| issue date = 11/26/2012 | | issue date = 11/26/2012 | ||
| title = SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 58 of 467 Through Attachment 3, Page 122 of 467 | | title = SNCF164-RPT-02, Ver. 1.0, Farley Unit 2 Seismic Walkdown Report, Rer SNC432467 for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment 3, Page 58 of 467 Through Attachment 3, Page 122 of 467 | ||
| author name = Miktus P | | author name = Miktus P | ||
| author affiliation = Southern Nuclear Operating Co, Inc, Southern Co | | author affiliation = Southern Nuclear Operating Co, Inc, Southern Co | ||
| addressee name = | | addressee name = | ||
Line 14: | Line 14: | ||
| document type = Report, Miscellaneous | | document type = Report, Miscellaneous | ||
| page count = 65 | | page count = 65 | ||
| project = | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of Status: UO | {{#Wiki_filter:ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of X*' | ||
ýEquip. Class' 10 Equipment l)escription RHR*PU1Pl BOOM COOLER'2B | Status: Yl*NE- UO Checklist (SWC) | ||
Seismic Walkdown Equipment ID No. Q2EI6HOO3B ýEquip. Class' 10 Equipment l)escription RHR*PU1Pl BOOM COOLER'2B , | |||
Bldg..AUXILIARY Floor El. 83 Room, Area 2129 Manufacturer.Model, Etc. (optional but recommentded). | Location: Bldg..AUXILIARY Floor El. 83 Room, Area 2129 Manufacturer.Model, Etc. (optional but recommentded). | ||
Instructions tor Completing Checklist This checklist may be used to document thteresults of the Seismic Walkdown of an item of equipment oh the SWEL. The spice below each of the following questions may be used to record the results ofjudgmients and findings. | Instructions tor Completing Checklist This checklist may be used to document thteresults of the Seismic Walkdown of an item of equipment oh the SWEL. The spice below each of the following questions may be used to record the results ofjudgmients and findings. Additional space is provided at the end of this checklist-for docutnenting other comments. | ||
Additional space is provided at the end of this checklist-for docutnenting other comments.Anchorage 1, Is the anehomtge configuraiibn verification required (ie., iý the itetii one of the 50% of SWEL items requiring such verification)? | Anchorage 1, Is the anehomtge configuraiibn verification required (ie., iý the itetii one VIJ Ne-l of the 50% of SWEL items requiring such verification)? | ||
: 2. Is the anchorage free of bent, broken, missing or loose hard(vare? | : 2. Is the anchorage free of bent, broken, missing or loose hard(vare? | ||
31 Is the anchorage free of corrosiotn that is more than mild surface oxidation? | YZNE, Uri NIALIJ 31 Is the anchorage free of corrosiotn that is more than mild surface YV Nn U-J N/AEl oxidation? | ||
: 4. Is the ainchotage free of visible cracks it the concrete near, the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note; This question only, applies if the item is one of the 50% for which an anchorage configurattion verification is required.) | : 4. Is the ainchotage free of visible cracks it the concrete near, the anchors? | ||
6, RBased on the above~rimhorage evaluations, is the anchdriage free of potentially advere, seistic conditions? | YF1 NO2 UD NAKQ | ||
: 5. Is the anchorage configuration consistent with plant documentation? | |||
8; Are overhead equipment. | (Note; This question only, applies if the item is one of the 50% for which an anchorage configurattion verification is required.) | ||
distribution systems, ceiling tiles and lighting, and masonry. block walls not likely to collapse onto the equipment? | 6, RBased on the above~rimhorage evaluations, is the anchdriage free of Y /N0 U*C potentially advere, seistic conditions? | ||
: 9. Do attacbed lines have adequate flexibility to avoid | IEnter the ajiir class nane from, Appendix W Classes of Equtpifent, Page 58 of 467 | ||
Evaluated"by: | |||
4/ | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 rF2-Q9 Sheet 2 Ofe 05 Status: Y21I/N-] uEi Seismic Walkdown Checklist (SWC) | ||
Bldg. AUXILIARY Floor El. 100 Room, Area 2185 Manufacturer, Model, Etc. (optional but recommended) | Equipment ID No. Q2E16HQ038 Equip. Class, 10 | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | * Equipment Description RHRPUMPFROOM COOLER2B Interaction Effects | ||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YLI NZ of the 50% of SWEL items requiring such verification)? | : 7. Are soft taTgels free from impact by nearby equipment or structures? Yýý[] UCI N/AD 8; Are overhead equipment. distribution systems, ceiling tiles and lighting, Yo[*] U{] NIAD and masonry. block walls not likely to collapse onto the equipment? | ||
COOLER IS MOUNTED TO CEILING AND IT IS NOT POSSIBLE TO VERIFY WELDS TO EMBEDDED STEEL IN CEILING 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation? | damageI | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | : 9. Do attacbed lines have adequate flexibility to avoid $N0, I,* N/AD | ||
U212563 REV 0 (9-26-03) | : 10. Based on the above seismic interaction evaluations, is equipment free 40, NE U[C] | ||
-UNABLE TO VERIFY 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | of potentially Adverse seismic interaction effects? | ||
Other Adverse Conditions jil Have you looked for and found no other seismic conditions that could YtNil] U[C] | |||
Page 63 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS | adversely affect the safety:functions of the equipiment' Comments (Additional pages-may be added as ne-essary) | ||
YN NEI U- N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NO U-1 N/A-]and masonry block walls not likely to collapse onto the equipment? | Evaluated"by: 4/4AL - Date: . 2-- , | ||
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the, above seismic interaction evaluations, is equipment free ofpotentiallyadverse seismic interaction effects? | " O" ' //4 1712:3 1211 z I/ | ||
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment? | Page 59 of 467 | ||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 60 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 61 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 62 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of/ tilsI4ov Status: YZ NIZ UI-1 Seismic Walkdown Checklist (SWC) | |||
Equipment ID No. Q2E16HOQ4A Equip. Class' 10 Equipment Description CCW PUMPROOM COOLER TRAIN A Location: Bldg. AUXILIARY Floor El. 100 Room, Area 2185 Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | |||
: 1. Is the anchorage configuration verification required (i.e., is the item one YLI NZ of the 50% of SWEL items requiring such verification)? | |||
COOLER IS MOUNTED TO CEILING AND IT IS NOT POSSIBLE TO VERIFY WELDS TO EMBEDDED STEEL IN CEILING | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NI U0 N/AD | |||
: 3. Is the anchorage free of corrosion that is more than mild surface YED ND UF] N/AD oxidation? | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI U[-D N/AD1 | |||
: 5. Is the anchorage configuration consistent with plant documentation? Y[- ND U0 N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
U212563 REV 0 (9-26-03) - UNABLE TO VERIFY | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of YN ND1 UD potentially adverse seismic conditions? | |||
IEnter the equipment class name from Appendix B: Classes of Equipment. | |||
Page 63 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1 0*0 Sheet. 2 of i It/10/fua-Status: YZ N- U-- | |||
Seismic Walkdown Checklist (SWC) | |||
Equipment ID No. Q2E16HOO4A Equip. Class, 10 Equipment Description CCW PUMPROOM COOLER T RAIN A Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? YN NEI U- N/AD | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NO U-1 N/A-] | |||
and masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UFD N/A[D | |||
: 10. Based on the,above seismic interaction evaluations, is equipment free YN NEI U-ofpotentiallyadverse seismic interaction effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could YE N[D] US adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | |||
AREA WALK-BY FOR ROOM 2185 IS IN FOLDER F2-79 (Q2P17HOO1B) | AREA WALK-BY FOR ROOM 2185 IS IN FOLDER F2-79 (Q2P17HOO1B) | ||
Evaluated by: TERRY A MULLENIX I Date: | Evaluated by: TERRY A MULLENIX I Date: Ii l3/~I2.. | ||
Bldg AUXILIARY Flbor El. 100 Room, Area 2 -?&'Z Manufactuirer, Model, Etc. (optional but recommended) | MCLAY i Ter, oA) | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipmeit on the SWE.L. The space beloweach of the foliowing questions may he used to record the results otfjudgments:and findings. | I Page 64 of 467 | ||
Additional space is provided at the end of this checklist for documenting other coumednts, I- Is the anehorage configuration verification required (iýe, is the item one of the'50%:of SWEL items requtiing such verificationt)? | |||
2, Is the anchorage free of bent, broken, missing or loose hardware?3, Is the anchorage free of corrosion ,that is more than mild surface oxidation? | A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 65 of 467 | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant docqumentation?(Note: Thi 's question only applies if the item is one ofthe 50% for which ats anchorage configuration verification is reqiuired.) | |||
6ý Based on the above anchorage evaluations, is the anchorage free of potentially adverse:seismic conditios? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 66 of 467 | ||
Checklist (SWC)Equipment ID No. W2E16HO058. | A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 67 of 467 | ||
Eqdip. Class, 10.Equipment Description AUXFEEWA TER | |||
YEN UI- N/A 8.. Are overhead equipmentt, distribution systems, ceiiing tiles andiighting, ':VI N/A,0'I and masonry block ý,a ij.i t likely to d011apse 6hto the.equipment? | 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 tr%' | ||
:9. Do lines have'adetuate flexibility to avoiddamage? | Page 68 of 467 | ||
NO U-1 NIA 10. Based on the above tismin interaction evaluations,.is equipment free Y[-N4 UE]of potenltially adverse. seismic interaction effects?Other Adverse ,Conditious It. Have you looked for and tbundno other seismic conditions that cmiold Y2-N UF]adversely affect the safty:%functions of the equipment? | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet id f 3 Status: ti*<N LU Seismic Walkdown Checklist (SWC) | |||
'Equipment ID No. Q2E16H05BI Equip, Class' 10 Equipment Description AUX FEEDWA TER PUMPROOM COOLER 2B iLocatibn: Bldg AUXILIARY Flbor El. 100 Room, Area 2 - ?&'Z Manufactuirer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipmeit on the SWE.L. The space beloweach of the foliowing questions may he used to record the results otfjudgments:and findings. Additional space is provided at the end of this checklist for documenting other coumednts, I- Is the anehorage configuration verification required (iýe, is the item one YD N*/ | |||
of the'50%:of SWEL items requtiing such verificationt)? | |||
2, Is the anchorage free of bent, broken, missing or loose hardware? | |||
3, Is the anchorage free of corrosion ,that is more than mild surface YO'ND UD NIAD] | |||
oxidation? | |||
*[]UD N/AD | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? | |||
: 5. Is the anchorage configuration consistent with plant docqumentation? YO ND ULD NIAE!K (Note: Thi 's question only applies if the item is one ofthe 50% for which ats anchorage configuration verification is reqiuired.) | |||
6ý Based on the above anchorage evaluations, is the anchorage free of Y0 NDU potentially adverse:seismic conditios? | |||
1E3mr fficequipmunt class name frota Appendix B;:Classas'oflquipmiits Page 69 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet2 Of3 Status: YfnL U01 Seismic Walkdown. Checklist (SWC) | |||
Equipment ID No. W2E16HO058. Eqdip. Class, 10. | |||
Equipment Description AUXFEEWA TER PUMPROOM COOLER 28 .. .. _ ,:. | |||
nteraction Effects N A | |||
: 7. Are soft targets free from impact by nearby equipment or structures? YEN UI- N/A 8.. Are overhead equipmentt, distribution systems, ceiiing tiles andiighting, ':VI N/A,0'I and masonry block ý,a ij.i t likely to d011apse 6hto the.equipment? | |||
:9. Do at*ched lines have'adetuate flexibility to avoiddamage? NO U-1 NIA | |||
: 10. Based on the above tismin interaction evaluations,.is equipment free Y[-N4 UE] | |||
of potenltially adverse. seismic interaction effects? | |||
Other Adverse,Conditious It. Have you looked for and tbundno other seismic conditions that cmiold Y2-N UF] | |||
adversely affect the safty:%functions of the equipment? | |||
Conmmenits (Addihional pages may be added'as necessary) | Conmmenits (Addihional pages may be added'as necessary) | ||
Evaluated by: SziLJA | Evaluated by: SziLJA | ||
Bjdg. AUXILIARY Floor EL 139 Room, Area. 2 Manufacturer, Model, Efc. (optiotial but recorm~iended) instructions for Completing Checklist Th s checklist may be used to document the results of the Seisimic Walkdown of an item of quipment on the SWEL. The space below each of the following quiestions may be used to record the results ofjudginents and findings, Additional space is provided at the. eddbfthis checklist.fdr documenting other conunents. 1, 1s the anchorage configuration verification required (i.e., is the item one of the 50% of SWEI items requifring such verification)? | ,d/ | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | A L..te | ||
: 4. Is the anchorage free of visible cracksin ihe concretenear the anchors?5. Isthe anchorage configuration consistent withplant documentation?(Note: This question~only applies if the iten is one ofthe50% for which an anchorage configuration veiificationis required.) | /zf ae:~ 9 1 Page 70 of 467 | ||
6, Based onthe above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 i NO. SNCF164-RPT-02, VERSION 1.0 Page 71 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of'q-Status: Y9j'NI-j UF-Seismic Walkdown Checklist (SWC) | |||
: 9. Do have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations,:is equipment free | Equipment ID No. Q2E16H0O7 Eqwip Equipment Description MCC 2A ROOM COOLEF Location: Bjdg. AUXILIARY Floor EL 139 Room, Area. 2 Manufacturer, Model, Efc. (optiotial but recorm~iended) instructions for Completing Checklist Th s checklist may be used to document the results of the Seisimic Walkdown of an item of quipment on the SWEL. The space below each of the following quiestions may be used to record the results ofjudginents and findings, Additional space is provided at the.eddbfthis checklist.fdr documenting other conunents. | ||
Bldg. &LAg.._ Floio El, 121' Room, Ariea ......Manufacturei'r, Model, Etc. (optional but recommended) | Ancho*afe 1, 1s the anchorage configuration verification required (i.e., is the item one YO N' of the 50% of SWEI items requifring such verification)? | ||
Instructioels for Completing Checklist This checklist may be used to document thexresults of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions. | : 2. Is the anchorage free of bent, broken, missing or loose hardware? YED UD N/AD Y gfND UI] N!AD2 | ||
may be used to record the results uf judgments and, findings. | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation?' | ||
Additional space is provided at the end of this checklist for doClrcenting other colfiments, Anehorne 1:. Is the anchorage configuration verification required (i.e:, is the item one of the 50/% of SWEL items.requiring such, verification)? | : 4. Is the anchorage free of visible cracksin ihe concretenear the anchors? Y2 ND UD N/AD | ||
Anchorage configuration was based on SEWS for 02E16H008- | : 5. Isthe anchorage configuration consistent withplant documentation? YO ND UD N`/As/ | ||
: 2. Is the anchorage free of bent. broken, missing or loose hardware?Welded to embedded steel 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | (Note: This question~only applies if the iten is one ofthe50% for which an anchorage configuration veiificationis required.) | ||
Very minpr surface. | 6, Based onthe above anchorage evaluations, is the anchorage free of Yl*/ ND1 UD potentially adverse seismic conditions? | ||
No. | Enter~the equipmem class name from AppendiX B: Classes o'Eqaipnent, Page 72 of 467 | ||
: 6. 'Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 ofl4 status: Y,' N(r- UL Seismic Walkdown Checklist (SWC) | ||
Equipment ID No. Q2E16H07 .. Equip, Class, 10 Equipment.Description MCC 2A ROOM COOLER.. | |||
Interacion Effects | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely tocollapse onto theequipment? | : 7. Are soft targets firee from impact by nearby equipment or structures? T YI40UEn N/AE 81-Are overhead equippment disfibuiion, systems,. ceiling 6ies and lightijg, Y[/\iEj- U0J N/Afl and masonry block walls nor likely to cb]lapi9 onto the equipmeni? | ||
Componentis~ad/ | : 9. Do attached*lines have adequate flexibility to avoid damage? Yf9fNC- UE) NIA% | ||
Evaluated by: P. Miktus9z4 | : 10. Based on the above seismic interaction evaluations,:is equipment free YYl'NLE U0] | ||
Page 77 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 78 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 79 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 | ofpotentially adverse seismic interaction effects? | ||
Other Adverse Conditions i1 . Have:you looked for and found-no otbher seismic c9onditions that could YE], UD adoersgIy aff.cttlie safety functions f the equipmeiit? | |||
Bldg. AUXILIARY Floor EL..00 Room, Area _ .U .Manufacturer,,Model, Etc. (optional but recotmnended) | Coamrtn*ts (Additional pages may be added as necessary) fi" " | ||
Instructions for-Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. | Evaluated by: A1 Date:.. | ||
Additional space is provided at the end of this checklist~for documenting other comments.Anchjorage I, Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items fequiritng such verification)? | ,MKII ( | ||
2, Is the anchoragefree of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?(JIM ~1~ | Page 73 of 467 | ||
T ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION61.0 Page 74 of 467 | |||
Yg /NJE Uo NIAC1 8, Are overhead equipment. , distribution systems, ceiling tiles and lightin, Y UC N/A0 and iriasoiry b6lck walls not likely to collause onto the equipment? | |||
9 aoK | A is ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 75 of 467 | ||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 | |||
,,4 , | |||
Sheet 1of,"11 Status: YN NEI uE] | |||
Seismic Walkdown Checklist (SWC) | |||
Eqoipimentl ID No, Q2E161-1008 Equip. Classk 10 Equipment Description 121'MCC 2BRoom ACU Location: Bldg. &LAg.._ Floio El, 121' Room, Ariea ...... | |||
Manufacturei'r, Model, Etc. (optional but recommended) | |||
Instructioels for Completing Checklist This checklist may be used to document thexresults of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions. may be used to record the results uf judgments and, findings. Additional space is provided at the end of this checklist for doClrcenting other colfiments, Anehorne 1:. Is the anchorage configuration verification required (i.e:, is the item one Y .NEI of the 50/%of SWEL items.requiring such, verification)? | |||
Anchorage configuration was based on SEWS for 02E16H008-Band QEI 16H.007-A dated 07-03-93 and 07-01-93 respectively. | |||
: 2. Is the anchorage free of bent. broken, missing or loose hardware? Y0 NO, U- N/AI Welded to embedded steel | |||
: 3. Is the anchorage free of corrosion that is more than mild surface YED NO UC N/AC oxidation? | |||
Very minpr surface.corrosionand cracked paintobserved. No. | |||
degradationof.weld observed. Conditionhas no adverse seismic impact.. | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y0 NC UC N/AC | |||
: 5. Is the anchorage:configuration consistent with plant documentation? YN NC UC N/AO (Note: This question only applies if the item is'one of tihe 50% for which an anchorage configuration verification is required.) | |||
: 6. 'Based on the above anchorage evaluations, is the anchorage free of YS0 NEI UC potentially adverse seismic conditions? | |||
Enter the eclaipmesnr ctass name from Appeudix B: Ctasses of Equipment, Page 76 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 ofx9 Status- YZ NTU UL Seismic Walkdown Checklist (SWC) | |||
EquiptnentiDNo. Q2E16HOO8 Eq.uip; Class' 10. | |||
Equipiient Descriptioh 121'MCC:2B Rom ACL,. | |||
Interdction Effects | |||
.7. Are soft targets fiee froom inmpactby ne.arhy equipment or structures? YZ NC UC N/ACl | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 'N17 UCl N/AC and masonry block walls not likely tocollapse onto theequipment? | |||
Componentis~ad/acentto a block wall. The wall was seishrically qualifiedas part of the response to NR C 1; E. Bulfetin 80 11, as documented in Report No FTG-C-002, Ro, and on drawing 0-206004, R16. | |||
: 9. Do attached lines.haVe adequateP:flexibility to avoid damage? YN NC UCn N/AC1 10! Based oh the above teismic inter'actiodn evaluations, is equipment free YO NEI CUl of~pdt{enitll) adverse, seismic interaction effects? | |||
Other Adverse Conditions I1. tLHave.you looked for and found no othee lsci-nic conditions that could YN No U0 adversely affect:the safety functions of the equipmen .. | |||
Comments (Additional pages may be added as necessary)' | |||
Evaluated by: P. Miktus9z4 Date: 08-23-12 S''YU(In 03-23-:12:. | |||
Page 77 of 467 | |||
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 78 of 467 | |||
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 79 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 4 10 Status: YI;-f 1\Z] [in Seismic Walkdown. Checklist (SWC) | |||
Equipment ID No. Q2E21FT0943 Equip. Class t 18 Equipment Description HIGH HEADQ SAFETY INJECTtON.tFLOW -RANSMITTER Location: Bldg. AUXILIARY Floor EL..00 Room, Area _ .U. | |||
Manufacturer,,Model, Etc. (optional but recotmnended) | |||
Instructions for-Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist~for documenting other comments. | |||
Anchjorage I, Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items fequiritng such verification)? | |||
2, Is the anchoragefree of bent, broken, missing or loose hardware? Yd( ND U1 N/AD | |||
: 3. Is the anchorage free of corrosion that is more than mild surface YdNE3 UrD N/AD oxidation? | |||
(JIM~ 1~ | |||
: 4. Is the anchorage free of visible cracks.in the concrete near the anchors? Yd ND UD N/A-0 | |||
: 5. Is the anchorage configuration consistent.with plant domumentation? YDI ND UD1TNA (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
tJL 0M6 ARý Qe'o 5 rNae A'j ,4rgyijoQA&E veopleAri r5 P.or | |||
&. Based on thie above anchorage evaluations, is the anchorage free of YtdNDC UD potentially adverse seismic conditions? | |||
Enter the equipment cla.s namie froin Appendix B- Classes of Equipment, Page 80 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 f Status. N4 UL Seismic Walkdown Checklist (SWC) | |||
Equipment ID No. Q2E21FT0943 Equip. Clas' 18 Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Interaction Effects | |||
: 7. Are soft targets free from impact by neaby equipmeat or structures? Yg /NJE Uo NIAC1 8, Are overhead equipment., distribution systems, ceiling tiles and lightin, Y N*E* UC N/A0 and iriasoiry b6lck walls not likely to collause onto the equipment? | |||
9 at aoK 1-5 A'h-e 0aqU rE WCeebir eo d - g U 7T, | |||
'E-,NVAW U N LNOPD (E4KE?T0 FtqN-et)V2, ACF DsQ4 D~-206502, 9: Do attached lines have adequate flexibility to avoid damage? 4 NE U5] N/A[3 | |||
: 10. Based on the aboves*eisific interactibn evaluations is equipment free YjNE] U[3 of potential1yadverse seismicinteiaction effects? | |||
Other Adverse Conditions 1.j,. Ha;,ve you looked for ar'd found no othlerseismic conditions that could Y4 Nin U0 adversely affect the safety functions of the equipment? | |||
Cow ments,(Additional pages maybe added as necessary) | Cow ments,(Additional pages maybe added as necessary) | ||
Evaluated by: Date __ _ | Evaluated by: Date __ _ _ | ||
Bldg. AUXILIARY Floor El. 100 RootnmArea 2 - | Page 81 of 467 | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item. of equipment on the SWtIL, The space below each of the following questions may be used to record the results ofjbidgments and findings. | |||
Additional spaceis provided at the end of this checklist fordoculnentibg other conmients. | A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSIOR Page 82 of 467 | ||
: 1. is the anchorage configuration verification requith (i.e., isthe i'em one YE NEI3, of the 50% of.SWEL items requiring such verification)? | |||
ho. | 3 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 83 of 467 | ||
: 2. Is-the anchorage free of beatbroken, missing or loose hardware?3. Is the anchrnige&free of corrosion that. is morethan mild surface oxidation? | |||
,4. is the anchorage free of visible cracks in,the concrete near the anchors?5. Isthe anichorage configuration consistent with plat,.d6cuientatiod? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet t of Status: Y15 N[* UE] | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | Seismic Walkdown Checklist (SWC) | ||
Equipment ID No. Q2E21LCVOI15B Equtip; CIass' 8 EquipmentiDescription RWSTTO CHARGING PUMP SUCTION VALVE LAocation: Bldg. AUXILIARY Floor El. 100 RootnmArea 2 Z_- _ | |||
Manufacturer, Model, Etc. (optional but recommended) | |||
Page 84 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 3 status: NW | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item.of equipment on the SWtIL, The space below each of the following questions may be used to record the results ofjbidgments and findings. Additional spaceis provided at the end of this checklist fordoculnentibg other conmients. | ||
YI[ NEI Ut] N/AL] | : 1. is the anchorage configuration verification requith (i.e., isthe i'em one YE NEI3, of the 50% of.SWEL items requiring such verification)? | ||
ii- F 4 s | ln*iine' cokr-y*.,rml- ho. ai-lckof-&ý4,* | ||
ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipenfut? | : 2. Is-the anchorage free of beatbroken, missing or loose hardware? YO NO UEJ NIAp | ||
: 9. Do attache dines hiavc adequate flexibility to avoid damage?10. Based on the above seismic interactionrevaluations, is equipnment free ofpotentially ader-se seismic interaction effects?Other Adverse Conditions 11, Have you looked -for and found no other seismic conditions that could adversely affe6t the safety functions of the equipment? | : 3. Is the anchrnige&free of corrosion that. is morethan mild surface YE NEJ UO N/Aal oxidation? | ||
,4. is the anchorage free of visible cracks in,the concrete near the anchors? YE NO Un N/Ap | |||
IEvaluated by: '4~ .\JuV ~ /t_.016 MIU | : 5. Isthe anichorage configuration consistent with plat,.d6cuientatiod? YE NE UE N/A[A (Note: This question only applies ifthe iterm is one of the 50% for which an anchorage cotnfigiration venfication is requited.) | ||
Bldg. AUXILIARY Floor El. 121: Room, Area 22 IQ Manufacturer, Model, Etc. (optional but iýeeommended) | : 6. Based on the above anchorage evaluations, is the anchorage free of YI160E lE potentially adverse seismic conditions? | ||
....Instructions for Completing Checklist This chbeklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the . | Enter the equipment, clas's siaine from Appendix. R- Clastnt of Equipmnent. | ||
Additiohal space is proi'ided at the end of tfiisecheckist for documentffigother comnents.Anorage 1. Is the anchorage configuration verification required (i.e:, is the item one of the 50% of SWEL items requiring such verfi catiort)? | Page 84 of 467 | ||
: 4. is the anchorage free of visible cracks in the concrete near the anchors?5, Is the anchorage configuration consistent witb plant documentation?(Note:This question only applies if the itiem is onel of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on theabove anchorage evaluations, is ie anchorage .free of potentially adverse seismic conditions? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 3 status: Y* NW u*Z Checklist (SWC) | ||
Seismic Walkdown Equipment ID N6. _2E21LCVOI16B , Equip. Class' 8 Equipment Description RWST TO CHARGING PUMP SUCTON VALVE Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? YI[ NEI Ut] N/AL] | |||
rT - _4=" . "it'h*I6cfr LIU ii-F 4 s j=*,,eeeeIv,, "Px~e | |||
yz 4 1EJ uo NIAD 8. Are overhead equipment,,disttibution systems, ceiling tiles and lighting, Y&ND UD1 N/AD and mnasdnry block walls not likely to collapse onto the equipment? | : 8. Are overhead equipment, disltributionsystems. ceiling tiles and lighting, Y NEI t UO NIAL and masonry block walls not likely to collapse onto the equipenfut? | ||
: 9. Doattaclied isnes 1taveadequate flexibilityto avoid.d4nsage?: | : 9. Do attache dines hiavc adequate flexibility to avoid damage? | ||
Y4"ND1 UE N/A[D, 0. Bsd the aipovelsniic interaction evaluatioiis, is equipmernt free YI- N!D3. U0D of potentially aderse seismic interaction effeets?Other Adverse Conditions | t Nt Ut] N/Al | ||
.11. Have you looked for and found no. other seisni.c conditions that. could | : 10. Based on the above seismic interactionrevaluations, is equipnment free Yb6 NL] Ut] | ||
Comments (Additional pages may be added as necessary) 11 Evaluated by:, | ofpotentially ader-se seismic interaction effects? | ||
Bldg. AUXILIARY Floor El. 121 Room, Area __._ _ _ _ | Other Adverse Conditions 11, Have you looked -for and found no other seismic conditions that could NEI Ut3 adversely affe6t the safety functions of the equipment? | ||
Additionalspace is provided at the end of Ihischecklist lbr documenting other comments.. | Comments (Additional pages may be added as necessary) | ||
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | IEvaluated by: '4~. Date: &/11L l | ||
: 2. Is the anchorage, free of bentý broken, missing or loose hardware?31 Is the anchorage free of corrosion that is more than mild surface | \JuV ~ / | ||
t_.016 MIU Page 85 of 467 | |||
: 6. Based on the aboe anchorage cvalUatilopsis the.anchborage free of potentially adverse seismic conditions? | |||
Entfer the equprment cwass Appendtix B: Cla.se, f Equipment. | A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 86 of 467 | ||
8, Are overhead equipment, distribution systems. ceiling ,iles and lghtitng, and masonry block walls not likely to collapse ontothe equipment? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 il/vj Page 87 of 467 | ||
: 9. Do attached linesdhave adequate flexibility to avoid damage?10. Based on the above seismic :interaction evaluations, is equipment free of potentially adverse'sdismic interaction.effects? | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet I of 3 Status: YVN-' Ul Seismic Walkdown Checklist (SWC) | |||
Equipment IDNo. Q2E21LT112 Equip. Class*,i a8 Equipment Description VCT LEVEL TRANSMITTER Location: Bldg. AUXILIARY Floor El. 121: Room, Area 22 IQ Manufacturer, Model, Etc. (optional but iýeeommended) .... | |||
: t. c~sc~ x.~s~c~.Status: | Instructions for Completing Checklist This chbeklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the .followingquestions maybe used'to record the results ofJudgnents and findings. Additiohal space is proi'ided at the end of tfiisecheckist for documentffigother comnents. | ||
Shee Nsofg Seismic Walkdown Checklist (SWC) -V& E&Equipmen't ID No. Q2E21? 0V80ý8 Equip. Class, 8 Equipment Description C7A.R ING PU P TO RCS ISOLATiON | Anorage | ||
: 1. Is the anchorage configuration verification required (i.e:, is the item one YO b of the 50% of SWEL items requiring such verfi catiort)? | |||
Bldg. AUXILIARY Floor E1 121 Room, Area Manufacthir'r, Model. Etc, (optional but recommended) | : 2. Is the anchorage free of bent ,broken, missing or loose hardware? IXVKD1 U0 N/AD | ||
Instructions for Completing Checklist This checklist may be | : 3. Ithe anchorage free of corrosion that is more than mild surface YbIN2urn N/ADI oxidation? | ||
Additional space is provided at the end of this checklist for documenting other comments.Ancorag 1. Isthe anchorage configration Verification required(i.e., is the item one YE NN'of the 50% of.SWEL items requiring such verification)? | : 4. is the anchorage free of visible cracks in the concrete near the anchors? yoND UD] N/AD 5, Is the anchorage configuration consistent witb plant documentation? YD NOl UD] N/A/ | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | (Note:This question only applies if the itiem is onel of the 50% for which an anchorage configuration verification is required.) | ||
Y[3 NE] UE] N/A[3" 3. Isthe anchorage free of corrosion that is more than mild surface YE] NEJ 'Ul NiAk" oXidation? | : 6. Based on theabove anchorage evaluations, is ie anchorage .free of y¥ ý.D. UD potentially adverse seismic conditions? | ||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UE] N/Ag" 5. Is the anchorage | IEnter the equipment class nmune fiom Appendix B: Ciasses of Equipment. | ||
[otfigurationconsistent with plant documentation? | Page 88 of 467 | ||
YE] NE U[] (Note: This questi only applies if the item is one of the 50% for which an anchiorage configuiration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage flee of V.UE potentially adverse seismic conditions? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Status: Shtt Y*N T. of 3 UDq Seismic Walkdown Checklist (SWC) | ||
Enter the: coui ments name from Appendjtx | Equipmeint ID No. Q_2E2it-T1.12 EquipL T Cas 18 Equiprencn Desri~ption VCT LEfVEL TRANSMiTTER... " | ||
. | .nteraction Effects | ||
: 7. Are soft targets free~from impact by niea -by equipment or structures? yz 4 1EJ uo NIAD | |||
: 8. Are overhead equipment,,disttibution systems, ceiling tiles and lighting, Y&ND UD1 N/AD and mnasdnry block walls not likely to collapse onto the equipment? | |||
: 9. Doattaclied isnes 1taveadequate flexibilityto avoid.d4nsage?: Y4"ND1 UE N/A[D, | |||
: 0. Bsd the aipovelsniic interaction evaluatioiis, is equipmernt free YI- N!D3. U0D of potentially aderse seismic interaction effeets? | |||
Other Adverse Conditions | |||
.11. Have you looked for and found no. other seisni.c conditions that. could I1El] UD adverseI, affect the safety fuinctions Of the equipment? | |||
Comments (Additional pages may be added as necessary) 11 Evaluated by:, Date: _________ | |||
wL ' | |||
Page 89 of 467 | |||
A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS is NO. SNCF164-RPT-02, VERSION 1.0 Page 90 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet I ofaiq Status: I"jNO UD] | |||
Seimic Walkdowrt Checklist (SWC) ~E~IV Equipment ID)No, Q2E.!MOV8100 Equip. Class, 8 Equipment DescriPtion RCP SEAL WATER RETURN ISOLATION Location: Bldg. AUXILIARY Floor El. 121 Room, Area __._ _ _ _ _ | |||
Manufacturer, Miodel,. Etc. (optional but recommended) instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of:judgments and findings. Additionalspace is provided at the end of Ihischecklist lbr documenting other comments.. | |||
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YNo of the 50% of SWEL items requiring such verification)? | |||
: 2. Is the anchorage, free of bentý broken, missing or loose hardware? YED NEI UD NI/AP 31 Is the anchorage free of corrosion that is more than mild surface YO NEI UDf N/A[2/ | |||
oxidation? | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NETU[ N/AU/ | |||
: 5. Is the anrchorage configuration consistent with plant documentation? YE_ NO~ UE N/A (Note: This questiotonly applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the aboe anchorage cvalUatilopsis the.anchborage free of YI*NO TUE1 potentially adverse seismic conditions? | |||
4-GQq 2Cr Entfer the equprment cwass namt-ne*n Appendtix B: Cla.se, f Equipment. | |||
Page 91 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet .2 0f;k Status: Y&'NE LiiiE Seismic Walkdown Checklist (SWC) | |||
Equipment f) No, Q2E21MOVSIO0 Equip. Classi 8 . ..... . _ . . | |||
Equipment Description RCP SEAL WA TER RETURN ISOLA TiON Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? 4 YlW 4[] UE] N/AL] | |||
8, Are overhead equipment, distribution systems. ceiling ,iles and lghtitng, YW//N] LCi N'/AFI and masonry block walls not likely to collapse ontothe equipment? | |||
: 9. Do attached linesdhave adequate flexibility to avoid damage? YO/"NE3 U0, N/AL] | |||
: 10. Based on the above seismic :interaction evaluations, is equipment free LONi'D of potentially adverse'sdismic interaction.effects? | |||
Other Adverse Conditions 11l. 1-ave you looked for and found no other seismic conditions thatcould Yf NO UL] | |||
adversely affect the safe-ty functions o the equipment? | |||
Com menits (Aditinonal pages may be added as necessary) rhs&v~VS | |||
~ osu~ (~c :(Do'S Eyaluated by: VI}QON.gc | |||
ý Date: ..... | |||
.I | |||
('ý-/ /ý.3 'ýý) | |||
Page 92 of 467 | |||
A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 93 of 467 | |||
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 94 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Shleeý' i o X~lt (~O~0Xins | |||
: t. c~sc~ x.~Žs~c~.Status: Shee Nsofg Seismic Walkdown Checklist (SWC) -V& E& | |||
Equipmen't ID No. Q2E21? 0V80ý8 Equip. Class, 8 Equipment Description C7A.R ING PU P TO RCS ISOLATiON __ | |||
Location: Bldg. AUXILIARY Floor E1 121 Room, Area Manufacthir'r, Model. Etc, (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be usedto document the results of the.Seismic Walkdown of an item of equiphient on the SVWEL,.The space below each of the following questions may be used to record the results ofjudgments and firidings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Ancorag | |||
: 1. Isthe anchorage configration Verification required(i.e., is the item one YE NN' of the 50% of.SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? Y[3 NE] UE] N/A[3" | |||
: 3. Isthe anchorage free of corrosion that is more than mild surface YE] NEJ 'Ul NiAk" oXidation? | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UE] N/Ag" | |||
: 5. Is the anchorage [otfigurationconsistent with plant documentation? YE] NE U[] NiWA* | |||
(Note: This questi only applies if the item is one of the 50% for which an anchiorage configuiration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage flee of Y*/.Np V.UE potentially adverse seismic conditions? | |||
Enter the: coui ments name from Appendjtx 15C'btsses of Equinrnentn Page 95 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 a-Y NofM. E s:t Status:Y-]:N .U ] | |||
Seismic Walkdown Checklist (SWC) | |||
Equip**ent lD No. Q0E21MOVMI08 Equi Chlass' 8 Equipment Desl)ý d io CHARG!NG PUMP TO RCS ISOL4A,1N . | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? YgfNI] U.1 N/AC. | |||
: 8. Ate overhead equipment, distribution systems, ceiling tiles andtighling, and masom'y block Walls not likely to collapse ofto the equipnient? | : 8. Ate overhead equipment, distribution systems, ceiling tiles andtighling, and masom'y block Walls not likely to collapse ofto the equipnient? | ||
9, Do attached linesihave adequate flexibility to avoid danMsge?1O0 Basedon le abO seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | 9, Do attached linesihave adequate flexibility to avoid danMsge? Y¥[N] U0 N/AO 1O0 Basedon le abO seismic interaction evaluations, is equipment free Y ,NtIUI of potentially adverse seismic interaction effects? | ||
Other Adverse Conditions j 1...ave you looked for andfound no-other seismic conditions that could Yd qNC. UVi adversely affect the sfety functions of the nquipment? | |||
Comments (Additienal pages moy be.added as necmssary) | Comments (Additienal pages moy be.added as necmssary) | ||
Evaluated byv_______D____ate:_______(J C/t5I Page 96 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 | Evaluated byv_______D____ate:_______ | ||
Bldg. AUXILIARY Floor 102 Roo, Area Mafiufacturer, Model, Etc. (optional but reconmmended) | (J C/t5I Page 96 of 467 | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an ein :of equipment onthe SWqEL. The space below each.ofthefollowing questions may be used-torecord the . | |||
Additional space is provided at the endof this checklist fordocumenting bther comments.Anchiorage. | A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION O1.0 Page 97 of 467 | ||
1, hs the anchorage configuration verification required (ice., is the item one YE] NI of the 50% of SWEL items requiring such verification)? | |||
Inii~ co~r ~ ho ctx)(ho.ýCje' | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of /A Status: YfA NO uM Seismic Walkdown Checklist (SWC) | ||
: 2. Is theanchorage free of bent, broken, missing or loose hardware?3, Is the.anchorage free of corrosion that is more than mild surface oxidation? | Equipment ID No. Q2E21MOV8109C Equip, Class, 8 Equipment Description CHARGING PUMPPOO2C MINIFLOW VALVE _ | ||
: 4. Is the anchorage free of visiblecracks in the concretenear tle anchors? | Loc*tion: Bldg. AUXILIARY Floor 102 Roo, Area Mafiufacturer, Model, Etc. (optional but reconmmended) | ||
6, Based on the above anchorage evaluations, is the anchorage free of potentiallyadverse scismic conditions? | Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an ein :of equipment onthe SWqEL. The space below each.ofthefollowing questions may be used-torecord the .resultsofjudgments and findings. Additional space is provided at the endof this checklist fordocumenting bther comments. | ||
Anchiorage. | |||
1, hs the anchorage configuration verification required (ice., is the item one YE] NI of the 50% of SWEL items requiring such verification)? | |||
Inii~ | |||
: 9. Do attached lines. have adequate flexibility to avoid darnage?10. Based on the ab es ei,-4ic interactionevaluations.,is equipment free ofpotentially adverse seismic interaction effects? | co~r ~ ho ctx)(ho.ýCje' | ||
: 2. Is theanchorage free of bent, broken, missing or loose hardware? YE] NE UE] N/Aý4 3, Is the.anchorage free of corrosion that is more than mild surface YE NEI Ut1 NWA oxidation? | |||
: 4. Is the anchorage free of visiblecracks in the concretenear tle anchors? YE] NE UO] .N/lA | |||
:CHG | : 5. Is the anchorage configuration ,onsistent with plant documentation? YE] NE]0 U1 N/A4 (Note: This question:only applies if the itemn is one of the 50% for which an anchorage configuration verification is required.) | ||
....Location, Bldg,. AUXILIARY Floor El. 100 RoomArea,___ | 6, Based on the above anchorage evaluations, is the anchorage free of Yo NE] UO potentiallyadverse scismic conditions? | ||
Manufactuer, Model, Etc. (optional bhit recommenided) | IEnter thieequipment classr ame from Appendix 3: Classes of Equipment. | ||
.... | Page 98 of 467 | ||
This checklist may be used to document.the results of the Seismic WValkdown of an item of equipment on the SWEL. The space below each of the following questions may ba used to repcord the results ofjudgments and findings. | |||
Additional space Is provided at the end of this checklisi for documenting other comments.Anchoraae 1. Is the anchorage configuration verification reqtired (i.e.,is the item one of the 50% of SWEL items requiring such verification)? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 I | ||
2.I s the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free.of conosion that is more than mild surface | Sheet 2 Of 4 Status: Yf:ý NO U0 Seismic Walkdown Checklist (SWC) | ||
Equipment ID No. Q2E2IMOV810.9C2 Equip. Class, 8: | |||
YD ND] UE] N,/Atn 5. Is the anchorage configuration consistent with plant documentation?(Note: This questiononly applies if the item is one of thc.50% for which an anchoragc configuration verification is required.) | Equipnient-Description CHARGING PUMP P002C MINIFLOW VALVE Interaction Effects | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | : 7. Are sofl targets free from impact.by nearby equipment or structures? Yf NEI 11] NiA[l 8- Are overhead eqtiipffient, distribution systems, ceiling tiles and lighting, Y NEI] U0 N/AC" and masory block walls not likely to collapse onto the equipment? | ||
: 9. Do attached lines.have adequate flexibility to avoid darnage? YPNO UEJ N/A[l | |||
.CHG PUMP SUCTION HDR ISOLATION Interaction Effects 7. Are solt targeis ftee f!-om impact by | : 10. Based on the ab es ei,-4ic interactionevaluations.,is equipment free Yo NOj U0C ofpotentially adverse seismic interaction effects? | ||
Y2(N0 UO N/AF-8. Are overhead equipmenijdistribution systems, ceiling riles and lighthig; Y[9'..ND UED N/AD3 and masonry walls not likely to collapse ontd tihe eq1ipment? | Other Adverse Conditions II. Have.you looked foramid found no other seismic conditions.that could YU NO UE adversely affbect the.safbty functions of the equipment? | ||
BLoa .. | Comments (Additional pages may be added as necessary) cx.,I,,.,~A t~ | ||
I:1 Have you looked, for and found no other seismic conditions thai could.adversely affect the safety funetidos of the equipment? | byv U.t, :. | ||
1/2~htAArnfYYl is U O(2LA WUXZ~~ NA (7t1?2LI%\/ Date: | |||
Date:, | -C 1~. | ||
Description CHG PUMP DISCHARGE HDR 13OM TION.Location: | Page 99 of 467 | ||
Bldg-. AUXILIARY Floor El. 1!2 _. .Room, Area Z11.E.Manufacturei, Model, Etc. (optional but recommended). | |||
Instructions for Completing Checklist This checklist'may be used to document the results of the Seismic Walk down of an item of equipment on. the SWEL. The:space b.elow each of the following qiuestions may be used to record the results of judgments and findings. | T ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION fl 77T, Ql Page 100 of 467 | ||
Additional space is provided at the end of this checklist for, documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 5,0 % of'SWELitems zequirrig..suci Vcrification)? | |||
: 2. Is:the anchorage free of bentj broken, missing or loose hardwyare? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 101 of 467 | ||
3, Is the anchoragefreeofcorrosion that is more than:mfildlsurface | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet j0fa Status: Y12f NOl UDE 11011" Seismic Walkdown Checklist (SWC) | |||
near the anchors? YE] NE] UE]N 5. Is the anchorage configuration consistent with'plant documentation?(Note*, This question iinly applies if the item is one of the.50% for which ai anchorage configuration verification is required2) | Equipment ID'No. Q2E21AMOV8130A Equip. Class' 8 Equipment Description :CHG PUMPSUCTIONHDRISOLATION . . . . | ||
: 6. Based on the aboye anchorange evaluations, is the anchorage free of | Location, Bldg,. AUXILIARY Floor El. 100 RoomArea,___ | ||
'codditions? | Manufactuer, Model, Etc. (optional bhit recommenided) __ .... _ _--_ _ | ||
Inst ructions for Completing Checklist: | |||
Page 106 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet a-afi,.JD~ | This checklist may be used to document.the results of the Seismic WValkdown of an item of equipment on the SWEL. The space below each of the following questions may ba used to repcord the results ofjudgments and findings. Additional space Is provided at the end of this checklisi for documenting other comments. | ||
Status: YE NEI UE]Seismic Walkdown Checklist (SWC)Equipment iD No. Q2E21MOV8133A Equip, 8 Equipent .Description CHG PUMP DISCHARGE HDR iSOLATION Interaction Effects 7. Are soft targets free from impact by nearty equipment or structures? | Anchoraae | ||
Yg"NC UC N/AM& Are overhead equipment; dis,4ibuio:nn systems, ceiling tiles and lighting, YE-"No U[2 N!AO and masonry block walls not'likey tib colapse onto the equipment? | : 1. Is the anchorage configuration verification reqtired (i.e.,is the item one YEI Nd of the 50% of SWEL items requiring such verification)? | ||
15 LJCK. WUAL | 2.I s the anchorage free of bent, broken, missing or loose hardware? YD NO'UL3C N/A[9/ | ||
YL~mNC UQ N/AC]10. Basedon the above:seimic interaction evahsations, is eqpipnI entffee YQNU, t/of potentially adverse seismnic interamtidn | : 3. Is the anchorage free.of conosion that is more than mild surface YO ND1 UO N"Ad oxidation? | ||
'ffects?Other Adverse Conditions 11:. Have you looked for and~found no other seismnic conditions that could adversely affect the.shafety. | : 4. Is the anchorage free of visible cracks in the concrete near the'anchors? YD ND] UE] N,/Atn | ||
functions of the equipmeit? | : 5. Is the anchorage configuration consistent with plant documentation? YD NEI UD NhAid (Note: This questiononly applies if the item is one of thc.50% for which an anchoragc configuration verification is required.) | ||
Bldg. AUXILIARY Floor El. 100 Room, Area 2.t-A Manufacturer, Model, Etc. (optional but recommended) | : 6. Based on the above anchorage evaluations, is the anchorage free of YEJ'NM UO potentially adverse seismic conditions? | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on'the SWEL. The space bellow each of the following queitions may be used to record the results'ofjudgments and findings. | Enter the equipmencltass name from Appendix B:,C1asSea of Equipment, Page 102 of 467 | ||
Additional spaceis provided at the end of this checklist for documenting other comments.Anchoraoe I Is the anchorage configuration verification required (iLe., is the item one.of the,50% of SWELL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the:anchorage free of corrosion that is more than mild surface oxidation? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 She.et 2 Ofof Status:., YV1 NE] -V .ý Seismic Walkdown' Checklist (SWC) | ||
: 4. Is the antchorage free of visible cracks in the concrete near the anchors?S. is the ainchorage configuration consistent with plant~documentertfion?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is requii-ed.) | Equipment ID No..Q2E21MOVS730A Equip. Class , __.. _ _ | ||
: 6. Based on the above anchorage evaluations, is theanchorage free of potentially adverse seismic conditions? | Equipment Description. CHG PUMP SUCTION HDR ISOLATION Interaction Effects | ||
: 7. Are solt targeis ftee f!-om impact by nearby equipment or struefures? Y2(N0 UO N/AF- | |||
TO RCS COLD LEG ISOLATION Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | : 8. Are overhead equipmenijdistribution systems, ceiling riles and lighthig; Y[9'..ND UED N/AD3 and masonry bloc*k walls not likely to collapse ontd tihe eq1ipment? | ||
YID;NE UM N/AE | BLoa .. 04 rHE W. 14 .1 &P me4 AWit 9ý Do'altached lines have ade~quate flexibility to avoid damage? Yld INE:1 VD N/AE1 | ||
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above: seismic interaction evaluatiorns, is equipment free of potentially adverse seismic isiteraction effects? | : 10. Based on the"above seismic interaction evaluations, is equipaierit free 4NDEIT of potentially adverse seismic interaction effects? | ||
.11. Have you looked for and found no other seismic conditions that could adversely affect | Other Adverse Conditions. | ||
I:1 Have you looked, for and found no other seismic conditions thai could. YJ NEI UED adversely affect the safety funetidos of the equipment? | |||
Evaluated by:_.Date-.Page 111 of 467 A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS | Comments (Additional pages may be added as neCestsary) | ||
.Equip. Class' 5 Equipment Description CHARGING/HHSI | Date:, | ||
Bldg. AUXILIARY Floor El. 100 Room, Area I2- 1.Manufacturer, Model,.Etc. (optional but recommended) | Page 103 of 467 | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown ofan item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorsi~1. Is the anchorage configuration verification required (i.e., is the item one Y06 NO of the 50%/ of SWEL items requiring such verification)? | SATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free | NO. SNCF164-RPT-02, VERSION 1.0 Page 104 of 467 | ||
: 4. Is the anchorage frie of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
vlýý W P 4 v Q 1EZ( 9,9 07A 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | ATTACHMENT 3:3 SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 105 of 467 | ||
8, Are overhead equipment, distribution systems, ceiling tiles and lighting, and masotuy block walls not likely to collapse onto the equilpment? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 | ||
: 9. Do attached lines haie adequate:fexibility to avoid damage? | :status: StYeettu J' 4u | ||
: 11. Have you looked for and foud no other seis=mi conditions that could Y[ffND UO adversely affect the safety functions of the equipment? | ýNin UF1 Seismic Walkdown Checklist (SWC) | ||
Equipment ID.No. Q2E2IMOV8133A Equip. Class' 8 Equipment: Description CHG PUMP DISCHARGE HDR 13OM TION | |||
.Location: Bldg-. AUXILIARY Floor El. 1!2 _. . Room, Area Z11.E | |||
.Manufacturei, Model, Etc. (optional but recommended). | |||
Instructions for Completing Checklist This checklist'may be used to document the results of the Seismic Walk down of an item of equipment on. the SWEL. The:space b.elow each of the following qiuestions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for, documenting other comments. | |||
Anchorage | |||
: 1. Is the anchorage configuration verification required (i.e., is the item one YO Nd of the 5,0 % of'SWELitems zequirrig..suci Vcrification)? | |||
: 2. Is:the anchorage free of bentj broken, missing or loose hardwyare? YE] NE ] N/-A 3, Is the anchoragefreeofcorrosion that is more than:mfildlsurface YE] NEI liE] N/A2! | |||
oxidation? | |||
: 4. Is the anchorage free of visible cracks in the concrete. near the anchors? YE] NE] UE]N | |||
: 5. Is the anchorage configuration consistent with'plant documentation? YE] NE] unE N/AER/ | |||
(Note*, This question iinly applies if the item is one of the.50% for which ai anchorage configuration verification is required2) | |||
: 6. Based on the aboye anchorange evaluations, is the anchorage free of Y4~ NE] UýE o6tential!, adt'ers.e..seismic 'codditions? | |||
'Enter the equipmentt class nametifioni Appeildix B: Ciasese ofEquipinent. | |||
Page 106 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet a-afi,.JD~ | |||
Status: YE NEI UE] | |||
Seismic Walkdown Checklist (SWC) | |||
Equipment iD No. Q2E21MOV8133A Equip, Cdiss* 8 Equipent .Description CHG PUMP DISCHARGE HDR iSOLATION Interaction Effects | |||
: 7. Are soft targets free from impact by nearty equipment or structures? Yg"NC UC N/AM | |||
& Are overhead equipment; dis,4ibuio:nn systems, ceiling tiles and lighting, YE-"No U[2 N!AO and masonry block walls not'likey tib colapse onto the equipment? | |||
15 LJCK. WUAL QVAL1UjA.TeI.D1TaC o | |||
.9 -Do attached lines have ade~quate flexibility to'av'oldazmageý? YL~mNC UQ N/AC] | |||
: 10. Basedon the above:seimic interaction evahsations, is eqpipnI entffee YQNU, t/ | |||
of potentially adverse seismnic interamtidn 'ffects? | |||
Other Adverse Conditions 11:. Have you looked for and~found no other seismnic conditions that could YT*NC U-adversely affect the.shafety. functions of the equipmeit? | |||
Comments (Additional pages may be added as nemssary) | |||
Palm Da~te: | |||
6.YVAL) | |||
Page 107 of 467 | |||
p ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 9 NO. SNCF164-RPT-02, VERSION 1.0 Page 108 of 467 | |||
0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 | |||
NO. SNCF164-RPT-02, VERSION 1.0 Page 109 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of[ 1[] | |||
Status. YP NDJ Un Seismic Walkdown Checklist (SWC) | |||
Equipmcnt lD No. Q2E21M0V8885 Equip. Class' 8 Equipment Description HHSI TO RCS COLD LEG ISOLA VTON Location: Bldg. AUXILIARY Floor El. 100 Room, Area 2.t-A Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on'the SWEL. The space bellow each of the following queitions may be used to record the results'ofjudgments and findings. Additional spaceis provided at the end of this checklist for documenting other comments. | |||
Anchoraoe I Is the anchorage configuration verification required (iLe., is the item one. YE Nb of the,50% of SWELL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE UE1 N/AM | |||
: 3. Is the:anchorage free of corrosion that is more than mild surface YEVNE' UE N/Ajd oxidation? | |||
: 4. Is the antchorage free of visible cracks in the concrete near the anchors? YE NEI UE N/Ad S. is the ainchorage configuration consistent with plant~documentertfion? YE NO UE N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is requii-ed.) | |||
: 6. Based on the above anchorage evaluations, is theanchorage free of potentially adverse seismic conditions? Y No Uglat, | |||
'Enter the equipnment olss name from Appeuidix B: Clases of EquipM61L Page 110 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 Of3 Status: Yo Nn LUi Seismic'Walkdown Checklist (SWC) | |||
Equipment ID No. Q V8885 Pnu~n (1,~s1 R Equipment Destfiption.HLHS/ TO RCS COLD LEG ISOLATION Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? YID;NE UM N/AE | |||
>t e--rdtel t | |||
'15 GVý~2ez~w E qfv- is, | |||
~ f~5.~**~~ f 1 | |||
j .: 1*C klt>V tC, Cý l~b0 atO(:V51'U jý MT 81 Are overhead equipment, distribution systems, ceiling tiles and lighting, YXZNO V-LJN/A[J and masonry block walls not likely to collapse-onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? YP NEI liE N-/AO | |||
: 10. Based on the above: seismic interaction evaluatiorns, is equipment free Y4NEI Li of potentially adverse seismic isiteraction effects? | |||
Other Adverse Conditions | |||
.11. Have you looked for and found no other seismic conditions that could YICNR UE adversely affect the safety functions of the equipmnent? | |||
Comnmentsf_(Additional pages may be added as necessary) | |||
Evaluated by:_ | |||
.Date-. | |||
Page 111 of 467 | |||
A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 112 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 113 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of ;r Status: YS'NEI Ur Seismic Walkdown Checklist (SWC) | |||
Equipment ID No. 02E21P02B . Equip. Class' 5 Equipment Description CHARGING/HHSI PUMPP002B SWING PUMP Location: Bldg. AUXILIARY Floor El. 100 Room, Area I2- 1. | |||
Manufacturer, Model,.Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown ofan item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorsi~ | |||
: 1. Is the anchorage configuration verification required (i.e., is the item one Y06 NO of the 50%/ of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? YI' NO U" N/AQ | |||
: 3. Is the anchorage free ofcorrosion that is more than mild surface Yf/NO U0 N/AQ' oxidation? | |||
: 4. Is the anchorage frie of visible cracks in the concrete near the anchors? Y[ 1 NO UED N/AO | |||
: 5. Is the anchorage configuration consistent with plant documentation? YR/N' U" N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
vlýý W P 4 v Q 1EZ( 9,9 07A | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of YdA NOI UO potentially adverse seismic conditions? | |||
IEnter the equipment class name from Appendix B: Classes of Equipment Page 114 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 4ý Status; Yg NE] uf Seismic Walkdown Checklist (SWC) | |||
EquipmentlDNo QL2E21P02B Equip. Class55 Equipment Description CHARGtNG.,'HHSt PUMPP002B.SqNG PUMP Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? yul'Ftý vD N/ADl 8, Are overhead equipment, distribution systems, ceiling tiles and lighting, YG/NO Uo N/AO and masotuy block walls not likely to collapse onto the equilpment? | |||
: 9. Do attached lines haie adequate:fexibility to avoid damage? YUNO: UO N/AO | |||
: 10. Based on the above seismic interaction evaluations, is equipmen free Y7 NDUD of potentially adverse sismic inieration effects? | |||
Other Adverse Conditions | |||
: 11. Have you looked for and foud no other seis=mi conditions that could Y[ffND UO adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
C600~i '00)T 6eI- f1,itrrATý l V A) 16F"P , 4 | C600~i '00)T 6eI- f1,itrrATý l V A) q 16F"P , 4 Evaluated by: :1 1 .I . IW ' 'Date: | ||
Page 115 of 467 | |||
Bldg.: YAR6 r, "L .... | |||
Model, Etc. (option:l but recomieended) | 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 116 of 467 | ||
Instructions for Completing Checklist This checklist may be used todocumeni the results of the Seismic Walkdown of an item of equipment on the SWl.,, The space: below eadh of ihe following questi | |||
Additional space is provided.atthe end of this checklist for ddcittntnfningother | A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0 | ||
?. .2.. Isthe anchorage free of bent, broken, missing | (,J Page 117 of 467 | ||
: 4. Is the anchorage ftce of visible cracks in the concretenear the anchors? :U[C N/AD1 ( 5 Is the anchoragecýofigriuri wdnsistert with plant ddoumen tation? | |||
: 6. B3ased on the above anchorage e'ialuations, isthe anchorage:firee of YkNPD 1C0 potentially adverse seismic conditions? | A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 | ||
[Eater trh equiphreanr eties namie fruns Appendis 03: Cla~sses of Eqeipor'ns. | ,Aq Page 118 of 467 | ||
Page 119 of 467 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Seismic Walkdown Checklist (SW.C)Equippment ID No, Q2FI6LT0501 Equip. Class, 18 Equipment Description RWST LEVEL TRANSMITTER.. | |||
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Status: YV Nn CuF Seismic Walkdown Checklist (SWC) | ||
8, Are overhead, equipment, distribution systems, ceiling tiles:and lighting, and masonry block walls not likelylto collapse onto the equtipoient? | Equipment IONo. 02F16LT0501 Equip. Class, 18 Equ.pmn | ||
.. Descriptin RWST LEVEL TRANSMITTER Location. Bldg.: YAR6 r, "L .... | |||
oO~~~ | oanBg orlEl. 155 Room, Area RWST Manufacturer. Model, Etc. (option:l but recomieended) | ||
: 11. Hlave you looked for and foun"d.; nib iher, sismicconditionsi that could NM UM adversely affect the safetyfunctions of the equipment? | Instructions for Completing Checklist This checklist may be used todocumeni the results of the Seismic Walkdown of an item of equipment on the SWl.,, The space: below eadh of ihe following questi fnmtiisbe,: ised to vecOrd the resulss of judgments and findings: Additional space is provided.atthe end of this checklist for ddcittntnfningother comnmients. | ||
Anchorae. | |||
1, Is the anchorage confgurzison verification reuired (i~e,usthe item one YD N,' | |||
of the 50% of SWEL items requiring stwh verification ?. . | |||
2.. Isthe anchorage free of bent, broken, missing oriloose.hard are? Y8 NC*- .U N/AD] | |||
: 3. Is the anchorage free of corrosion that is more than mild surface N U0 N/AD oxidation? | |||
: 4. Is the anchorage ftce of visible cracks in the concretenear the anchors? Y[*-NIE :U[C N/AD1 | |||
( 5 Is the anchoragecýofigriuri wdnsistert with plant ddoumen tation? | |||
(Note: This qsteSriOn otihyapplies it.se item-iis one of rihe: 5017for whi ch an anchorage configuraionverification is required.) | |||
YD NDJ U5D N/A,"j " | |||
: 6. B3ased on the above anchorage e'ialuations, isthe anchorage:firee of YkNPD 1C0 potentially adverse seismic conditions? | |||
[Eater trh equiphreanr eties namie fruns Appendis 03:Cla~sses of Eqeipor'ns. | |||
Page 119 of 467 | |||
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet z ofw Status: N N1 U[] | |||
Seismic Walkdown Checklist (SW.C) | |||
Equippment ID No, Q2FI6LT0501 Equip. Class, 18 Equipment Description RWST LEVEL TRANSMITTER.. | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? hX10Ut0 NIAQ) 8, Are overhead, equipment, distribution systems, ceiling tiles:and lighting, NO*UEJ N/AEJ and masonry block walls not likelylto collapse onto the equtipoient? | |||
9, Doattached lines have adequate flexibility to avoid damage? 5JNO UEJ N/AE 4~~~~~~~. ~r -L oO~~~ ma /~ s~i~-~c& | |||
"10 ¢I " Based on the above seismic interaction evaluations, is equipment free YkTNr UE3 of potentially adverse seismic interaction eifects? | |||
Other Adverse Conditions | |||
: 11. Hlave you looked for and foun"d.; nib iher, sismicconditionsi that could NM UM adversely affect the safetyfunctions of the equipment? | |||
Conntnents (Additional pages may be added as necessary) | Conntnents (Additional pages may be added as necessary) | ||
/jA o,0-Evaluated by: j>tz D a | /jA o,0-Evaluated by: j>tz D a t6.ý&---3-0 1-2-0 Z-,>- | ||
ý'/'o/;-,0/ Z. | |||
Page 120 of 467 | |||
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS is NO. SNCF164-RPT-02, VERSION 1.0 Page 121 of 467 | |||
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 122 of 467}} |
Latest revision as of 08:17, 6 February 2020
ML13004A254 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 11/26/2012 |
From: | Miktus P Southern Nuclear Operating Co, Southern Co |
To: | Office of Nuclear Reactor Regulation |
References | |
NL-12-2267 SNCF164-RPT-02, Ver. 1.0 | |
Download: ML13004A254 (65) | |
Text
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of X*'
Status: Yl*NE- UO Checklist (SWC)
Seismic Walkdown Equipment ID No. Q2EI6HOO3B ýEquip. Class' 10 Equipment l)escription RHR*PU1Pl BOOM COOLER'2B ,
Location: Bldg..AUXILIARY Floor El. 83 Room, Area 2129 Manufacturer.Model, Etc. (optional but recommentded).
Instructions tor Completing Checklist This checklist may be used to document thteresults of the Seismic Walkdown of an item of equipment oh the SWEL. The spice below each of the following questions may be used to record the results ofjudgmients and findings. Additional space is provided at the end of this checklist-for docutnenting other comments.
Anchorage 1, Is the anehomtge configuraiibn verification required (ie., iý the itetii one VIJ Ne-l of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hard(vare?
YZNE, Uri NIALIJ 31 Is the anchorage free of corrosiotn that is more than mild surface YV Nn U-J N/AEl oxidation?
- 4. Is the ainchotage free of visible cracks it the concrete near, the anchors?
YF1 NO2 UD NAKQ
- 5. Is the anchorage configuration consistent with plant documentation?
(Note; This question only, applies if the item is one of the 50% for which an anchorage configurattion verification is required.)
6, RBased on the above~rimhorage evaluations, is the anchdriage free of Y /N0 U*C potentially advere, seistic conditions?
IEnter the ajiir class nane from, Appendix W Classes of Equtpifent, Page 58 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 rF2-Q9 Sheet 2 Ofe 05 Status: Y21I/N-] uEi Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E16HQ038 Equip. Class, 10
- Equipment Description RHRPUMPFROOM COOLER2B Interaction Effects
- 7. Are soft taTgels free from impact by nearby equipment or structures? Yýý[] UCI N/AD 8; Are overhead equipment. distribution systems, ceiling tiles and lighting, Yo[*] U{] NIAD and masonry. block walls not likely to collapse onto the equipment?
damageI
- 9. Do attacbed lines have adequate flexibility to avoid $N0, I,* N/AD
- 10. Based on the above seismic interaction evaluations, is equipment free 40, NE U[C]
of potentially Adverse seismic interaction effects?
Other Adverse Conditions jil Have you looked for and found no other seismic conditions that could YtNil] U[C]
adversely affect the safety:functions of the equipiment' Comments (Additional pages-may be added as ne-essary)
Evaluated"by: 4/4AL - Date: . 2-- ,
" O" ' //4 1712:3 1211 z I/
Page 59 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 60 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 61 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 62 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of/ tilsI4ov Status: YZ NIZ UI-1 Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E16HOQ4A Equip. Class' 10 Equipment Description CCW PUMPROOM COOLER TRAIN A Location: Bldg. AUXILIARY Floor El. 100 Room, Area 2185 Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YLI NZ of the 50% of SWEL items requiring such verification)?
COOLER IS MOUNTED TO CEILING AND IT IS NOT POSSIBLE TO VERIFY WELDS TO EMBEDDED STEEL IN CEILING
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NI U0 N/AD
- 3. Is the anchorage free of corrosion that is more than mild surface YED ND UF] N/AD oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YN NEI U[-D N/AD1
- 5. Is the anchorage configuration consistent with plant documentation? Y[- ND U0 N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
U212563 REV 0 (9-26-03) - UNABLE TO VERIFY
- 6. Based on the above anchorage evaluations, is the anchorage free of YN ND1 UD potentially adverse seismic conditions?
IEnter the equipment class name from Appendix B: Classes of Equipment.
Page 63 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1 0*0 Sheet. 2 of i It/10/fua-Status: YZ N- U--
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E16HOO4A Equip. Class, 10 Equipment Description CCW PUMPROOM COOLER T RAIN A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? YN NEI U- N/AD
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NO U-1 N/A-]
and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UFD N/A[D
- 10. Based on the,above seismic interaction evaluations, is equipment free YN NEI U-ofpotentiallyadverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE N[D] US adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
AREA WALK-BY FOR ROOM 2185 IS IN FOLDER F2-79 (Q2P17HOO1B)
Evaluated by: TERRY A MULLENIX I Date: Ii l3/~I2..
MCLAY i Ter, oA)
I Page 64 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 65 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 66 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 67 of 467
0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 tr%'
Page 68 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet id f 3 Status: ti*<N LU Seismic Walkdown Checklist (SWC)
'Equipment ID No. Q2E16H05BI Equip, Class' 10 Equipment Description AUX FEEDWA TER PUMPROOM COOLER 2B iLocatibn: Bldg AUXILIARY Flbor El. 100 Room, Area 2 - ?&'Z Manufactuirer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipmeit on the SWE.L. The space beloweach of the foliowing questions may he used to record the results otfjudgments:and findings. Additional space is provided at the end of this checklist for documenting other coumednts, I- Is the anehorage configuration verification required (iýe, is the item one YD N*/
of the'50%:of SWEL items requtiing such verificationt)?
2, Is the anchorage free of bent, broken, missing or loose hardware?
3, Is the anchorage free of corrosion ,that is more than mild surface YO'ND UD NIAD]
oxidation?
- []UD N/AD
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
- 5. Is the anchorage configuration consistent with plant docqumentation? YO ND ULD NIAE!K (Note: Thi 's question only applies if the item is one ofthe 50% for which ats anchorage configuration verification is reqiuired.)
6ý Based on the above anchorage evaluations, is the anchorage free of Y0 NDU potentially adverse:seismic conditios?
1E3mr fficequipmunt class name frota Appendix B;:Classas'oflquipmiits Page 69 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet2 Of3 Status: YfnL U01 Seismic Walkdown. Checklist (SWC)
Equipment ID No. W2E16HO058. Eqdip. Class, 10.
Equipment Description AUXFEEWA TER PUMPROOM COOLER 28 .. .. _ ,:.
nteraction Effects N A
- 7. Are soft targets free from impact by nearby equipment or structures? YEN UI- N/A 8.. Are overhead equipmentt, distribution systems, ceiiing tiles andiighting, ':VI N/A,0'I and masonry block ý,a ij.i t likely to d011apse 6hto the.equipment?
- 9. Do at*ched lines have'adetuate flexibility to avoiddamage? NO U-1 NIA
- 10. Based on the above tismin interaction evaluations,.is equipment free Y[-N4 UE]
of potenltially adverse. seismic interaction effects?
Other Adverse,Conditious It. Have you looked for and tbundno other seismic conditions that cmiold Y2-N UF]
adversely affect the safty:%functions of the equipment?
Conmmenits (Addihional pages may be added'as necessary)
Evaluated by: SziLJA
,d/
A L..te
/zf ae:~ 9 1 Page 70 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 i NO. SNCF164-RPT-02, VERSION 1.0 Page 71 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of'q-Status: Y9j'NI-j UF-Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E16H0O7 Eqwip Equipment Description MCC 2A ROOM COOLEF Location: Bjdg. AUXILIARY Floor EL 139 Room, Area. 2 Manufacturer, Model, Efc. (optiotial but recorm~iended) instructions for Completing Checklist Th s checklist may be used to document the results of the Seisimic Walkdown of an item of quipment on the SWEL. The space below each of the following quiestions may be used to record the results ofjudginents and findings, Additional space is provided at the.eddbfthis checklist.fdr documenting other conunents.
Ancho*afe 1, 1s the anchorage configuration verification required (i.e., is the item one YO N' of the 50% of SWEI items requifring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YED UD N/AD Y gfND UI] N!AD2
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?'
- 4. Is the anchorage free of visible cracksin ihe concretenear the anchors? Y2 ND UD N/AD
- 5. Isthe anchorage configuration consistent withplant documentation? YO ND UD N`/As/
(Note: This question~only applies if the iten is one ofthe50% for which an anchorage configuration veiificationis required.)
6, Based onthe above anchorage evaluations, is the anchorage free of Yl*/ ND1 UD potentially adverse seismic conditions?
Enter~the equipmem class name from AppendiX B: Classes o'Eqaipnent, Page 72 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 ofl4 status: Y,' N(r- UL Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E16H07 .. Equip, Class, 10 Equipment.Description MCC 2A ROOM COOLER..
Interacion Effects
- 7. Are soft targets firee from impact by nearby equipment or structures? T YI40UEn N/AE 81-Are overhead equippment disfibuiion, systems,. ceiling 6ies and lightijg, Y[/\iEj- U0J N/Afl and masonry block walls nor likely to cb]lapi9 onto the equipmeni?
- 9. Do attached*lines have adequate flexibility to avoid damage? Yf9fNC- UE) NIA%
- 10. Based on the above seismic interaction evaluations,:is equipment free YYl'NLE U0]
ofpotentially adverse seismic interaction effects?
Other Adverse Conditions i1 . Have:you looked for and found-no otbher seismic c9onditions that could YE], UD adoersgIy aff.cttlie safety functions f the equipmeiit?
Coamrtn*ts (Additional pages may be added as necessary) fi" "
Evaluated by: A1 Date:..
,MKII (
Page 73 of 467
T ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION61.0 Page 74 of 467
A is ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 75 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0
,,4 ,
Sheet 1of,"11 Status: YN NEI uE]
Seismic Walkdown Checklist (SWC)
Eqoipimentl ID No, Q2E161-1008 Equip. Classk 10 Equipment Description 121'MCC 2BRoom ACU Location: Bldg. &LAg.._ Floio El, 121' Room, Ariea ......
Manufacturei'r, Model, Etc. (optional but recommended)
Instructioels for Completing Checklist This checklist may be used to document thexresults of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions. may be used to record the results uf judgments and, findings. Additional space is provided at the end of this checklist for doClrcenting other colfiments, Anehorne 1:. Is the anchorage configuration verification required (i.e:, is the item one Y .NEI of the 50/%of SWEL items.requiring such, verification)?
Anchorage configuration was based on SEWS for 02E16H008-Band QEI 16H.007-A dated 07-03-93 and 07-01-93 respectively.
- 2. Is the anchorage free of bent. broken, missing or loose hardware? Y0 NO, U- N/AI Welded to embedded steel
- 3. Is the anchorage free of corrosion that is more than mild surface YED NO UC N/AC oxidation?
Very minpr surface.corrosionand cracked paintobserved. No.
degradationof.weld observed. Conditionhas no adverse seismic impact..
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y0 NC UC N/AC
- 5. Is the anchorage:configuration consistent with plant documentation? YN NC UC N/AO (Note: This question only applies if the item is'one of tihe 50% for which an anchorage configuration verification is required.)
- 6. 'Based on the above anchorage evaluations, is the anchorage free of YS0 NEI UC potentially adverse seismic conditions?
Enter the eclaipmesnr ctass name from Appeudix B: Ctasses of Equipment, Page 76 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 ofx9 Status- YZ NTU UL Seismic Walkdown Checklist (SWC)
EquiptnentiDNo. Q2E16HOO8 Eq.uip; Class' 10.
Equipiient Descriptioh 121'MCC:2B Rom ACL,.
Interdction Effects
.7. Are soft targets fiee froom inmpactby ne.arhy equipment or structures? YZ NC UC N/ACl
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y0 'N17 UCl N/AC and masonry block walls not likely tocollapse onto theequipment?
Componentis~ad/acentto a block wall. The wall was seishrically qualifiedas part of the response to NR C 1; E. Bulfetin 80 11, as documented in Report No FTG-C-002, Ro, and on drawing 0-206004, R16.
- 9. Do attached lines.haVe adequateP:flexibility to avoid damage? YN NC UCn N/AC1 10! Based oh the above teismic inter'actiodn evaluations, is equipment free YO NEI CUl of~pdt{enitll) adverse, seismic interaction effects?
Other Adverse Conditions I1. tLHave.you looked for and found no othee lsci-nic conditions that could YN No U0 adversely affect:the safety functions of the equipmen ..
Comments (Additional pages may be added as necessary)'
Evaluated by: P. Miktus9z4 Date: 08-23-12 SYU(In 03-23-:12:.
Page 77 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 78 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 79 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 4 10 Status: YI;-f 1\Z] [in Seismic Walkdown. Checklist (SWC)
Equipment ID No. Q2E21FT0943 Equip. Class t 18 Equipment Description HIGH HEADQ SAFETY INJECTtON.tFLOW -RANSMITTER Location: Bldg. AUXILIARY Floor EL..00 Room, Area _ .U.
Manufacturer,,Model, Etc. (optional but recotmnended)
Instructions for-Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist~for documenting other comments.
Anchjorage I, Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items fequiritng such verification)?
2, Is the anchoragefree of bent, broken, missing or loose hardware? Yd( ND U1 N/AD
- 3. Is the anchorage free of corrosion that is more than mild surface YdNE3 UrD N/AD oxidation?
(JIM~ 1~
- 4. Is the anchorage free of visible cracks.in the concrete near the anchors? Yd ND UD N/A-0
- 5. Is the anchorage configuration consistent.with plant domumentation? YDI ND UD1TNA (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
tJL 0M6 ARý Qe'o 5 rNae A'j ,4rgyijoQA&E veopleAri r5 P.or
&. Based on thie above anchorage evaluations, is the anchorage free of YtdNDC UD potentially adverse seismic conditions?
Enter the equipment cla.s namie froin Appendix B- Classes of Equipment, Page 80 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 f Status. N4 UL Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21FT0943 Equip. Clas' 18 Equipment Description HIGH HEAD SAFETY INJECTION FLOW TRANSMITTER Interaction Effects
- 7. Are soft targets free from impact by neaby equipmeat or structures? Yg /NJE Uo NIAC1 8, Are overhead equipment., distribution systems, ceiling tiles and lightin, Y N*E* UC N/A0 and iriasoiry b6lck walls not likely to collause onto the equipment?
9 at aoK 1-5 A'h-e 0aqU rE WCeebir eo d - g U 7T,
'E-,NVAW U N LNOPD (E4KE?T0 FtqN-et)V2, ACF DsQ4 D~-206502, 9: Do attached lines have adequate flexibility to avoid damage? 4 NE U5] N/A[3
- 10. Based on the aboves*eisific interactibn evaluations is equipment free YjNE] U[3 of potential1yadverse seismicinteiaction effects?
Other Adverse Conditions 1.j,. Ha;,ve you looked for ar'd found no othlerseismic conditions that could Y4 Nin U0 adversely affect the safety functions of the equipment?
Cow ments,(Additional pages maybe added as necessary)
Evaluated by: Date __ _ _
Page 81 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSIOR Page 82 of 467
3 0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 83 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet t of Status: Y15 N[* UE]
Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21LCVOI15B Equtip; CIass' 8 EquipmentiDescription RWSTTO CHARGING PUMP SUCTION VALVE LAocation: Bldg. AUXILIARY Floor El. 100 RootnmArea 2 Z_- _
Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item.of equipment on the SWtIL, The space below each of the following questions may be used to record the results ofjbidgments and findings. Additional spaceis provided at the end of this checklist fordoculnentibg other conmients.
- 1. is the anchorage configuration verification requith (i.e., isthe i'em one YE NEI3, of the 50% of.SWEL items requiring such verification)?
ln*iine' cokr-y*.,rml- ho. ai-lckof-&ý4,*
- 2. Is-the anchorage free of beatbroken, missing or loose hardware? YO NO UEJ NIAp
- 3. Is the anchrnige&free of corrosion that. is morethan mild surface YE NEJ UO N/Aal oxidation?
,4. is the anchorage free of visible cracks in,the concrete near the anchors? YE NO Un N/Ap
- 5. Isthe anichorage configuration consistent with plat,.d6cuientatiod? YE NE UE N/A[A (Note: This question only applies ifthe iterm is one of the 50% for which an anchorage cotnfigiration venfication is requited.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YI160E lE potentially adverse seismic conditions?
Enter the equipment, clas's siaine from Appendix. R- Clastnt of Equipmnent.
Page 84 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 3 status: Y* NW u*Z Checklist (SWC)
Seismic Walkdown Equipment ID N6. _2E21LCVOI16B , Equip. Class' 8 Equipment Description RWST TO CHARGING PUMP SUCTON VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? YI[ NEI Ut] N/AL]
rT - _4=" . "it'h*I6cfr LIU ii-F 4 s j=*,,eeeeIv,, "Px~e
- 8. Are overhead equipment, disltributionsystems. ceiling tiles and lighting, Y NEI t UO NIAL and masonry block walls not likely to collapse onto the equipenfut?
- 9. Do attache dines hiavc adequate flexibility to avoid damage?
t Nt Ut] N/Al
- 10. Based on the above seismic interactionrevaluations, is equipnment free Yb6 NL] Ut]
ofpotentially ader-se seismic interaction effects?
Other Adverse Conditions 11, Have you looked -for and found no other seismic conditions that could NEI Ut3 adversely affe6t the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
IEvaluated by: '4~. Date: &/11L l
\JuV ~ /
t_.016 MIU Page 85 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 86 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 il/vj Page 87 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet I of 3 Status: YVN-' Ul Seismic Walkdown Checklist (SWC)
Equipment IDNo. Q2E21LT112 Equip. Class*,i a8 Equipment Description VCT LEVEL TRANSMITTER Location: Bldg. AUXILIARY Floor El. 121: Room, Area 22 IQ Manufacturer, Model, Etc. (optional but iýeeommended) ....
Instructions for Completing Checklist This chbeklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the .followingquestions maybe used'to record the results ofJudgnents and findings. Additiohal space is proi'ided at the end of tfiisecheckist for documentffigother comnents.
Anorage
- 1. Is the anchorage configuration verification required (i.e:, is the item one YO b of the 50% of SWEL items requiring such verfi catiort)?
- 2. Is the anchorage free of bent ,broken, missing or loose hardware? IXVKD1 U0 N/AD
- 3. Ithe anchorage free of corrosion that is more than mild surface YbIN2urn N/ADI oxidation?
- 4. is the anchorage free of visible cracks in the concrete near the anchors? yoND UD] N/AD 5, Is the anchorage configuration consistent witb plant documentation? YD NOl UD] N/A/
(Note:This question only applies if the itiem is onel of the 50% for which an anchorage configuration verification is required.)
- 6. Based on theabove anchorage evaluations, is ie anchorage .free of y¥ ý.D. UD potentially adverse seismic conditions?
IEnter the equipment class nmune fiom Appendix B: Ciasses of Equipment.
Page 88 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Status: Shtt Y*N T. of 3 UDq Seismic Walkdown Checklist (SWC)
Equipmeint ID No. Q_2E2it-T1.12 EquipL T Cas 18 Equiprencn Desri~ption VCT LEfVEL TRANSMiTTER... "
.nteraction Effects
- 7. Are soft targets free~from impact by niea -by equipment or structures? yz 4 1EJ uo NIAD
- 8. Are overhead equipment,,disttibution systems, ceiling tiles and lighting, Y&ND UD1 N/AD and mnasdnry block walls not likely to collapse onto the equipment?
- 9. Doattaclied isnes 1taveadequate flexibilityto avoid.d4nsage?: Y4"ND1 UE N/A[D,
- 0. Bsd the aipovelsniic interaction evaluatioiis, is equipmernt free YI- N!D3. U0D of potentially aderse seismic interaction effeets?
Other Adverse Conditions
.11. Have you looked for and found no. other seisni.c conditions that. could I1El] UD adverseI, affect the safety fuinctions Of the equipment?
Comments (Additional pages may be added as necessary) 11 Evaluated by:, Date: _________
wL '
Page 89 of 467
A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS is NO. SNCF164-RPT-02, VERSION 1.0 Page 90 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet I ofaiq Status: I"jNO UD]
Seimic Walkdowrt Checklist (SWC) ~E~IV Equipment ID)No, Q2E.!MOV8100 Equip. Class, 8 Equipment DescriPtion RCP SEAL WATER RETURN ISOLATION Location: Bldg. AUXILIARY Floor El. 121 Room, Area __._ _ _ _ _
Manufacturer, Miodel,. Etc. (optional but recommended) instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of:judgments and findings. Additionalspace is provided at the end of Ihischecklist lbr documenting other comments..
Anchorage I. Is the anchorage configuration verification required (i.e., is the item one YNo of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage, free of bentý broken, missing or loose hardware? YED NEI UD NI/AP 31 Is the anchorage free of corrosion that is more than mild surface YO NEI UDf N/A[2/
oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YO NETU[ N/AU/
- 5. Is the anrchorage configuration consistent with plant documentation? YE_ NO~ UE N/A (Note: This questiotonly applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the aboe anchorage cvalUatilopsis the.anchborage free of YI*NO TUE1 potentially adverse seismic conditions?
4-GQq 2Cr Entfer the equprment cwass namt-ne*n Appendtix B: Cla.se, f Equipment.
Page 91 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet .2 0f;k Status: Y&'NE LiiiE Seismic Walkdown Checklist (SWC)
Equipment f) No, Q2E21MOVSIO0 Equip. Classi 8 . ..... . _ . .
Equipment Description RCP SEAL WA TER RETURN ISOLA TiON Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? 4 YlW 4[] UE] N/AL]
8, Are overhead equipment, distribution systems. ceiling ,iles and lghtitng, YW//N] LCi N'/AFI and masonry block walls not likely to collapse ontothe equipment?
- 9. Do attached linesdhave adequate flexibility to avoid damage? YO/"NE3 U0, N/AL]
- 10. Based on the above seismic :interaction evaluations, is equipment free LONi'D of potentially adverse'sdismic interaction.effects?
Other Adverse Conditions 11l. 1-ave you looked for and found no other seismic conditions thatcould Yf NO UL]
adversely affect the safe-ty functions o the equipment?
Com menits (Aditinonal pages may be added as necessary) rhs&v~VS
~ osu~ (~c :(Do'S Eyaluated by: VI}QON.gc
ý Date: .....
.I
('ý-/ /ý.3 'ýý)
Page 92 of 467
A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 93 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 94 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Shleeý' i o X~lt (~O~0Xins
- t. c~sc~ x.~Žs~c~.Status: Shee Nsofg Seismic Walkdown Checklist (SWC) -V& E&
Equipmen't ID No. Q2E21? 0V80ý8 Equip. Class, 8 Equipment Description C7A.R ING PU P TO RCS ISOLATiON __
Location: Bldg. AUXILIARY Floor E1 121 Room, Area Manufacthir'r, Model. Etc, (optional but recommended)
Instructions for Completing Checklist This checklist may be usedto document the results of the.Seismic Walkdown of an item of equiphient on the SVWEL,.The space below each of the following questions may be used to record the results ofjudgments and firidings. Additional space is provided at the end of this checklist for documenting other comments.
Ancorag
- 1. Isthe anchorage configration Verification required(i.e., is the item one YE NN' of the 50% of.SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Y[3 NE] UE] N/A[3"
- 3. Isthe anchorage free of corrosion that is more than mild surface YE] NEJ 'Ul NiAk" oXidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YE] NEI UE] N/Ag"
- 5. Is the anchorage [otfigurationconsistent with plant documentation? YE] NE U[] NiWA*
(Note: This questi only applies if the item is one of the 50% for which an anchiorage configuiration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage flee of Y*/.Np V.UE potentially adverse seismic conditions?
Enter the: coui ments name from Appendjtx 15C'btsses of Equinrnentn Page 95 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 a-Y NofM. E s:t Status:Y-]:N .U ]
Seismic Walkdown Checklist (SWC)
Equip**ent lD No. Q0E21MOVMI08 Equi Chlass' 8 Equipment Desl)ý d io CHARG!NG PUMP TO RCS ISOL4A,1N .
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? YgfNI] U.1 N/AC.
- 8. Ate overhead equipment, distribution systems, ceiling tiles andtighling, and masom'y block Walls not likely to collapse ofto the equipnient?
9, Do attached linesihave adequate flexibility to avoid danMsge? Y¥[N] U0 N/AO 1O0 Basedon le abO seismic interaction evaluations, is equipment free Y ,NtIUI of potentially adverse seismic interaction effects?
Other Adverse Conditions j 1...ave you looked for andfound no-other seismic conditions that could Yd qNC. UVi adversely affect the sfety functions of the nquipment?
Comments (Additienal pages moy be.added as necmssary)
Evaluated byv_______D____ate:_______
(J C/t5I Page 96 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION O1.0 Page 97 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of /A Status: YfA NO uM Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E21MOV8109C Equip, Class, 8 Equipment Description CHARGING PUMPPOO2C MINIFLOW VALVE _
Loc*tion: Bldg. AUXILIARY Floor 102 Roo, Area Mafiufacturer, Model, Etc. (optional but reconmmended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an ein :of equipment onthe SWqEL. The space below each.ofthefollowing questions may be used-torecord the .resultsofjudgments and findings. Additional space is provided at the endof this checklist fordocumenting bther comments.
Anchiorage.
1, hs the anchorage configuration verification required (ice., is the item one YE] NI of the 50% of SWEL items requiring such verification)?
Inii~
co~r ~ ho ctx)(ho.ýCje'
- 2. Is theanchorage free of bent, broken, missing or loose hardware? YE] NE UE] N/Aý4 3, Is the.anchorage free of corrosion that is more than mild surface YE NEI Ut1 NWA oxidation?
- 4. Is the anchorage free of visiblecracks in the concretenear tle anchors? YE] NE UO] .N/lA
- 5. Is the anchorage configuration ,onsistent with plant documentation? YE] NE]0 U1 N/A4 (Note: This question:only applies if the itemn is one of the 50% for which an anchorage configuration verification is required.)
6, Based on the above anchorage evaluations, is the anchorage free of Yo NE] UO potentiallyadverse scismic conditions?
IEnter thieequipment classr ame from Appendix 3: Classes of Equipment.
Page 98 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 I
Sheet 2 Of 4 Status: Yf:ý NO U0 Seismic Walkdown Checklist (SWC)
Equipment ID No. Q2E2IMOV810.9C2 Equip. Class, 8:
Equipnient-Description CHARGING PUMP P002C MINIFLOW VALVE Interaction Effects
- 7. Are sofl targets free from impact.by nearby equipment or structures? Yf NEI 11] NiA[l 8- Are overhead eqtiipffient, distribution systems, ceiling tiles and lighting, Y NEI] U0 N/AC" and masory block walls not likely to collapse onto the equipment?
- 9. Do attached lines.have adequate flexibility to avoid darnage? YPNO UEJ N/A[l
- 10. Based on the ab es ei,-4ic interactionevaluations.,is equipment free Yo NOj U0C ofpotentially adverse seismic interaction effects?
Other Adverse Conditions II. Have.you looked foramid found no other seismic conditions.that could YU NO UE adversely affbect the.safbty functions of the equipment?
Comments (Additional pages may be added as necessary) cx.,I,,.,~A t~
byv U.t, :.
1/2~htAArnfYYl is U O(2LA WUXZ~~ NA (7t1?2LI%\/ Date:
-C 1~.
Page 99 of 467
T ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION fl 77T, Ql Page 100 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 101 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet j0fa Status: Y12f NOl UDE 11011" Seismic Walkdown Checklist (SWC)
Equipment ID'No. Q2E21AMOV8130A Equip. Class' 8 Equipment Description :CHG PUMPSUCTIONHDRISOLATION . . . .
Location, Bldg,. AUXILIARY Floor El. 100 RoomArea,___
Manufactuer, Model, Etc. (optional bhit recommenided) __ .... _ _--_ _
Inst ructions for Completing Checklist:
This checklist may be used to document.the results of the Seismic WValkdown of an item of equipment on the SWEL. The space below each of the following questions may ba used to repcord the results ofjudgments and findings. Additional space Is provided at the end of this checklisi for documenting other comments.
Anchoraae
- 1. Is the anchorage configuration verification reqtired (i.e.,is the item one YEI Nd of the 50% of SWEL items requiring such verification)?
2.I s the anchorage free of bent, broken, missing or loose hardware? YD NO'UL3C N/A[9/
- 3. Is the anchorage free.of conosion that is more than mild surface YO ND1 UO N"Ad oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the'anchors? YD ND] UE] N,/Atn
- 5. Is the anchorage configuration consistent with plant documentation? YD NEI UD NhAid (Note: This questiononly applies if the item is one of thc.50% for which an anchoragc configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YEJ'NM UO potentially adverse seismic conditions?
Enter the equipmencltass name from Appendix B:,C1asSea of Equipment, Page 102 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 She.et 2 Ofof Status:., YV1 NE] -V .ý Seismic Walkdown' Checklist (SWC)
Equipment ID No..Q2E21MOVS730A Equip. Class , __.. _ _
Equipment Description. CHG PUMP SUCTION HDR ISOLATION Interaction Effects
- 7. Are solt targeis ftee f!-om impact by nearby equipment or struefures? Y2(N0 UO N/AF-
- 8. Are overhead equipmenijdistribution systems, ceiling riles and lighthig; Y[9'..ND UED N/AD3 and masonry bloc*k walls not likely to collapse ontd tihe eq1ipment?
BLoa .. 04 rHE W. 14 .1 &P me4 AWit 9ý Do'altached lines have ade~quate flexibility to avoid damage? Yld INE:1 VD N/AE1
- 10. Based on the"above seismic interaction evaluations, is equipaierit free 4NDEIT of potentially adverse seismic interaction effects?
Other Adverse Conditions.
I:1 Have you looked, for and found no other seismic conditions thai could. YJ NEI UED adversely affect the safety funetidos of the equipment?
Comments (Additional pages may be added as neCestsary)
Date:,
Page 103 of 467
SATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-02, VERSION 1.0 Page 104 of 467
ATTACHMENT 3:3 SEISMIC WALKDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 105 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0
- status: StYeettu J' 4u
ýNin UF1 Seismic Walkdown Checklist (SWC)
Equipment ID.No. Q2E2IMOV8133A Equip. Class' 8 Equipment: Description CHG PUMP DISCHARGE HDR 13OM TION
.Location: Bldg-. AUXILIARY Floor El. 1!2 _. . Room, Area Z11.E
.Manufacturei, Model, Etc. (optional but recommended).
Instructions for Completing Checklist This checklist'may be used to document the results of the Seismic Walk down of an item of equipment on. the SWEL. The:space b.elow each of the following qiuestions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for, documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one YO Nd of the 5,0 % of'SWELitems zequirrig..suci Vcrification)?
- 2. Is:the anchorage free of bentj broken, missing or loose hardwyare? YE] NE ] N/-A 3, Is the anchoragefreeofcorrosion that is more than:mfildlsurface YE] NEI liE] N/A2!
oxidation?
- 4. Is the anchorage free of visible cracks in the concrete. near the anchors? YE] NE] UE]N
- 5. Is the anchorage configuration consistent with'plant documentation? YE] NE] unE N/AER/
(Note*, This question iinly applies if the item is one of the.50% for which ai anchorage configuration verification is required2)
- 6. Based on the aboye anchorange evaluations, is the anchorage free of Y4~ NE] UýE o6tential!, adt'ers.e..seismic 'codditions?
'Enter the equipmentt class nametifioni Appeildix B: Ciasese ofEquipinent.
Page 106 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet a-afi,.JD~
Status: YE NEI UE]
Seismic Walkdown Checklist (SWC)
Equipment iD No. Q2E21MOV8133A Equip, Cdiss* 8 Equipent .Description CHG PUMP DISCHARGE HDR iSOLATION Interaction Effects
- 7. Are soft targets free from impact by nearty equipment or structures? Yg"NC UC N/AM
& Are overhead equipment; dis,4ibuio:nn systems, ceiling tiles and lighting, YE-"No U[2 N!AO and masonry block walls not'likey tib colapse onto the equipment?
15 LJCK. WUAL QVAL1UjA.TeI.D1TaC o
.9 -Do attached lines have ade~quate flexibility to'av'oldazmageý? YL~mNC UQ N/AC]
- 10. Basedon the above:seimic interaction evahsations, is eqpipnI entffee YQNU, t/
of potentially adverse seismnic interamtidn 'ffects?
Other Adverse Conditions 11:. Have you looked for and~found no other seismnic conditions that could YT*NC U-adversely affect the.shafety. functions of the equipmeit?
Comments (Additional pages may be added as nemssary)
Palm Da~te:
6.YVAL)
Page 107 of 467
p ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 9 NO. SNCF164-RPT-02, VERSION 1.0 Page 108 of 467
0ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0
NO. SNCF164-RPT-02, VERSION 1.0 Page 109 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 1 of[ 1[]
Status. YP NDJ Un Seismic Walkdown Checklist (SWC)
Equipmcnt lD No. Q2E21M0V8885 Equip. Class' 8 Equipment Description HHSI TO RCS COLD LEG ISOLA VTON Location: Bldg. AUXILIARY Floor El. 100 Room, Area 2.t-A Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on'the SWEL. The space bellow each of the following queitions may be used to record the results'ofjudgments and findings. Additional spaceis provided at the end of this checklist for documenting other comments.
Anchoraoe I Is the anchorage configuration verification required (iLe., is the item one. YE Nb of the,50% of SWELL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE UE1 N/AM
- 3. Is the:anchorage free of corrosion that is more than mild surface YEVNE' UE N/Ajd oxidation?
- 4. Is the antchorage free of visible cracks in the concrete near the anchors? YE NEI UE N/Ad S. is the ainchorage configuration consistent with plant~documentertfion? YE NO UE N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is requii-ed.)
- 6. Based on the above anchorage evaluations, is theanchorage free of potentially adverse seismic conditions? Y No Uglat,
'Enter the equipnment olss name from Appeuidix B: Clases of EquipM61L Page 110 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 Of3 Status: Yo Nn LUi Seismic'Walkdown Checklist (SWC)
Equipment ID No. Q V8885 Pnu~n (1,~s1 R Equipment Destfiption.HLHS/ TO RCS COLD LEG ISOLATION Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? YID;NE UM N/AE
>t e--rdtel t
'15 GVý~2ez~w E qfv- is,
~ f~5.~**~~ f 1
j .: 1*C klt>V tC, Cý l~b0 atO(:V51'U jý MT 81 Are overhead equipment, distribution systems, ceiling tiles and lighting, YXZNO V-LJN/A[J and masonry block walls not likely to collapse-onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? YP NEI liE N-/AO
- 10. Based on the above: seismic interaction evaluatiorns, is equipment free Y4NEI Li of potentially adverse seismic isiteraction effects?
Other Adverse Conditions
.11. Have you looked for and found no other seismic conditions that could YICNR UE adversely affect the safety functions of the equipmnent?
Comnmentsf_(Additional pages may be added as necessary)
Evaluated by:_
.Date-.
Page 111 of 467
A 0 ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 112 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 113 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet i of ;r Status: YS'NEI Ur Seismic Walkdown Checklist (SWC)
Equipment ID No. 02E21P02B . Equip. Class' 5 Equipment Description CHARGING/HHSI PUMPP002B SWING PUMP Location: Bldg. AUXILIARY Floor El. 100 Room, Area I2- 1.
Manufacturer, Model,.Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown ofan item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorsi~
- 1. Is the anchorage configuration verification required (i.e., is the item one Y06 NO of the 50%/ of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? YI' NO U" N/AQ
- 3. Is the anchorage free ofcorrosion that is more than mild surface Yf/NO U0 N/AQ' oxidation?
- 4. Is the anchorage frie of visible cracks in the concrete near the anchors? Y[ 1 NO UED N/AO
- 5. Is the anchorage configuration consistent with plant documentation? YR/N' U" N/A0 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
vlýý W P 4 v Q 1EZ( 9,9 07A
- 6. Based on the above anchorage evaluations, is the anchorage free of YdA NOI UO potentially adverse seismic conditions?
IEnter the equipment class name from Appendix B: Classes of Equipment Page 114 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet 2 of 4ý Status; Yg NE] uf Seismic Walkdown Checklist (SWC)
EquipmentlDNo QL2E21P02B Equip. Class55 Equipment Description CHARGtNG.,'HHSt PUMPP002B.SqNG PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? yul'Ftý vD N/ADl 8, Are overhead equipment, distribution systems, ceiling tiles and lighting, YG/NO Uo N/AO and masotuy block walls not likely to collapse onto the equilpment?
- 9. Do attached lines haie adequate:fexibility to avoid damage? YUNO: UO N/AO
- 10. Based on the above seismic interaction evaluations, is equipmen free Y7 NDUD of potentially adverse sismic inieration effects?
Other Adverse Conditions
- 11. Have you looked for and foud no other seis=mi conditions that could Y[ffND UO adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
C600~i '00)T 6eI- f1,itrrATý l V A) q 16F"P , 4 Evaluated by: :1 1 .I . IW ' 'Date:
Page 115 of 467
0 ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Page 116 of 467
A ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0
(,J Page 117 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 NO. SNCF164-RPT-02, VERSION 1.0
,Aq Page 118 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Status: YV Nn CuF Seismic Walkdown Checklist (SWC)
Equipment IONo. 02F16LT0501 Equip. Class, 18 Equ.pmn
.. Descriptin RWST LEVEL TRANSMITTER Location. Bldg.: YAR6 r, "L ....
oanBg orlEl. 155 Room, Area RWST Manufacturer. Model, Etc. (option:l but recomieended)
Instructions for Completing Checklist This checklist may be used todocumeni the results of the Seismic Walkdown of an item of equipment on the SWl.,, The space: below eadh of ihe following questi fnmtiisbe,: ised to vecOrd the resulss of judgments and findings: Additional space is provided.atthe end of this checklist for ddcittntnfningother comnmients.
Anchorae.
1, Is the anchorage confgurzison verification reuired (i~e,usthe item one YD N,'
of the 50% of SWEL items requiring stwh verification ?. .
2.. Isthe anchorage free of bent, broken, missing oriloose.hard are? Y8 NC*- .U N/AD]
- 3. Is the anchorage free of corrosion that is more than mild surface N U0 N/AD oxidation?
- 4. Is the anchorage ftce of visible cracks in the concretenear the anchors? Y[*-NIE :U[C N/AD1
( 5 Is the anchoragecýofigriuri wdnsistert with plant ddoumen tation?
(Note: This qsteSriOn otihyapplies it.se item-iis one of rihe: 5017for whi ch an anchorage configuraionverification is required.)
YD NDJ U5D N/A,"j "
- 6. B3ased on the above anchorage e'ialuations, isthe anchorage:firee of YkNPD 1C0 potentially adverse seismic conditions?
[Eater trh equiphreanr eties namie fruns Appendis 03:Cla~sses of Eqeipor'ns.
Page 119 of 467
ATTACHMENT 3: SEISMIC WALKDOWN CHECKLISTS NO. SNCF164-RPT-02, VERSION 1.0 Sheet z ofw Status: N N1 U[]
Seismic Walkdown Checklist (SW.C)
Equippment ID No, Q2FI6LT0501 Equip. Class, 18 Equipment Description RWST LEVEL TRANSMITTER..
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? hX10Ut0 NIAQ) 8, Are overhead, equipment, distribution systems, ceiling tiles:and lighting, NO*UEJ N/AEJ and masonry block walls not likelylto collapse onto the equtipoient?
9, Doattached lines have adequate flexibility to avoid damage? 5JNO UEJ N/AE 4~~~~~~~. ~r -L oO~~~ ma /~ s~i~-~c&
"10 ¢I " Based on the above seismic interaction evaluations, is equipment free YkTNr UE3 of potentially adverse seismic interaction eifects?
Other Adverse Conditions
- 11. Hlave you looked for and foun"d.; nib iher, sismicconditionsi that could NM UM adversely affect the safetyfunctions of the equipment?
Conntnents (Additional pages may be added as necessary)
/jA o,0-Evaluated by: j>tz D a t6.ý&---3-0 1-2-0 Z-,>-
ý'/'o/;-,0/ Z.
Page 120 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS is NO. SNCF164-RPT-02, VERSION 1.0 Page 121 of 467
A ATTACHMENT 3: SEISMIC WALKIDOWN CHECKLISTS 0 0 NO. SNCF164-RPT-02, VERSION 1.0 Page 122 of 467