| | issue date = 12/21/2015 | | | issue date = 12/21/2015 |
| | title = Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA | | | title = Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA |
| | author name = Wentzel M J | | | author name = Wentzel M |
| | author affiliation = NRC/NRR/DLR/RPB2 | | | author affiliation = NRC/NRR/DLR/RPB2 |
| | addressee name = | | | addressee name = |
Line 14: |
Line 14: |
| | page count = 9 | | | page count = 9 |
| | project = CAC:MD5407, CAC:MD5408 | | | project = CAC:MD5407, CAC:MD5408 |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 21, 2015 Vice President, Operations Entergy Nuclear Operations, Inc. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 21, 2015 Vice President, Operations Entergy Nuclear Operations, Inc. |
| Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 SUBJECT: PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408) Dear Sir or Madam: | | Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 |
|
| |
|
| By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009 and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2). Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation." In accordance with the enclosed audit plan, the NRC staff plans to conduct an onsite audit of the service water integrity and fire water system aging management programs during the week of February 22, 2016. If you have any questions, please contact me by telephone at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov. Sincerely,
| | ==SUBJECT:== |
| /RA/ Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
| | PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408) |
|
| |
|
| Enclosure:
| | ==Dear Sir or Madam:== |
| As stated cc w/encl: Listserv Vice President, Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
| |
|
| |
|
| SUBJECT: PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)
| | By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009 and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2). Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation. |
| Dear Sir or Madam: By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009 and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2). Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation."
| | In accordance with the enclosed audit plan, the NRC staff plans to conduct an onsite audit of the service water integrity and fire water system aging management programs during the week of February 22, 2016. If you have any questions, please contact me by telephone at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov. |
| | Sincerely, |
| | /RA/ |
| | Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 |
|
| |
|
| In accordance with the enclosed audit plan, the NRC staff plans to conduct an onsite audit of the service water integrity and fire water system aging management programs during the week of February 22, 2016. If you have any questions, please contact me by telephone at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov. Sincerely, /RA/ Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 Enclosure: As stated cc w/encl: Listserv
| | ==Enclosure:== |
|
| |
|
| DISTRIBUTION: See next page ADAMS Accession No.: ML15327A213 *concurrence via email OFFICE LA:DLR* PM:RPB2:DLR BC:RARB:DLR BC:RPB1:DLR PM:RPB2:DLR NAME IBetts MWentzel DMorey YDiaz MWentzel DATE 11/24/15 11/24/15 12/16/15 12/18/15 12/21/15 OFFICIAL RECORD COPY Letter to Vice President, Operations, Entergy from M. Wentzel dated December 21, 2015. SUBJECT: PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)
| | As stated cc w/encl: Listserv |
| DISTRIBUTION: HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraAfpb Resource RidsNrrDeEvib Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsNrrPMIndianPoint Resource
| |
| ------------- IBetts YDiaz MWentzel WHolston JGavula DPickett STurk, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OCA MGray, RI GDentel, RI DonaldJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA DTifft, RI NMcNamara, RI BHaagensen, RI GNewman, RI SRich, RI ENCLOSURE Audit Plan Service Water Integrity and Fire Water System Aging Management Program Review for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application February 23-25, 2016
| |
|
| |
|
| Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
| | ML15327A213 *concurrence via email OFFICE LA:DLR* PM:RPB2:DLR BC:RARB:DLR BC:RPB1:DLR PM:RPB2:DLR NAME IBetts MWentzel DMorey YDiaz MWentzel DATE 11/24/15 11/24/15 12/16/15 12/18/15 12/21/15 Letter to Vice President, Operations, Entergy from M. Wentzel dated December 21, 2015. |
| - 2 - Service Water Integrity and Fire Water System Aging Management Program Audit Plan Indian Point Nuclear Generating Unit Nos. 2 and 3 1. Background By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009, and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2).
| | |
| Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system (FWS) components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation." The NRC staff from the Division of License Renewal will lead a supplemental regulatory audit to gain a better understanding of Entergy's responses to requests for additional information (RAIs) related to LR-ISG-2012-02, submitted by letters dated December 16, 2014, and August 18, 2015 (ADAMS Accession Nos. ML14365A069 and ML15236A017, respectively). The audit will cover the aging management programs (AMPs) for managing recurring internal corrosion in the service water integrity (SWI) and FWS, as well as aging effects managed by the Fire Water System Program described in license renewal application (LRA) B.1.14. 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR), Part 54 (10 CFR Part 54), "Requirements for Renewal of Operating Licenses for Nuclear Power Plants." Guidance is provided in NUREG-1800, Rev. 2, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants" (SRP-LR), dated December 2010, NUREG-1801, Rev. 2, "Generic Aging Lessons Learned (GALL) Report," dated December 2010, and LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation," dated November 2013. 3. Regulatory Audit Scope The scope of this audit is to examine Entergy's RAI response, associated materials, and supporting documentation for the SWI and FWS AMPs. Audit team members will focus on reviewing the documents and requested information listed in the Audit Needs section of this plan and discussing the information with Entergy's subject matter experts. 4. Information and Other Material Necessary for the Regulatory Audit As described in the Audit Needs List. 5. Team Assignments Area of Review Assigned Auditor Project Manager Michael Wentzel | | ==SUBJECT:== |
| - 3 - Area of Review Assigned Auditor Technical Reviewer James Gavula Technical Reviewer William Holston Technical Reviewer Brian Allik 6. Logistics The audit will be conducted on location at the IP2 and IP3 site from February 23 to February 25, 2016. Entrance and exit briefings will be held at the beginning and end of the audit, respectively. 7. Special Requests The NRC staff request a suitable facility for the audit team to caucus during the audit. In addition, the NRC staff request Entergy have one or more break-out rooms available for meetings between staff and Entergy personnel. 8. Deliverables The NRC staff will issue an audit report to Entergy, which normally occurs within 90 days from the end of the audit. 9. References a. Periodic Summary Report of NRC Regulatory Commitment Changes at Indian Point 1 and 2, Letter NL-01-088, dated July 3, 2001. b. Reply to Request for Additional Information Regarding License Renewal Application - Operating Experience, Letter NL-08-091, dated June 5, 2008. c. NUREG 1930, "Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, dated November 2009. d. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-14-147, dated December 16, 2014. e. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-15-092, dated August 18, 2015.
| | PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408) |
| - 4 - Service Water Integrity and Fire Water System Aging Management Programs Audit Needs List DATE 1. Documents or Information for Review: a. Plant-specific leak-related operating experience for the FWS and city water system (CWS), and all associated corrective action entries for the past 10 years. This should include all leaks with the exception of packing leaks. b. Inspection reports for the 14 non-destructive evaluation (NDE) inspections for FWS (9 IP1 and 5 IP2). c. Tmin computations and stress reports to determine longitudinal pipe stress in the vicinity of the 14 NDE inspections. d. Copy of preventive maintenance for charcoal replacement and sampling for the IP2, IP3, and Technical Support Center (TSC) charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. e. Drawings of charcoal filter units in relation to location of deluge piping.
| | DISTRIBUTION: |
| : f. Drawings showing the number and location of all wet pipe sprinkler systems subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. g. Procedures used for implementation of the Service Water Integrity Program, as described in LRA B.1.34. h. For the leaks discussed in response to RAI 3.0.3-4, request 4b (NL-15-092): i. Provide associated corrective action documents for all service water system leaks within the past 10 years. In addition to these documents, also include a summary of all corrective action documents associated with the service water system within the past 10 years. ii. Distinguish between those leaks associated with internal lining/coating issues (i.e., gaps in concrete lining, or failed coating) and those leaks not associated with internal coating issues. iii. For any of the in-service inspection (ISI) Class 3 leaks where American Society of Mechanical Engineers (ASME) Code Case 513-3 was used, provide the locations of the augmented sample(s) examined and the engineering evaluations that identified these locations as being the most susceptible. 2. Interview and Discussion Meeting: a. Discuss the adequacy of the number of inspections conducted to date to manage loss of material due to recurring internal corrosion in the fire water and city water systems. | | HARD COPY: |
| It is not clear to the staff that sufficient inspections have been conducted to justify a one-time based exclusion of future inspections (i.e., 9 inspections at Unit 1, 5 at Unit 2, none at Unit 3). b. Discuss: 1) the effect of leakage on nearby safety-related components; 2) acceptance criteria in relation to the pressure boundary function and structural integrity (attached)function of the piping; 3) the lack of specificity related to extent of condition | | DLR RF E-MAIL: |
| - 5 - inspections that would occur if opportunistic inspections or leakage events reveal wall loss sufficient to cause leakage, loss of pressure boundary function; or loss of structural integrity (attached) function; and 4) based on the probable lack of volumetric wall thickness data from original construction, specifically how inspection results were projected to 60 years. c. Describe the configuration of the water distribution piping inside each of the charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. For example, is the water distributed by nozzles, or flow holes? Is the piping above or within the charcoal beds? Will the piping be inspected during charcoal replacement or sampling? What is the periodicity of replacement and sampling? Reference enhancements appearing in Attachment 2, page 10 of 13 of letter NL-15-092. d. Describe the periodicity and method for deluge valve testing for all charcoal filter beds subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. Exception No. 3, Attachment 2, page 57 of 66 of letter NL-14-147 states that, "[t]he deluge valve for the IP2 primary auxiliary building exhaust, containment building purge exhaust and containment building pressure relief charcoal units are tested each refueling outage, which is every two years." e. Describe the number of wet pipe sprinkler systems in each building that are subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. In addition, provide the basis for inspecting one-third of the systems, as described in response to RAI 3.0.3-11 (NL-15-092) instead of one-half as cited by NFPA 25, "Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems,' Section 14.2. f. Reconcile the response to RAI 3.0.3-4, request 4b (NL-15-092), which reported three ISI Class 3 leaks identified in 2013, with the statement in Licensee Event Report (LER) 247/2013-004 that eight pin hole leaks were discovered during an engineering walkdown of the service water system where "seven leaks were on socket welds and one was on an elbow with all located in the ASME Section XI Code boundary." g. In context of the following statement (NL-01-088, Attachment 1), provide details relating to the radiographic inspections of the service water piping welds that are performed as part of the Generic Letter (GL) 89-13 program: The exam is also more sophisticated than a random 10% of welds. For example, the exam for 10 inch piping inside containment is as follows: 20% of welds that have shown moderate scalloping, 5% of the welds that have shown scalloping, 1% of welds that have minor scalloping and 1% of previously accepted or repaired welds. h. Provide details relating to the internal visual inspections performed by the Service Water Integrity program, as described in LRA B.1.34 (i.e., how much piping is inspected and frequency of inspections). Describe the process for using the results from the visual inspections to directing volumetric inspections. i. Identify the approximate number of safety-related weld locations and nonsafety-related weld locations that are subject to aging management review for which aging effects are managed by the Service Water Integrity Program, as described in LRA B.1.34. Response 4c to RAI 3.0.3-4 (NL-15-092) states that 20 to 30 weld locations
| | PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraAfpb Resource RidsNrrDeEvib Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsNrrPMIndianPoint Resource IBetts YDiaz MWentzel WHolston JGavula DPickett STurk, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OCA MGray, RI GDentel, RI DonaldJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA DTifft, RI NMcNamara, RI BHaagensen, RI GNewman, RI SRich, RI |
| - 6 - are inspected each outage; what percentage of the total locations does this number represent? j. The response to RAI AUX-2 (NL-08-091, Attachment I) states that "the Service Water Integrity Program is credited for managing the effects of aging on components as listed in LRA Section 3 Tables regardless of safety classification." LER 286/2011-003 states that the GL 89-13 program will be revised to include nonsafety-related service water lines 1221 and 1222. Provide discussion relating to how these piping segments will be treated differently in the GL 89-13 program as compared to how they were treated in the Service Water Integrity Program. Are these now the only nonsafety-related piping segments included in the GL 89-13 program? k. LER 286/2014-002 states that procedure 3-PT-185B was specifically developed to address problems with leaks developing in stagnant vent and drain connection piping and it is the main line of defense for preventing future leaks. The response to RAI 3.0.3-4 (NL-15-092) states that the flushing and inspections performed under 3-PT-185B have been effective at managing the effects of aging; however, leaks continue to occur in the associated piping. Of the leaks that occurred in the past 10 years, provide information about the leaks that occurred in the piping segments where 3-PT-185B was or should have been used. l. Inspections of the service water intake structure are included as part of GL 89-13. If these inspections are not part of the Service Water Integrity Program, as described in LRA B.1.34, which aging management program do these inspections fall under?
| | |
| Discuss the differences/similarities between the silting issue that is documented in LER 247/2011-003 and the silting levels seen in 2007. Discuss corrective actions from 2007, and whether these should have prevented the 2011 event. | | Audit Plan Service Water Integrity and Fire Water System Aging Management Program Review for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application February 23-25, 2016 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ENCLOSURE |
| }} | | |
| | Service Water Integrity and Fire Water System Aging Management Program Audit Plan Indian Point Nuclear Generating Unit Nos. 2 and 3 |
| | : 1. Background By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009, and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2). |
| | Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system (FWS) components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation. |
| | The NRC staff from the Division of License Renewal will lead a supplemental regulatory audit to gain a better understanding of Entergys responses to requests for additional information (RAIs) related to LR-ISG-2012-02, submitted by letters dated December 16, 2014, and August 18, 2015 (ADAMS Accession Nos. ML14365A069 and ML15236A017, respectively). The audit will cover the aging management programs (AMPs) for managing recurring internal corrosion in the service water integrity (SWI) and FWS, as well as aging effects managed by the Fire Water System Program described in license renewal application (LRA) B.1.14. |
| | : 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR), Part 54 (10 CFR Part 54), Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Guidance is provided in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants (SRP-LR), dated December 2010, NUREG-1801, Rev. 2, Generic Aging Lessons Learned (GALL) Report, dated December 2010, and LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation, dated November 2013. |
| | : 3. Regulatory Audit Scope The scope of this audit is to examine Entergys RAI response, associated materials, and supporting documentation for the SWI and FWS AMPs. Audit team members will focus on reviewing the documents and requested information listed in the Audit Needs section of this plan and discussing the information with Entergys subject matter experts. |
| | : 4. Information and Other Material Necessary for the Regulatory Audit As described in the Audit Needs List. |
| | : 5. Team Assignments Area of Review Assigned Auditor Project Manager Michael Wentzel |
| | |
| | Area of Review Assigned Auditor Technical Reviewer James Gavula Technical Reviewer William Holston Technical Reviewer Brian Allik |
| | : 6. Logistics The audit will be conducted on location at the IP2 and IP3 site from February 23 to February 25, 2016. Entrance and exit briefings will be held at the beginning and end of the audit, respectively. |
| | : 7. Special Requests The NRC staff request a suitable facility for the audit team to caucus during the audit. In addition, the NRC staff request Entergy have one or more break-out rooms available for meetings between staff and Entergy personnel. |
| | : 8. Deliverables The NRC staff will issue an audit report to Entergy, which normally occurs within 90 days from the end of the audit. |
| | : 9. References |
| | : a. Periodic Summary Report of NRC Regulatory Commitment Changes at Indian Point 1 and 2, Letter NL-01-088, dated July 3, 2001. |
| | : b. Reply to Request for Additional Information Regarding License Renewal Application - |
| | Operating Experience, Letter NL-08-091, dated June 5, 2008. |
| | : c. NUREG 1930, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, dated November 2009. |
| | : d. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-14-147, dated December 16, 2014. |
| | : e. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-15-092, dated August 18, 2015. |
| | |
| | Service Water Integrity and Fire Water System Aging Management Programs Audit Needs List DATE |
| | : 1. Documents or Information for Review: |
| | : a. Plant-specific leak-related operating experience for the FWS and city water system (CWS), and all associated corrective action entries for the past 10 years. This should include all leaks with the exception of packing leaks. |
| | : b. Inspection reports for the 14 non-destructive evaluation (NDE) inspections for FWS (9 IP1 and 5 IP2). |
| | : c. Tmin computations and stress reports to determine longitudinal pipe stress in the vicinity of the 14 NDE inspections. |
| | : d. Copy of preventive maintenance for charcoal replacement and sampling for the IP2, IP3, and Technical Support Center (TSC) charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. |
| | : e. Drawings of charcoal filter units in relation to location of deluge piping. |
| | : f. Drawings showing the number and location of all wet pipe sprinkler systems subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. |
| | : g. Procedures used for implementation of the Service Water Integrity Program, as described in LRA B.1.34. |
| | : h. For the leaks discussed in response to RAI 3.0.3-4, request 4b (NL-15-092): |
| | : i. Provide associated corrective action documents for all service water system leaks within the past 10 years. In addition to these documents, also include a summary of all corrective action documents associated with the service water system within the past 10 years. |
| | ii. Distinguish between those leaks associated with internal lining/coating issues (i.e., |
| | gaps in concrete lining, or failed coating) and those leaks not associated with internal coating issues. |
| | iii. For any of the in-service inspection (ISI) Class 3 leaks where American Society of Mechanical Engineers (ASME) Code Case 513-3 was used, provide the locations of the augmented sample(s) examined and the engineering evaluations that identified these locations as being the most susceptible. |
| | : 2. Interview and Discussion Meeting: |
| | : a. Discuss the adequacy of the number of inspections conducted to date to manage loss of material due to recurring internal corrosion in the fire water and city water systems. |
| | It is not clear to the staff that sufficient inspections have been conducted to justify a one-time based exclusion of future inspections (i.e., 9 inspections at Unit 1, 5 at Unit 2, none at Unit 3). |
| | : b. Discuss: 1) the effect of leakage on nearby safety-related components; 2) acceptance criteria in relation to the pressure boundary function and structural integrity (attached) function of the piping; 3) the lack of specificity related to extent of condition |
| | |
| | inspections that would occur if opportunistic inspections or leakage events reveal wall loss sufficient to cause leakage, loss of pressure boundary function; or loss of structural integrity (attached) function; and 4) based on the probable lack of volumetric wall thickness data from original construction, specifically how inspection results were projected to 60 years. |
| | : c. Describe the configuration of the water distribution piping inside each of the charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. For example, is the water distributed by nozzles, or flow holes? Is the piping above or within the charcoal beds? Will the piping be inspected during charcoal replacement or sampling? What is the periodicity of replacement and sampling? Reference enhancements appearing in Attachment 2, page 10 of 13 of letter NL-15-092. |
| | : d. Describe the periodicity and method for deluge valve testing for all charcoal filter beds subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. Exception No. 3, Attachment 2, page 57 of 66 of letter NL-14-147 states that, [t]he deluge valve for the IP2 primary auxiliary building exhaust, containment building purge exhaust and containment building pressure relief charcoal units are tested each refueling outage, which is every two years. |
| | : e. Describe the number of wet pipe sprinkler systems in each building that are subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. In addition, provide the basis for inspecting one-third of the systems, as described in response to RAI 3.0.3-11 (NL 092) instead of one-half as cited by NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, Section 14.2. |
| | : f. Reconcile the response to RAI 3.0.3-4, request 4b (NL-15-092), which reported three ISI Class 3 leaks identified in 2013, with the statement in Licensee Event Report (LER) 247/2013-004 that eight pin hole leaks were discovered during an engineering walkdown of the service water system where seven leaks were on socket welds and one was on an elbow with all located in the ASME Section XI Code boundary. |
| | : g. In context of the following statement (NL-01-088, Attachment 1), provide details relating to the radiographic inspections of the service water piping welds that are performed as part of the Generic Letter (GL) 89-13 program: |
| | The exam is also more sophisticated than a random 10% of welds. For example, the exam for 10 inch piping inside containment is as follows: |
| | 20% of welds that have shown moderate scalloping, 5% of the welds that have shown scalloping, 1% of welds that have minor scalloping and 1% of previously accepted or repaired welds. |
| | : h. Provide details relating to the internal visual inspections performed by the Service Water Integrity program, as described in LRA B.1.34 (i.e., how much piping is inspected and frequency of inspections). Describe the process for using the results from the visual inspections to directing volumetric inspections. |
| | : i. Identify the approximate number of safety-related weld locations and nonsafety-related weld locations that are subject to aging management review for which aging effects are managed by the Service Water Integrity Program, as described in LRA B.1.34. Response 4c to RAI 3.0.3-4 (NL-15-092) states that 20 to 30 weld locations |
| | |
| | are inspected each outage; what percentage of the total locations does this number represent? |
| | : j. The response to RAI AUX-2 (NL-08-091, Attachment I) states that the Service Water Integrity Program is credited for managing the effects of aging on components as listed in LRA Section 3 Tables regardless of safety classification. LER 286/2011-003 states that the GL 89-13 program will be revised to include nonsafety-related service water lines 1221 and 1222. Provide discussion relating to how these piping segments will be treated differently in the GL 89-13 program as compared to how they were treated in the Service Water Integrity Program. Are these now the only nonsafety-related piping segments included in the GL 89-13 program? |
| | : k. LER 286/2014-002 states that procedure 3-PT-185B was specifically developed to address problems with leaks developing in stagnant vent and drain connection piping and it is the main line of defense for preventing future leaks. The response to RAI 3.0.3-4 (NL-15-092) states that the flushing and inspections performed under 3-PT-185B have been effective at managing the effects of aging; however, leaks continue to occur in the associated piping. Of the leaks that occurred in the past 10 years, provide information about the leaks that occurred in the piping segments where 3-PT-185B was or should have been used. |
| | : l. Inspections of the service water intake structure are included as part of GL 89-13. If these inspections are not part of the Service Water Integrity Program, as described in LRA B.1.34, which aging management program do these inspections fall under? |
| | Discuss the differences/similarities between the silting issue that is documented in LER 247/2011-003 and the silting levels seen in 2007. Discuss corrective actions from 2007, and whether these should have prevented the 2011 event.}} |
Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML15327A213, ML16133A459, ML16133A499, ML17101A697, ML17207A165, ML17256A286, ML18212A032, ML18212A185, NL-16-138, Amendment 18 to License Renewal Application, NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components., NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms, NL-17-157, Amendment 19 to License Renewal Application (LRA)
|
MONTHYEARML15344A4362015-12-10010 December 2015 Lr Hearing - (External_Sender) Draft Audit Plan Edits Project stage: Request ML15327A2132015-12-21021 December 2015 Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA Project stage: Other ML15351A2032015-12-30030 December 2015 Summary of Conference Call Held on December 9, 2015, Between the NRC and Entergy Nuclear Operations, Inc. Concerning the Draft Audit Plan for the Service Water Integrity and Fire Water System Aging Management Programs Project stage: Draft Other ML16133A4592016-06-15015 June 2016 Service Water and Fire Water Systems Aging Management Programs Audit Report for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application Project stage: Other ML16133A4992016-06-21021 June 2016 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the Indian Point LRA Safety Review Project stage: Other ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: RAI ML16208A2772016-07-26026 July 2016 Lr Hearing - RAI Set 2016-01 Project stage: Request NL-16-122, Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 (CAC Nos. MD5407 and MD5408)2016-12-0202 December 2016 Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-16-138, Amendment 18 to License Renewal Application2016-12-15015 December 2016 Amendment 18 to License Renewal Application Project stage: Other NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components.2017-01-17017 January 2017 Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components. Project stage: Other NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms2017-02-0808 February 2017 Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms Project stage: Other ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 Project stage: RAI ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 Project stage: RAI ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) Project stage: RAI ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 (CAC Nos. MD5407 and MD5408) Project stage: RAI ML17101A6972017-04-25025 April 2017 License Renewal Clarification Call on Baffle Bolt Rai'S Project stage: Other NL-17-052, Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-012017-05-0808 May 2017 Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-01 Project stage: Response to RAI NL-17-053, Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 (CAC Nos. MD5407 and MD5408)2017-05-18018 May 2017 Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-17-060, Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408)2017-05-19019 May 2017 Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI ML17128A3352017-05-23023 May 2017 Summary of Telephone Conference Call Between the NRC and Entergy Concerning RAIs Pertaining to IP2 and IP3 Project stage: RAI NL-17-061, Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-042017-05-24024 May 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-04 Project stage: Response to RAI NL-17-069, Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 (CAC Nos. MD5407 and MD5408)2017-06-0808 June 2017 Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 (CAC Nos. MD5407 and MD5408) Project stage: Response to RAI NL-17-074, Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA)2017-06-27027 June 2017 Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA) Project stage: Response to RAI ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 Project stage: RAI ML17160A1652017-06-27027 June 2017 Summary of Telephone Conference Call Held on May 31,2017, Between the NRC and Entergy Nuclear Operations Inc. Concerning Requests for Additional Information Pertaining to the Indian Point, License Renewal Application (TAC Nos. MD5407/MD5408 Project stage: RAI NL-17-084, Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-062017-07-27027 July 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-06 Project stage: Response to RAI NL-17-092, Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-052017-07-27027 July 2017 Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-05 Project stage: Response to RAI ML17207A1652017-09-0101 September 2017 License Renewal Audit Plan Regarding the Service Water Integrity Program Project stage: Other ML17250A2442017-09-20020 September 2017 Audit Report for IP Swi - Aug 2017 Project stage: Acceptance Review ML17191A4562017-09-20020 September 2017 06/08/2017 Telecon Summary Related to Indian Point License Renewal RAIs Associated with ISG-2016-01 Project stage: RAI ML17180A5032017-09-21021 September 2017 04/19/2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application Project stage: RAI ML17256A2862017-09-25025 September 2017 Summary of Telephone Call on 09/06/17, Between NRC and Entergy Concerning Next Steps from the Site Audit on 08/1-3/17 Project stage: Other NL-17-127, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)2017-11-0808 November 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408) Project stage: Supplement NL-17-155, Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-12-14014 December 2017 Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-17-157, Amendment 19 to License Renewal Application (LRA)2017-12-14014 December 2017 Amendment 19 to License Renewal Application (LRA) Project stage: Other NL-17-161, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)2017-12-21021 December 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408) Project stage: Supplement NL-18-010, Supplemental Information Regarding the Review of the License Renewal Application2018-02-26026 February 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18107A7592018-04-30030 April 2018 NUREG-1437, Suppl. 38, Vol. 5, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 38 Regarding Indian Port Nuclear Generating Unit Nos. 2 and 3 Final. Project stage: Acceptance Review NL-18-030, Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA)2018-05-0808 May 2018 Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA) Project stage: Supplement NL-18-044, Supplemental Information Regarding the Review of the License Renewal Application2018-06-25025 June 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18200A3332018-08-0101 August 2018 NUREG-1930, Supp 3, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18211A4842018-08-0707 August 2018 to NUREG-1930, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18211A5842018-09-17017 September 2018 Issuance of Renewed Facility Operating License Nos. DPR 26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408) Project stage: Request ML18212A1882018-09-17017 September 2018 Renewed License Appendix C Project stage: Acceptance Review ML18212A1852018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix B Project stage: Other ML18212A1812018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix a Project stage: Acceptance Review ML18212A0322018-09-17017 September 2018 Records of Decision for the Indian Point Renewed Licenses Project stage: Other ML18211A5962018-09-17017 September 2018 Transmittal Letter - Issuance of Renewed Facility Operating License Nos. DPR-26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408) Project stage: Approval ML18211A5782018-09-17017 September 2018 Federal Register Notice - Announcing the Issuance of the Indian Point Renewed Licenses Project stage: Approval ML18213A1142018-09-17017 September 2018 Renewed Facility Operating License Project stage: Other 2017-04-25
[Table View] |
|
---|
Category:Audit Plan
MONTHYEARML21231A1822021-08-26026 August 2021 Unit, No. 3 - Audit Plan in Support of Review of License Amendment Request Regarding the Installation and Use of a New Auxiliary Lifting Device ML17207A1652017-09-0101 September 2017 License Renewal Audit Plan Regarding the Service Water Integrity Program ML17187A1952017-07-0606 July 2017 Regulatory Audit Plan for July 10-11, 2017, Audit in Support of License Amendment Request to Extend Milestone 8 Implementation Date ML17177A4462017-07-0606 July 2017 Audit Plan for Licensee Responses Concerning Seismic Hazard Reevaluations Related to Request for Information -(50.54(F) Letter) Regarding Recommendation 2.1 of the Near-Term Task Force ML16259A1892016-12-0505 December 2016 Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML15327A2132015-12-21021 December 2015 Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA ML15301A0932015-10-30030 October 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15124A3402015-05-0606 May 2015 Nuclear Regulatory Commission Plan for the Audit of Entergy Nucleaer Operations, Inc'S. Flooding Hazard Reevaluation Report Submittal Relating to the Fukushima Near-Term Task Force Recommendation 2.1 - Flooding for Indian Point Nuclear Gene ML14356A0032015-02-10010 February 2015 Audit of Licensee Responses to the Expedited Seismic Evaluation Process to Support Implementation of Near-Term Task Force Recommendation 2.1, Seismic ML14121A4312014-05-0505 May 2014 Regulatory Audit Plan for May 27 - 30, 2014, Audit at the Indian Point Facility to Support Review of Near Term Task Force Recommendation 2.1: Flooding Hazard Reevaluation Report (TAC MF3313 & MF3314) ML14083A6202014-03-26026 March 2014 Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051 2021-08-26
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 21, 2015 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)
Dear Sir or Madam:
By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009 and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2). Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.
In accordance with the enclosed audit plan, the NRC staff plans to conduct an onsite audit of the service water integrity and fire water system aging management programs during the week of February 22, 2016. If you have any questions, please contact me by telephone at 301-415-6459, or by e-mail at michael.wentzel@nrc.gov.
Sincerely,
/RA/
Michael J. Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc w/encl: Listserv
ML15327A213 *concurrence via email OFFICE LA:DLR* PM:RPB2:DLR BC:RARB:DLR BC:RPB1:DLR PM:RPB2:DLR NAME IBetts MWentzel DMorey YDiaz MWentzel DATE 11/24/15 11/24/15 12/16/15 12/18/15 12/21/15 Letter to Vice President, Operations, Entergy from M. Wentzel dated December 21, 2015.
SUBJECT:
PLAN FOR THE REGULATORY AUDIT OF THE SERVICE WATER INTEGRITY AND FIRE WATER SYSTEM AGING MANAGEMENT PROGRAMS PERTAINING TO THE INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 LICENSE RENEWAL APPLICATION (CAC NOS. MD5407 AND MD5408)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRsrg Resource RidsNrrDraAfpb Resource RidsNrrDeEvib Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource RidsNrrPMIndianPoint Resource IBetts YDiaz MWentzel WHolston JGavula DPickett STurk, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OCA MGray, RI GDentel, RI DonaldJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA DTifft, RI NMcNamara, RI BHaagensen, RI GNewman, RI SRich, RI
Audit Plan Service Water Integrity and Fire Water System Aging Management Program Review for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application February 23-25, 2016 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ENCLOSURE
Service Water Integrity and Fire Water System Aging Management Program Audit Plan Indian Point Nuclear Generating Unit Nos. 2 and 3
- 1. Background By letter dated April 23, 2007, as supplemented by letters dated May 3, 2007, and June 21, 2007, Entergy Nuclear Operations, Inc. (Entergy), submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 the U.S. Nuclear Regulatory Commission (NRC) for renewal of the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3). The NRC staff documented its findings in the Safety Evaluation Report (SER) related to the license renewal of IP2 and IP3, which was issued August 11, 2009, and supplemented August 30, 2011 (SER Supplement 1), and November 6, 2014 (SER Supplement 2).
Subsequent the issuance of SER Supplement 1, the NRC staff identified additional operating experience at several nuclear power plants regarding recurring internal corrosion, corrosion occurring under insulation, and managing aging effects for fire water system (FWS) components. To address this operating experience, on November 22, 2013, the NRC staff issued interim staff guidance document LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.
The NRC staff from the Division of License Renewal will lead a supplemental regulatory audit to gain a better understanding of Entergys responses to requests for additional information (RAIs) related to LR-ISG-2012-02, submitted by letters dated December 16, 2014, and August 18, 2015 (ADAMS Accession Nos. ML14365A069 and ML15236A017, respectively). The audit will cover the aging management programs (AMPs) for managing recurring internal corrosion in the service water integrity (SWI) and FWS, as well as aging effects managed by the Fire Water System Program described in license renewal application (LRA) B.1.14.
- 2. Regulatory Audit Bases License renewal requirements are specified in Title 10 of the Code of Federal Regulations (CFR), Part 54 (10 CFR Part 54), Requirements for Renewal of Operating Licenses for Nuclear Power Plants. Guidance is provided in NUREG-1800, Rev. 2, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants (SRP-LR), dated December 2010, NUREG-1801, Rev. 2, Generic Aging Lessons Learned (GALL) Report, dated December 2010, and LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation, dated November 2013.
- 3. Regulatory Audit Scope The scope of this audit is to examine Entergys RAI response, associated materials, and supporting documentation for the SWI and FWS AMPs. Audit team members will focus on reviewing the documents and requested information listed in the Audit Needs section of this plan and discussing the information with Entergys subject matter experts.
- 4. Information and Other Material Necessary for the Regulatory Audit As described in the Audit Needs List.
- 5. Team Assignments Area of Review Assigned Auditor Project Manager Michael Wentzel
Area of Review Assigned Auditor Technical Reviewer James Gavula Technical Reviewer William Holston Technical Reviewer Brian Allik
- 6. Logistics The audit will be conducted on location at the IP2 and IP3 site from February 23 to February 25, 2016. Entrance and exit briefings will be held at the beginning and end of the audit, respectively.
- 7. Special Requests The NRC staff request a suitable facility for the audit team to caucus during the audit. In addition, the NRC staff request Entergy have one or more break-out rooms available for meetings between staff and Entergy personnel.
- 8. Deliverables The NRC staff will issue an audit report to Entergy, which normally occurs within 90 days from the end of the audit.
- 9. References
- a. Periodic Summary Report of NRC Regulatory Commitment Changes at Indian Point 1 and 2, Letter NL-01-088, dated July 3, 2001.
- b. Reply to Request for Additional Information Regarding License Renewal Application -
Operating Experience, Letter NL-08-091, dated June 5, 2008.
- c. NUREG 1930, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3, dated November 2009.
- d. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-14-147, dated December 16, 2014.
- e. Reply to Request for Additional Information Regarding the License Renewal Application, Indian Point Nuclear Generating Unit Nos. 2 & 3, Letter NL-15-092, dated August 18, 2015.
Service Water Integrity and Fire Water System Aging Management Programs Audit Needs List DATE
- 1. Documents or Information for Review:
- a. Plant-specific leak-related operating experience for the FWS and city water system (CWS), and all associated corrective action entries for the past 10 years. This should include all leaks with the exception of packing leaks.
- b. Inspection reports for the 14 non-destructive evaluation (NDE) inspections for FWS (9 IP1 and 5 IP2).
- c. Tmin computations and stress reports to determine longitudinal pipe stress in the vicinity of the 14 NDE inspections.
- d. Copy of preventive maintenance for charcoal replacement and sampling for the IP2, IP3, and Technical Support Center (TSC) charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14.
- e. Drawings of charcoal filter units in relation to location of deluge piping.
- f. Drawings showing the number and location of all wet pipe sprinkler systems subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14.
- g. Procedures used for implementation of the Service Water Integrity Program, as described in LRA B.1.34.
- h. For the leaks discussed in response to RAI 3.0.3-4, request 4b (NL-15-092):
- i. Provide associated corrective action documents for all service water system leaks within the past 10 years. In addition to these documents, also include a summary of all corrective action documents associated with the service water system within the past 10 years.
ii. Distinguish between those leaks associated with internal lining/coating issues (i.e.,
gaps in concrete lining, or failed coating) and those leaks not associated with internal coating issues.
iii. For any of the in-service inspection (ISI) Class 3 leaks where American Society of Mechanical Engineers (ASME) Code Case 513-3 was used, provide the locations of the augmented sample(s) examined and the engineering evaluations that identified these locations as being the most susceptible.
- 2. Interview and Discussion Meeting:
- a. Discuss the adequacy of the number of inspections conducted to date to manage loss of material due to recurring internal corrosion in the fire water and city water systems.
It is not clear to the staff that sufficient inspections have been conducted to justify a one-time based exclusion of future inspections (i.e., 9 inspections at Unit 1, 5 at Unit 2, none at Unit 3).
- b. Discuss: 1) the effect of leakage on nearby safety-related components; 2) acceptance criteria in relation to the pressure boundary function and structural integrity (attached) function of the piping; 3) the lack of specificity related to extent of condition
inspections that would occur if opportunistic inspections or leakage events reveal wall loss sufficient to cause leakage, loss of pressure boundary function; or loss of structural integrity (attached) function; and 4) based on the probable lack of volumetric wall thickness data from original construction, specifically how inspection results were projected to 60 years.
- c. Describe the configuration of the water distribution piping inside each of the charcoal filter units subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. For example, is the water distributed by nozzles, or flow holes? Is the piping above or within the charcoal beds? Will the piping be inspected during charcoal replacement or sampling? What is the periodicity of replacement and sampling? Reference enhancements appearing in Attachment 2, page 10 of 13 of letter NL-15-092.
- d. Describe the periodicity and method for deluge valve testing for all charcoal filter beds subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. Exception No. 3, Attachment 2, page 57 of 66 of letter NL-14-147 states that, [t]he deluge valve for the IP2 primary auxiliary building exhaust, containment building purge exhaust and containment building pressure relief charcoal units are tested each refueling outage, which is every two years.
- e. Describe the number of wet pipe sprinkler systems in each building that are subject to aging management review for which aging effects are managed by the Fire Water Systems Program, as described in LRA B.1.14. In addition, provide the basis for inspecting one-third of the systems, as described in response to RAI 3.0.3-11 (NL 092) instead of one-half as cited by NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, Section 14.2.
- f. Reconcile the response to RAI 3.0.3-4, request 4b (NL-15-092), which reported three ISI Class 3 leaks identified in 2013, with the statement in Licensee Event Report (LER) 247/2013-004 that eight pin hole leaks were discovered during an engineering walkdown of the service water system where seven leaks were on socket welds and one was on an elbow with all located in the ASME Section XI Code boundary.
- g. In context of the following statement (NL-01-088, Attachment 1), provide details relating to the radiographic inspections of the service water piping welds that are performed as part of the Generic Letter (GL) 89-13 program:
The exam is also more sophisticated than a random 10% of welds. For example, the exam for 10 inch piping inside containment is as follows:
20% of welds that have shown moderate scalloping, 5% of the welds that have shown scalloping, 1% of welds that have minor scalloping and 1% of previously accepted or repaired welds.
- h. Provide details relating to the internal visual inspections performed by the Service Water Integrity program, as described in LRA B.1.34 (i.e., how much piping is inspected and frequency of inspections). Describe the process for using the results from the visual inspections to directing volumetric inspections.
- i. Identify the approximate number of safety-related weld locations and nonsafety-related weld locations that are subject to aging management review for which aging effects are managed by the Service Water Integrity Program, as described in LRA B.1.34. Response 4c to RAI 3.0.3-4 (NL-15-092) states that 20 to 30 weld locations
are inspected each outage; what percentage of the total locations does this number represent?
- j. The response to RAI AUX-2 (NL-08-091, Attachment I) states that the Service Water Integrity Program is credited for managing the effects of aging on components as listed in LRA Section 3 Tables regardless of safety classification. LER 286/2011-003 states that the GL 89-13 program will be revised to include nonsafety-related service water lines 1221 and 1222. Provide discussion relating to how these piping segments will be treated differently in the GL 89-13 program as compared to how they were treated in the Service Water Integrity Program. Are these now the only nonsafety-related piping segments included in the GL 89-13 program?
- k. LER 286/2014-002 states that procedure 3-PT-185B was specifically developed to address problems with leaks developing in stagnant vent and drain connection piping and it is the main line of defense for preventing future leaks. The response to RAI 3.0.3-4 (NL-15-092) states that the flushing and inspections performed under 3-PT-185B have been effective at managing the effects of aging; however, leaks continue to occur in the associated piping. Of the leaks that occurred in the past 10 years, provide information about the leaks that occurred in the piping segments where 3-PT-185B was or should have been used.
- l. Inspections of the service water intake structure are included as part of GL 89-13. If these inspections are not part of the Service Water Integrity Program, as described in LRA B.1.34, which aging management program do these inspections fall under?
Discuss the differences/similarities between the silting issue that is documented in LER 247/2011-003 and the silting levels seen in 2007. Discuss corrective actions from 2007, and whether these should have prevented the 2011 event.