~

- 2000 Second A son gvenue sum memnu a y sw September 2, 1980 i-EF2-49,839 l

Mr. James G. Keppler l

-Regional Director.

L

.U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 i

Reference:

Enrico Fermi Power Plant, Unit 2

~

USNRC Licensina Docket: 50-341 USNRC IE Bulletin 80-19 (7-31-80)

USNRC IE Bulletin 80-19, Rev. 1 (8-15-80)

Subject:

Detroit Edison Response to NRC IE Bulletin 80-19, Rev. 1

Dear Mr. Keppler:

I

-The Project Engineering Organization for Enrico Fermi Power

-Plant,. Unit 2 has reviewed the Reactor Protective Systems for applications of the C. P. Clare Model.HG2X-1011 mercury -

wetted matrix relays as directed in the subject Bulletin.

The review determined that the C. P. Clare Model HG2X-1011 mercury - wetted relays are not used in the logic matrix of L

the-Enrico Fermi 2 Reactor Protective Systems; hence, no

)

. corrective action is necessary.

Should you require additional information from Detroit Edison L

in this matter, please advise us.

'Very truly yours, l

<. MW j.

L

EH/JDR/Im 80102novgg g 1 s 99

- ~.

c.n*-

'~*

Mr.' James G. Keppler.

. September 2,-1980 J; _

Page 2:

.EF2-49,839 cc:. Director-Divisiorior Reactor Construction: Inspection Office of-Inspection and Enforcement -

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Director.

Division of Reactor Operations Inspection Office of: Inspection and Enforcenent U.S. Nuclear Regulatory. Commission Washington, D.C.

20555 Director

- Division of Operating Reactors Office of Nuclear. Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450-North Dixie Highway

-Newport, Michigan. 48166-

'l m

e