| title = Indian Point, Units 1, 2, and 3 - Revision 18 to Emergency Plan Implementing Procedures, IP-EP-220, Technical Support Center.
| title = Revision 18 to Emergency Plan Implementing Procedures, IP-EP-220, Technical Support Center.
| author name = Martin R A
| author name = Martin R
| author affiliation = Entergy Nuclear Northeast
| author affiliation = Entergy Nuclear Northeast
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OEntergyIndian Point Energy Center CONTROLLED DOCUMENTDocument Control TRANSMITTAL 450 BroadwayBuchanan, NY 10511TO: DISTRIBUTION  
{{#Wiki_filter:OEntergy Indian Point Energy Center                             CONTROLLED DOCUMENT Document Control                                                   TRANSMITTAL 450 Broadway Buchanan, NY 10511 TO:     DISTRIBUTION                             "'DATE:                           January 26, 2016 FROM: IPEC DOCUMENT CONTROL           - 3 RD FLooR ADMIN BLDG           PHONE #: 914-254-6835 TRANSMITTAL #: EP- 16-0002 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).
"'DATE: January 26, 2016FROM: IPEC DOCUMENT CONTROL -3RD FLooR ADMIN BLDG PHONE #: 914-254-6835 TRANSMITTAL  
Sign and return the receipt acknowledgement below within ten (10) working days.
#: EP- 16-0002The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into yourcontrolled document file, properly disposition superseded, voided, or inactive document(s).
AFFECTED DOCUME.NT:           IPEC EMERGENCY PLAN PROCEDURES DOG     REV#                         TILE                                       ISTRUTION THE FOLLOWING PROCEDURE(S) HAS BEEN REVISIED, PLEASE REMOVE YOUR CURRENT COPY AND REPLACE WITH ATTACHED UPDATED PROCEDURE: *,
Sign and return the receipt acknowledgement below within ten (10) working days.AFFECTED DOCUME.NT:
IP-EP-220: REV.18-EFFECTIVE JAN 2 ? 2C'i3*
IPEC EMERGENCY PLAN PROCEDURES DOG REV# TILE ISTRUTION THE FOLLOWING PROCEDURE(S)
DATE RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)
HAS BEEN REVISIED, PLEASE REMOVE YOUR CURRENTCOPY AND REPLACE WITH ATTACHED UPDATED PROCEDURE:  
(IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).                                                                 r NAME (PRINT).             SIGNATURE                 DATE                   COPY LOCATION
*,IP-EP-220:
REV.18-EFFECTIVE JAN 2 ? DATERECEIPT OF THE ABOVE LISTED DOCUMENT(S)
IS HEREBY ACKNOWLEDGED.
I CERTIFY THAT ALLSUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S)
IN MY POSSESSION HAVE BEENREMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)(IF APPLICABLE)
AS SHOWN ON THE DOCUMENT(S).
rNAME (PRINT).
SIGNATURE DATE COPY LOCATION P NON-QUALITY RELATED IP-EP-220 Revision 18erg EMERGENCY PLAN PROCEDURE
_____________I
" mPLEMENTING I.ROCEDURES REFE.REN'CE USE Page. 1 of 29Technical Support CenterPrepared by:Approval:
*Print Name ..Signature:
DatePrint Name ig treDate*Effective Date: 01/27/16Procedure extensively revised -no revision bars were used.lP-EP-220 (Technical Support Center) RI8,doc
__ IPEC NON-QUALITY REL.ATED IiP-EP-220 Revision 18-EiderJy, EMERGENCY PLANPRCDE
* IMPLEMENTING S PROCEDURES REFERENCE USE " Page 2 Ot 29.Table of Contents1.0 PURPOSE..,..
....... .... .... ...........................................................


==32.0 REFERENCES==
Revision 18 I
........................3 3.0 DEFINITIONS,.......................................
L*        P                        NON-QUALITY RELATED    IP-EP-220 l~cy*
,.......................................
erg      EMERGENCY PLAN                PROCEDURE        _____________I
34.0 RESPONSIBILITiES
      "              mPLEMENTING
..................................................
          .           ROCEDURES                  REFE.REN'CE USE        Page. 1   of  29 Technical Support Center Prepared by:
34.1 Emergency Plant Manager.......
                                      *Print Name      ..             Signature:        Date Approval:
...........................................
Print Name                  ig treDate
34.2 TSC Manager.....................
                                      *Effective Date: 01/27/16 Procedure extensively revised - no revision bars were used.
..35.0 DETAILS......................................  
lP-EP-220 (Technical Support Center) RI8,doc
..46.0 INTERFACES_
 
....... .......................................................................
__              IPEC                              NON-QUALITY REL.ATED              IiP-EP-220                Revision 18
57.0 RECORDS .........
    -  EiderJy,     EMERGENCY PLANPRCDE
.....................
* IMPLEMENTING S PROCEDURES                          REFERENCE USE          "              Page              2       Ot    29.
.........
Table of Contents 1.0 PURPOSE..,..       .......         ....     ....     ........................................................... 3
.................
..... .........
.........
...58.0 REQUIREMENTS AND COMMITMENT,......".............
...........
,...... 59.0 ATTACHMENTS.:..................  
...................
: .......................
.......,........5 9.1 Emergency Plant Manager Checklist...............
...............................
59.2 TSC Manager Checklist..................11 9.3 Operations Coordinator Checklist
...........................................
,.....139.4 Reactor Engineer Checklist.........................................................
149.5 Engineering Coordinator Checklist.........................
......................
159.6 Mechanical and Electrical/l&C Engineer Checklist
...........................  
...169.7 IT Specialist Checklist
.............................................................
179.8 TSC Communicator Checklist
..............................................
189.9 Radiological Coordinator Checklist
...... ................
:..................
199.1t0 TSC Security Coordinator Checklist........................................
249.11 TSC/OSC Layout...................................................
...... 279.1 2 TSC/OSC Public Address System Description and Operation..............
289.13 iPEC TSC ERO Staffing...................................................
29 I__IPEC NON-QUALITY RELATED IP-EP-220 Revision 18I -EMERGENCY PLAN PROCEDURE IiMPLEMENTING jIPROCEDURES REFERENCE UsE Page 3 Of 2.99TECHNICAL SUPPORT CENTER (TSC)1.0 PURPOSEITo describe site specific actions for the activation and operation of the Technical Support Center (TSC). This procedure will be used in conjunction with the fleetprocedure, EN-EP-61 0, Technical Support Center (TSC) Operations.


==2.0 REFERENCES==
==2.0 REFERENCES==
........................3 3.0 DEFINITIONS,.......................................                                    ,....................................... 3 4.0 RESPONSIBILITiES ..................................................                                                                3 4.1      Emergency Plant Manager.......                  ..........................................
                                                                      .                                                                3 4.2      TSC Manager.....................                                                                                      .. 3 5.0 DETAILS......................................                                                                                  .. 4 6.0 INTERFACES_ ....... . ...................................................................... 5 7.0 RECORDS .......................................                    .................    ......... ..............            ... 5 8.0 REQUIREMENTS AND COMMITMENT,......".............                                                    ...........        ,...... 5 9.0 ATTACHMENTS.:.................. ...................            :          .......................    ....... ,........5 9.1 Emergency Plant Manager Checklist............... ............................... 5 9.2 TSC Manager Checklist..................11 9.3 Operations Coordinator Checklist ........................................... ,.....13 9.4 Reactor Engineer Checklist......................................................... 14 9.5 Engineering Coordinator Checklist......................... ......................                                        15 9.6 Mechanical and Electrical/l&C Engineer Checklist ...........................                                        ... 16 9.7 IT Specialist Checklist ............................................................. 17 9.8 TSC Communicator Checklist .............................................. 18 9.9 Radiological Coordinator Checklist ......                        ................                    :.................. 19 9.1t0 TSC Security Coordinator Checklist........................................ 24 9.11 TSC/OSC Layout................................................... ...... 27 9.1 2 TSC/OSC Public Address System Description and Operation.............. 28 9.13 iPEC TSC ERO Staffing................................................... 29


2.1 indian Point Energy Center Emergency Plan3.0 DEFINITIONS 3.1 See EN-EP-GlO Section 3.0 for definitions.
I__IPEC I En*eiy*
    -                EMERGENCY PLAN iMPLEMENTING NON-QUALITY RELATED PROCEDURE        I j
IP-EP-220    Revision 18 IPROCEDURES                            REFERENCE UsE          Page    3    Of  2.99 TECHNICAL SUPPORT CENTER (TSC) 1.0     PURPOSEI To describe site specific actions for the activation and operation of the Technical Support Center (TSC). This procedure will be used in conjunction with the fleet procedure, EN-EP-61 0, Technical Support Center (TSC) Operations.


==4.0 RESPONSIBILITIEES==
==2.0     REFERENCES==
4.1 See EN-EP-610 for Responsibilities.
 
5.0 DETAILS5.10 See EN-EP-610 for Details.6.0 INTERFACES 6.1 IP-EP-1 15, Emergency Plan Forms6.2 IP-EP-21 0, Central Control Room6.3 IP-EP-230, Operations Support Center:6.4 IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite6.5 IP-EP-5lO, Meteorological, Radiological  
2.1      indian Point Energy Center Emergency Plan 3.0      DEFINITIONS 3.1      See EN-EP-GlO Section 3.0 for definitions.
& Plant Data Acquisition System6.6 IP-EP-610, Emergency Termination and Recovery6.7 IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during anEmergency 6.8 0-FSG-100, BDBEEIELAP Emergency Response6.9 EN-EP-6 10, Technical Support Center (TSC) Operations 7.0 RECORDSAll forms and logs completed by the Emergency Response Organization during adeclared emergency are Quality Records and shall be maintained for the life of theplant plus twenty (20) years.
4.0      RESPONSIBILITIEES 4.1     See EN-EP-610 for Responsibilities.
ll~(?,"2_,EMERGENCY PLAN .PROCEDURE 8.0 REQUIREMEiNTS AND COMMITMENT CROSS-REFERENCE None9.0 ATTACHMENTS 9.1 Emergency Plant Manager Checklist.
5.0     DETAILS 5.10     See EN-EP-610 for Details.
9.2 TSC Manager Checklist 9.3 Operations Coordinator Checklist  
6.0     INTERFACES 6.1     IP-EP-1 15, Emergency Plan Forms 6.2     IP-EP-21 0, Central Control Room 6.3     IP-EP-230, Operations Support Center:
....9.4 Reactor Engineer Checklist 9.5 Engineering Coordinator Checklist 9.8 Mechanical and Electrical  
6.4     IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite 6.5     IP-EP-5lO, Meteorological, Radiological & Plant Data Acquisition System 6.6     IP-EP-610, Emergency Termination and Recovery 6.7     IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during an Emergency 6.8     0-FSG-100, BDBEEIELAP Emergency Response 6.9     EN-EP-6 10, Technical Support Center (TSC) Operations 7.0     RECORDS All forms and logs completed by the Emergency Response Organization during a declared emergency are Quality Records and shall be maintained for the life of the plant plus twenty (20) years.
/ I&C Engineer Checklist 9.7 IT Specialist Checklist 9.8 TSC Communicator Checklist 8.9 Radiological Coordinator Checklist 9.10 TSC Security Coordinator Checklist 9.11 TSCIOSC Layout9.12 TSCIOSC Public Address System Description and Operation 9.13 'IPEC TSC ERO Staffing SIPEC NCR-QUALITY RELATED I P-EP-20O Revi~ion' 18 EMERGENCY PLAN PROCEDURE I1 ' IMPLEMENTING j.. ,.... ...... .PROCEDURES REFERENCE UsE Page _5 of 29Attachment 9.1Emergency Plant Manager Checklist Sheet ! of 61.0 Initial ii NOTESNOTE:Procedure refers to an event at Unit 2, Unit 3 or both (i.e.,Security, Natural event). If determined to be a Site event, thenUnit 2 will be the lead plant for all communications, This is a Core Staffing position..
 
1.1 Follow. responsibilities/activities in EN-EP-61 0Attachment 9.1 and the following:
      -* ll~(?,"2_,EMERGENCY PLAN   . PROCEDURE 8.0   REQUIREMEiNTS AND COMMITMENT CROSS-REFERENCE None 9.0   ATTACHMENTS 9.1   Emergency Plant Manager Checklist.
1.2 IF a Beyond Design Basis External Event (BDBEE) occursthat results in an Extended Loss of AC Power (ELAP) toeither unit, THEN entry into, 0-FSG-100, BDBEE/ELAP Emergency  
9.2   TSC Manager Checklist 9.3   Operations Coordinator Checklist           ....
: Response, is required..
9.4   Reactor Engineer Checklist 9.5   Engineering Coordinator Checklist 9.8   Mechanical and Electrical / I&C Engineer Checklist 9.7   IT Specialist Checklist 9.8   TSC Communicator Checklist 8.9   Radiological Coordinator Checklist 9.10 TSC Security Coordinator Checklist 9.11 TSCIOSC Layout 9.12 TSCIOSC Public Address System Description and Operation 9.13 'IPEC TSC ERO Staffing
"1.3 Assume the position of Emergency Plant Manager(EPM).A. Announce yourself as the EPM and provide initialbriefing to the TSCIOSC staff. Ensure briefing coversthe following items;1. introduction of Self and Facility Managers.
* 1 SIPEC
: 2. Establish clear expectations for:a. Use of Three-Part Communications by EReOmembers.b. Use of phones during facility briefs,c. Limit excess chaffer during emergency,
    *~~J~jpj/ergy, EMERGENCY PLAN IMPLEMENTING PROCEDURES REFERENCE UsE Ij..
NCR-QUALITY RELATED I PROCEDURE P-EP-20O Page    _5 Revi~ion' 18 of 29 Attachment 9.1 Emergency Plant Manager Checklist Sheet ! of 6 1.0     Initial Responsibili~iI*ii                                       NOTES NOTE:
Procedure refers to an event at Unit 2, Unit 3 or both (i.e.,
Security, Natural event). Ifdetermined to be a Site event, then Unit 2 will be the lead plant for all communications, This is a Core Staffing position..
1.1     Follow. responsibilities/activities in EN-EP-61 0 Attachment 9.1 and the following:
1.2     IF a Beyond Design Basis External Event (BDBEE) occurs that results in an Extended Loss of AC Power (ELAP) to either unit, THEN entry into, 0-FSG-100, BDBEE/ELAP Emergency Response, is required..
"1.3   Assume the position of Emergency Plant Manager (EPM).
A. Announce yourself as the EPM and provide initial briefing to the TSCIOSC staff. Ensure briefing covers the following items;
: 1. introduction of Self and Facility Managers.
: 2. Establish clear expectations for:
: a. Use of Three-Part Communications by EReO members.
: b. Use of phones during facility briefs,
: c. Limit excess chaffer during emergency,
: d. Review and follow your procedures,
: d. Review and follow your procedures,
: 3. Remind personnel to validate information,
: 3. Remind personnel to validate information,
: 4. When ready, announce to the TSC/OSC that theTSC/OSC is operational.
: 4. When ready, announce to the TSC/OSC that the TSC/OSC is operational.
I tEnergy.
 
eMERGENCY PLAN PRoCEDURE IIMPLEMENTING j==-l ...... ..... .. ....... PR.......  
I     tEnergy.         eMERGENCY PLAN             PRoCEDURE         I IMPLEMENTING
.ocEDURES.  
    .. .. ....... PR.......
....... REFERE........CE.
                          . ocEDURES. ....... REFERE.. . . .CE. U!      j..P........
U! j..P........
j==-l . .....   ...
Of 2Attachment 9.1Emergency Plant Manager Checklist Sheet 2 ofi62.0 Cantinuous ResponsibilitviActivity IF an emergency classificatio setred due to a securitycondition, THEN evacuation and accountability may put 'personnel at risk. Therefore, in these situations, evacuation andaccountability will be suspended until directed by Security andcleared through the Incident Commander.
Of 2 Attachment 9.1 Emergency Plant Manager Checklist Sheet 2 ofi6 2.0         Cantinuous ResponsibilitviActivity NOTES IF an emergency classificatio         setred due to a security condition, THEN evacuation and accountability may put                     '
NOTE:After initial accountability has been completed, facility managers areresponsible for accountability of individuals assigned to their respective organizations.
personnel at risk. Therefore, in these situations, evacuation and accountability will be suspended until directed by Security and cleared through the Incident Commander.
2.1 At a Site Area Emergency or higher classification, or ifthe decision has been made to do so, iNITIATEaccountability.
NOTE:
After initial accountability has been completed, facility managers are responsible for accountability of individuals assigned to their respective organizations.
2.1     At a Site Area Emergency or higher classification, or if the decision has been made to do so, iNITIATE accountability.
A. Direct the. TSC Security Coordinator/Lead Accountability Officer (LAO) to perform accountability.
A. Direct the. TSC Security Coordinator/Lead Accountability Officer (LAO) to perform accountability.
Initial accountability shall be completed withinapproximately 30.,minutes from the declaration of the-event.B. L.F anyone is unaccounted for THEN direct the TSCSecurity Coordinator and the OSO Manager tocommence search and rescue operations.
Initial accountability shall be completed within approximately 30.,minutes from the declaration of the
C. Direct TSC Manager, OSC Manager, POM and TSCSecurity Coordinator to maintain onsite accountability throughout the event.NOTES IPEC [. NON-QUALITYRELATE IP-EP-220 Rvision 18IMPLEMENTING I "jPROCEDURES-RFRCEUSE jPage 7_ Of 29.Attachment 9.1Emergency Plant Manager Checklist Sheet 3 of. 6Continuous ResponsibilitvlActivitv fcont.) NOTES2.2 When' applicable, direct implementation of SevereAccident Management Guidelines.
            - event.
A. When the Control Room transitions from the EOPs to.SACRG-1, or only declares an EAL for SFP conditions, ENSURE the TSC Reactor Engineer is ready to takeover Severe Accident Management  
B. L.F anyone is unaccounted for THEN direct the TSC Security Coordinator and the OSO Manager to commence search and rescue operations.
: control, as. SAMGevaluator.
C. Direct TSC Manager, OSC Manager, POM and TSC Security Coordinator to maintain onsite accountability throughout the event.
6 .Once the SAMG Evaluator(s) is ready to take overSevere Accident Management control ANNOUNCE.
 
* yourself as the Severe Accident Management DecisionMaker.*C.- CONFER with the SAMG Evaluators which. SAM....guidanc~e should be implemented.
jPROCEDURES-IPEC IMPLEMENTING
[. NON-QUALITYRELATE RFRCEUSE
                                                      "    I IP-EP-220 jPage Rvision 18 7_ Of   29
                      .             Attachment 9.1
                  *.        Emergency Plant Manager Checklist Sheet 3 of.6 Continuous ResponsibilitvlActivitv fcont.)                             NOTES 2.2   When' applicable, direct implementation of Severe Accident Management Guidelines.
A. When the Control Room transitions from the EOPs to.
SACRG-1, or only declares an EAL for SFP conditions, ENSURE the TSC Reactor Engineer is ready to take over Severe Accident Management control, as. SAMG evaluator.
6 . Once the SAMG Evaluator(s) is ready to take over Severe Accident Management control ANNOUNCE.
        *yourself as the Severe Accident Management Decision Maker.
    *C.- CONFER with the SAMG Evaluators which. SAM....
guidanc~e should be implemented.
D. NOTIFY the Emergency Director (ED) which guidance:
D. NOTIFY the Emergency Director (ED) which guidance:
will be implemented.
will be implemented. IF the guidance involves a release to the environment, ENSURE the ED discusses this with the Radiological Assessment Coordinator and the State/Counties prior to implementation.
IF the guidance involves arelease to the environment, ENSURE the ED discusses this with the Radiological Assessment Coordinator andthe State/Counties prior to implementation.
2.3   Authorize Emergency Exposures I KI issuance A. Inform the TSCIOSC Manager and Radiological.
2.3 Authorize Emergency Exposures I KI issuanceA. Inform the TSCIOSC Manager and Radiological.
Coordinator that you authorize emergency exposures up to 1 Remn TEDE for all TSC/OSC and Operations personnel dispatched into the plant. Document this authorization in WebEOC, OR on your ERO Log Sheet (Form E:P-1 0) if WebEOC is unavailable.
Coordinator that you authorize emergency exposures up to 1 Remn TEDE for all TSC/OSC and Operations personnel dispatched into the plant. Document thisauthorization in WebEOC, OR on your ERO Log Sheet(Form E:P-1 0) if WebEOC is unavailable.
B. I.F emergency measures require additional exposure THEN raise the emergency exposure limit 1 Rem at a time up to 5 Remn.
B. I.F emergency measures require additional exposureTHEN raise the emergency exposure limit 1 Rem at atime up to 5 Remn.
 
I __I'EC, NON-QUALITY RELATED IP-EP-220 Revision 18 EMERGENCY PL.AN -PROCEDURE U
I __I'EC,
* iMPLEMENTING
    *En*--gy,          EMERGENCY    PL.AN NON-QUALITY RELATED
-I ..PROCEDURES j REFERENCE USE Page 8 of 29Attchment 9.1Emergency Plant Manager" Checklist Sheet 4 of 6Continuous Res~onsibllltvlActivitv (cont.) NOTESC. Review and authorize, when requested by OSO Staff,emergency exposures beyond* 5 Remn on an individual basis using Emergency Exposure Authorization (FormEP-6) guidelines.
                                              -PROCEDURE IP-EP-220   Revision 18 U
D. When requested by Radiological Coordinator, authorize issuance of Potassium Iodine (Ki). (KI is normallyissued at 5 Remn ODE projected child thyroid dose ordeclaration of a General Emergency.)
I ..
2.4 Circumstances including, but not lirnited to a poweroutage, toxic gas condition, or increased radiation levels may necessltate~he need to evacuate theTSCIOSC complex.
* iMPLEMENTING PROCEDURES         j     REFERENCE USE Page   8   of   29 Attchment 9.1 Emergency Plant Manager"Checklist Sheet 4 of 6 Continuous Res~onsibllltvlActivitv (cont.)                                   NOTES C. Review and authorize, when requested by OSO Staff, emergency exposures beyond* 5 Remn on an individual basis using Emergency Exposure Authorization (Form EP-6) guidelines.
IF it becomes necessary toevacuate the TSCIOSC complex for any reason, thefollowing guidance shall be followed.  
D. When requested by Radiological Coordinator, authorize issuance of Potassium Iodine (Ki). (KI is normally issued at 5 Remn ODE projected child thyroid dose or declaration of a General Emergency.)
:A. Work with the Fadiological Coordinator, TSC/OSCManagers and TSC Security Coordinator to determine.
2.4     Circumstances including, but not lirnited to a power outage, toxic gas condition, or increased radiation levels may necessltate~he need to evacuate the TSCIOSC complex. IF it becomes necessary to evacuate the TSCIOSC complex for any reason, the following guidance shall be followed.                             :
a suitable alternate location(s) for TSC and DSC staffs. iIn selecting an alternate  
A. Work with the Fadiological Coordinator, TSC/OSC Managers and TSC Security Coordinator to determine.
: location, keep the following in* .mind:1. In the event of increased radiation levels or a toxicgas condition, consider relocating individuals to theCR or Outage Control Center. Another possiblealternative location for consideration is the EQF..Although desirable to keep the entire staff together, it may be necessary to utilize more than one facility.
a suitable alternate location(s) for TSC and DSC staffs. i In selecting an alternate location, keep the following in* .
: 2. In the event of a power outage, there may beadditional locations that could be used forrelocation.
mind:
Such possible locations include an IPECConference Room within the Protected Area, the.Outage Control Center, the Indian Point TrainingCenter or even the Generation Support Building.
: 1. In the event of increased radiation levels or a toxic gas condition, consider relocating individuals to the CR or Outage Control Center. Another possible alternative location for consideration is the EQF..
: 3. In selecting the facility to which you are relocating to, ensure that you consider the ability for theTSO/OSC staffs to function in the new facility.
Although desirable to keep the entire staff together, it may be necessary to utilize more than one facility.
ii ___ EMRG~cIPEC PL NONQ IY EAE P-EPo22O Revision 18iMPLEMENTING
: 2. In the event of a power outage, there may be additional locations that could be used for relocation. Such possible locations include an IPEC Conference Room within the Protected Area, the.
,Attachment 9.1Emergency Plant Manager Checklist Sheet 5 of 6Continuous Responsibility/Activity Icont.) NOTESSome items for consideration include:-Is the required Plant information able to bereadily obtained?
Outage Control Center, the Indian Point Training Center or even the Generation Support Building.
-Are the necessary computer resources available?
: 3. In selecting the facility to which you are relocating to, ensure that you consider the ability for the TSO/OSC staffs to function in the new facility.
-ill adequate communications be obtainable with all of the necessary parties?B. PRIOR to evacuating the TSC/OSC complex, addressthe following:
 
: 1. Ensure that evacuating personnel take their positionbooks with them to the new location.
ii ___
: 2. Ensure that all needed data is gathered andtransported during the relocation of personnel.
* EMRG~cIPEC PL       NONQ       IY EAE     P-EPo22O Revision 18 iMPLEMENTING                                                    ,
Examples include information on the electronic
Attachment 9.1 Emergency Plant Manager Checklist Sheet 5 of 6 Continuous Responsibility/Activity Icont.)                                   NOTES Some items for consideration include:
: displays, other charted information, completed logsand the like.3. Inform the ED and thePOM of your relocation plans. Advise them that yQu will notify them ofwhen you have relocated and are a functioning facility.
                -Is   the required Plant information able to be readily obtained?
if relocation will be at two or more sites,direct an individual at each of those sites to adviseyou when their relocation is complete.
              -     Are the necessary computer resources available?
: 4. Determine the speed at which the relocation ofpersonnel should occur giving consideration to thefollowing items:a. Consider the impact of immediate relocation vs.mitigation activities in progress.
                -     ill adequate communications be obtainable with all of the necessary parties?
: b. Current radiological or hazardous conditions within the TSC/OSC.c. Radiological or hazardous conditions at theproposed TSC/OSC.d. Radiological or hazardous conditions en route.e. The adequacy of response from the alternate location.
B. PRIOR to evacuating the TSC/OSC complex, address the following:
I negEMERGENCY PLAN .PROCEDURE I
: 1. Ensure that evacuating personnel take their position books with them to the new location.
REFERENCE USE Page _10 Of _29Attachment 9.1Emergency Plant Manager Checklist Sheet 6 of 6Continuous ResponsibilitvlActivity (cont.) NOTESf. Determine proper path to take to new locations.
: 2. Ensure that all needed data is gathered and transported during the relocation of personnel.
Examples include information on the electronic displays, other charted information, completed logs and the like.
: 3. Inform the ED and thePOM of your relocation plans. Advise them that yQu will notify them of when you have relocated and are a functioning facility. if relocation will be at two or more sites, direct an individual at each of those sites to advise you when their relocation is complete.
: 4. Determine the speed at which the relocation of personnel should occur giving consideration to the following items:
: a. Consider the impact of immediate relocation vs.
mitigation activities in progress.
: b. Current radiological or hazardous conditions within the TSC/OSC.
: c. Radiological or hazardous conditions at the proposed TSC/OSC.
: d. Radiological or hazardous conditions en route.
: e. The adequacy of response from the alternate location.
 
I   negEMERGENCY PLAN PROCEDURES*
                                          .PROCEDURE REFERENCE USE I    Page _10 Of _29 Attachment 9.1 Emergency Plant Manager Checklist Sheet 6 of 6 Continuous ResponsibilitvlActivity (cont.)                           NOTES
: f. Determine proper path to take to new locations.
: g. Direct personnel to relocate.
: g. Direct personnel to relocate.
: h. Notify Security to= instruct incoming personnel toreport to the designated alternate TSC/OSClocation(s).
: h. Notify Security to= instruct incoming personnel to report to the designated alternate TSC/OSC location(s).
: 5. After arriving at the new TSCIOSC location(s),
: 5. After arriving at the new TSCIOSC location(s), re-establish this new location as the TSC/OSC.
re-establish this new location as the TSC/OSC.6. Set up the appropriate equipment such as electronic
: 6. Set up the appropriate equipment such as electronic displays, plant data displays and telephones.
: displays, plant data displays and telephones.
: 7. Notify the ED and POM when established and ready
: 7. Notify the ED and POM when established and ready* to commence functioning-~as the TSCIOSC.8. Obtain an updated briefing on the current status of* the emergency.,
* to commence functioning-~as the TSCIOSC.
plant conditions and any actionsthat are in progress or that may have beencompleted.  
: 8. Obtain an updated briefing on the current status of
-9. Continue functioning as the EPM~.C. Direct personnel to relocate TSCIOSC personnel.
* the emergency., plant conditions and any actions that are in progress or that may have been completed.                       -
IPEC NON-QUALITY RELATED IPE20 Reion1Enfery. EMERGENCY PLAN PROCEDURE 1PROCEDURES REFERENCE USE Page 11 of 29 jAttachment 9.2TSC Manager Checklist Sheet I of 2This is a core staffing position1.0 NOTES1.1 Follow responsibiltitieslactivities in EN-EP-Bl0 Attachment 9.2and the following:
: 9. Continue functioning as the EPM~.
1.2 Activation of the TSC and assume the position of TSC Manager,.
C. Direct personnel to relocate TSCIOSC personnel.
A. Synchronize your time with the ISC/OSC clock. Verify with theEQE andlor CR that the time displayed in the TSC/OSC is thesame as it is there.B. Verify you have the following core staffing prior to declaring theTSC staffed:a. EPMb. TSC Managerc. TSC Communicator
 
Enfery.
IPEC EMERGENCY PLAN PROCEDURES NON-QUALITY RELATED PROCEDURE REFERENCE USE 1  IPE20 Page     11 Reion1 of   29 j Attachment 9.2 TSC Manager Checklist Sheet I of 2 This is a core staffing position 1.0   jllj~alRespojsiblliIv/Acivi*                                                  NOTES 1.1     Follow responsibiltitieslactivities in EN-EP-Bl0 Attachment 9.2 and the following:
1.2   Activation of the TSC and assume the position of TSC Manager,.
A. Synchronize your time with the ISC/OSC clock. Verify with the EQE andlor CR that the time displayed in the TSC/OSC is the same as it is there.
B. Verify you have the following core staffing prior to declaring the TSC staffed:
: a. EPM
: b. TSC Manager
: c. TSC Communicator
: d. Mechanical Engineer"
: d. Mechanical Engineer"
: e. Electrical/Ll&C Engineerf. Reactor Engineerg. Rad Coordinator C. Staff the TSC using Form EP-lO-ALL, "Filling an ERO VacancyDuring Facility Activation/Operation" D. IF additional personnel are required THENN:a. IF it is during normal working hours THE=N call or assignsomeone to call the Assembly Areas for needed personnel.
: e. Electrical/Ll&C Engineer
: b. IF needed individuals are not available onsite THEN assignsomeone to call individuals at home using the Emergency Telephone Directory (ETD).E. Emergency Response Data System (E=ROS)a. If requested to verify, EROS is active. Refer to procedure EN-EP-31 1, Emergency Response Data System (ERDS)Activation via the Virtual Private Network (VPN).b. I]F ERDS is not functional, designate a person withOperations experience to go to the Control Room tocomplete Forms 31 A, B, C OR 42 A, B, C. (Forms EP-53,54, 55 and EP-57, 58, 59).
: f. Reactor Engineer
IPEC NNQAm EAE PE-2 eiin1j Entergy.
: g. Rad Coordinator C. Staff the TSC using Form EP-lO-ALL, "Filling an ERO Vacancy During Facility Activation/Operation" D. IF additional personnel are required THENN:
EMERGENCY PLAN PREDRSM PLEMENTI NG PucIPROCEDURE REFERE'NCE USE Page 12 Of 29'Attachment 9.2TSC Manager Checklist Sheet 2 of 2Initial ResponsibilitvlActivitv (con=t=)
: a. IF it is during normal working hours THE=N call or assign someone to call the Assembly Areas for needed personnel.
NOTESc. Once the A, B, C Forms are completed, they' are to befaxed to the NRC within 60 minutes.d. PICS should be started to display plant data for the affectedunit IF both Units are affected utilize multiple computers todisplay both plants' data.2.0 Continuous Responsibilitv/Activitv¢ 2.1 Manage the activities of the TSC Staff:A. Provide a central organization and facility for the accumulation and transmittal of plant information to the EOF and NRC.8. When applicable, direst the appropriate individuals to implement and perform monitoring and evaluations as directed in the. ShdianPoint Severe Accident Management (SAMG) Guidelines.
: b. IF needed individuals are not available onsite THEN assign someone to call individuals at home using the Emergency Telephone Directory (ETD).
C. if requested by the NRC to provide an open communications linefor plant data , THN direct an individual having sufficient technical knowledge to staff the ENS phone. This person maylocate in any facility with ENS phone access. If necessary, request the Security Coordinator to obtain additional personal to.support this activity.
E. Emergency Response Data System (E=ROS)
: 0. Verify that the Engineering Action Tracking (Admin) Display isupdated promptly as new tasks are assigned and old taskscompleted and as priorities are changed..
: a. If requested to verify, EROS is active. Refer to procedure EN-EP-31 1, Emergency Response Data System (ERDS)
E. Anticipate TSC support requirements from ERe,F. Direct TSC staff to obtain drawings and information asneeded to solve plant problems.
Activation via the Virtual Private Network (VPN).
2.2 Monitor containment integrity status throughout the event:A. Initiate a review to determine if any non-automatic containment isolation valves should be closed. (Reference 2-ES-i1.4; 3-ES-i .3;3-SOP-CEB-Oil)
: b. I]F ERDS is not functional, designate a person with Operations experience to go to the Control Room to complete Forms 31 A, B, C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57, 58, 59).
B. Repeat the above review, approximately every 2 hours for first 24hours of event and thereafter at the discretion of the EPM.
 
IPEC NON-QUALITY RELATED IP-EP-22O Revision 18~E~rg. EMERGENCY PLAN PROCEDURE IPROCEDURES REFF-RENCE USE Page 13 of 29Attachment 9.3Operations Coordinator Checklist Sheet I of I1.0 Follow ResponsibilitieslActivities in EN-EP-BlO, Attachment 9.3  
j      Entergy.      IPEC EMERGENCY    PLAN    NNQAmPREDREAE            PE-2         eiin1 SM PLEMENTI NG             Puc IPROCEDURE                              REFERE'NCE USE         Page     12   Of 29' Attachment 9.2 TSC Manager Checklist Sheet 2 of 2 Initial ResponsibilitvlActivitv (con=t=)                                                 NOTES
-,#. IPEC NoN-QuALrrY RELATED iP-EP'22O Revision 18-Ene~ y, *EMERGENCY PLAN PROCEDURE IIMPLEMENTING PROCEDURES REFERENCE USE [_Page 14 Of 29Attachment 9.4Reactor Engineer Checklist Sheet I of IThis is a core staffing position.
: c. Once the A, B, C Forms are completed, they' are to be faxed to the NRC within 60 minutes.
1.0 ResponsibilitvlActivitv, NOTES1.1 Follow responsibilitieslactivities in EN-EP-610 Attachment 9.4and the following:
: d. PICS should be started to display plant data for the affected unit IF both Units are affected utilize multiple computers to display both plants' data.
1.2 Monitor plant conditions for any indications of core damage.A. Perform and update core damage assessment based on currentinformation using guidance provided in procedure IP-EP-360, Core Damage Assessment. B3. Notify TSC Manager and/or Engineering Coordinator, immediately of any changes in core status.C. Keep the Radiological Coordinator informed on core status toassist in maintaining radiological controls for plant personnel.
2.0     Continuous Responsibilitv/Activitv¢ 2.1     Manage the activities of the TSC Staff:
iD. Through the TSC Manager and/or the Radiological Coordinator, ensure that the EOF Radiological Assessment Coordinator iskept informed of the latest estimate of the amount of coredamage.E. Maintain the Fission Product Barrier Status Board as needed.1.3 Assist the 2PM in imnplement~ation of Severe AccidentManagement Guidelines.
A. Provide a central organization and facility for the accumulation and transmittal of plant information to the EOF and NRC.
A. When the Control Room transitions from the EOPs to SACRG-1, or only declares an EAL for SFP conditions inform the EPMwhen you are ready to take over Severe Accident Management (SAM) control.B. INFORM EPMV which SAM guidance should be implemented.
: 8. When applicable, direst the appropriate individuals to implement and perform monitoring and evaluations as directed in the. Shdian Point Severe Accident Management (SAMG) Guidelines.
C. IF guidance involves a release to the environment ENSURE theEPM and Emergency Director discuss it with the Radiological Assessment Coordinator who discusses it with theState/Counties prior to implementation.
C. if requested by the NRC to provide an open communications line for plant data , THN direct an individual having sufficient technical knowledge to staff the ENS phone. This person may locate in any facility with ENS phone access. If necessary, request the Security Coordinator to obtain additional personal to
"1.4 Receive status updates from the TSC Manager andlor EPM andif directed post updates on the appropriate electronic displays.
            .support this activity.
I Enlergy EMERGENCY PLAN ,PROCEDURE II ' PROCEDURES  
: 0. Verify that the Engineering Action Tracking (Admin) Display is updated promptly as new tasks are assigned and old tasks completed and as priorities are changed..
-' REFERENCE USE Page ' 1 Of 29 jAttachment 9.5Engineering Coordinator.
E. Anticipate TSC support requirements from ERe, F. Direct TSC staff to obtain drawings and information as needed to solve plant problems.
Checklist Sheet* 1 of 11.0 Follow ResponsibilitieslActivities in EN-EP-610, Attachment 9.5.2.0 if requested to provide information to the. NRC Operations Center follow responsibilities in ENEP-SlO, Att achment 9.1 2.  
2.2     Monitor containment integrity status throughout the event:
~EIery EMERGENCY PLAN PROCEDURE IIPROCEDURES J REFERENCE USE j Page 16 Of0 2.99Attachment 9.6Mechanical and Electricall Il&C Engineer Checklist Sheet 1 of 11.0 Fallow ResponsibilitieslActivities in EN-EP-610 Attachment 9.6.
A. Initiate a review to determine if any non-automatic containment isolation valves should be closed. (Reference 2-ES-i1.4; 3-ES-i .3; 3-SOP-CEB-Oil)
PEMREC Y L N POCEDUAU RELr IP.E-2 eiin1~~En~eIMPLEMERGNCTPLNGPoWR MPROEMUENTN IPRCDRSREFERENCE USE Page 1=7 of 29 jAttchment 9.7IT Specialist Checklist Sheet I of 11.0 Initial Responsibili~tvActiviv NOTES1.1 Follow responsibilltieslactlivties in EN-EP-BIG Attachment 9.7 and the following:
B. Repeat the above review, approximately every 2 hours for first 24 hours of event and thereafter at the discretion of the EPM.
 
    ~E~rg.
IPEC EMERGENCY PLAN PROCEDURES NON-QUALITY RELATED PROCEDURE REFF-RENCE USE IIP-EP-22O Page   13 Revision 18 of   29 Attachment 9.3 Operations Coordinator Checklist Sheet I of I 1.0 Follow ResponsibilitieslActivities in EN-EP-BlO, Attachment 9.3
 
    -     ,#.           IPEC
      -Ene~ y, *EMERGENCY PLAN IMPLEMENTING NoN-QuALrrY RELATED PROCEDURE        I iP-EP'22O   Revision 18 PROCEDURES             REFERENCE USE       [_Page     14     Of   29 Attachment 9.4 Reactor Engineer Checklist Sheet I of I This is a core staffing position.
1.0     ResponsibilitvlActivitv,                                                         NOTES 1.1     Follow responsibilitieslactivities in EN-EP-610 Attachment 9.4 and the following:
1.2     Monitor plant conditions for any indications of core damage.
A. Perform and update core damage assessment based on current information using guidance provided in procedure IP-EP-360, Core Damage Assessment.
* B3. Notify TSC Manager and/or Engineering Coordinator, immediately of any changes in core status.
C. Keep the Radiological Coordinator informed on core status to assist in maintaining radiological controls for plant personnel. i D. Through the TSC Manager and/or the Radiological Coordinator, ensure that the EOF Radiological Assessment Coordinator is kept informed of the latest estimate of the amount of core damage.
E. Maintain the Fission Product Barrier Status Board as needed.
1.3     Assist the 2PM in imnplement~ation of Severe Accident Management Guidelines.
A. When the Control Room transitions from the EOPs to SACRG-1, or only declares an EAL for SFP conditions inform the EPM when you are ready to take over Severe Accident Management (SAM) control.
B. INFORM EPMV which SAM guidance should be implemented.
C. IF guidance involves a release to the environment ENSURE the EPM and Emergency Director discuss it with the Radiological Assessment Coordinator who discusses it with the State/Counties prior to implementation.
"1.4   Receive status updates from the TSC Manager andlor EPM and if directed post updates on the appropriate electronic displays.
 
I   Enlergy     EMERGENCY PLAN     ,PROCEDURE       I I  '             PROCEDURES     -'     REFERENCE USE     Page   '1 Of 29 j Attachment 9.5 Engineering Coordinator. Checklist Sheet* 1 of 1 1.0   Follow ResponsibilitieslActivities in EN-EP-610, Attachment 9.5.
2.0   if requested to provide information to the. NRC Operations Center follow responsibilities in ENEP-SlO, Attachment 9.12.
 
    ~EIery       EMERGENCY PLAN           PROCEDURE     I IPROCEDURES                  J     REFERENCE USE j   Page     16 Of0 2.99 Attachment 9.6 Mechanical and Electricall Il&C Engineer Checklist Sheet 1 of 1 1.0   Fallow ResponsibilitieslActivities in EN-EP-610 Attachment 9.6.
 
PEMREC   Y L     N       POCEDUAU RELr       IP.E-2         eiin1
    ~~En~eIMPLEMERGNCTPLNGPoWR MPROEMUENTN PRCDRSREFERENCE USE Page     1=7 of   29 j Attchment 9.7 IT Specialist Checklist Sheet I of 1 1.0 Initial Responsibili~tvActiviv                                       NOTES 1.1 Follow responsibilltieslactlivties in EN-EP-BIG Attachment 9.7 and the following:
1,2 Assume the position of IT Specialist
1,2 Assume the position of IT Specialist
[NOTERDS is not functional in the Simulator for a DrillA. Emergency Response Data System (ERDS)1. If requested to verify EROS is activated, refer toprocedure EN-EP-31 1, Emergency Response DataSystem (EROS) Activation via the Virtual PrivateNetwork (VPN).2. I F EROS is not functional, notify the TSC Managerto designate an operations experienced person togo to the Control Room to complete Forms 31 A. E8,C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57,58, 59). Once the A, B, C Forms are completed,,
[NOT ERDS is not functional in the Simulator for a Drill A. Emergency Response Data System (ERDS)
they are to be faxed to the NRC within 60 minutes.3. Inform TSC Communicator of the time EROS wasverified of activation O_.R activated and to log inWebEOC.B3. Ensure computer displays in the TSC and OSCcontinue to operate properly.
: 1. If requested to verify EROS is activated, refer to procedure EN-EP-31 1, Emergency Response Data System (EROS) Activation via the Virtual Private Network (VPN).
: 1. IF the PICS displays are NOT functioning THEperform the following:
: 2. IF EROS is not functional, notify the TSC Manager to designate an operations experienced person to go to the Control Room to complete Forms 31 A. E8, C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57, 58, 59). Once the A, B, C Forms are completed,,
(a) IF Unit 2 obtain 42A, 42B and 42C data from theCCR (IP-EP-115 EP Forms 53, 54, and 55)(b) IF Unit 3 obtain 31A, 31B and 31C data from theCCR (IP-EP-1 15 EP Forms 57, 58 and 59).
they are to be faxed to the NRC within 60 minutes.
En~L'y~y PEMREC Y -~ NON-QUALITY RELATED 1 P-EP-220 Revision 18IMPLEMENTING j ,,.PROCEDURES "REFERENCE-USE JPage :is8 Of 29 9.8TSC Communicator Checklist Sheet Ilofi11 .0 Follow Responsibilities/Activities in EN-EP=I0,.
: 3. Inform TSC Communicator of the time EROS was verified of activation O_.R activated and to log in WebEOC.
Att(achment 9.8.2.0 Verify that at least one of the Public Address Systems(Red or Green) in the TSCIOSC is turned on and ready.for use. Refer to 9.12 of this procedure for adescription and operation.
B3. Ensure computer displays in the TSC and OSC continue to operate properly.
SIPEC NON-QUALITY RELATED IP..EP-22O Revision 18#l*y EMERGENCY PLAN PROCEOURE IMPLEMENTING IPRCDRS j REFERENCE USE Page 199 of 2.9 JAttachment 9.9Radiological Coordinator Checklist Sheet 1 of 5This is a Core Staffing Position.
: 1. IF the PICS displays are NOT functioning THE perform the following:
1.0 Initial Responsibili~tvActivitv NOTES1.1 Follow responsibilities/activities in EN-EP-610 Attachment 9.9 and the following:
(a) IF Unit 2 obtain 42A, 42B and 42C data from the CCR (IP-EP-115 EP Forms 53, 54, and 55)
1.2 Assume the position of Radiological Coordinator.
(b) IF Unit 3 obtain 31A, 31B and 31C data from the CCR (IP-EP-1 15 EP Forms 57, 58 and 59).
 
En~L'y~y     PEMREC   Y IMPLEMENTING
            ,.PROCEDURES
                                    -~NON-QUALITY RELATED "REFERENCE-USE 1
                                                          ,j P-EP-220 JPage     :is8 Revision 18 Of 29 Att*achment 9.8 TSC Communicator Checklist Sheet Ilofi1 1.0 Follow Responsibilities/Activities in EN-EP=I0,.
Att(achment 9.8.
2.0 Verify that at least one of the Public Address Systems (Red or Green) in the TSCIOSC is turned on and ready.
for use. Refer to Att*achment 9.12 of this procedure for a description and operation.
 
SIPEC                               NON-QUALITY RELATED IP..EP-22O     Revision 18
        #ly        EMERGENCY PLAN           PROCEOURE IMPLEMENTING       I PRCDRS        j   REFERENCE USE         Page   199   of   2.9 J Attachment 9.9 Radiological Coordinator Checklist Sheet 1 of 5 This is a Core Staffing Position.
1.0   Initial Responsibili~tvActivitv                                         NOTES 1.1   Follow responsibilities/activities in EN-EP-610 Attachment 9.9 and the following:
1.2   Assume the position of Radiological Coordinator.
A. Request the Control Room to align the OSCITSC ventilation system for incident operation per procedure, if required.
A. Request the Control Room to align the OSCITSC ventilation system for incident operation per procedure, if required.
B. Establish the capability for monitoring of Iodine, should itbecome necessary.
B. Establish the capability for monitoring of Iodine, should it become necessary. Have a Rad Protection Tech set up the AMS-4 as per Attachment 9A13 of procedure IP EP-230, 2.0   Continuous ResponsibilitvtActivitv 2.1     Establish Radiological Control oversight.
Have a Rad Protection Tech set up theAMS-4 as per Attachment 9A13 of procedure IP EP-230,2.0 Continuous ResponsibilitvtActivitv 2.1 Establish Radiological Control oversight.
A. Verify that the radiological controls for the TSCIOSC have been set up per sheet 9 of this check list.
A. Verify that the radiological controls for the TSCIOSC havebeen set up per sheet 9 of this check list.2.2 IF there are contaminated injured personnel THEN performthe following:
2.2     IF there are contaminated injured personnel THEN perform the following:
A. Provide radiological support for the assessment, treatment, and transportation of contaminated injured personnel.
A. Provide radiological support for the assessment, treatment, and transportation of contaminated injured personnel. Act as the point of contact with the hospital where treatment is executed.
Act asthe point of contact with the hospital where treatment isexecuted.
: 8. Make arrangements to pick up Rad Protection personnel at the hospital.
: 8. Make arrangements to pick up Rad Protection personnel atthe hospital.
C. Follow proper procedures to retrieve radioactive waste from offsite treatment locations.
C. Follow proper procedures to retrieve radioactive waste fromoffsite treatment locations.
: 0. Obtain concurrence from the EPM prior to releasing the hospital's Radiological Emergency Room or the ambulance for uncontrolled use.
: 0. Obtain concurrence from the EPM prior to releasing thehospital's Radiological Emergency Room or the ambulance for uncontrolled use.
 
ml~ey, EMERGENCY PLAN PROCEDURE*
ml~ey,       EMERGENCY PLAN             PROCEDURE*
Attachment  
Attachment ,9.
,9..Radiological Coordinator Checklist Sheet 2 of 5Continuous Res ponslbtil/Activitv.,(cant.)  
            .             Radiological Coordinator Checklist Sheet 2 of 5 Continuous Res ponslbtil/Activitv.,(cant.)           -         NOTES 2.3   Provide oversight to ensure emergency teams receive .proper briefs on radiological conditions       .
-NOTES2.3 Provide oversight to ensure emergency teamsreceive .proper briefs on radiological conditions  
and requirements.
.and requirements.
2.4   IF individuals receive or are expected to receive radiolodine uptakes >~5 REM CDE child thyroid dose or a General Emergency has been declared THEN:
2.4 IF individuals receive or are expected to receiveradiolodine uptakes >~ 5 REM CDE child thyroiddose or a General Emergency has been declaredTHEN:*A. issue K! to onsite emergency workers applying thefollowing controls:
    *A. issue K!to onsite emergency workers applying the following controls:
: 1. Brief personnel in the protected area on theuse of KI and its potential side effects usingsheet 11 of this Attachment 9.9..2. Assure that persons in the TSC/OSC, bothCCR's and Security personnel within theprotected area are briefed.3. For R&CA team personnel record KI issuanceinformation on Individual Exposure TrackingLog (Formn EP-29).4. Have all TSCIOSC personnel and securitypersonnel:
: 1. Brief personnel in the protected area on the use of KI and its potential side effects using sheet 11 of this Attachment 9.9..
within the protected area report tothe TSC/OSC for distribution of KI.2.8 Verify that the decontamination efforts ofpersonnel, equipment, and onsite areas areappropriate.
: 2. Assure that persons in the TSC/OSC, both CCR's and Security personnel within the protected area are briefed.
2.6 Participate in Facility Briefings to announceradiological conditions at the TSC1OSC and alsoaffected locations with an emphasis on status of aradiological release.
: 3. For R&CA team personnel record KI issuance information on Individual Exposure Tracking Log (Formn EP-29).
EMERGENCY PLAN PREURIMPLEENTIN 9.9RadiologicaI Coordinator Checklist Sheet 3 of 5AA~\ CEOSCTSC!NRCEP'N/uter RoomA~"' .,NN 2ACornpiTSCtOSC Access Points to be posted:If Hallway Contamination  
: 4. Have all TSCIOSC personnel and security personnel: within the protected area report to the TSC/OSC for distribution of KI.
<~ 100}0 dpm/ 100 sq. cm If Hallway Contamination  
2.8   Verify that the decontamination efforts of personnel, equipment, and onsite areas are appropriate.
>' 1000 dpm/ 100 sq. cmA. En~ry/Exit A. No Entry. Exit Only8, No EntrylNo Exit B. Entry to TSC/iOSC.
2.6   Participate in Facility Briefings to announce radiological conditions at the TSC1OSC and also affected locations with an emphasis on status of a radiological release.
No Exit. White Step Off PadC. No Entry/Na Exit and Frisk Shoes before stepping here C. No Entry/No Exit0, Equipment cabinets.
 
Place sign at top of' stairway  
Eieiy*              EMERGENCY PLAN                     PREUR IMPLEENTIN Atta*chment 9.9 RadiologicaI Coordinator Checklist Sheet 3 of 5 A                                          ~\         C A
: 0. Equipment  
E OSC        !N R
: cabinets, Place sign at top of stairwa~y, No Entry/No}
C E
Exit without permission from RAD Coordinator.
TSC        P
No EntrylNo Exit without permission from RADE. Air Monitoring Equipment Coordinator E. Air Monitoring Equipment  
                              'N A              /                 Cornpi uter Room
" Einergy EMERGENCY PLAN PROCEDURE
                    ~"'   .,
~iMPLEMENTING PROCEDURES REFERENCE S Pg 2 f2Attchment 9.9Radiological Coordinator Checklist Sheet 4 of 5 _information on use of Potassium IodideIOSA TT' TabletsPotassium Iodide TabletsTAKE POTASSIUM IODIDE ONLY WHENPUBLIC HEALTH OFFICIALS TELL YOU.iN A RADIATION EMERGENCY RADIOACT1VE IODINE C OULD BERELEASED INTO THE AIR, POTASSIUM IODIDE ( A FORM OF IODINE) CAN HELPPROTECT YOU.o IF YOU ARE TOLD TO TAKE THISMEDICINE.
NN   2 A
TAKE IT ONE TIME EVERY 24HOURS, DO NOT TAKE IT MORE OFTEN.MORE WILL NOT HELP YOU AND MAYINCREASE THE RISK OF SIDE EFFECTS.NOT TAKE THIS DRUG IF YOU KNOWYOU ARE ALLERGIC TO IODIDE (,SEESI DE EFFECTS BELOW)DIRECTIONS FOR USEUse only when directed by Emergency Management, State, Local or Public Health Officials DOSEADULTS AND CHILDREN ONE YEAR OF AGE OROLWER:One (I) tablet once a day. Crush for smallchiildren.
TSCtOSC Access Points to be posted:
BABIES UNDER ONE YEAR OF AGE:One-half (1/2) tablet onos a day. Crush first.DOSAGETake for 10 days unless directed otherwise.
If Hallway Contamination <~100}0 dpm/ 100 sq. cm             If Hallway Contamination >' 1000 dpm/ 100 sq. cm A.En~ry/Exit                                                 A. No Entry. Exit Only 8, No EntrylNo Exit                                           B. Entry to TSC/iOSC. No Exit. White Step Off Pad C. No Entry/Na Exit and Frisk Shoes before stepping here C. No Entry/No Exit 0, Equipment cabinets. Place sign at top of' stairway         0. Equipment cabinets, Place sign at top of stairwa~y, No Entry/No} Exit without permission from RAD Coordinator. No EntrylNo Exit without permission from RAD E. Air Monitoring Equipment                                     Coordinator E. Air Monitoring Equipment
Slore your supply at momn temperature between 590F and 860 F. Keep package dry and foil packetsintact.KEEP YOUR SUPPLYV OUT OF REACH OFCHILDREN.
 
SIDIE EFFECTSUsually, side effects of potassium iodide happenwhen people take higher doses for a long time. Youshould be careful not to lake more than therecommended dose or take it for longer than you aretold. Side effects are unlikely because of the lowdose and Ihe short tme you will be taking the drug.Possible sid effects include skin rashes, swelilng ofthe salivary glands, and "icdism' (metaltic tasle,bumlng mouth and throat, sore teeth and gums,symptoms of a head cold, and sometimes stomachupset and diarrhea).
" Einergy                 EMERGENCY PLAN                     PROCEDURE
WARNINGPOTASSIUM IODIDE SHOULD NOT BE USED BYPEOPLE ALLERGIC TO IODIDE, Keep oul of thereach of children.
  ~iMPLEMENTING PROCEDURES                     REFERENCE           S               Pg             2     f2 Attchment 9.9 Radiological Coordinator Checklist Sheet 4 of 5         _
In case of overdose or allergicreaction, so nlact a physician or public healthauthority, HOW POTASSIUM IODIDE WORKSCertain forms of iodine help your thyroid gland workright. Most people get the iodine they need fromlfoods like iodized salt or fish. The thyroid can "store"or hold only a certain amount of iodine,In a radiation emergency radioactive iodine may bereleased In the air. If this air is breathed orswallowed it may enter the Ihyroid and damage it.The damage may not show itsef for years. Child renare the most likely to have thyroid damage.lf you take potassium iodide, it wiU fill up you thyroidgland. This reduced the chances that radioactive iodine will enter your thyroid.WHO SHOULD NOT TAKE POTASSIUM IODIDEThe only people who should not take tablets whendirected to do so are people who know they areallergic to iodine. Pregnantwomen.
information on use of Potassium Iodide IOSA TT' Tablets Potassium Iodide Tablets o*  TAKE POTASSIUM IODIDE ONLY WHEN                                      WARNING PUBLIC HEALTH OFFICIALS TELL YOU.             POTASSIUM IODIDE SHOULD NOT BE USED BY iN A RADIATION EMERGENCY                     PEOPLE ALLERGIC TO IODIDE, Keep oul of the RADIOACT1VE IODINE C OULD BE                  reach of children. In case of overdose or allergic RELEASED INTO THE AIR, POTASSIUM             reaction, so nlact a physician or public health IODIDE ( A FORM OF IODINE) CAN HELP          authority, PROTECT YOU.
nursslg women,children and bables may take this drug,HOW AND WHENPotassium lodide should be taken as soon aspossible after authorities tell you to take ft.You should take one dose every 24 hours.MORE WILL NOT HELP YOU, AND WILLINCREASE THE CHANCES OF SI DE EFFECTS.Continue to take the drug for 10 days.WHAT TO 00 IF SIDE EFFECT OCCURSTOP taking the drugs and contact a doctor or publichealth officials for instructions.
o   IF YOU ARE TOLD TO TAKE THIS                            HOW POTASSIUM IODIDE WORKS MEDICINE. TAKE IT ONE TIME EVERY 24          Certain forms of iodine help your thyroid gland work HOURS, DO NOT TAKE IT MORE OFTEN.             right. Most people get the iodine they need froml MORE WILL NOT HELP YOU AND MAY                foods like iodized salt or fish. The thyroid can "store" INCREASE THE RISK OF SIDE EFFECTS.           or hold only a certain amount of iodine, NOT TAKE THIS DRUG IF YOU KNOW In a radiation emergency radioactive iodine may be YOU ARE ALLERGIC TO IODIDE (,SEE released In the air. If this air is breathed or SI DE EFFECTS BELOW) swallowed it may enter the Ihyroid and damage it.
DESCRIPTION AND USEEach IOSATTM Tablet contains 130 ofpotassium iodide.Thyroid blocking in emergency only.
DIRECTIONS FOR USE                  The damage may not show itsef for years. Child ren Use only when directed by Emergency Management,         are the most likely to have thyroid damage.
r , e'ye MREcIPEC PLNNON-QUALITYP C~RRELATED IP-EP-220 Revision 18j Enery EERECYPLNPROCEDURESI IPRCDRSREFERENCE USE Page 2_3 of 299Attchment 9.9Radiological Coordinator Checklist Sheet 5 of 5BRIEFING iNFORMATiON ON USE OF POTASSiUM IODIDE (K!I)Why is Potassium Iodide being issued? In accordance with the NewYork State Policy on Potassium iodide, potassium iodide isrecommended on a projected thyroid dose of 5 Remn. Potassium Iodide isissued at a declared General Emergency or during an emergency relatedradioactive airborne release.
State, Local or Public Health Officials                 lfyou take potassium iodide, it wiU fill up you thyroid gland. This reduced the chances that radioactive DOSE                        iodine will enter your thyroid.
Taking Potassium iodide is voluntary.
ADULTS AND CHILDREN ONE YEAR OF AGE OR OLWER:                                                   WHO SHOULD NOT TAKE POTASSIUM IODIDE One (I) tablet once a day. Crush for small      The only people who should not take tablets when chiildren.                                      directed to do so are people who know they are BABIES UNDER ONE YEAR OF AGE:                           allergic to iodine. Pregnantwomen. nursslg women, One-half (1/2) tablet onos a day. Crush first. children and bables may take this drug, HOW AND WHEN DOSAGE                        Potassium lodide should be taken as soon as Take for 10 days unless directed otherwise.              possible after authorities tell you to take ft.
What is Potassium Iodide? Potassium iodide is a thyroid blockingprotective action for exposure to radioactive iodine. If you take potassium iodide it will saturate your thyroid gland which will reduce the chancesthat radioactive iodine-will enter your thyroid.
Slore your supply at momn temperature between 590      You should take one dose every 24 hours.
Additional information isavailable on the information handout with each tablet.What dosage to take? A 130 milligram tablet. You should take as soonas possible after being told. One (1) tablet every 24 hours. Take for 10days. Unless otherwise directed.
F and 860 F. Keep package dry and foil packets          MORE WILL NOT HELP YOU, AND WILL intact.                                                INCREASE THE CHANCES OF SI DE EFFECTS.
Side Effects?
KEEP YOUR SUPPLYV OUT OF REACH OF                Continue to take the drug for 10 days.
Skin rash, swelling of salivary glands, a metallic taste,burning mouth and throat, sore teeth and gums, symptoms of a headcold and sometimes upset stomach or diarrhe~i.
CHILDREN.
This would usuallyhappen when higher doses are taken over long period of time.WARNING!I Potassium iodide should not be taken by people allergic to iodine or shellfish.
WHAT TO 00 IF SIDE EFFECT OCCUR SIDIE EFFECTS                    STOP taking the drugs and contact a doctor or public Usually, side effects of potassium iodide happen        health officials for instructions.
EE MERGENCY PLAN j PROCEDURE NNUAIYRLTD IPoEP22O Revision 18~ En~n'v iMPLEMENTING OI PROCEDURES REFERENCE USE Page 244 of 299Attchment 9.10TSC Security Coordinator Checklist Sheet 1 of 31.0 tnitial ResponsibiiltvlActivibt NOTES1.1 Follow responsibilitieslactivities in EN-EP-4I0 Attchment 9,.10and the following:
when people take higher doses for a long time. You should be careful not to lake more than the recommended dose or take it for longer than you are told. Side effects are unlikely because of the low                      DESCRIPTION AND USE dose and Ihe short tme you will be taking the drug.
1.2 Assume the duties of the Security Coordinator.
Each IOSATTM Tablet contains 130 mg* of Possible sid effects include skin rashes, swelilng of    potassium iodide.
A. Refer to EN-EP-SI0 Attachment 9.10.B. Secure Site Access at the SITE AREA or GENERALEMERGENCY level as follows:(,a) Notify CAS and SAS to secure the site, except for EReMembers, per procedure IP-EP-240, Security.-Notify the EPM when this has been done.1.,3 Assign OSC Log Keeper to the position of Coordinator.
the salivary glands, and "icdism' (metaltic tasle, bumlng mouth and throat, sore teeth and gums,           Thyroid blocking in *adiatlon emergency only.
A. Report readiness to conduct Accountability to the EPM. Utilizethe OSC Log Keeper to assist in Accountability.
symptoms of a head cold, and sometimes stomach upset and diarrhea).
Bl. Direct the OSC Log Keeper to support the monitoring of" theAccountability Card Readers while ERe members are cardinginto the TSC/OSC, direct them to verify badges are properlyread by the Accountability Card Reader and to log the nameand badge number on an Accountability Roster (Form EP-47) ofanyone having diffculty using the proximity card readers.
 
NON-QUALITY RELATED iPE-2 ein 18Enierye EMERGENCY PLAN PROCEDURE IPROCEDURES REFERENCE USE Page 25 of 29Attachment 9.10TSC Security Coordinator Checklist Sheet 2 of 32.0 Continuous ResponsibilitvlActivitv NOTES2.1 iF relocation of personnel ofiite is called for THEN:A. Follow guidance in IP-EP-430, Site Assembly, Accountability andRelocation of Personnel Offsite.B. Coordinate with TSC Radiological Coordinator to monitorevacuation routes.2.2 IF relocating to the Security Administration Offces THEN informthe following individuals.
r    j
A. Emergency Plant ManagerB. TSC Radiological Coordinator C. Emergency DirectorD. Lead Accountability Officer (LAO)2.3 The Lead Accountability Officer (LAO) will generate the list ofmissing persons.
        , e'ye Enery MREcIPECPLNNON-QUALITYP EERECYPLNPROCEDURESI C~RRELATED  IP-EP-220    Revision 18 IPRCDRSREFERENCE                      USE      Page    2_3  of   299 Attchment 9.9 Radiological Coordinator Checklist Sheet 5 of 5 BRIEFING iNFORMATiON ON USE OF POTASSiUM IODIDE (K!I)
This list will be provided to the Emergency PlantManager, POM, and/or TSC Security Coordinator.
Why is Potassium Iodide being issued? In accordance with the New York State Policy on Potassium iodide, potassium iodide is recommended on a projected thyroid dose of 5 Remn. Potassium Iodide is issued at a declared General Emergency or during an emergency related radioactive airborne release. Taking Potassium iodide is voluntary.
NOTEDuring plant shutdowns, when there may be large numbers ofworkers onsite and within the radiological control areas, a Radiation Protection computer printout may be used to assist in locatingmissing personnel within the radiological control area afteraccountability is completed.
What is Potassium Iodide? Potassium iodide is a thyroid blocking protective action for exposure to radioactive iodine. If you take potassium iodide it will saturate your thyroid gland which will reduce the chances that radioactive iodine-will enter your thyroid. Additional information is available on the information handout with each tablet.
: 1. IF there are individuals who are missing THEN:(a) Review Accountability Rosters (Form EP-47) used toidentify ERO members experiencing difficulty using theproximity card readers and remove them from theMissing Persons List.(b) Obtain the Radiation Protection Computer Printout ofindividuals within the Radiological Control Area.(c) Check off names of possible missing individuals whohave left the Protected Area to narrow the list of actualmissing MEGNY LNPOCEDUArYRELAE IP-EP-220 Revision 18~~~Entergy IMPLEMENTlNGPLNMREC RCDR ae ~ oAttachment 9.1 0TSC Security Coordinator Checklist Sheet 3 of 3Continuous ResponsibilitvlActivitv (cont,) NOTESpersons and review RP computer printout for any missingindividuals within the Radiological Control Area.(d) inform the EPM immediately of any personnel discovered missing during accountability process.4. Assist OSC Staff in maintaining accountability of all OSCpersonnel through the use of status boards, teamassignments, Individual.
What dosage to take? A 130 milligram tablet. You should take as soon as possible after being told. One (1) tablet every 24 hours. Take for 10 days. Unless otherwise directed.
Exposure Tracking Log (Form EP-29)and ERO Tracking Log (Form EP-42).2.4 Use the 08C Log Keeper to maintain Continuing Accountability A. Use Onsite ERO Shift Rosters (Form EP-43) to list individuals currently on the Tirst shift in the TSC and OSC.B. Request EOF Support Staff to identify the current EOF personnel.
Side Effects? Skin rash, swelling of salivary glands, a metallic taste, burning mouth and throat, sore teeth and gums, symptoms of a head cold and sometimes upset stomach or diarrhe~i. This would usually happen when higher doses are taken over long period of time.
C. Work with TSC and OSC Managers to identify personnel to fill.second shift and ensure all needed positions are identified andestablish time second shift is to be called in.D. Use ETD to identify and contact individuals to fill positions onsecond OSC Log-Keeper and EOF Staff may be used toassist in notifications.
WARNING!I Potassium iodide should not be taken by people allergic to iodine or shell fish.
E, Inform the TSG and OSO Managers when notifications arecompleted and if there are any problems filling required positions.
 
00iIPEC 1 NON-QUALITY RELATED iP-EP-220 Revision 18* Enlergy EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES J REFERENCE USE ,. lPage __of 2Attachment 9.11tTSC I QSC Layout and NRC RoomSheet 1 of 1TYPICAL Arrangement (Personnel locations may be changed as needed to facilitate communication and movement without a procedure revision)
      ~  En~n'v
--- R M oN.QUALIT IP.EP-220 Revsion 18'~EIdtgEMERGENCY PLAN RELATED PROCEDOURE iMPLEMENTING-PRCDRSREFSReNCe USE Page Of 299Attachment 9.1 2TSCIOSC Public Address System Description and Operation Sheet 1 of 11,0 GeneralThere are three Public Address Systems (PAs) in the TSC/OSC and they have been colorcoded for easy identification of microphones and speakers.
* MERGENCY PLAN EE iMPLEMENTING j    PROCEDURE NNUAIYRLTD              IPoEP22O    Revision 18 OI      PROCEDURES            REFERENCE USE       Page       244  of     299 Attchment 9.10 TSC Security Coordinator Checklist Sheet 1 of 3 1.0  tnitial ResponsibiiltvlActivibt                                            NOTES 1.1  Follow responsibilitieslactivities in EN-EP-4I0 Attchment 9,.10 and the following:
1.2  Assume the duties of the Security Coordinator.
A. Refer to EN-EP-SI0 Attachment 9.10.
B. Secure Site Access at the SITE AREA or GENERAL EMERGENCY level as follows:
(,a) Notify CAS and SAS to secure the site, except for ERe Members, per procedure IP-EP-240, Security.
(b)* -Notify the EPM when this has been done.
1.,3 Assign OSC Log Keeper to the position of Accountabiity*
Coordinator.
A. Report readiness to conduct Accountability to the EPM. Utilize the OSC Log Keeper to assist in Accountability.
Bl. Direct the OSC Log Keeper to support the monitoring of"the Accountability Card Readers while ERe members are carding into the TSC/OSC, direct them to verify badges are properly read by the Accountability Card Reader and to log the name and badge number on an Accountability Roster (Form EP-47) of anyone having diffculty using the proximity card readers.
 
      *ElIPEC Enierye    EMERGENCY PLAN NON-QUALITY RELATED PROCEDURE      I iPE-2            ein    18 PROCEDURES              REFERENCE USE        Page        25  of 29 Attachment 9.10 TSC Security Coordinator Checklist Sheet 2 of 3 2.0 Continuous ResponsibilitvlActivitv                                        NOTES 2.1    iF relocation of personnel ofiite is called for THEN:
A. Follow guidance in IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite.
B. Coordinate with TSC Radiological Coordinator to monitor evacuation routes.
2.2   IF relocating to the Security Administration Offces THEN inform the following individuals.
A. Emergency Plant Manager B. TSC Radiological Coordinator C. Emergency Director D. Lead Accountability Officer (LAO) 2.3  The Lead Accountability Officer (LAO) will generate the list of missing persons. This list will be provided to the Emergency Plant Manager, POM, and/or TSC Security Coordinator.
NOTE During plant shutdowns, when there may be large numbers of workers onsite and within the radiological control areas, a Radiation Protection computer printout may be used to assist in locating missing personnel within the radiological control area after accountability is completed.
: 1. IF there are individuals who are missing THEN:
(a)  Review Accountability Rosters (Form EP-47) used to identify ERO members experiencing difficulty using the proximity card readers and remove them from the Missing Persons List.
(b)  Obtain the Radiation Protection Computer Printout of individuals within the Radiological Control Area.
(c)  Check off names of possible missing individuals who have left the Protected Area to narrow the list of actual missing
 
          *E*        MEGNY LNPOCEDUArYRELAE                        IP-EP-220  Revision 18
    ~~~Entergy        IMPLEMENTlNGPLNMREC        RCDR              ae        ~  o Attachment 9.1 0 TSC Security Coordinator Checklist Sheet 3 of 3 Continuous ResponsibilitvlActivitv (cont,)                                  NOTES persons and review RP computer printout for any missing individuals within the Radiological Control Area.
(d)   inform the EPM immediately of any personnel discovered missing during accountability process.
: 4. Assist OSC Staff in maintaining accountability of all OSC personnel through the use of status boards, team assignments, Individual. Exposure Tracking Log (Form EP-29) and ERO Tracking Log (Form EP-42).
2.4  Use the 08C Log Keeper to maintain Continuing Accountability A. Use Onsite ERO Shift Rosters (Form EP-43) to list individuals currently on the Tirst shift in the TSC and OSC.
B. Request EOF Support Staff to identify the current EOF personnel.
C. Work with TSC and OSC Managers to identify personnel to fill.
second shift and ensure all needed positions are identified and establish time second shift is to be called in.
D. Use ETD to identify and contact individuals to fill positions on second shift.* OSC Log-Keeper and EOF Staff may be used to assist in notifications.
E, Inform the TSG and OSO Managers when notifications are completed and if there are any problems filling required positions.
 
0                                                                                                                0i
* Enlergy        IPEC EMERGENCY PLAN    1    NON-QUALITY RELATED PROCEDURE                iP-EP-220              Revision 18 IMPLEMENTING PROCEDURES        J      REFERENCE USE    ,. lPage                    __of              2 Attachment 9.11t TSC I QSC Layout and NRC Room Sheet 1 of 1 TYPICAL Arrangement (Personnel locations may be changed as needed to facilitate communication and movement without a procedure revision)
 
              ---                            R MoN.QUALIT          IP.EP-220 Revsion 18
        '~EIdtgEMERGENCY PLAN RELATED PROCEDOURE iMPLEMENTING-PRCDRSREFSReNCe USE                      Page      2*    Of  299 Attachment 9.1 2 TSCIOSC Public Address System Description and Operation Sheet 1 of 1 1,0 General There are three Public Address Systems (PAs) in the TSC/OSC and they have been color coded for easy identification of microphones and speakers.
2.0 SystemslOperation 2.1 Blue System comprises the plant page system. This page system is only from U2. The Speakers are located in the Halls, the OSC Bull Pen, the R&CA Briefing room, the NRC Conference Room, and the old U2 Records room. Volume controls are typically walls near speakers. Activation is via the normal plant page access.
2.2 Red System is the permanently installed TSCIOSC page system. The speakers are located in the ceilings similar to the Plant Page, system. Speakers are in the Halls, the OSC Bull Pen, the R&CA Briefing room, the TSC/OSC Command room, the NRC Conference room and the old U2 Records room. The speakers are marked with red tape. Each speaker has its own on/off switch and volume control knob. The amplifier and two microphones are on/in the counter separating the TSC and OSC each marked with RED tape. The microphones are wireless and battery powered and simply require that they be turned on to activate the system. Volume control is-via the local speaker or the amplifier on the counter separating the TSC and 0S0.
2.3 Green System consists of wireless portable speakers distributed around the facility. Each speaker must be turned on by a switch on the back and the volume adjusted locally by a switch on the front. The volume should be turned up to full volume and adjusted down as needed. Speakers are located in the 0SC Bull Pen, the TSC/OSC Command room, the NRC Conference room, the Whole Body Count room and the old U2 Records room. There are two microphones on/in the TSC/OSC Counter each marked with GREEN tape. The microphones are wireless and battery powered and simply require that they be turned on to activate the system. Additional batteries are available in the supply boxes. Note that this system does not cover the Hallways.


==2.0 SystemslOperation==
Attachment 9.13 IPEC TSC STAFFING Sheet 1 of 1 At IPEC, the expectation is that ALL individuals assigned to the Technical Support Center (TSC) report to the facility within 60 minutes of the declaration of an Event.
2.1 Blue System comprises the plant page system. This page system is only from U2. TheSpeakers are located in the Halls, the OSC Bull Pen, the R&CA Briefing room, the NRCConference Room, and the old U2 Records room. Volume controls are typically walls nearspeakers.
The TSC is able to be considered STAFFED when the following Core Individuals are present: Emergency Plant Manager (EPM), TSC Manager, TSC Communicator, Rad Coordinator, Mechanical Engineer, Electricalll&C Engineer and Reactor Engineer. Regardless of whoever else is available these positions MUST be filled before the TSC can be considered to be STAFFED.
Activation is via the normal plant page access.2.2 Red System is the permanently installed TSCIOSC page system. The speakers are locatedin the ceilings similar to the Plant Page, system. Speakers are in the Halls, the OSC BullPen, the R&CA Briefing room, the TSC/OSC Command room, the NRC Conference roomand the old U2 Records room. The speakers are marked with red tape. Each speaker hasits own on/off switch and volume control knob. The amplifier and two microphones areon/in the counter separating the TSC and OSC each marked with RED tape. Themicrophones are wireless and battery powered and simply require that they be turned on toactivate the system. Volume control is-via the local speaker or the amplifier on the counterseparating the TSC and 0S0.2.3 Green System consists of wireless portable speakers distributed around the facility.
The IPEC Emergency Plan in Section B (Table B-I) requires the following to respond within .60 minutes: TSC Communicator, a Reactor Engineer, an Electrical Engineer and a Mechanical Engineer.
Eachspeaker must be turned on by a switch on the back and the volume adjusted locally by aswitch on the front. The volume should be turned up to full volume and adjusted down asneeded. Speakers are located in the 0SC Bull Pen, the TSC/OSC Command room, theNRC Conference room, the Whole Body Count room and the old U2 Records room. Thereare two microphones on/in the TSC/OSC Counter each marked with GREEN tape. Themicrophones are wireless and battery powered and simply require that they be turned on toactivate the system. Additional batteries are available in the supply boxes. Note that thissystem does not cover the Hallways.
The TSC may be declared OPERATIONAL whenever Core Individuals are achieved and the TSC Manager determines that the facility is adequately staffed for the event and equipment is set up and available to perform the emergency functions assigned to the TSC.
Attachment 9.13IPEC TSC STAFFINGSheet 1 of 1At IPEC, the expectation is that ALL individuals assigned to the Technical Support Center (TSC) report to the facility within 60 minutes of thedeclaration of an Event.The TSC is able to be considered STAFFED when the following CoreIndividuals are present:
 
Emergency Plant Manager (EPM), TSC Manager,TSC Communicator, Rad Coordinator, Mechanical  
ATTACHMENT 9.1                                                                         IOCFR5O.54{q) SCeswNG SHEET 1 Ot 4 ProcedureiDocument Number:                                           Revision:
: Engineer, Electricalll&C Engineer and Reactor Engineer.
EN-EP-SI 0                                                                       2 IP-EP-220                                                                         t EquipmentiacliitylOther:             indian Point Energy Center
Regardless of whoever else is available these positions MUST be filled before the TSC can be considered to beSTAFFED.The IPEC Emergency Plan in Section B (Table B-I) requires the following torespond within .60 minutes:
 
TSC Communicator, a Reactor Engineer, anElectrical Engineer and a Mechanical Engineer.
==Title:==
The TSC may be declared OPERATIONAL whenever Core Individuals areachieved and the TSC Manager determines that the facility is adequately staffed for the event and equipment is set up and available to perform theemergency functions assigned to the TSC.
Technical Support Center fTSC) Operations Technical Support Center Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan):
ATTACHMENT 9.1 IOCFR5O.54{q)
This change issues fleet procedure EN-EP-610, "Technical Support Center (TSC) Operations" and revises IP-EP-220 to remove any duplicate tasks in EN.EP-610; however maintain any site specific requirements or commitments.
SCeswNGSHEET 1 Ot 4ProcedureiDocument Number: Revision:
Part Ii. Activity Previously Reviewed?                                                   NE                 *N Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or               50.54(q)(3)       Continue to Alert and Notification System Design Report?                                             EOT reutioni . ext Enter If YES, identify bounding source document numberlapproval reference and                   justification ensure the basis for concluding the source document fully bounds the                     b~ow and proposed change is documented below:,                                                       opeePr JustfifcatIon:
EN-EP-SI 0 2IP-EP-220 tEquipmentiacliitylOther:
indian Point Energy CenterTitle:Technical Support Center fTSC) Operations Technical Support CenterPart I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a changeto the emergency plan or affect the implementation of the emergency plan):This change issues fleet procedure EN-EP-610, "Technical Support Center (TSC) Operations" and revises IP-EP-220 toremove any duplicate tasks in EN.EP-610; however maintain any site specific requirements or commitments.
Part Ii. Activity Previously Reviewed?
NE Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3)
Continue toAlert and Notification System Design Report? EOT reutioni ext .EnterIf YES, identify bounding source document numberlapproval reference and justification ensure the basis for concluding the source document fully bounds the b~ow andproposed change is documented below:, opeePrJustfifcatIon:
[Cs8ounding document attached (optional)
[Cs8ounding document attached (optional)
Part ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity.  
Part ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity. (Refer to EN-LI-i100)
(Refer to EN-LI-i100)
NOTE: For example, when a design change is the proposed activity, consequential actions may include changes to other documents which have a different change control process and are NOT to be included in this 50.54(q)(3)
NOTE: For example, when a design change is the proposed  
: activity, consequential actions may include changes toother documents which have a different change control process and are NOT to be included in this 50.54(q)(3)
APPLICABILITY CONCLUSION.
APPLICABILITY CONCLUSION.
0] If there are no controlling change processes, continue the 50.54(q)(  
0] If there are no controlling change processes, continue the 50.54(q)( 3) Screening.
: 3) Screening.
[] One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects Ihe implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify he applicable controlling change processes below.
[] One or more controlling change processes are selected,  
D] One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3)
: however, some portion of the activity involves theemergency plan or affects Ihe implementation of the emergency plan; continue the 50.54(q)(3)
Evaluation is NOT reguired. Identify controilinq change processes below and complete Part VI.
Screening for that portionof the activity.
CONTROLLING CHANGE PROCESSES 10 CFR 50.54q only.
Identify he applicable controlling change processes below.D] One or more controlling change processes are selected and fully bounds all aspects of the activity.
Part IV. Editorial Change                                                                 []E               0* NO 50 54(q)13)       Continu* to =itexi Is this activity an editorial or typographical change such as fornatting, paragraph       EValIatUWm is     part numbering, spelling, or punctuation that does not change intent?                         NOT required, Justficaion:Enter J~~~~~ustification                                                   wsifim a"nd C*tmplL'ta Part "NO"S Is checked because the procedure revision contains non-editoril               vi.
50.54(q)(3)
changes.
Evaluation is NOT reguired.
EN-EP-305 REV 3
Identify controilinq change processes below and complete Part VI.CONTROLLING CHANGE PROCESSES 10 CFR 50.54q only.Part IV. Editorial Change []E NO50 54(q)13) to =itexiIs this activity an editorial or typographical change such as fornatting, paragraph EValIatUWm is partnumbering,  
 
: spelling, or punctuation that does not change intent? NOT required, Justficaion:Enter J~~~~~ustification wsifim a"nd Part"NO"S Is checked because the procedure revision contains non-editoril vi.changes.EN-EP-305 REV 3 ATTACHMENT 9.1SHET 2 OF 4I0CFRSO.54(q)
ATTACHMENT 9.1                                                                              I0CFRSO.54(q) SCREENING SHET 2 OF 4 ProcedurelDocument Number:                                                       Revision:
SCREENING ProcedurelDocument Number: Revision:
EN-EP-61 0                                                                                   2 IP-EP-220                                                                                   18 EqulpmentiFacilitylOther: Indian Point Energy Center
EN-EP-61 0 2IP-EP-220 18EqulpmentiFacilitylOther:
 
Indian Point Energy CenterTitle:Technical Support Center (TSC) Operations Technical Support CenterPart V. Emergency Planning ElementlFunction Screen (Associated 10 CFR 50.47(b) planning standard function identified inbracketsl Does this activitv affect any of the followina, includina orooram elements from NUREG-0654/FEMA REP-i Section II?1. Responsibility for emergency response is assigned.  
==Title:==
[1] [2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 [staffing) in accordance with the emergency plan. [1]3. The process ensures that on shift emergency response responsibilities are staffed and assigned.  
Technical Support Center (TSC) Operations Technical Support Center Part  V. Emergency bracketsl              Planning Does this activitv      ElementlFunction affect                  Screen any of the followina,      (Associated includina orooram10elements CFR 50.47(b) planning standard function from NUREG-0654/FEMA       REP-i identified Section II?in
[2]' LII4. The process for timely augmentation of onshift staff is established and maintained.
: 1. Responsibility for emergency response is assigned. [1]                                                                         [
12] Ql5. Arrangements for requesting and using off site assistance have been made. [3] fJ6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] [7/. A standard scheme of emerg;ency classification and action levels is in use. [41 -8. Procedure's for notification of State and local governmental agencies are capable of alerting them of the [declared emergency within 15 minutes after declaration of an emergency and providing follow-up Snotifications.  
: 2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7                           [
[5]8.' A/dministrative and physical means have been established for alerting and'providing prompt instructions to fJthe public within the plume exposure pathway.  
staffing) in accordance with the emergency plan. [1]
(5]'10. The public ANS meets the design requirements of FEMA-REP&deg;-1 0, Guide for Evaluation of Alert andNotification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS designreport and supporting FEMA approval letter. [5]11. Systems are established for prompt communication among principal emergency response organizations.  
: 3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2]'                           LII
[6] [12. Systems are established for prompt communication to emergency response personnel.  
: 4. The process for timely augmentation of onshift staff is established and maintained. 12]                                       Ql
[8] E13; Emergency preparedne'ss information is made available to the public on a periodic basis within the plume [exposure pathway emergency planning zone (EPZ). [7]14. Coordinated dissemination of public information during emergencies is established.  
: 5. Arrangements for requesting and using off site assistance have been made. [3]                                                 fJ
[71[15. dequte fciliies re mintaned o suportemerenc respnse,,
: 6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3]                               [
816. Adequate equipmet iesr maintained to support emergency response.  
7/. A standard scheme of emerg;ency classification and action levels is in use. [41                                                 -
[8] ['17. Methods,  
: 8. Procedure's for notification of State and local governmental agencies are capable of alerting them of the                     [
: systems, and equipment for assessment of radioactive releases are in use. (9]1-18. A range of public PARs is available for implementation during emergencies.  
declared emergency within 15 minutes after declaration of an emergency and providing follow-up Snotifications. [5]
[10] [19. Evacuation time estimates for the population located in the plume exposure pathway EpZ are available to I--support the formulation of PARs and have been provided to State and local governmental authorities.  
8.' A/dministrative and physical means have been established for alerting and'providing prompt instructions to                     fJ the public within the plume exposure pathway. (5]
[10]20. A range of protective actions is available for plant emergency workers during emergencies, including those LIIfor hostile action events.[10]
'10. The public ANS meets the design requirements of FEMA-REP&deg;-1 0, Guide for Evaluation of Alert and Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5]
EN-EP-305 REV 3 ATTACHMENT#
: 11. Systems are established for prompt communication among principal emergency response organizations. [6]                         [
9.1SHEET 3 0F 4I OCFR50.54(q)
: 12. Systems are established for prompt communication to emergency response personnel. [8]                                           E 13; Emergency preparedne'ss information is made available to the public on a periodic basis within the plume                       [
SCREENING EquipmentIFac~lityIOther:.
exposure pathway emergency planning zone (EPZ). [7]
indian Point E.nergy CenterTitle:Technical Support Center (TSC) Operations Technical Support Center21. The resources for controlling radiological exposures for emergency workers are established.  
: 14. Coordinated dissemination of public information during emergencies is established. [71[
[11] [22. Arrangements are made for medical services for contaminated, injured individuals.  
: 15. dequte re   mintaned o suportemerenc fciliies                                  respnse,,   8
[12] [23. Plans for recovery and reentry are developed.  
: 16. Adequate equipmet iesr         maintained to support emergency response. [8]                                                   [
[13] [24. A drill and exercise program (including radiological,  
'17. Methods, systems, and equipment for assessment of radioactive releases are in use. (9]1-
: medical, health physics and other program areas) is [established.  
: 18. A range of public PARs is available for implementation during emergencies. [10]                                                 [
[14]25. Drills, exercises, and training evolutions that provide performance opportunities to develop,  
: 19. Evacuation time estimates for the population located in the plume exposure pathway EpZ are available to                         I--
: maintain, and [demonstrate key skills are assessed via a formal critique process in order to identify weaknesses.  
support the formulation of PARs and have been provided to State and local governmental authorities. [10]
[14]26. Identified weaknesses are corrected.  
: 20. A range of protective actions is available for plant emergency workers during emergencies, including those                     LII for hostile action events.[10]
[14].....
EN-EP-305 REV 3
: 27. Training is provided to emergency responders.  
 
[15] "28, Responsibility for emergency plan development and review is established.  
ATTACHMENT# 9.1                                                                            I OCFR50.54(q) SCREENING SHEET 3 0F 4 EquipmentIFac~lityIOther:. indian Point E.nergy Center
[16] [29. Planners responsible for emergency plan development and maintenance are properly trained.  
 
[16] ______APPLICABILITY CONCLUSION 0] If no Part V criteria are checked, a 50.54(q)(3)
==Title:==
Evaluation is [OT required; document the basis for condlusion below andcomplete Part VI, .[] If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3)
Technical Support Center (TSC) Operations Technical Support Center
Evaluation.  
: 21. The resources for controlling radiological exposures for emergency workers are established. [11]                                   [
.. .... ..BASIS FOR CONCLUSION:
: 22. Arrangements are made for medical services for contaminated, injured individuals. [12]                                             [
: 23. Plans for recovery and reentry are developed. [13]                                                                               [
: 24. A drill and exercise program (including radiological, medical, health physics and other program areas) is                         [
established. [14]
: 25. Drills, exercises, and training evolutions that provide performance opportunities to develop, maintain, and                       [
demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]
: 26. Identified weaknesses are corrected. [14].....
: 27. Training is provided to emergency responders. [15]                                                                                   "
28, Responsibility for emergency plan development and review is established. [16]                                                     [
: 29. Planners responsible for emergency plan development and maintenance are properly trained. [16]                               ______
APPLICABILITY CONCLUSION 0] Ifno Part V criteria are checked, a 50.54(q)(3) Evaluation is [OT required; document the basis for condlusion below and complete Part VI,       .   *.
[] If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation.                       ..   ....         ..
BASIS FOR CONCLUSION:
This change issues the new fleet procedure for the Technical Support Center cr[scj at IPEC and revises the site specific facility procedure.
This change issues the new fleet procedure for the Technical Support Center cr[scj at IPEC and revises the site specific facility procedure.
The fleet procedure describes the activation and operation of the TSQ. Introduction of the new fleet procedures does not affect norchange the intent of the facilities and equipment already in existence.
The fleet procedure describes the activation and operation of the TSQ. Introduction of the new fleet procedures does not affect nor change the intent of the facilities and equipment already in existence. The procedure is written to ensure the existing facility and TSC equipment will be used and maintained for any Emergency Response Organization (ERe) response.
The procedure is written to ensure the existing facility and TSCequipment will be used and maintained for any Emergency Response Organization (ERe) response.
IP-EP-220 (220) will be maintained at this time; however, it will be revised to remove any tasks duplicated in EN-EP-610 (610). Fleet standard forms .and site specific forrms will.be used as needed to support 610 and new revision of 220; this will ensure IPEC site-specitlc Emergency Plan requirements and associated processes are retained; The 610, new fleet forms, the revised 220 and current site specific forms were reviewed against the current IPEC TSC procedure, iP-EP-220, "Technical Support Center" revision 17, the Emergency Plan, and IPEC Emergency Plan commitments. Based on this review, there are two standard ERO position titles which were not: adopted by IPEC Emergency Planning; TSC Mechanical Coordinator and ENS Communicator. EN-EP-801 states that the TSC Mechanical Coordinator is optional if the TSC and OSC are co-located. These two facilities are co-located at.IPEC. The ENS communicator was not added to the TSC since the ENS communications is designated to the Engineering Coordinator at IPEC and will remain, In 2011. a 50.S54Q evaluation was performed and approved this difference. IPEC will assign dhe Engineering Coordinator to perform the checklist of ENS communicator. There is one commitment which discusses having directions for relocation to an alternate location as necessary. These directions are provided in the EPM checklists in the TSC procedure, IP-EP-220 revision 18. Changes made to IP-EP-220 revision 18 removed only duplicate tasks. Any tasks site specific and not performed in 610 will remain in 220, revision 18. Utilizing EN-EP-610, revision 2 and IP-EP-220 revision 18 for the TSC will address all tasks required for the TSC ERe and no changes to the response processes of facility activation, response time, and organization responsibilities, addressed by 10CFRS0.47(b) planning standards will be made.
IP-EP-220 (220) will be maintained at this time; however, it will be revised to remove any tasks duplicated in EN-EP-610 (610). Fleetstandard forms .and site specific forrms will.be used as needed to support 610 and new revision of 220; this will ensure IPEC site-specitlc Emergency Plan requirements and associated processes are retained; The 610, new fleet forms, the revised 220 and current site specificforms were reviewed against the current IPEC TSC procedure, iP-EP-220, "Technical Support Center" revision 17, the Emergency Plan,and IPEC Emergency Plan commitments.
Summary - No ERO positions changes have been made. No ERO responsibilities have been added or deleted. The description, activation and operation of"the TSCas described in the IPEC Emergency Plan have not been changed. All site specific commitments continue to be met under the fleet procedure or the use of the site specific facility procedure. This change does not alter the TSC structure, organization or location.
Based on this review, there are two standard ERO position titles which were not: adopted byIPEC Emergency Planning; TSC Mechanical Coordinator and ENS Communicator.
The revision of the Technical Support Center procedure, IP-EP-220 rev 18 and issuance of the fleet Technical Support Center Operations procedure, EN-EP-610 and site specific fornis screens out.
EN-EP-801 states that the TSC Mechanical Coordinator is optional if the TSC and OSC are co-located.
Changes made to IP-EP-220 rev. 18 and EN-EP-610 revision 2 have been reviewed to determine if they affect any of the planning standards or program elements in Part V of this form. It has been concluded that there Is no affect and no f'urther evaluation is required and the c:haoges do not reqluire a change to the I]PEC Emergency* Plan.
These two facilities are co-located at. IPEC. The ENS communicator was not added to theTSC since the ENS communications is designated to the Engineering Coordinator at IPEC and will remain, In 2011. a 50.S54Q evaluation was performed and approved this difference.
EN-EP-305 REV 3
IPEC will assign dhe Engineering Coordinator to perform the checklist of ENScommunicator.
 
There is one commitment which discusses having directions for relocation to an alternate location as necessary.
ATTACHMENT 9.1                                                    I 0CFRS0.54(q) SCREENING SHELET 4 OF 4 EquipnuentlFacllity/Other:     Indian Point Energy Center
Thesedirections are provided in the EPM checklists in the TSC procedure, IP-EP-220 revision  
 
: 18. Changes made to IP-EP-220 revision 18removed only duplicate tasks. Any tasks site specific and not performed in 610 will remain in 220, revision  
==Title:==
: 18. Utilizing EN-EP-610, revision 2 and IP-EP-220 revision 18 for the TSC will address all tasks required for the TSC ERe and no changes to the responseprocesses of facility activation, response time, and organization responsibilities, addressed by 1OCFRS0.47(b) planning standards will bemade.Summary -No ERO positions changes have been made. No ERO responsibilities have been added or deleted.
Technical Support Center (rSC) Operations Technical Support Center Part Vi, Signatures:
The description, activation and operation of" the TSC as described in the I PEC Emergency Plan have not been changed.
Preparer Name (Print)                               Preparer Signature             Date:
All site specific commitments continue to bemet under the fleet procedure or the use of the site specific facility procedure.
Rebecca A. Martin                                                                               !
This change does not alter the TSC structure, organization or location.
(Optional) Reviewer Name (Print)                     Reviewer SignatureDt:
The revision of the Technical Support Center procedure, IP-EP-220 rev 18 and issuance of the fleet Technical Support Center Operations procedure, EN-EP-610 and site specific fornis screens out.Changes made to IP-EP-220 rev. 18 and EN-EP-610 revision 2 have been reviewed to determine if they affect any of theplanning standards or program elements in Part V of this form. It has been concluded that there Is no affect and no f'urtherevaluation is required and the c:haoges do not reqluire a change to the I]PEC Plan.EN-EP-305 REV 3 ATTACHMENT 9.1SHELET 4 OF 4I 0CFRS0.54(q)
Approver Name (Print)                               AppoerSgature                 Date:"
SCREENING EquipnuentlFacllity/Other:
EP Manager           -.. . ..       ..                                                     _._   _ _ _
Indian Point Energy CenterTitle:Technical Support Center (rSC) Operations Technical Support CenterPart Vi, Signatures:
                                                /
Preparer Name (Print) Preparer Signature Date:Rebecca A. Martin !(Optional)
EN-EP-305 REV 3
Reviewer Name (Print) Reviewer SignatureDt:
 
Approver Name (Print) AppoerSgature Date:"EP Manager -.. ... .._._ _ _ _/EN-EP-305 REV 3 IPEC IMPLEMENTING PROCEDURE Rev:. 1PREPARATION, REWV EW, AND APPROVAL Pae 4of4kTTACHMENT IPEC PROCEDURE REVIEW AND APPROVAL...... ~ ~(Page 1 of 1)... ..Procedure Title: Technical Support CenterProcedure No: IP-EP-220 Existing Rev: 17 New Rev: 18 DRN/EC No: DRN-15-01355 Procedure Activity  
IPEC IMPLEMENTING PROCEDURE                                                               IP-SMM-AD-1*02                Rev:. 1 PREPARATION,                       REWV EW, AND APPROVAL                                                     Pae 4of4 kTTACHMENT 1*0.2                                                                    IPEC PROCEDURE REVIEW AND APPROVAL
..............
                            ......                                     ~ ~(Page 1 of 1)...                                               ..
Temnorarv Procedure Change(MARK Applicable) 0] Converted To I PEC, Replaces:  
Procedure
(fl1ARK Applicable)
 
[] NEW PROCEDURE Unit 1 Procedure No: 03 EDITORIAL Temporary Procedure Change0] GEN ERAL REVISION (Enter Step Number In Revision Summary)O] PARTIAL REVISION Unit 2 Procedure No: [] ADVANCE Temporary Procedure ChangeIJ CONDITIONAL Temporary Procedure ChangeU] EDITORIAL REVISION TerminaingCodition
==Title:==
[] VOID PROCEDURE Unit 3 Procedure No: TriaigCniin
Technical Support Center Procedure No: IP-EP-220                             Existing Rev: 17       New Rev:         18     DRN/EC No:           DRN-15-01355 Procedure Activity..............                                                             Temnorarv Procedure Change (MARK Applicable)                   0] Converted To IPEC, Replaces:                                   (fl1ARK Applicable)
_________
[] NEW PROCEDURE                           Unit 1 Procedure No:                         03 EDITORIAL Temporary Procedure Change 0] GEN ERAL REVISION                                                                         (Enter Step Number In Revision Summary)
O1 SUPERSEDED O] RAPID REVISION Document in Microsoft Word: 0VODDNPCNs)
O] PARTIAL REVISION                         Unit 2 Procedure No:                         [] ADVANCE Temporary Procedure Change IJ CONDITIONAL Temporary Procedure Change U] EDITORIAL REVISION                                                                     TerminaingCodition
.__ ___ ___ _ Yes D].No ___VOIDDRNTPCNos):
[] VOID PROCEDURE                           Unit 3 Procedure No:                         TriaigCniin                   _________
Revision Summary [] N/A -See Revision Summary page.Revised to support implementation of new fleet facility procedures.
O1 SUPERSEDED O] RAPID REVISION                           Document in Microsoft Word:                   0VODDNPCNs)
Removed any duplicate tasks and kept site specificreqluirements and commitrrients..  
___         ___           _ .__                Yes       D].No               ___VOIDDRNTPCNos):
.*
Revision Summary                         [] N/A - See Revision Summary page.
Implementation Plan? 0] Yes 0] No Formal Training? Yes O]No Special Handling?_[]
Revised to support implementation of new fleet facility procedures. Removed any duplicate tasks and kept site specific reqluirements and commitrrients..                          .
Yes []NoRPO Dept: ,Emergency Planning Writer (Print Name! ExtI Sign): Rebecca A. Martin / G (_1~d~Revew and A2revaI (Per Attachment 10.1, IPCReview And A Requirements)
* ImleentationRequiremen*
: 1. 0 Technical Reviewer;*.Casey Karsten/  
Implementation Plan? 0] Yes 0] No Formal Training? 0* Yes O]No Special Handling?_[] Yes []No RPO Dept: ,Emergency Planning                           Writer (Print Name! ExtI Sign): Rebecca A. Martin /                   G (_1~d~
"I / ": :(Print Name! Sidnature/
Revew and A2revaI (Per Attachment 10.1, IPCReview And A _*ve~l Requirements)
Date)2. U] Cross-Disciplinary Reviewers:
: 1. 0 Technical Reviewer;*.Casey Karsten/ "I                                                   /     &*i
Dept: ________Reviewer:
                                                  "::(Print                           Name! Sidnature/ Date)
______________________________
: 2. U]     Cross-Disciplinary Reviewers:
(Print Name! Stgnature Date)Dept: _____ __Reviewer:
Dept: ________Reviewer:                         ______________________________
/,1 / (Prin Name! Signaturel Date)O3 PAD required and is compleX~(/PAD Approver and Reviewer qualifications have been verified)
(Print Name! Stgnature Date)
OPrevious exclusion from further LI-i 00 Review is still validOl PAD not required due to type of change4. 0] Non-Intent Determination Complete:
Dept: _____                 __Reviewer:
NO change of purpose or scopeNO reduction in the level of nuclear safetyNO voiding or canceling of a procedure, unless requirements are incorporated into another procedure or the need for theprocedure was eliminated via an alternate process(Print N]ame! SIgnaturel Date)NO change 10 loss restrictive acceptance criteriaNOQ change to steps previously identified as commitment stepsNO deviation from the Quality Assurance Program ManualNO change that may result in deviations from Technical Specifications.
                                                              /,1
PSAR. plant design requirements, or previously made commitments
                                                                /             (Prin Name! Signaturel Date)
: 5. U] On-Shift Shift M~anager/CRS:
O3 PAD required and is compleX~(/PAD Approver and Reviewer qualifications have been verified)
: 6. [ User Validation:
OPrevious exclusion from further LI-i 00 Review is still valid Ol PAD not required due to type of change
User:(Print Name! Signature!Date)
: 4. 0]     Non-Intent Determination Complete:
Validator:
(Print N]ame! SIgnaturel Date)
: 7. U] Special Handling Requirements Understood:
NO change of purpose or scope                                        NO change 10 loss restrictive acceptance criteria NO reduction in the level of nuclear safety                          NOQ change to steps previously identified as commitment steps NO voiding or canceling of a procedure, unless requirements           NO deviation from the Quality Assurance Program Manual are incorporated into another procedure or the need for the          NO change that may result in deviations from Technical Specifications.
procedure was eliminated via an alternate process                    PSAR. plant design requirements, or previously made commitments
: 5. U]     On-Shift Shift M~anager/CRS:
(Print Name! Signature!Date)
: 6. [       User Validation: User:                                                 Validator:
: 7. U]     Special Handling Requirements Understood:
(IPrint Naein! Signature/)Date)
(IPrint Naein! Signature/)Date)
Emergency Planning Document Change Checklist Form(All sections must be completed, N/A or place a check on the line where applicable)
Section 1Doc/Procedure Type: (circle one) Administrative I I.molementino I Doe/Procedure No: IP EP 220 CIA: Yes No CIA No. _______Due Date:_____
Doc/Procedure Title: Technical Support Center Rev No: 188 Rev Distribution Date: 01/27/16Reason for EPDCC: New X Revision Cancel Date of EPOCC: 01/13!16Section 2Change Description
: 1. Originator:
Rebecca A. Martin. C, ,,.V,..2. Class of Change: -Technical Correction
___ New Commitment__
Other X3. Page numbers affected and reason for change: Revised to suo10ort imp~lementation of new fleetfacility procedures.
Removed any duplicate tasks a~nd kept site spec~ific reqiu!r~em.rents andcommitments.
: 4. Emergency Planning Documents Affected:
None5. Emergency Planning Procedures Affected:
IP-EP-.220
: 6. ReFerences:
Other Procedure(s) 41 Nt Regulatory Document
# N/AOther:7. Reviewed training requirements with department training coordinator
__date:_____
: 8. The f~ollowing are complete, or are not applicable and are so marked.Tech Review n/a__ 50.54q. X ENN-Ll.-100:
N/A PL-155 N/A SMVM-AD-102 XManager approval X SRC N/A9. Both table of contents and transmittals are complete_______date_________
: 10. Approved dec/procedure delivered to Document Control for distribution
___date____
: 11. Position Binders updated if applicable:
.date___12. Copy of EPDCC and documentlprocedure placed in EP file date____Sheet 1 of 1Sheet of IForm EP-AD2-1 Rev. 0 IPEC EMERGENCY PLAN DISTRIBUTION LISTPage 1 of 2" IP3 CONTROL ROOMDELIVERED BYDOCUMENTS IP3 53FT. CCR1 COPY OF ALL EP'SIP3 SHIFT MANAGER DEIEEIYP3 53FT. ELEVATION 1 COPY OF ALL EP'SDOCUMENTS IP2 CONTROL ROOM DEIEEIYP2 53FT. CCR 1 COPY OF ALL EP'SDOCUMENTS IPEC TSC DELIVERED BY IP2 53FT. ELEVATION 1 COPY OF ALL EP'SDOCUMENTS IP2 SIMULATOR DEIEEDBIP2 SIMULATOR BLDG. 1 COPY OF ALL EP'SDOCUMENTS IP2 SIMULATOR
-CLASSROOM 4 DEIEEDBIP2 SIMULATOR BLDG. 1 COPY OF ALL EP'SDOCUMENTS DELIVERED BY 3 COPIES OF ALL EP'SIP2 SIMULATOR
-CLASSROOM 5 DOUETIP2 SIMULATOR BLDG. EXPTELANRC RESIDENT INSPECTOR NRC IP2 88FT. ELEVATION 1 COPY OF ALL EP'S1 COPY OF ALL EP'S ANDDOC CONTROL DESK NRC -ROCKVILLE, MD OFFSlTE GENERAL RECORDSADDRESS " EXCEPT IP-EP-1 151 COPY OF ALL EP'S ANDNRC STEVE BARR OFFSlTE GENERAL RECORDSEXCEPT IP-EP-1 151 COPY OF ALL EP'S ANDNRC DEPUTY DIRECTOR OFFSlTE GENERAL RECORDSEXCEPT IP-EP-1 151 COPY OF THEFOLLOWING:
E-PLAN, IP-EP-115, 120,NEW YORK STATE OEM TED FISCH OFFSlTE 20 5,30 4,30410, 420, 430, 620 & IP-10551 COPY OF E-PLAN,WESTCHESTER COUNTY OEM DENNIS DELBORGO OFFSlTEIPE-1&34 ROCKLAND COUNTY FIRE AND NIHLSLNGIF~T COPY OF E-PLAN,EMERGENCY SERVICES NIHLSLNOOFIEIP-EP-310
& 340ORANGE COUNTY EMERGENCY SHNOIIHE F~T COPY OF E-PLAN,SERVICES CENTER SHNO IHROFIEIP-EP-310
& 340PUTNAM COUNTY BUREAU OF ANHNIUTO F~T COPY OF E-PLAN,EMERGENCY SERVICES ATOYUONFSTEIP-EP-310
& 340 OEntergyIndian Point Energy Center CONTROLLED DOCUMENTDocument Control TRANSMITTAL 450 BroadwayBuchanan, NY 10511TO: DISTRIBUTION
"'DATE: January 26, 2016FROM: IPEC DOCUMENT CONTROL -3RD FLooR ADMIN BLDG PHONE #: 914-254-6835 TRANSMITTAL
#: EP- 16-0002The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into yourcontrolled document file, properly disposition superseded, voided, or inactive document(s).
Sign and return the receipt acknowledgement below within ten (10) working days.AFFECTED DOCUME.NT:
IPEC EMERGENCY PLAN PROCEDURES DOG REV# TILE ISTRUTION THE FOLLOWING PROCEDURE(S)
HAS BEEN REVISIED, PLEASE REMOVE YOUR CURRENTCOPY AND REPLACE WITH ATTACHED UPDATED PROCEDURE:
*,IP-EP-220:
REV.18-EFFECTIVE JAN 2 ? DATERECEIPT OF THE ABOVE LISTED DOCUMENT(S)
IS HEREBY ACKNOWLEDGED.
I CERTIFY THAT ALLSUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S)
IN MY POSSESSION HAVE BEENREMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)(IF APPLICABLE)
AS SHOWN ON THE DOCUMENT(S).
rNAME (PRINT).
SIGNATURE DATE COPY LOCATION P NON-QUALITY RELATED IP-EP-220 Revision 18erg EMERGENCY PLAN PROCEDURE
_____________I
" mPLEMENTING I.ROCEDURES REFE.REN'CE USE Page. 1 of 29Technical Support CenterPrepared by:Approval:
*Print Name ..Signature:
DatePrint Name ig treDate*Effective Date: 01/27/16Procedure extensively revised -no revision bars were used.lP-EP-220 (Technical Support Center) RI8,doc
__ IPEC NON-QUALITY REL.ATED IiP-EP-220 Revision 18-EiderJy, EMERGENCY PLANPRCDE
* IMPLEMENTING S PROCEDURES REFERENCE USE " Page 2 Ot 29.Table of Contents1.0 PURPOSE..,..
....... .... .... ...........................................................


==32.0 REFERENCES==
Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable)
........................3 3.0 DEFINITIONS,.......................................
Section 1 Doc/Procedure Type: (circle one) Administrative I I.molementino I EPLA*N Doe/Procedure No: IP EP 220      CIA: Yes        No        CIA No. _______Due                Date:_____
,.......................................
Doc/Procedure
34.0 RESPONSIBILITiES
 
..................................................
==Title:==
34.1 Emergency Plant Manager.......  
Technical Support Center      Rev No: 188 Rev Distribution Date: 01/27/16 Reason for EPDCC:            New      X      Revision          Cancel      Date of EPOCC: 01/13!16 Section 2 Change Description
...........................................
: 1.     Originator: Rebecca A. Martin.             ,.*      C, ,,.V,..
34.2 TSC Manager.....................  
: 2.     Class of Change: -Technical      Correction  ___    New Commitment__ Other              X
..35.0 DETAILS......................................  
: 3.     Page numbers affected and reason for change: Revised to suo10ort imp~lementation of new fleet facility procedures. Removed any duplicate tasks a~nd kept site spec~ific reqiu!r~em.rents and commitments.
..46.0 INTERFACES_
: 4.     Emergency Planning Documents Affected: None
....... .......................................................................
: 5.     Emergency Planning Procedures Affected: IP-EP-.220
57.0 RECORDS .........  
: 6.     ReFerences: Other Procedure(s) 41Nt        Regulatory Document # N/A Other:
.....................
: 7.     Reviewed training requirements with department training coordinator __date:_____
.........
: 8.     The f~ollowing are complete, or are not applicable and are so marked.
.................
Tech Review n/a__ 50.54q.         X    ENN-Ll.-100: N/A PL-155          N/A    SMVM-AD-102    X Manager approval      X SRC      N/A
..... .........
: 9. Both table of contents and transmittals are complete_______date_________
.........
: 10. Approved dec/procedure delivered to Document Control for distribution ___date____
...58.0 REQUIREMENTS AND COMMITMENT,......".............
: 11. Position Binders updated ifapplicable:                                                . date___
...........
: 12. Copy of EPDCC and documentlprocedure placed in EP file                                  date____
,...... 59.0 ATTACHMENTS.:..................  
Sheet 1 of 1                              Sheet of EP-AD2-1 IForm    Rev. 0
...................
 
: .......................
IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2
.......,........5 9.1 Emergency Plant Manager Checklist...............
    "  ;;i**LOCATIOP DELIVERED BY IP3 CONTROL ROOM                                            IP3 53FT. CCR        1 COPY OF ALL EP'S DOCUMENTS IP3 SHIFT MANAGER                DEIEEIYP3                  53FT. ELEVATION      1 COPY OF ALL EP'S DOCUMENTS IP2 CONTROL ROOM                DEIEEIYP2                      53FT. CCR        1 COPY OF ALL EP'S DOCUMENTS IPEC TSC                          DELIVERED BY          IP2 53FT. ELEVATION      1 COPY OF ALL EP'S DOCUMENTS IP2 SIMULATOR                    DEIEEDBIP2                SIMULATOR BLDG.       1 COPY OF ALL EP'S DOCUMENTS IP2 SIMULATOR    - CLASSROOM 4    DEIEEDBIP2                SIMULATOR BLDG.       1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY                                    3 COPIES OF ALL EP'S IP2 SIMULATOR  - CLASSROOM 5    DOUETIP2                SIMULATOR BLDG.           EXPTELA NRC RESIDENT INSPECTOR                NRC              IP2 88FT. ELEVATION      1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND DOC CONTROL DESK              NRC - ROCKVILLE, MD              OFFSlTE            GENERAL RECORDS ADDRESS                                "        EXCEPT IP-EP-1 15 1 COPY OF ALL EP'S AND NRC                                STEVE BARR                  OFFSlTE            GENERAL RECORDS EXCEPT IP-EP-1 15 1 COPY OF ALL EP'S AND NRC                            DEPUTY DIRECTOR                OFFSlTE            GENERAL RECORDS EXCEPT IP-EP-1 15 1 COPY OF THE FOLLOWING:
...............................
E-PLAN, IP-EP-115, 120, NEW YORK STATE OEM                  TED FISCH                  OFFSlTE          20 5,30        4,30 410, 420, 430, 620 & IP-1055 1 COPY OF E-PLAN, WESTCHESTER COUNTY OEM          DENNIS DELBORGO                OFFSlTEIPE-1&34 ROCKLAND COUNTY FIRE AND       NIHLSLNGIF~T                                          COPY OF E-PLAN, EMERGENCY SERVICES              NIHLSLNOOFIEIP-EP-310                                          & 340 ORANGE COUNTY EMERGENCY        SHNOIIHE                          F~T                COPY OF E-PLAN, SERVICES CENTER                SHNO        IHROFIEIP-EP-310                                    & 340 PUTNAM COUNTY BUREAU OF        ANHNIUTO                          F~T                COPY OF E-PLAN, EMERGENCY SERVICES              ATOYUONFSTEIP-EP-310                                            & 340
59.2 TSC Manager Checklist..................11 9.3 Operations Coordinator Checklist
 
...........................................
OEntergy Indian Point Energy Center                            CONTROLLED DOCUMENT Document Control                                                  TRANSMITTAL 450 Broadway Buchanan, NY 10511 TO:    DISTRIBUTION                              "'DATE:                          January 26, 2016 FROM: IPEC DOCUMENT CONTROL            - 3 RD FLooR ADMIN BLDG            PHONE #: 914-254-6835 TRANSMITTAL #: EP- 16-0002 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).
,.....139.4 Reactor Engineer Checklist.........................................................
Sign and return the receipt acknowledgement below within ten (10) working days.
149.5 Engineering Coordinator Checklist.........................
AFFECTED DOCUME.NT:            IPEC EMERGENCY PLAN PROCEDURES DOG    REV#                          TILE                                        ISTRUTION THE FOLLOWING PROCEDURE(S) HAS BEEN REVISIED, PLEASE REMOVE YOUR CURRENT COPY AND REPLACE WITH ATTACHED UPDATED PROCEDURE: *,
......................
IP-EP-220: REV.18-EFFECTIVE JAN 2 ? 2C'i3*
159.6 Mechanical and Electrical/l&C Engineer Checklist
DATE RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)
...........................
(IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).                                                                 r NAME (PRINT).             SIGNATURE                  DATE                    COPY LOCATION
...169.7 IT Specialist Checklist
 
.............................................................
Revision 18 I
179.8 TSC Communicator Checklist
L*        P                        NON-QUALITY RELATED    IP-EP-220 l~cy*
..............................................
erg      EMERGENCY PLAN                PROCEDURE        _____________I
189.9 Radiological Coordinator Checklist
      "              mPLEMENTING
...... ................
          .           ROCEDURES                  REFE.REN'CE USE        Page. 1  of  29 Technical Support Center Prepared by:
:..................
                                      *Print Name      ..             Signature:        Date Approval:
199.1t0 TSC Security Coordinator Checklist........................................
Print Name                  ig treDate
249.11 TSC/OSC Layout...................................................
                                      *Effective Date: 01/27/16 Procedure extensively revised - no revision bars were used.
...... 279.1 2 TSC/OSC Public Address System Description and Operation..............
lP-EP-220 (Technical Support Center) RI8,doc
289.13 iPEC TSC ERO Staffing...................................................
 
29 I__IPEC NON-QUALITY RELATED IP-EP-220 Revision 18I -EMERGENCY PLAN PROCEDURE IiMPLEMENTING jIPROCEDURES REFERENCE UsE Page 3 Of 2.99TECHNICAL SUPPORT CENTER (TSC)1.0 PURPOSEITo describe site specific actions for the activation and operation of the Technical Support Center (TSC). This procedure will be used in conjunction with the fleetprocedure, EN-EP-61 0, Technical Support Center (TSC) Operations.
__              IPEC                              NON-QUALITY REL.ATED              IiP-EP-220                Revision 18
    -  EiderJy,    EMERGENCY PLANPRCDE
* IMPLEMENTING S PROCEDURES                          REFERENCE USE          "              Page              2      Ot    29.
Table of Contents 1.0 PURPOSE..,..       .......         ....     ....     ........................................................... 3


==2.0 REFERENCES==
==2.0 REFERENCES==
........................3 3.0 DEFINITIONS,.......................................                                    ,....................................... 3 4.0 RESPONSIBILITiES ..................................................                                                                3 4.1      Emergency Plant Manager.......                  ..........................................
                                                                      .                                                                3 4.2      TSC Manager.....................                                                                                      .. 3 5.0 DETAILS......................................                                                                                  .. 4 6.0 INTERFACES_ ....... . ...................................................................... 5 7.0 RECORDS .......................................                    .................    ......... ..............            ... 5 8.0 REQUIREMENTS AND COMMITMENT,......".............                                                    ...........        ,...... 5 9.0 ATTACHMENTS.:.................. ...................            :          .......................    ....... ,........5 9.1 Emergency Plant Manager Checklist............... ............................... 5 9.2 TSC Manager Checklist..................11 9.3 Operations Coordinator Checklist ........................................... ,.....13 9.4 Reactor Engineer Checklist......................................................... 14 9.5 Engineering Coordinator Checklist......................... ......................                                        15 9.6 Mechanical and Electrical/l&C Engineer Checklist ...........................                                        ... 16 9.7 IT Specialist Checklist ............................................................. 17 9.8 TSC Communicator Checklist .............................................. 18 9.9 Radiological Coordinator Checklist ......                        ................                    :.................. 19 9.1t0 TSC Security Coordinator Checklist........................................ 24 9.11 TSC/OSC Layout................................................... ...... 27 9.1 2 TSC/OSC Public Address System Description and Operation.............. 28 9.13 iPEC TSC ERO Staffing................................................... 29


2.1 indian Point Energy Center Emergency Plan3.0 DEFINITIONS 3.1 See EN-EP-GlO Section 3.0 for definitions.
I__IPEC I En*eiy*
    -                EMERGENCY PLAN iMPLEMENTING NON-QUALITY RELATED PROCEDURE        I j
IP-EP-220    Revision 18 IPROCEDURES                            REFERENCE UsE          Page    3    Of  2.99 TECHNICAL SUPPORT CENTER (TSC) 1.0     PURPOSEI To describe site specific actions for the activation and operation of the Technical Support Center (TSC). This procedure will be used in conjunction with the fleet procedure, EN-EP-61 0, Technical Support Center (TSC) Operations.


==4.0 RESPONSIBILITIEES==
==2.0     REFERENCES==
4.1 See EN-EP-610 for Responsibilities.
 
5.0 DETAILS5.10 See EN-EP-610 for Details.6.0 INTERFACES 6.1 IP-EP-1 15, Emergency Plan Forms6.2 IP-EP-21 0, Central Control Room6.3 IP-EP-230, Operations Support Center:6.4 IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite6.5 IP-EP-5lO, Meteorological, Radiological  
2.1      indian Point Energy Center Emergency Plan 3.0      DEFINITIONS 3.1      See EN-EP-GlO Section 3.0 for definitions.
& Plant Data Acquisition System6.6 IP-EP-610, Emergency Termination and Recovery6.7 IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during anEmergency 6.8 0-FSG-100, BDBEEIELAP Emergency Response6.9 EN-EP-6 10, Technical Support Center (TSC) Operations 7.0 RECORDSAll forms and logs completed by the Emergency Response Organization during adeclared emergency are Quality Records and shall be maintained for the life of theplant plus twenty (20) years.
4.0      RESPONSIBILITIEES 4.1     See EN-EP-610 for Responsibilities.
ll~(?,"2_,EMERGENCY PLAN .PROCEDURE 8.0 REQUIREMEiNTS AND COMMITMENT CROSS-REFERENCE None9.0 ATTACHMENTS 9.1 Emergency Plant Manager Checklist.
5.0     DETAILS 5.10     See EN-EP-610 for Details.
9.2 TSC Manager Checklist 9.3 Operations Coordinator Checklist  
6.0     INTERFACES 6.1     IP-EP-1 15, Emergency Plan Forms 6.2     IP-EP-21 0, Central Control Room 6.3     IP-EP-230, Operations Support Center:
....9.4 Reactor Engineer Checklist 9.5 Engineering Coordinator Checklist 9.8 Mechanical and Electrical  
6.4     IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite 6.5     IP-EP-5lO, Meteorological, Radiological & Plant Data Acquisition System 6.6     IP-EP-610, Emergency Termination and Recovery 6.7     IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during an Emergency 6.8     0-FSG-100, BDBEEIELAP Emergency Response 6.9     EN-EP-6 10, Technical Support Center (TSC) Operations 7.0     RECORDS All forms and logs completed by the Emergency Response Organization during a declared emergency are Quality Records and shall be maintained for the life of the plant plus twenty (20) years.
/ I&C Engineer Checklist 9.7 IT Specialist Checklist 9.8 TSC Communicator Checklist 8.9 Radiological Coordinator Checklist 9.10 TSC Security Coordinator Checklist 9.11 TSCIOSC Layout9.12 TSCIOSC Public Address System Description and Operation 9.13 'IPEC TSC ERO Staffing SIPEC NCR-QUALITY RELATED I P-EP-20O Revi~ion' 18 EMERGENCY PLAN PROCEDURE I1 ' IMPLEMENTING j.. ,.... ...... .PROCEDURES REFERENCE UsE Page _5 of 29Attachment 9.1Emergency Plant Manager Checklist Sheet ! of 61.0 Initial ii NOTESNOTE:Procedure refers to an event at Unit 2, Unit 3 or both (i.e.,Security, Natural event). If determined to be a Site event, thenUnit 2 will be the lead plant for all communications, This is a Core Staffing position..
 
1.1 Follow. responsibilities/activities in EN-EP-61 0Attachment 9.1 and the following:
      -* ll~(?,"2_,EMERGENCY PLAN   . PROCEDURE 8.0   REQUIREMEiNTS AND COMMITMENT CROSS-REFERENCE None 9.0   ATTACHMENTS 9.1   Emergency Plant Manager Checklist.
1.2 IF a Beyond Design Basis External Event (BDBEE) occursthat results in an Extended Loss of AC Power (ELAP) toeither unit, THEN entry into, 0-FSG-100, BDBEE/ELAP Emergency  
9.2   TSC Manager Checklist 9.3   Operations Coordinator Checklist           ....
: Response, is required..
9.4   Reactor Engineer Checklist 9.5   Engineering Coordinator Checklist 9.8   Mechanical and Electrical / I&C Engineer Checklist 9.7   IT Specialist Checklist 9.8   TSC Communicator Checklist 8.9   Radiological Coordinator Checklist 9.10 TSC Security Coordinator Checklist 9.11 TSCIOSC Layout 9.12 TSCIOSC Public Address System Description and Operation 9.13 'IPEC TSC ERO Staffing
"1.3 Assume the position of Emergency Plant Manager(EPM).A. Announce yourself as the EPM and provide initialbriefing to the TSCIOSC staff. Ensure briefing coversthe following items;1. introduction of Self and Facility Managers.
* 1 SIPEC
: 2. Establish clear expectations for:a. Use of Three-Part Communications by EReOmembers.b. Use of phones during facility briefs,c. Limit excess chaffer during emergency,
    *~~J~jpj/ergy, EMERGENCY PLAN IMPLEMENTING PROCEDURES REFERENCE UsE Ij..
NCR-QUALITY RELATED I PROCEDURE P-EP-20O Page    _5 Revi~ion' 18 of 29 Attachment 9.1 Emergency Plant Manager Checklist Sheet ! of 6 1.0     Initial Responsibili~iI*ii                                       NOTES NOTE:
Procedure refers to an event at Unit 2, Unit 3 or both (i.e.,
Security, Natural event). Ifdetermined to be a Site event, then Unit 2 will be the lead plant for all communications, This is a Core Staffing position..
1.1     Follow. responsibilities/activities in EN-EP-61 0 Attachment 9.1 and the following:
1.2     IF a Beyond Design Basis External Event (BDBEE) occurs that results in an Extended Loss of AC Power (ELAP) to either unit, THEN entry into, 0-FSG-100, BDBEE/ELAP Emergency Response, is required..
"1.3   Assume the position of Emergency Plant Manager (EPM).
A. Announce yourself as the EPM and provide initial briefing to the TSCIOSC staff. Ensure briefing covers the following items;
: 1. introduction of Self and Facility Managers.
: 2. Establish clear expectations for:
: a. Use of Three-Part Communications by EReO members.
: b. Use of phones during facility briefs,
: c. Limit excess chaffer during emergency,
: d. Review and follow your procedures,
: d. Review and follow your procedures,
: 3. Remind personnel to validate information,
: 3. Remind personnel to validate information,
: 4. When ready, announce to the TSC/OSC that theTSC/OSC is operational.
: 4. When ready, announce to the TSC/OSC that the TSC/OSC is operational.
I tEnergy.
 
eMERGENCY PLAN PRoCEDURE IIMPLEMENTING j==-l ...... ..... .. ....... PR.......  
I     tEnergy.         eMERGENCY PLAN             PRoCEDURE         I IMPLEMENTING
.ocEDURES.  
    .. .. ....... PR.......
....... REFERE........CE.
                          . ocEDURES. ....... REFERE.. . . .CE. U!      j..P........
U! j..P........
j==-l . .....   ...
Of 2Attachment 9.1Emergency Plant Manager Checklist Sheet 2 ofi62.0 Cantinuous ResponsibilitviActivity IF an emergency classificatio setred due to a securitycondition, THEN evacuation and accountability may put 'personnel at risk. Therefore, in these situations, evacuation andaccountability will be suspended until directed by Security andcleared through the Incident Commander.
Of 2 Attachment 9.1 Emergency Plant Manager Checklist Sheet 2 ofi6 2.0         Cantinuous ResponsibilitviActivity NOTES IF an emergency classificatio         setred due to a security condition, THEN evacuation and accountability may put                     '
NOTE:After initial accountability has been completed, facility managers areresponsible for accountability of individuals assigned to their respective organizations.
personnel at risk. Therefore, in these situations, evacuation and accountability will be suspended until directed by Security and cleared through the Incident Commander.
2.1 At a Site Area Emergency or higher classification, or ifthe decision has been made to do so, iNITIATEaccountability.
NOTE:
After initial accountability has been completed, facility managers are responsible for accountability of individuals assigned to their respective organizations.
2.1     At a Site Area Emergency or higher classification, or if the decision has been made to do so, iNITIATE accountability.
A. Direct the. TSC Security Coordinator/Lead Accountability Officer (LAO) to perform accountability.
A. Direct the. TSC Security Coordinator/Lead Accountability Officer (LAO) to perform accountability.
Initial accountability shall be completed withinapproximately 30.,minutes from the declaration of the-event.B. L.F anyone is unaccounted for THEN direct the TSCSecurity Coordinator and the OSO Manager tocommence search and rescue operations.
Initial accountability shall be completed within approximately 30.,minutes from the declaration of the
C. Direct TSC Manager, OSC Manager, POM and TSCSecurity Coordinator to maintain onsite accountability throughout the event.NOTES IPEC [. NON-QUALITYRELATE IP-EP-220 Rvision 18IMPLEMENTING I "jPROCEDURES-RFRCEUSE jPage 7_ Of 29.Attachment 9.1Emergency Plant Manager Checklist Sheet 3 of. 6Continuous ResponsibilitvlActivitv fcont.) NOTES2.2 When' applicable, direct implementation of SevereAccident Management Guidelines.
            - event.
A. When the Control Room transitions from the EOPs to.SACRG-1, or only declares an EAL for SFP conditions, ENSURE the TSC Reactor Engineer is ready to takeover Severe Accident Management  
B. L.F anyone is unaccounted for THEN direct the TSC Security Coordinator and the OSO Manager to commence search and rescue operations.
: control, as. SAMGevaluator.
C. Direct TSC Manager, OSC Manager, POM and TSC Security Coordinator to maintain onsite accountability throughout the event.
6 .Once the SAMG Evaluator(s) is ready to take overSevere Accident Management control ANNOUNCE.
 
* yourself as the Severe Accident Management DecisionMaker.*C.- CONFER with the SAMG Evaluators which. SAM....guidanc~e should be implemented.
jPROCEDURES-IPEC IMPLEMENTING
[. NON-QUALITYRELATE RFRCEUSE
                                                      "    I IP-EP-220 jPage Rvision 18 7_ Of   29
                      .             Attachment 9.1
                  *.        Emergency Plant Manager Checklist Sheet 3 of.6 Continuous ResponsibilitvlActivitv fcont.)                             NOTES 2.2   When' applicable, direct implementation of Severe Accident Management Guidelines.
A. When the Control Room transitions from the EOPs to.
SACRG-1, or only declares an EAL for SFP conditions, ENSURE the TSC Reactor Engineer is ready to take over Severe Accident Management control, as. SAMG evaluator.
6 . Once the SAMG Evaluator(s) is ready to take over Severe Accident Management control ANNOUNCE.
        *yourself as the Severe Accident Management Decision Maker.
    *C.- CONFER with the SAMG Evaluators which. SAM....
guidanc~e should be implemented.
D. NOTIFY the Emergency Director (ED) which guidance:
D. NOTIFY the Emergency Director (ED) which guidance:
will be implemented.
will be implemented. IF the guidance involves a release to the environment, ENSURE the ED discusses this with the Radiological Assessment Coordinator and the State/Counties prior to implementation.
IF the guidance involves arelease to the environment, ENSURE the ED discusses this with the Radiological Assessment Coordinator andthe State/Counties prior to implementation.
2.3   Authorize Emergency Exposures I KI issuance A. Inform the TSCIOSC Manager and Radiological.
2.3 Authorize Emergency Exposures I KI issuanceA. Inform the TSCIOSC Manager and Radiological.
Coordinator that you authorize emergency exposures up to 1 Remn TEDE for all TSC/OSC and Operations personnel dispatched into the plant. Document this authorization in WebEOC, OR on your ERO Log Sheet (Form E:P-1 0) if WebEOC is unavailable.
Coordinator that you authorize emergency exposures up to 1 Remn TEDE for all TSC/OSC and Operations personnel dispatched into the plant. Document thisauthorization in WebEOC, OR on your ERO Log Sheet(Form E:P-1 0) if WebEOC is unavailable.
B. I.F emergency measures require additional exposure THEN raise the emergency exposure limit 1 Rem at a time up to 5 Remn.
B. I.F emergency measures require additional exposureTHEN raise the emergency exposure limit 1 Rem at atime up to 5 Remn.
 
I __I'EC, NON-QUALITY RELATED IP-EP-220 Revision 18 EMERGENCY PL.AN -PROCEDURE U
I __I'EC,
* iMPLEMENTING
    *En*--gy,          EMERGENCY    PL.AN NON-QUALITY RELATED
-I ..PROCEDURES j REFERENCE USE Page 8 of 29Attchment 9.1Emergency Plant Manager" Checklist Sheet 4 of 6Continuous Res~onsibllltvlActivitv (cont.) NOTESC. Review and authorize, when requested by OSO Staff,emergency exposures beyond* 5 Remn on an individual basis using Emergency Exposure Authorization (FormEP-6) guidelines.
                                              -PROCEDURE IP-EP-220   Revision 18 U
D. When requested by Radiological Coordinator, authorize issuance of Potassium Iodine (Ki). (KI is normallyissued at 5 Remn ODE projected child thyroid dose ordeclaration of a General Emergency.)
I ..
2.4 Circumstances including, but not lirnited to a poweroutage, toxic gas condition, or increased radiation levels may necessltate~he need to evacuate theTSCIOSC complex.
* iMPLEMENTING PROCEDURES         j     REFERENCE USE Page   8   of   29 Attchment 9.1 Emergency Plant Manager"Checklist Sheet 4 of 6 Continuous Res~onsibllltvlActivitv (cont.)                                   NOTES C. Review and authorize, when requested by OSO Staff, emergency exposures beyond* 5 Remn on an individual basis using Emergency Exposure Authorization (Form EP-6) guidelines.
IF it becomes necessary toevacuate the TSCIOSC complex for any reason, thefollowing guidance shall be followed.  
D. When requested by Radiological Coordinator, authorize issuance of Potassium Iodine (Ki). (KI is normally issued at 5 Remn ODE projected child thyroid dose or declaration of a General Emergency.)
:A. Work with the Fadiological Coordinator, TSC/OSCManagers and TSC Security Coordinator to determine.
2.4     Circumstances including, but not lirnited to a power outage, toxic gas condition, or increased radiation levels may necessltate~he need to evacuate the TSCIOSC complex. IF it becomes necessary to evacuate the TSCIOSC complex for any reason, the following guidance shall be followed.                             :
a suitable alternate location(s) for TSC and DSC staffs. iIn selecting an alternate  
A. Work with the Fadiological Coordinator, TSC/OSC Managers and TSC Security Coordinator to determine.
: location, keep the following in* .mind:1. In the event of increased radiation levels or a toxicgas condition, consider relocating individuals to theCR or Outage Control Center. Another possiblealternative location for consideration is the EQF..Although desirable to keep the entire staff together, it may be necessary to utilize more than one facility.
a suitable alternate location(s) for TSC and DSC staffs. i In selecting an alternate location, keep the following in* .
: 2. In the event of a power outage, there may beadditional locations that could be used forrelocation.
mind:
Such possible locations include an IPECConference Room within the Protected Area, the.Outage Control Center, the Indian Point TrainingCenter or even the Generation Support Building.
: 1. In the event of increased radiation levels or a toxic gas condition, consider relocating individuals to the CR or Outage Control Center. Another possible alternative location for consideration is the EQF..
: 3. In selecting the facility to which you are relocating to, ensure that you consider the ability for theTSO/OSC staffs to function in the new facility.
Although desirable to keep the entire staff together, it may be necessary to utilize more than one facility.
ii ___ EMRG~cIPEC PL NONQ IY EAE P-EPo22O Revision 18iMPLEMENTING
: 2. In the event of a power outage, there may be additional locations that could be used for relocation. Such possible locations include an IPEC Conference Room within the Protected Area, the.
,Attachment 9.1Emergency Plant Manager Checklist Sheet 5 of 6Continuous Responsibility/Activity Icont.) NOTESSome items for consideration include:-Is the required Plant information able to bereadily obtained?
Outage Control Center, the Indian Point Training Center or even the Generation Support Building.
-Are the necessary computer resources available?
: 3. In selecting the facility to which you are relocating to, ensure that you consider the ability for the TSO/OSC staffs to function in the new facility.
-ill adequate communications be obtainable with all of the necessary parties?B. PRIOR to evacuating the TSC/OSC complex, addressthe following:
 
: 1. Ensure that evacuating personnel take their positionbooks with them to the new location.
ii ___
: 2. Ensure that all needed data is gathered andtransported during the relocation of personnel.
* EMRG~cIPEC PL       NONQ       IY EAE     P-EPo22O Revision 18 iMPLEMENTING                                                    ,
Examples include information on the electronic
Attachment 9.1 Emergency Plant Manager Checklist Sheet 5 of 6 Continuous Responsibility/Activity Icont.)                                   NOTES Some items for consideration include:
: displays, other charted information, completed logsand the like.3. Inform the ED and thePOM of your relocation plans. Advise them that yQu will notify them ofwhen you have relocated and are a functioning facility.
                -Is   the required Plant information able to be readily obtained?
if relocation will be at two or more sites,direct an individual at each of those sites to adviseyou when their relocation is complete.
              -     Are the necessary computer resources available?
: 4. Determine the speed at which the relocation ofpersonnel should occur giving consideration to thefollowing items:a. Consider the impact of immediate relocation vs.mitigation activities in progress.
                -     ill adequate communications be obtainable with all of the necessary parties?
: b. Current radiological or hazardous conditions within the TSC/OSC.c. Radiological or hazardous conditions at theproposed TSC/OSC.d. Radiological or hazardous conditions en route.e. The adequacy of response from the alternate location.
B. PRIOR to evacuating the TSC/OSC complex, address the following:
I negEMERGENCY PLAN .PROCEDURE I
: 1. Ensure that evacuating personnel take their position books with them to the new location.
REFERENCE USE Page _10 Of _29Attachment 9.1Emergency Plant Manager Checklist Sheet 6 of 6Continuous ResponsibilitvlActivity (cont.) NOTESf. Determine proper path to take to new locations.
: 2. Ensure that all needed data is gathered and transported during the relocation of personnel.
Examples include information on the electronic displays, other charted information, completed logs and the like.
: 3. Inform the ED and thePOM of your relocation plans. Advise them that yQu will notify them of when you have relocated and are a functioning facility. if relocation will be at two or more sites, direct an individual at each of those sites to advise you when their relocation is complete.
: 4. Determine the speed at which the relocation of personnel should occur giving consideration to the following items:
: a. Consider the impact of immediate relocation vs.
mitigation activities in progress.
: b. Current radiological or hazardous conditions within the TSC/OSC.
: c. Radiological or hazardous conditions at the proposed TSC/OSC.
: d. Radiological or hazardous conditions en route.
: e. The adequacy of response from the alternate location.
 
I   negEMERGENCY PLAN PROCEDURES*
                                          .PROCEDURE REFERENCE USE I    Page _10 Of _29 Attachment 9.1 Emergency Plant Manager Checklist Sheet 6 of 6 Continuous ResponsibilitvlActivity (cont.)                           NOTES
: f. Determine proper path to take to new locations.
: g. Direct personnel to relocate.
: g. Direct personnel to relocate.
: h. Notify Security to= instruct incoming personnel toreport to the designated alternate TSC/OSClocation(s).
: h. Notify Security to= instruct incoming personnel to report to the designated alternate TSC/OSC location(s).
: 5. After arriving at the new TSCIOSC location(s),
: 5. After arriving at the new TSCIOSC location(s), re-establish this new location as the TSC/OSC.
re-establish this new location as the TSC/OSC.6. Set up the appropriate equipment such as electronic
: 6. Set up the appropriate equipment such as electronic displays, plant data displays and telephones.
: displays, plant data displays and telephones.
: 7. Notify the ED and POM when established and ready
: 7. Notify the ED and POM when established and ready* to commence functioning-~as the TSCIOSC.8. Obtain an updated briefing on the current status of* the emergency.,
* to commence functioning-~as the TSCIOSC.
plant conditions and any actionsthat are in progress or that may have beencompleted.  
: 8. Obtain an updated briefing on the current status of
-9. Continue functioning as the EPM~.C. Direct personnel to relocate TSCIOSC personnel.
* the emergency., plant conditions and any actions that are in progress or that may have been completed.                       -
IPEC NON-QUALITY RELATED IPE20 Reion1Enfery. EMERGENCY PLAN PROCEDURE 1PROCEDURES REFERENCE USE Page 11 of 29 jAttachment 9.2TSC Manager Checklist Sheet I of 2This is a core staffing position1.0 NOTES1.1 Follow responsibiltitieslactivities in EN-EP-Bl0 Attachment 9.2and the following:
: 9. Continue functioning as the EPM~.
1.2 Activation of the TSC and assume the position of TSC Manager,.
C. Direct personnel to relocate TSCIOSC personnel.
A. Synchronize your time with the ISC/OSC clock. Verify with theEQE andlor CR that the time displayed in the TSC/OSC is thesame as it is there.B. Verify you have the following core staffing prior to declaring theTSC staffed:a. EPMb. TSC Managerc. TSC Communicator
 
Enfery.
IPEC EMERGENCY PLAN PROCEDURES NON-QUALITY RELATED PROCEDURE REFERENCE USE 1  IPE20 Page     11 Reion1 of   29 j Attachment 9.2 TSC Manager Checklist Sheet I of 2 This is a core staffing position 1.0   jllj~alRespojsiblliIv/Acivi*                                                  NOTES 1.1     Follow responsibiltitieslactivities in EN-EP-Bl0 Attachment 9.2 and the following:
1.2   Activation of the TSC and assume the position of TSC Manager,.
A. Synchronize your time with the ISC/OSC clock. Verify with the EQE andlor CR that the time displayed in the TSC/OSC is the same as it is there.
B. Verify you have the following core staffing prior to declaring the TSC staffed:
: a. EPM
: b. TSC Manager
: c. TSC Communicator
: d. Mechanical Engineer"
: d. Mechanical Engineer"
: e. Electrical/Ll&C Engineerf. Reactor Engineerg. Rad Coordinator C. Staff the TSC using Form EP-lO-ALL, "Filling an ERO VacancyDuring Facility Activation/Operation" D. IF additional personnel are required THENN:a. IF it is during normal working hours THE=N call or assignsomeone to call the Assembly Areas for needed personnel.
: e. Electrical/Ll&C Engineer
: b. IF needed individuals are not available onsite THEN assignsomeone to call individuals at home using the Emergency Telephone Directory (ETD).E. Emergency Response Data System (E=ROS)a. If requested to verify, EROS is active. Refer to procedure EN-EP-31 1, Emergency Response Data System (ERDS)Activation via the Virtual Private Network (VPN).b. I]F ERDS is not functional, designate a person withOperations experience to go to the Control Room tocomplete Forms 31 A, B, C OR 42 A, B, C. (Forms EP-53,54, 55 and EP-57, 58, 59).
: f. Reactor Engineer
IPEC NNQAm EAE PE-2 eiin1j Entergy.
: g. Rad Coordinator C. Staff the TSC using Form EP-lO-ALL, "Filling an ERO Vacancy During Facility Activation/Operation" D. IF additional personnel are required THENN:
EMERGENCY PLAN PREDRSM PLEMENTI NG PucIPROCEDURE REFERE'NCE USE Page 12 Of 29'Attachment 9.2TSC Manager Checklist Sheet 2 of 2Initial ResponsibilitvlActivitv (con=t=)
: a. IF it is during normal working hours THE=N call or assign someone to call the Assembly Areas for needed personnel.
NOTESc. Once the A, B, C Forms are completed, they' are to befaxed to the NRC within 60 minutes.d. PICS should be started to display plant data for the affectedunit IF both Units are affected utilize multiple computers todisplay both plants' data.2.0 Continuous Responsibilitv/Activitv&#xa2; 2.1 Manage the activities of the TSC Staff:A. Provide a central organization and facility for the accumulation and transmittal of plant information to the EOF and NRC.8. When applicable, direst the appropriate individuals to implement and perform monitoring and evaluations as directed in the. ShdianPoint Severe Accident Management (SAMG) Guidelines.
: b. IF needed individuals are not available onsite THEN assign someone to call individuals at home using the Emergency Telephone Directory (ETD).
C. if requested by the NRC to provide an open communications linefor plant data , THN direct an individual having sufficient technical knowledge to staff the ENS phone. This person maylocate in any facility with ENS phone access. If necessary, request the Security Coordinator to obtain additional personal to.support this activity.
E. Emergency Response Data System (E=ROS)
: 0. Verify that the Engineering Action Tracking (Admin) Display isupdated promptly as new tasks are assigned and old taskscompleted and as priorities are changed..
: a. If requested to verify, EROS is active. Refer to procedure EN-EP-31 1, Emergency Response Data System (ERDS)
E. Anticipate TSC support requirements from ERe,F. Direct TSC staff to obtain drawings and information asneeded to solve plant problems.
Activation via the Virtual Private Network (VPN).
2.2 Monitor containment integrity status throughout the event:A. Initiate a review to determine if any non-automatic containment isolation valves should be closed. (Reference 2-ES-i1.4; 3-ES-i .3;3-SOP-CEB-Oil)
: b. I]F ERDS is not functional, designate a person with Operations experience to go to the Control Room to complete Forms 31 A, B, C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57, 58, 59).
B. Repeat the above review, approximately every 2 hours for first 24hours of event and thereafter at the discretion of the EPM.
 
IPEC NON-QUALITY RELATED IP-EP-22O Revision 18~E~rg. EMERGENCY PLAN PROCEDURE IPROCEDURES REFF-RENCE USE Page 13 of 29Attachment 9.3Operations Coordinator Checklist Sheet I of I1.0 Follow ResponsibilitieslActivities in EN-EP-BlO, Attachment 9.3  
j      Entergy.      IPEC EMERGENCY    PLAN    NNQAmPREDREAE            PE-2         eiin1 SM PLEMENTI NG             Puc IPROCEDURE                              REFERE'NCE USE         Page     12   Of 29' Attachment 9.2 TSC Manager Checklist Sheet 2 of 2 Initial ResponsibilitvlActivitv (con=t=)                                                 NOTES
-,#. IPEC NoN-QuALrrY RELATED iP-EP'22O Revision 18-Ene~ y, *EMERGENCY PLAN PROCEDURE IIMPLEMENTING PROCEDURES REFERENCE USE [_Page 14 Of 29Attachment 9.4Reactor Engineer Checklist Sheet I of IThis is a core staffing position.
: c. Once the A, B, C Forms are completed, they' are to be faxed to the NRC within 60 minutes.
1.0 ResponsibilitvlActivitv, NOTES1.1 Follow responsibilitieslactivities in EN-EP-610 Attachment 9.4and the following:
: d. PICS should be started to display plant data for the affected unit IF both Units are affected utilize multiple computers to display both plants' data.
1.2 Monitor plant conditions for any indications of core damage.A. Perform and update core damage assessment based on currentinformation using guidance provided in procedure IP-EP-360, Core Damage Assessment. B3. Notify TSC Manager and/or Engineering Coordinator, immediately of any changes in core status.C. Keep the Radiological Coordinator informed on core status toassist in maintaining radiological controls for plant personnel.
2.0     Continuous Responsibilitv/Activitv&#xa2; 2.1     Manage the activities of the TSC Staff:
iD. Through the TSC Manager and/or the Radiological Coordinator, ensure that the EOF Radiological Assessment Coordinator iskept informed of the latest estimate of the amount of coredamage.E. Maintain the Fission Product Barrier Status Board as needed.1.3 Assist the 2PM in imnplement~ation of Severe AccidentManagement Guidelines.
A. Provide a central organization and facility for the accumulation and transmittal of plant information to the EOF and NRC.
A. When the Control Room transitions from the EOPs to SACRG-1, or only declares an EAL for SFP conditions inform the EPMwhen you are ready to take over Severe Accident Management (SAM) control.B. INFORM EPMV which SAM guidance should be implemented.
: 8. When applicable, direst the appropriate individuals to implement and perform monitoring and evaluations as directed in the. Shdian Point Severe Accident Management (SAMG) Guidelines.
C. IF guidance involves a release to the environment ENSURE theEPM and Emergency Director discuss it with the Radiological Assessment Coordinator who discusses it with theState/Counties prior to implementation.
C. if requested by the NRC to provide an open communications line for plant data , THN direct an individual having sufficient technical knowledge to staff the ENS phone. This person may locate in any facility with ENS phone access. If necessary, request the Security Coordinator to obtain additional personal to
"1.4 Receive status updates from the TSC Manager andlor EPM andif directed post updates on the appropriate electronic displays.
            .support this activity.
I Enlergy EMERGENCY PLAN ,PROCEDURE II ' PROCEDURES  
: 0. Verify that the Engineering Action Tracking (Admin) Display is updated promptly as new tasks are assigned and old tasks completed and as priorities are changed..
-' REFERENCE USE Page ' 1 Of 29 jAttachment 9.5Engineering Coordinator.
E. Anticipate TSC support requirements from ERe, F. Direct TSC staff to obtain drawings and information as needed to solve plant problems.
Checklist Sheet* 1 of 11.0 Follow ResponsibilitieslActivities in EN-EP-610, Attachment 9.5.2.0 if requested to provide information to the. NRC Operations Center follow responsibilities in ENEP-SlO, Att achment 9.1 2.  
2.2     Monitor containment integrity status throughout the event:
~EIery EMERGENCY PLAN PROCEDURE IIPROCEDURES J REFERENCE USE j Page 16 Of0 2.99Attachment 9.6Mechanical and Electricall Il&C Engineer Checklist Sheet 1 of 11.0 Fallow ResponsibilitieslActivities in EN-EP-610 Attachment 9.6.
A. Initiate a review to determine if any non-automatic containment isolation valves should be closed. (Reference 2-ES-i1.4; 3-ES-i .3; 3-SOP-CEB-Oil)
PEMREC Y L N POCEDUAU RELr IP.E-2 eiin1~~En~eIMPLEMERGNCTPLNGPoWR MPROEMUENTN IPRCDRSREFERENCE USE Page 1=7 of 29 jAttchment 9.7IT Specialist Checklist Sheet I of 11.0 Initial Responsibili~tvActiviv NOTES1.1 Follow responsibilltieslactlivties in EN-EP-BIG Attachment 9.7 and the following:
B. Repeat the above review, approximately every 2 hours for first 24 hours of event and thereafter at the discretion of the EPM.
 
    ~E~rg.
IPEC EMERGENCY PLAN PROCEDURES NON-QUALITY RELATED PROCEDURE REFF-RENCE USE IIP-EP-22O Page   13 Revision 18 of   29 Attachment 9.3 Operations Coordinator Checklist Sheet I of I 1.0 Follow ResponsibilitieslActivities in EN-EP-BlO, Attachment 9.3
 
    -     ,#.           IPEC
      -Ene~ y, *EMERGENCY PLAN IMPLEMENTING NoN-QuALrrY RELATED PROCEDURE        I iP-EP'22O   Revision 18 PROCEDURES             REFERENCE USE       [_Page     14     Of   29 Attachment 9.4 Reactor Engineer Checklist Sheet I of I This is a core staffing position.
1.0     ResponsibilitvlActivitv,                                                         NOTES 1.1     Follow responsibilitieslactivities in EN-EP-610 Attachment 9.4 and the following:
1.2     Monitor plant conditions for any indications of core damage.
A. Perform and update core damage assessment based on current information using guidance provided in procedure IP-EP-360, Core Damage Assessment.
* B3. Notify TSC Manager and/or Engineering Coordinator, immediately of any changes in core status.
C. Keep the Radiological Coordinator informed on core status to assist in maintaining radiological controls for plant personnel. i D. Through the TSC Manager and/or the Radiological Coordinator, ensure that the EOF Radiological Assessment Coordinator is kept informed of the latest estimate of the amount of core damage.
E. Maintain the Fission Product Barrier Status Board as needed.
1.3     Assist the 2PM in imnplement~ation of Severe Accident Management Guidelines.
A. When the Control Room transitions from the EOPs to SACRG-1, or only declares an EAL for SFP conditions inform the EPM when you are ready to take over Severe Accident Management (SAM) control.
B. INFORM EPMV which SAM guidance should be implemented.
C. IF guidance involves a release to the environment ENSURE the EPM and Emergency Director discuss it with the Radiological Assessment Coordinator who discusses it with the State/Counties prior to implementation.
"1.4   Receive status updates from the TSC Manager andlor EPM and if directed post updates on the appropriate electronic displays.
 
I   Enlergy     EMERGENCY PLAN     ,PROCEDURE       I I  '             PROCEDURES     -'     REFERENCE USE     Page   '1 Of 29 j Attachment 9.5 Engineering Coordinator. Checklist Sheet* 1 of 1 1.0   Follow ResponsibilitieslActivities in EN-EP-610, Attachment 9.5.
2.0   if requested to provide information to the. NRC Operations Center follow responsibilities in ENEP-SlO, Attachment 9.12.
 
    ~EIery       EMERGENCY PLAN           PROCEDURE     I IPROCEDURES                  J     REFERENCE USE j   Page     16 Of0 2.99 Attachment 9.6 Mechanical and Electricall Il&C Engineer Checklist Sheet 1 of 1 1.0   Fallow ResponsibilitieslActivities in EN-EP-610 Attachment 9.6.
 
PEMREC   Y L     N       POCEDUAU RELr       IP.E-2         eiin1
    ~~En~eIMPLEMERGNCTPLNGPoWR MPROEMUENTN PRCDRSREFERENCE USE Page     1=7 of   29 j Attchment 9.7 IT Specialist Checklist Sheet I of 1 1.0 Initial Responsibili~tvActiviv                                       NOTES 1.1 Follow responsibilltieslactlivties in EN-EP-BIG Attachment 9.7 and the following:
1,2 Assume the position of IT Specialist
1,2 Assume the position of IT Specialist
[NOTERDS is not functional in the Simulator for a DrillA. Emergency Response Data System (ERDS)1. If requested to verify EROS is activated, refer toprocedure EN-EP-31 1, Emergency Response DataSystem (EROS) Activation via the Virtual PrivateNetwork (VPN).2. I F EROS is not functional, notify the TSC Managerto designate an operations experienced person togo to the Control Room to complete Forms 31 A. E8,C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57,58, 59). Once the A, B, C Forms are completed,,
[NOT ERDS is not functional in the Simulator for a Drill A. Emergency Response Data System (ERDS)
they are to be faxed to the NRC within 60 minutes.3. Inform TSC Communicator of the time EROS wasverified of activation O_.R activated and to log inWebEOC.B3. Ensure computer displays in the TSC and OSCcontinue to operate properly.
: 1. If requested to verify EROS is activated, refer to procedure EN-EP-31 1, Emergency Response Data System (EROS) Activation via the Virtual Private Network (VPN).
: 1. IF the PICS displays are NOT functioning THEperform the following:
: 2. IF EROS is not functional, notify the TSC Manager to designate an operations experienced person to go to the Control Room to complete Forms 31 A. E8, C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57, 58, 59). Once the A, B, C Forms are completed,,
(a) IF Unit 2 obtain 42A, 42B and 42C data from theCCR (IP-EP-115 EP Forms 53, 54, and 55)(b) IF Unit 3 obtain 31A, 31B and 31C data from theCCR (IP-EP-1 15 EP Forms 57, 58 and 59).
they are to be faxed to the NRC within 60 minutes.
En~L'y~y PEMREC Y -~ NON-QUALITY RELATED 1 P-EP-220 Revision 18IMPLEMENTING j ,,.PROCEDURES "REFERENCE-USE JPage :is8 Of 29 9.8TSC Communicator Checklist Sheet Ilofi11 .0 Follow Responsibilities/Activities in EN-EP=I0,.
: 3. Inform TSC Communicator of the time EROS was verified of activation O_.R activated and to log in WebEOC.
Att(achment 9.8.2.0 Verify that at least one of the Public Address Systems(Red or Green) in the TSCIOSC is turned on and ready.for use. Refer to 9.12 of this procedure for adescription and operation.
B3. Ensure computer displays in the TSC and OSC continue to operate properly.
SIPEC NON-QUALITY RELATED IP..EP-22O Revision 18#l*y EMERGENCY PLAN PROCEOURE IMPLEMENTING IPRCDRS j REFERENCE USE Page 199 of 2.9 JAttachment 9.9Radiological Coordinator Checklist Sheet 1 of 5This is a Core Staffing Position.
: 1. IF the PICS displays are NOT functioning THE perform the following:
1.0 Initial Responsibili~tvActivitv NOTES1.1 Follow responsibilities/activities in EN-EP-610 Attachment 9.9 and the following:
(a) IF Unit 2 obtain 42A, 42B and 42C data from the CCR (IP-EP-115 EP Forms 53, 54, and 55)
1.2 Assume the position of Radiological Coordinator.
(b) IF Unit 3 obtain 31A, 31B and 31C data from the CCR (IP-EP-1 15 EP Forms 57, 58 and 59).
 
En~L'y~y     PEMREC   Y IMPLEMENTING
            ,.PROCEDURES
                                    -~NON-QUALITY RELATED "REFERENCE-USE 1
                                                          ,j P-EP-220 JPage     :is8 Revision 18 Of 29 Att*achment 9.8 TSC Communicator Checklist Sheet Ilofi1 1.0 Follow Responsibilities/Activities in EN-EP=I0,.
Att(achment 9.8.
2.0 Verify that at least one of the Public Address Systems (Red or Green) in the TSCIOSC is turned on and ready.
for use. Refer to Att*achment 9.12 of this procedure for a description and operation.
 
SIPEC                               NON-QUALITY RELATED IP..EP-22O     Revision 18
        #ly        EMERGENCY PLAN           PROCEOURE IMPLEMENTING       I PRCDRS        j   REFERENCE USE         Page   199   of   2.9 J Attachment 9.9 Radiological Coordinator Checklist Sheet 1 of 5 This is a Core Staffing Position.
1.0   Initial Responsibili~tvActivitv                                         NOTES 1.1   Follow responsibilities/activities in EN-EP-610 Attachment 9.9 and the following:
1.2   Assume the position of Radiological Coordinator.
A. Request the Control Room to align the OSCITSC ventilation system for incident operation per procedure, if required.
A. Request the Control Room to align the OSCITSC ventilation system for incident operation per procedure, if required.
B. Establish the capability for monitoring of Iodine, should itbecome necessary.
B. Establish the capability for monitoring of Iodine, should it become necessary. Have a Rad Protection Tech set up the AMS-4 as per Attachment 9A13 of procedure IP EP-230, 2.0   Continuous ResponsibilitvtActivitv 2.1     Establish Radiological Control oversight.
Have a Rad Protection Tech set up theAMS-4 as per Attachment 9A13 of procedure IP EP-230,2.0 Continuous ResponsibilitvtActivitv 2.1 Establish Radiological Control oversight.
A. Verify that the radiological controls for the TSCIOSC have been set up per sheet 9 of this check list.
A. Verify that the radiological controls for the TSCIOSC havebeen set up per sheet 9 of this check list.2.2 IF there are contaminated injured personnel THEN performthe following:
2.2     IF there are contaminated injured personnel THEN perform the following:
A. Provide radiological support for the assessment, treatment, and transportation of contaminated injured personnel.
A. Provide radiological support for the assessment, treatment, and transportation of contaminated injured personnel. Act as the point of contact with the hospital where treatment is executed.
Act asthe point of contact with the hospital where treatment isexecuted.
: 8. Make arrangements to pick up Rad Protection personnel at the hospital.
: 8. Make arrangements to pick up Rad Protection personnel atthe hospital.
C. Follow proper procedures to retrieve radioactive waste from offsite treatment locations.
C. Follow proper procedures to retrieve radioactive waste fromoffsite treatment locations.
: 0. Obtain concurrence from the EPM prior to releasing the hospital's Radiological Emergency Room or the ambulance for uncontrolled use.
: 0. Obtain concurrence from the EPM prior to releasing thehospital's Radiological Emergency Room or the ambulance for uncontrolled use.
ml~ey, EMERGENCY PLAN PROCEDURE*
Attachment
,9..Radiological Coordinator Checklist Sheet 2 of 5Continuous Res ponslbtil/Activitv.,(cant.)
-NOTES2.3 Provide oversight to ensure emergency teamsreceive .proper briefs on radiological conditions
.and requirements.
2.4 IF individuals receive or are expected to receiveradiolodine uptakes >~ 5 REM CDE child thyroiddose or a General Emergency has been declaredTHEN:*A. issue K! to onsite emergency workers applying thefollowing controls:
: 1. Brief personnel in the protected area on theuse of KI and its potential side effects usingsheet 11 of this Attachment 9.9..2. Assure that persons in the TSC/OSC, bothCCR's and Security personnel within theprotected area are briefed.3. For R&CA team personnel record KI issuanceinformation on Individual Exposure TrackingLog (Formn EP-29).4. Have all TSCIOSC personnel and securitypersonnel:
within the protected area report tothe TSC/OSC for distribution of KI.2.8 Verify that the decontamination efforts ofpersonnel, equipment, and onsite areas areappropriate.
2.6 Participate in Facility Briefings to announceradiological conditions at the TSC1OSC and alsoaffected locations with an emphasis on status of aradiological release.
EMERGENCY PLAN PREURIMPLEENTIN 9.9RadiologicaI Coordinator Checklist Sheet 3 of 5AA~\ CEOSCTSC!NRCEP'N/uter RoomA~"' .,NN 2ACornpiTSCtOSC Access Points to be posted:If Hallway Contamination
<~ 100}0 dpm/ 100 sq. cm If Hallway Contamination
>' 1000 dpm/ 100 sq. cmA. En~ry/Exit A. No Entry. Exit Only8, No EntrylNo Exit B. Entry to TSC/iOSC.
No Exit. White Step Off PadC. No Entry/Na Exit and Frisk Shoes before stepping here C. No Entry/No Exit0, Equipment cabinets.
Place sign at top of' stairway
: 0. Equipment
: cabinets, Place sign at top of stairwa~y, No Entry/No}
Exit without permission from RAD Coordinator.
No EntrylNo Exit without permission from RADE. Air Monitoring Equipment Coordinator E. Air Monitoring Equipment
" Einergy EMERGENCY PLAN PROCEDURE
~iMPLEMENTING PROCEDURES REFERENCE S Pg 2 f2Attchment 9.9Radiological Coordinator Checklist Sheet 4 of 5 _information on use of Potassium IodideIOSA TT' TabletsPotassium Iodide TabletsTAKE POTASSIUM IODIDE ONLY WHENPUBLIC HEALTH OFFICIALS TELL YOU.iN A RADIATION EMERGENCY RADIOACT1VE IODINE C OULD BERELEASED INTO THE AIR, POTASSIUM IODIDE ( A FORM OF IODINE) CAN HELPPROTECT YOU.o IF YOU ARE TOLD TO TAKE THISMEDICINE.
TAKE IT ONE TIME EVERY 24HOURS, DO NOT TAKE IT MORE OFTEN.MORE WILL NOT HELP YOU AND MAYINCREASE THE RISK OF SIDE EFFECTS.NOT TAKE THIS DRUG IF YOU KNOWYOU ARE ALLERGIC TO IODIDE (,SEESI DE EFFECTS BELOW)DIRECTIONS FOR USEUse only when directed by Emergency Management, State, Local or Public Health Officials DOSEADULTS AND CHILDREN ONE YEAR OF AGE OROLWER:One (I) tablet once a day. Crush for smallchiildren.
BABIES UNDER ONE YEAR OF AGE:One-half (1/2) tablet onos a day. Crush first.DOSAGETake for 10 days unless directed otherwise.
Slore your supply at momn temperature between 590F and 860 F. Keep package dry and foil packetsintact.KEEP YOUR SUPPLYV OUT OF REACH OFCHILDREN.
SIDIE EFFECTSUsually, side effects of potassium iodide happenwhen people take higher doses for a long time. Youshould be careful not to lake more than therecommended dose or take it for longer than you aretold. Side effects are unlikely because of the lowdose and Ihe short tme you will be taking the drug.Possible sid effects include skin rashes, swelilng ofthe salivary glands, and "icdism' (metaltic tasle,bumlng mouth and throat, sore teeth and gums,symptoms of a head cold, and sometimes stomachupset and diarrhea).
WARNINGPOTASSIUM IODIDE SHOULD NOT BE USED BYPEOPLE ALLERGIC TO IODIDE, Keep oul of thereach of children.
In case of overdose or allergicreaction, so nlact a physician or public healthauthority, HOW POTASSIUM IODIDE WORKSCertain forms of iodine help your thyroid gland workright. Most people get the iodine they need fromlfoods like iodized salt or fish. The thyroid can "store"or hold only a certain amount of iodine,In a radiation emergency radioactive iodine may bereleased In the air. If this air is breathed orswallowed it may enter the Ihyroid and damage it.The damage may not show itsef for years. Child renare the most likely to have thyroid damage.lf you take potassium iodide, it wiU fill up you thyroidgland. This reduced the chances that radioactive iodine will enter your thyroid.WHO SHOULD NOT TAKE POTASSIUM IODIDEThe only people who should not take tablets whendirected to do so are people who know they areallergic to iodine. Pregnantwomen.
nursslg women,children and bables may take this drug,HOW AND WHENPotassium lodide should be taken as soon aspossible after authorities tell you to take ft.You should take one dose every 24 hours.MORE WILL NOT HELP YOU, AND WILLINCREASE THE CHANCES OF SI DE EFFECTS.Continue to take the drug for 10 days.WHAT TO 00 IF SIDE EFFECT OCCURSTOP taking the drugs and contact a doctor or publichealth officials for instructions.
DESCRIPTION AND USEEach IOSATTM Tablet contains 130 ofpotassium iodide.Thyroid blocking in emergency only.
r , e'ye MREcIPEC PLNNON-QUALITYP C~RRELATED IP-EP-220 Revision 18j Enery EERECYPLNPROCEDURESI IPRCDRSREFERENCE USE Page 2_3 of 299Attchment 9.9Radiological Coordinator Checklist Sheet 5 of 5BRIEFING iNFORMATiON ON USE OF POTASSiUM IODIDE (K!I)Why is Potassium Iodide being issued? In accordance with the NewYork State Policy on Potassium iodide, potassium iodide isrecommended on a projected thyroid dose of 5 Remn. Potassium Iodide isissued at a declared General Emergency or during an emergency relatedradioactive airborne release.
Taking Potassium iodide is voluntary.
What is Potassium Iodide? Potassium iodide is a thyroid blockingprotective action for exposure to radioactive iodine. If you take potassium iodide it will saturate your thyroid gland which will reduce the chancesthat radioactive iodine-will enter your thyroid.
Additional information isavailable on the information handout with each tablet.What dosage to take? A 130 milligram tablet. You should take as soonas possible after being told. One (1) tablet every 24 hours. Take for 10days. Unless otherwise directed.
Side Effects?
Skin rash, swelling of salivary glands, a metallic taste,burning mouth and throat, sore teeth and gums, symptoms of a headcold and sometimes upset stomach or diarrhe~i.
This would usuallyhappen when higher doses are taken over long period of time.WARNING!I Potassium iodide should not be taken by people allergic to iodine or shellfish.
EE MERGENCY PLAN j PROCEDURE NNUAIYRLTD IPoEP22O Revision 18~ En~n'v iMPLEMENTING OI PROCEDURES REFERENCE USE Page 244 of 299Attchment 9.10TSC Security Coordinator Checklist Sheet 1 of 31.0 tnitial ResponsibiiltvlActivibt NOTES1.1 Follow responsibilitieslactivities in EN-EP-4I0 Attchment 9,.10and the following:
1.2 Assume the duties of the Security Coordinator.
A. Refer to EN-EP-SI0 Attachment 9.10.B. Secure Site Access at the SITE AREA or GENERALEMERGENCY level as follows:(,a) Notify CAS and SAS to secure the site, except for EReMembers, per procedure IP-EP-240, Security.-Notify the EPM when this has been done.1.,3 Assign OSC Log Keeper to the position of Coordinator.
A. Report readiness to conduct Accountability to the EPM. Utilizethe OSC Log Keeper to assist in Accountability.
Bl. Direct the OSC Log Keeper to support the monitoring of" theAccountability Card Readers while ERe members are cardinginto the TSC/OSC, direct them to verify badges are properlyread by the Accountability Card Reader and to log the nameand badge number on an Accountability Roster (Form EP-47) ofanyone having diffculty using the proximity card readers.
NON-QUALITY RELATED iPE-2 ein 18Enierye EMERGENCY PLAN PROCEDURE IPROCEDURES REFERENCE USE Page 25 of 29Attachment 9.10TSC Security Coordinator Checklist Sheet 2 of 32.0 Continuous ResponsibilitvlActivitv NOTES2.1 iF relocation of personnel ofiite is called for THEN:A. Follow guidance in IP-EP-430, Site Assembly, Accountability andRelocation of Personnel Offsite.B. Coordinate with TSC Radiological Coordinator to monitorevacuation routes.2.2 IF relocating to the Security Administration Offces THEN informthe following individuals.
A. Emergency Plant ManagerB. TSC Radiological Coordinator C. Emergency DirectorD. Lead Accountability Officer (LAO)2.3 The Lead Accountability Officer (LAO) will generate the list ofmissing persons.
This list will be provided to the Emergency PlantManager, POM, and/or TSC Security Coordinator.
NOTEDuring plant shutdowns, when there may be large numbers ofworkers onsite and within the radiological control areas, a Radiation Protection computer printout may be used to assist in locatingmissing personnel within the radiological control area afteraccountability is completed.
: 1. IF there are individuals who are missing THEN:(a) Review Accountability Rosters (Form EP-47) used toidentify ERO members experiencing difficulty using theproximity card readers and remove them from theMissing Persons List.(b) Obtain the Radiation Protection Computer Printout ofindividuals within the Radiological Control Area.(c) Check off names of possible missing individuals whohave left the Protected Area to narrow the list of actualmissing MEGNY LNPOCEDUArYRELAE IP-EP-220 Revision 18~~~Entergy IMPLEMENTlNGPLNMREC RCDR ae ~ oAttachment 9.1 0TSC Security Coordinator Checklist Sheet 3 of 3Continuous ResponsibilitvlActivitv (cont,) NOTESpersons and review RP computer printout for any missingindividuals within the Radiological Control Area.(d) inform the EPM immediately of any personnel discovered missing during accountability process.4. Assist OSC Staff in maintaining accountability of all OSCpersonnel through the use of status boards, teamassignments, Individual.
Exposure Tracking Log (Form EP-29)and ERO Tracking Log (Form EP-42).2.4 Use the 08C Log Keeper to maintain Continuing Accountability A. Use Onsite ERO Shift Rosters (Form EP-43) to list individuals currently on the Tirst shift in the TSC and OSC.B. Request EOF Support Staff to identify the current EOF personnel.
C. Work with TSC and OSC Managers to identify personnel to fill.second shift and ensure all needed positions are identified andestablish time second shift is to be called in.D. Use ETD to identify and contact individuals to fill positions onsecond OSC Log-Keeper and EOF Staff may be used toassist in notifications.
E, Inform the TSG and OSO Managers when notifications arecompleted and if there are any problems filling required positions.
00iIPEC 1 NON-QUALITY RELATED iP-EP-220 Revision 18* Enlergy EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES J REFERENCE USE ,. lPage __of 2Attachment 9.11tTSC I QSC Layout and NRC RoomSheet 1 of 1TYPICAL Arrangement (Personnel locations may be changed as needed to facilitate communication and movement without a procedure revision)
--- R M oN.QUALIT IP.EP-220 Revsion 18'~EIdtgEMERGENCY PLAN RELATED PROCEDOURE iMPLEMENTING-PRCDRSREFSReNCe USE Page Of 299Attachment 9.1 2TSCIOSC Public Address System Description and Operation Sheet 1 of 11,0 GeneralThere are three Public Address Systems (PAs) in the TSC/OSC and they have been colorcoded for easy identification of microphones and speakers.


==2.0 SystemslOperation==
ml~ey,      EMERGENCY PLAN            PROCEDURE*
2.1 Blue System comprises the plant page system. This page system is only from U2. TheSpeakers are located in the Halls, the OSC Bull Pen, the R&CA Briefing room, the NRCConference Room, and the old U2 Records room. Volume controls are typically walls nearspeakers.
Attachment ,9.
Activation is via the normal plant page access.2.2 Red System is the permanently installed TSCIOSC page system. The speakers are locatedin the ceilings similar to the Plant Page, system. Speakers are in the Halls, the OSC BullPen, the R&CA Briefing room, the TSC/OSC Command room, the NRC Conference roomand the old U2 Records room. The speakers are marked with red tape. Each speaker hasits own on/off switch and volume control knob. The amplifier and two microphones areon/in the counter separating the TSC and OSC each marked with RED tape. Themicrophones are wireless and battery powered and simply require that they be turned on toactivate the system. Volume control is-via the local speaker or the amplifier on the counterseparating the TSC and 0S0.2.3 Green System consists of wireless portable speakers distributed around the facility.
            .            Radiological Coordinator Checklist Sheet 2 of 5 Continuous Res ponslbtil/Activitv.,(cant.)          -          NOTES 2.3  Provide oversight to ensure emergency teams receive .proper briefs on radiological conditions      .
Eachspeaker must be turned on by a switch on the back and the volume adjusted locally by aswitch on the front. The volume should be turned up to full volume and adjusted down asneeded. Speakers are located in the 0SC Bull Pen, the TSC/OSC Command room, theNRC Conference room, the Whole Body Count room and the old U2 Records room. Thereare two microphones on/in the TSC/OSC Counter each marked with GREEN tape. Themicrophones are wireless and battery powered and simply require that they be turned on toactivate the system. Additional batteries are available in the supply boxes. Note that thissystem does not cover the Hallways.
and requirements.
Attachment 9.13IPEC TSC STAFFINGSheet 1 of 1At IPEC, the expectation is that ALL individuals assigned to the Technical Support Center (TSC) report to the facility within 60 minutes of thedeclaration of an Event.The TSC is able to be considered STAFFED when the following CoreIndividuals are present:
2.4  IF individuals receive or are expected to receive radiolodine uptakes >~5 REM CDE child thyroid dose or a General Emergency has been declared THEN:
Emergency Plant Manager (EPM), TSC Manager,TSC Communicator, Rad Coordinator, Mechanical  
    *A. issue K!to onsite emergency workers applying the following controls:
: Engineer, Electricalll&C Engineer and Reactor Engineer.
: 1. Brief personnel in the protected area on the use of KI and its potential side effects using sheet 11 of this Attachment 9.9..
Regardless of whoever else is available these positions MUST be filled before the TSC can be considered to beSTAFFED.The IPEC Emergency Plan in Section B (Table B-I) requires the following torespond within .60 minutes:
: 2. Assure that persons in the TSC/OSC, both CCR's and Security personnel within the protected area are briefed.
TSC Communicator, a Reactor Engineer, anElectrical Engineer and a Mechanical Engineer.
: 3. For R&CA team personnel record KI issuance information on Individual Exposure Tracking Log (Formn EP-29).
The TSC may be declared OPERATIONAL whenever Core Individuals areachieved and the TSC Manager determines that the facility is adequately staffed for the event and equipment is set up and available to perform theemergency functions assigned to the TSC.
: 4. Have all TSCIOSC personnel and security personnel: within the protected area report to the TSC/OSC for distribution of KI.
ATTACHMENT 9.1 IOCFR5O.54{q)
2.8  Verify that the decontamination efforts of personnel, equipment, and onsite areas are appropriate.
SCeswNGSHEET 1 Ot 4ProcedureiDocument Number: Revision:
2.6  Participate in Facility Briefings to announce radiological conditions at the TSC1OSC and also affected locations with an emphasis on status of a radiological release.
EN-EP-SI 0 2IP-EP-220 tEquipmentiacliitylOther:
 
indian Point Energy CenterTitle:Technical Support Center fTSC) Operations Technical Support CenterPart I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a changeto the emergency plan or affect the implementation of the emergency plan):This change issues fleet procedure EN-EP-610, "Technical Support Center (TSC) Operations" and revises IP-EP-220 toremove any duplicate tasks in EN.EP-610; however maintain any site specific requirements or commitments.
Eieiy*              EMERGENCY PLAN                      PREUR IMPLEENTIN Atta*chment 9.9 RadiologicaI Coordinator Checklist Sheet 3 of 5 A                                          ~\          C A
Part Ii. Activity Previously Reviewed?
E OSC        !N R
NE Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3)
C E
Continue toAlert and Notification System Design Report? EOT reutioni ext .EnterIf YES, identify bounding source document numberlapproval reference and justification ensure the basis for concluding the source document fully bounds the b~ow andproposed change is documented below:, opeePrJustfifcatIon:
TSC        P
                              'N A              /                  Cornpi uter Room
                    ~"'  .,
NN  2 A
TSCtOSC Access Points to be posted:
If Hallway Contamination <~100}0 dpm/ 100 sq. cm              If Hallway Contamination >' 1000 dpm/ 100 sq. cm A.En~ry/Exit                                                  A. No Entry. Exit Only 8, No EntrylNo Exit                                            B. Entry to TSC/iOSC. No Exit. White Step Off Pad C. No Entry/Na Exit and Frisk Shoes before stepping here C. No Entry/No Exit 0, Equipment cabinets. Place sign at top of' stairway          0. Equipment cabinets, Place sign at top of stairwa~y, No Entry/No} Exit without permission from RAD Coordinator. No EntrylNo Exit without permission from RAD E. Air Monitoring Equipment                                      Coordinator E. Air Monitoring Equipment
 
" Einergy                EMERGENCY PLAN                    PROCEDURE
  ~iMPLEMENTING PROCEDURES                      REFERENCE          S                Pg            2    f2 Attchment 9.9 Radiological Coordinator Checklist Sheet 4 of 5          _
information on use of Potassium Iodide IOSA TT' Tablets Potassium Iodide Tablets o*  TAKE POTASSIUM IODIDE ONLY WHEN                                      WARNING PUBLIC HEALTH OFFICIALS TELL YOU.            POTASSIUM IODIDE SHOULD NOT BE USED BY iN A RADIATION EMERGENCY                      PEOPLE ALLERGIC TO IODIDE, Keep oul of the RADIOACT1VE IODINE C OULD BE                  reach of children. In case of overdose or allergic RELEASED INTO THE AIR, POTASSIUM              reaction, so nlact a physician or public health IODIDE ( A FORM OF IODINE) CAN HELP          authority, PROTECT YOU.
o    IF YOU ARE TOLD TO TAKE THIS                            HOW POTASSIUM IODIDE WORKS MEDICINE. TAKE IT ONE TIME EVERY 24          Certain forms of iodine help your thyroid gland work HOURS, DO NOT TAKE IT MORE OFTEN.            right. Most people get the iodine they need froml MORE WILL NOT HELP YOU AND MAY                foods like iodized salt or fish. The thyroid can "store" INCREASE THE RISK OF SIDE EFFECTS.            or hold only a certain amount of iodine, NOT TAKE THIS DRUG IF YOU KNOW In a radiation emergency radioactive iodine may be YOU ARE ALLERGIC TO IODIDE (,SEE released In the air. If this air is breathed or SI DE EFFECTS BELOW) swallowed it may enter the Ihyroid and damage it.
DIRECTIONS FOR USE                  The damage may not show itsef for years. Child ren Use only when directed by Emergency Management,        are the most likely to have thyroid damage.
State, Local or Public Health Officials                lfyou take potassium iodide, it wiU fill up you thyroid gland. This reduced the chances that radioactive DOSE                        iodine will enter your thyroid.
ADULTS AND CHILDREN ONE YEAR OF AGE OR OLWER:                                                    WHO SHOULD NOT TAKE POTASSIUM IODIDE One (I) tablet once a day. Crush for small      The only people who should not take tablets when chiildren.                                      directed to do so are people who know they are BABIES UNDER ONE YEAR OF AGE:                          allergic to iodine. Pregnantwomen. nursslg women, One-half (1/2) tablet onos a day. Crush first. children and bables may take this drug, HOW AND WHEN DOSAGE                        Potassium lodide should be taken as soon as Take for 10 days unless directed otherwise.              possible after authorities tell you to take ft.
Slore your supply at momn temperature between 590      You should take one dose every 24 hours.
F and 860 F. Keep package dry and foil packets          MORE WILL NOT HELP YOU, AND WILL intact.                                                INCREASE THE CHANCES OF SI DE EFFECTS.
KEEP YOUR SUPPLYV OUT OF REACH OF                Continue to take the drug for 10 days.
CHILDREN.
WHAT TO 00 IF SIDE EFFECT OCCUR SIDIE EFFECTS                    STOP taking the drugs and contact a doctor or public Usually, side effects of potassium iodide happen        health officials for instructions.
when people take higher doses for a long time. You should be careful not to lake more than the recommended dose or take it for longer than you are told. Side effects are unlikely because of the low                      DESCRIPTION AND USE dose and Ihe short tme you will be taking the drug.
Each IOSATTM Tablet contains 130 mg* of Possible sid effects include skin rashes, swelilng of    potassium iodide.
the salivary glands, and "icdism' (metaltic tasle, bumlng mouth and throat, sore teeth and gums,            Thyroid blocking in *adiatlon emergency only.
symptoms of a head cold, and sometimes stomach upset and diarrhea).
 
r    j
        ,  e'ye Enery MREcIPECPLNNON-QUALITYP EERECYPLNPROCEDURESI C~RRELATED  IP-EP-220    Revision 18 IPRCDRSREFERENCE                      USE      Page    2_3  of  299 Attchment 9.9 Radiological Coordinator Checklist Sheet 5 of 5 BRIEFING iNFORMATiON ON USE OF POTASSiUM IODIDE (K!I)
Why is Potassium Iodide being issued? In accordance with the New York State Policy on Potassium iodide, potassium iodide is recommended on a projected thyroid dose of 5 Remn. Potassium Iodide is issued at a declared General Emergency or during an emergency related radioactive airborne release. Taking Potassium iodide is voluntary.
What is Potassium Iodide? Potassium iodide is a thyroid blocking protective action for exposure to radioactive iodine. If you take potassium iodide it will saturate your thyroid gland which will reduce the chances that radioactive iodine-will enter your thyroid. Additional information is available on the information handout with each tablet.
What dosage to take? A 130 milligram tablet. You should take as soon as possible after being told. One (1) tablet every 24 hours. Take for 10 days. Unless otherwise directed.
Side Effects? Skin rash, swelling of salivary glands, a metallic taste, burning mouth and throat, sore teeth and gums, symptoms of a head cold and sometimes upset stomach or diarrhe~i. This would usually happen when higher doses are taken over long period of time.
WARNING!I Potassium iodide should not be taken by people allergic to iodine or shell fish.
 
      ~  En~n'v
* MERGENCY PLAN EE iMPLEMENTING j    PROCEDURE NNUAIYRLTD              IPoEP22O    Revision 18 OI      PROCEDURES            REFERENCE USE        Page      244  of    299 Attchment 9.10 TSC Security Coordinator Checklist Sheet 1 of 3 1.0  tnitial ResponsibiiltvlActivibt                                            NOTES 1.1  Follow responsibilitieslactivities in EN-EP-4I0 Attchment 9,.10 and the following:
1.2  Assume the duties of the Security Coordinator.
A. Refer to EN-EP-SI0 Attachment 9.10.
B. Secure Site Access at the SITE AREA or GENERAL EMERGENCY level as follows:
(,a) Notify CAS and SAS to secure the site, except for ERe Members, per procedure IP-EP-240, Security.
(b)* -Notify the EPM when this has been done.
1.,3 Assign OSC Log Keeper to the position of Accountabiity*
Coordinator.
A. Report readiness to conduct Accountability to the EPM. Utilize the OSC Log Keeper to assist in Accountability.
Bl. Direct the OSC Log Keeper to support the monitoring of"the Accountability Card Readers while ERe members are carding into the TSC/OSC, direct them to verify badges are properly read by the Accountability Card Reader and to log the name and badge number on an Accountability Roster (Form EP-47) of anyone having diffculty using the proximity card readers.
 
      *ElIPEC Enierye    EMERGENCY PLAN NON-QUALITY RELATED PROCEDURE      I iPE-2            ein    18 PROCEDURES              REFERENCE USE        Page        25  of 29 Attachment 9.10 TSC Security Coordinator Checklist Sheet 2 of 3 2.0 Continuous ResponsibilitvlActivitv                                        NOTES 2.1    iF relocation of personnel ofiite is called for THEN:
A. Follow guidance in IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite.
B. Coordinate with TSC Radiological Coordinator to monitor evacuation routes.
2.2    IF relocating to the Security Administration Offces THEN inform the following individuals.
A. Emergency Plant Manager B. TSC Radiological Coordinator C. Emergency Director D. Lead Accountability Officer (LAO) 2.3  The Lead Accountability Officer (LAO) will generate the list of missing persons. This list will be provided to the Emergency Plant Manager, POM, and/or TSC Security Coordinator.
NOTE During plant shutdowns, when there may be large numbers of workers onsite and within the radiological control areas, a Radiation Protection computer printout may be used to assist in locating missing personnel within the radiological control area after accountability is completed.
: 1. IF there are individuals who are missing THEN:
(a)  Review Accountability Rosters (Form EP-47) used to identify ERO members experiencing difficulty using the proximity card readers and remove them from the Missing Persons List.
(b)  Obtain the Radiation Protection Computer Printout of individuals within the Radiological Control Area.
(c)  Check off names of possible missing individuals who have left the Protected Area to narrow the list of actual missing
 
          *E*        MEGNY LNPOCEDUArYRELAE                        IP-EP-220  Revision 18
    ~~~Entergy        IMPLEMENTlNGPLNMREC        RCDR              ae        ~  o Attachment 9.1 0 TSC Security Coordinator Checklist Sheet 3 of 3 Continuous ResponsibilitvlActivitv (cont,)                                  NOTES persons and review RP computer printout for any missing individuals within the Radiological Control Area.
(d)  inform the EPM immediately of any personnel discovered missing during accountability process.
: 4. Assist OSC Staff in maintaining accountability of all OSC personnel through the use of status boards, team assignments, Individual. Exposure Tracking Log (Form EP-29) and ERO Tracking Log (Form EP-42).
2.4  Use the 08C Log Keeper to maintain Continuing Accountability A. Use Onsite ERO Shift Rosters (Form EP-43) to list individuals currently on the Tirst shift in the TSC and OSC.
B. Request EOF Support Staff to identify the current EOF personnel.
C. Work with TSC and OSC Managers to identify personnel to fill.
second shift and ensure all needed positions are identified and establish time second shift is to be called in.
D. Use ETD to identify and contact individuals to fill positions on second shift.* OSC Log-Keeper and EOF Staff may be used to assist in notifications.
E, Inform the TSG and OSO Managers when notifications are completed and if there are any problems filling required positions.
 
0                                                                                                                0i
* Enlergy        IPEC EMERGENCY PLAN    1    NON-QUALITY RELATED PROCEDURE                iP-EP-220              Revision 18 IMPLEMENTING PROCEDURES        J      REFERENCE USE    ,. lPage                    __of              2 Attachment 9.11t TSC I QSC Layout and NRC Room Sheet 1 of 1 TYPICAL Arrangement (Personnel locations may be changed as needed to facilitate communication and movement without a procedure revision)
 
              ---                            R MoN.QUALIT          IP.EP-220 Revsion 18
        '~EIdtgEMERGENCY PLAN RELATED PROCEDOURE iMPLEMENTING-PRCDRSREFSReNCe USE                      Page      2*    Of  299 Attachment 9.1 2 TSCIOSC Public Address System Description and Operation Sheet 1 of 1 1,0 General There are three Public Address Systems (PAs) in the TSC/OSC and they have been color coded for easy identification of microphones and speakers.
2.0 SystemslOperation 2.1 Blue System comprises the plant page system. This page system is only from U2. The Speakers are located in the Halls, the OSC Bull Pen, the R&CA Briefing room, the NRC Conference Room, and the old U2 Records room. Volume controls are typically walls near speakers. Activation is via the normal plant page access.
2.2 Red System is the permanently installed TSCIOSC page system. The speakers are located in the ceilings similar to the Plant Page, system. Speakers are in the Halls, the OSC Bull Pen, the R&CA Briefing room, the TSC/OSC Command room, the NRC Conference room and the old U2 Records room. The speakers are marked with red tape. Each speaker has its own on/off switch and volume control knob. The amplifier and two microphones are on/in the counter separating the TSC and OSC each marked with RED tape. The microphones are wireless and battery powered and simply require that they be turned on to activate the system. Volume control is-via the local speaker or the amplifier on the counter separating the TSC and 0S0.
2.3 Green System consists of wireless portable speakers distributed around the facility. Each speaker must be turned on by a switch on the back and the volume adjusted locally by a switch on the front. The volume should be turned up to full volume and adjusted down as needed. Speakers are located in the 0SC Bull Pen, the TSC/OSC Command room, the NRC Conference room, the Whole Body Count room and the old U2 Records room. There are two microphones on/in the TSC/OSC Counter each marked with GREEN tape. The microphones are wireless and battery powered and simply require that they be turned on to activate the system. Additional batteries are available in the supply boxes. Note that this system does not cover the Hallways.
 
Attachment 9.13 IPEC TSC STAFFING Sheet 1 of 1 At IPEC, the expectation is that ALL individuals assigned to the Technical Support Center (TSC) report to the facility within 60 minutes of the declaration of an Event.
The TSC is able to be considered STAFFED when the following Core Individuals are present: Emergency Plant Manager (EPM), TSC Manager, TSC Communicator, Rad Coordinator, Mechanical Engineer, Electricalll&C Engineer and Reactor Engineer. Regardless of whoever else is available these positions MUST be filled before the TSC can be considered to be STAFFED.
The IPEC Emergency Plan in Section B (Table B-I) requires the following to respond within .60 minutes: TSC Communicator, a Reactor Engineer, an Electrical Engineer and a Mechanical Engineer.
The TSC may be declared OPERATIONAL whenever Core Individuals are achieved and the TSC Manager determines that the facility is adequately staffed for the event and equipment is set up and available to perform the emergency functions assigned to the TSC.
 
ATTACHMENT 9.1                                                                         IOCFR5O.54{q) SCeswNG SHEET 1 Ot 4 ProcedureiDocument Number:                                           Revision:
EN-EP-SI 0                                                                       2 IP-EP-220                                                                         t EquipmentiacliitylOther:             indian Point Energy Center
 
==Title:==
Technical Support Center fTSC) Operations Technical Support Center Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan):
This change issues fleet procedure EN-EP-610, "Technical Support Center (TSC) Operations" and revises IP-EP-220 to remove any duplicate tasks in EN.EP-610; however maintain any site specific requirements or commitments.
Part Ii. Activity Previously Reviewed?                                                   NE                 *N Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or               50.54(q)(3)       Continue to Alert and Notification System Design Report?                                             EOT reutioni . ext Enter If YES, identify bounding source document numberlapproval reference and                   justification ensure the basis for concluding the source document fully bounds the                     b~ow and proposed change is documented below:,                                                       opeePr JustfifcatIon:
[Cs8ounding document attached (optional)
[Cs8ounding document attached (optional)
Part ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity.  
Part ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity. (Refer to EN-LI-i100)
(Refer to EN-LI-i100)
NOTE: For example, when a design change is the proposed activity, consequential actions may include changes to other documents which have a different change control process and are NOT to be included in this 50.54(q)(3)
NOTE: For example, when a design change is the proposed  
: activity, consequential actions may include changes toother documents which have a different change control process and are NOT to be included in this 50.54(q)(3)
APPLICABILITY CONCLUSION.
APPLICABILITY CONCLUSION.
0] If there are no controlling change processes, continue the 50.54(q)(  
0] If there are no controlling change processes, continue the 50.54(q)( 3) Screening.
: 3) Screening.
[] One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects Ihe implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify he applicable controlling change processes below.
[] One or more controlling change processes are selected,  
D] One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3)
: however, some portion of the activity involves theemergency plan or affects Ihe implementation of the emergency plan; continue the 50.54(q)(3)
Evaluation is NOT reguired. Identify controilinq change processes below and complete Part VI.
Screening for that portionof the activity.
CONTROLLING CHANGE PROCESSES 10 CFR 50.54q only.
Identify he applicable controlling change processes below.D] One or more controlling change processes are selected and fully bounds all aspects of the activity.
Part IV. Editorial Change                                                                 []E               0* NO 50 54(q)13)       Continu* to =itexi Is this activity an editorial or typographical change such as fornatting, paragraph       EValIatUWm is     part numbering, spelling, or punctuation that does not change intent?                         NOT required, Justficaion:Enter J~~~~~ustification                                                   wsifim a"nd C*tmplL'ta Part "NO"S Is checked because the procedure revision contains non-editoril               vi.
50.54(q)(3)
changes.
Evaluation is NOT reguired.
EN-EP-305 REV 3
Identify controilinq change processes below and complete Part VI.CONTROLLING CHANGE PROCESSES 10 CFR 50.54q only.Part IV. Editorial Change []E NO50 54(q)13) to =itexiIs this activity an editorial or typographical change such as fornatting, paragraph EValIatUWm is partnumbering,  
 
: spelling, or punctuation that does not change intent? NOT required, Justficaion:Enter J~~~~~ustification wsifim a"nd Part"NO"S Is checked because the procedure revision contains non-editoril vi.changes.EN-EP-305 REV 3 ATTACHMENT 9.1SHET 2 OF 4I0CFRSO.54(q)
ATTACHMENT 9.1                                                                              I0CFRSO.54(q) SCREENING SHET 2 OF 4 ProcedurelDocument Number:                                                       Revision:
SCREENING ProcedurelDocument Number: Revision:
EN-EP-61 0                                                                                   2 IP-EP-220                                                                                   18 EqulpmentiFacilitylOther: Indian Point Energy Center
EN-EP-61 0 2IP-EP-220 18EqulpmentiFacilitylOther:
 
Indian Point Energy CenterTitle:Technical Support Center (TSC) Operations Technical Support CenterPart V. Emergency Planning ElementlFunction Screen (Associated 10 CFR 50.47(b) planning standard function identified inbracketsl Does this activitv affect any of the followina, includina orooram elements from NUREG-0654/FEMA REP-i Section II?1. Responsibility for emergency response is assigned.  
==Title:==
[1] [2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 [staffing) in accordance with the emergency plan. [1]3. The process ensures that on shift emergency response responsibilities are staffed and assigned.  
Technical Support Center (TSC) Operations Technical Support Center Part  V. Emergency bracketsl              Planning Does this activitv      ElementlFunction affect                  Screen any of the followina,      (Associated includina orooram10elements CFR 50.47(b) planning standard function from NUREG-0654/FEMA       REP-i identified Section II?in
[2]' LII4. The process for timely augmentation of onshift staff is established and maintained.
: 1. Responsibility for emergency response is assigned. [1]                                                                         [
12] Ql5. Arrangements for requesting and using off site assistance have been made. [3] fJ6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] [7/. A standard scheme of emerg;ency classification and action levels is in use. [41 -8. Procedure's for notification of State and local governmental agencies are capable of alerting them of the [declared emergency within 15 minutes after declaration of an emergency and providing follow-up Snotifications.  
: 2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7                           [
[5]8.' A/dministrative and physical means have been established for alerting and'providing prompt instructions to fJthe public within the plume exposure pathway.  
staffing) in accordance with the emergency plan. [1]
(5]'10. The public ANS meets the design requirements of FEMA-REP&deg;-1 0, Guide for Evaluation of Alert andNotification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS designreport and supporting FEMA approval letter. [5]11. Systems are established for prompt communication among principal emergency response organizations.  
: 3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2]'                           LII
[6] [12. Systems are established for prompt communication to emergency response personnel.  
: 4. The process for timely augmentation of onshift staff is established and maintained. 12]                                       Ql
[8] E13; Emergency preparedne'ss information is made available to the public on a periodic basis within the plume [exposure pathway emergency planning zone (EPZ). [7]14. Coordinated dissemination of public information during emergencies is established.  
: 5. Arrangements for requesting and using off site assistance have been made. [3]                                                 fJ
[71[15. dequte fciliies re mintaned o suportemerenc respnse,,
: 6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3]                               [
816. Adequate equipmet iesr maintained to support emergency response.  
7/. A standard scheme of emerg;ency classification and action levels is in use. [41                                                 -
[8] ['17. Methods,  
: 8. Procedure's for notification of State and local governmental agencies are capable of alerting them of the                     [
: systems, and equipment for assessment of radioactive releases are in use. (9]1-18. A range of public PARs is available for implementation during emergencies.  
declared emergency within 15 minutes after declaration of an emergency and providing follow-up Snotifications. [5]
[10] [19. Evacuation time estimates for the population located in the plume exposure pathway EpZ are available to I--support the formulation of PARs and have been provided to State and local governmental authorities.  
8.' A/dministrative and physical means have been established for alerting and'providing prompt instructions to                     fJ the public within the plume exposure pathway. (5]
[10]20. A range of protective actions is available for plant emergency workers during emergencies, including those LIIfor hostile action events.[10]
'10. The public ANS meets the design requirements of FEMA-REP&deg;-1 0, Guide for Evaluation of Alert and Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5]
EN-EP-305 REV 3 ATTACHMENT#
: 11. Systems are established for prompt communication among principal emergency response organizations. [6]                         [
9.1SHEET 3 0F 4I OCFR50.54(q)
: 12. Systems are established for prompt communication to emergency response personnel. [8]                                           E 13; Emergency preparedne'ss information is made available to the public on a periodic basis within the plume                       [
SCREENING EquipmentIFac~lityIOther:.
exposure pathway emergency planning zone (EPZ). [7]
indian Point E.nergy CenterTitle:Technical Support Center (TSC) Operations Technical Support Center21. The resources for controlling radiological exposures for emergency workers are established.  
: 14. Coordinated dissemination of public information during emergencies is established. [71[
[11] [22. Arrangements are made for medical services for contaminated, injured individuals.  
: 15. dequte re   mintaned o suportemerenc fciliies                                  respnse,,   8
[12] [23. Plans for recovery and reentry are developed.  
: 16. Adequate equipmet iesr         maintained to support emergency response. [8]                                                   [
[13] [24. A drill and exercise program (including radiological,  
'17. Methods, systems, and equipment for assessment of radioactive releases are in use. (9]1-
: medical, health physics and other program areas) is [established.  
: 18. A range of public PARs is available for implementation during emergencies. [10]                                                 [
[14]25. Drills, exercises, and training evolutions that provide performance opportunities to develop,  
: 19. Evacuation time estimates for the population located in the plume exposure pathway EpZ are available to                         I--
: maintain, and [demonstrate key skills are assessed via a formal critique process in order to identify weaknesses.  
support the formulation of PARs and have been provided to State and local governmental authorities. [10]
[14]26. Identified weaknesses are corrected.  
: 20. A range of protective actions is available for plant emergency workers during emergencies, including those                     LII for hostile action events.[10]
[14].....
EN-EP-305 REV 3
: 27. Training is provided to emergency responders.  
 
[15] "28, Responsibility for emergency plan development and review is established.  
ATTACHMENT# 9.1                                                                            I OCFR50.54(q) SCREENING SHEET 3 0F 4 EquipmentIFac~lityIOther:. indian Point E.nergy Center
[16] [29. Planners responsible for emergency plan development and maintenance are properly trained.  
 
[16] ______APPLICABILITY CONCLUSION 0] If no Part V criteria are checked, a 50.54(q)(3)
==Title:==
Evaluation is [OT required; document the basis for condlusion below andcomplete Part VI, .[] If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3)
Technical Support Center (TSC) Operations Technical Support Center
Evaluation.  
: 21. The resources for controlling radiological exposures for emergency workers are established. [11]                                   [
.. .... ..BASIS FOR CONCLUSION:
: 22. Arrangements are made for medical services for contaminated, injured individuals. [12]                                             [
: 23. Plans for recovery and reentry are developed. [13]                                                                               [
: 24. A drill and exercise program (including radiological, medical, health physics and other program areas) is                         [
established. [14]
: 25. Drills, exercises, and training evolutions that provide performance opportunities to develop, maintain, and                       [
demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]
: 26. Identified weaknesses are corrected. [14].....
: 27. Training is provided to emergency responders. [15]                                                                                   "
28, Responsibility for emergency plan development and review is established. [16]                                                     [
: 29. Planners responsible for emergency plan development and maintenance are properly trained. [16]                               ______
APPLICABILITY CONCLUSION 0] Ifno Part V criteria are checked, a 50.54(q)(3) Evaluation is [OT required; document the basis for condlusion below and complete Part VI,       .   *.
[] If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation.                       ..   ....         ..
BASIS FOR CONCLUSION:
This change issues the new fleet procedure for the Technical Support Center cr[scj at IPEC and revises the site specific facility procedure.
This change issues the new fleet procedure for the Technical Support Center cr[scj at IPEC and revises the site specific facility procedure.
The fleet procedure describes the activation and operation of the TSQ. Introduction of the new fleet procedures does not affect norchange the intent of the facilities and equipment already in existence.
The fleet procedure describes the activation and operation of the TSQ. Introduction of the new fleet procedures does not affect nor change the intent of the facilities and equipment already in existence. The procedure is written to ensure the existing facility and TSC equipment will be used and maintained for any Emergency Response Organization (ERe) response.
The procedure is written to ensure the existing facility and TSCequipment will be used and maintained for any Emergency Response Organization (ERe) response.
IP-EP-220 (220) will be maintained at this time; however, it will be revised to remove any tasks duplicated in EN-EP-610 (610). Fleet standard forms .and site specific forrms will.be used as needed to support 610 and new revision of 220; this will ensure IPEC site-specitlc Emergency Plan requirements and associated processes are retained; The 610, new fleet forms, the revised 220 and current site specific forms were reviewed against the current IPEC TSC procedure, iP-EP-220, "Technical Support Center" revision 17, the Emergency Plan, and IPEC Emergency Plan commitments. Based on this review, there are two standard ERO position titles which were not: adopted by IPEC Emergency Planning; TSC Mechanical Coordinator and ENS Communicator. EN-EP-801 states that the TSC Mechanical Coordinator is optional if the TSC and OSC are co-located. These two facilities are co-located at.IPEC. The ENS communicator was not added to the TSC since the ENS communications is designated to the Engineering Coordinator at IPEC and will remain, In 2011. a 50.S54Q evaluation was performed and approved this difference. IPEC will assign dhe Engineering Coordinator to perform the checklist of ENS communicator. There is one commitment which discusses having directions for relocation to an alternate location as necessary. These directions are provided in the EPM checklists in the TSC procedure, IP-EP-220 revision 18. Changes made to IP-EP-220 revision 18 removed only duplicate tasks. Any tasks site specific and not performed in 610 will remain in 220, revision 18. Utilizing EN-EP-610, revision 2 and IP-EP-220 revision 18 for the TSC will address all tasks required for the TSC ERe and no changes to the response processes of facility activation, response time, and organization responsibilities, addressed by 10CFRS0.47(b) planning standards will be made.
IP-EP-220 (220) will be maintained at this time; however, it will be revised to remove any tasks duplicated in EN-EP-610 (610). Fleetstandard forms .and site specific forrms will.be used as needed to support 610 and new revision of 220; this will ensure IPEC site-specitlc Emergency Plan requirements and associated processes are retained; The 610, new fleet forms, the revised 220 and current site specificforms were reviewed against the current IPEC TSC procedure, iP-EP-220, "Technical Support Center" revision 17, the Emergency Plan,and IPEC Emergency Plan commitments.
Summary - No ERO positions changes have been made. No ERO responsibilities have been added or deleted. The description, activation and operation of"the TSCas described in the IPEC Emergency Plan have not been changed. All site specific commitments continue to be met under the fleet procedure or the use of the site specific facility procedure. This change does not alter the TSC structure, organization or location.
Based on this review, there are two standard ERO position titles which were not: adopted byIPEC Emergency Planning; TSC Mechanical Coordinator and ENS Communicator.
The revision of the Technical Support Center procedure, IP-EP-220 rev 18 and issuance of the fleet Technical Support Center Operations procedure, EN-EP-610 and site specific fornis screens out.
EN-EP-801 states that the TSC Mechanical Coordinator is optional if the TSC and OSC are co-located.
Changes made to IP-EP-220 rev. 18 and EN-EP-610 revision 2 have been reviewed to determine if they affect any of the planning standards or program elements in Part V of this form. It has been concluded that there Is no affect and no f'urther evaluation is required and the c:haoges do not reqluire a change to the I]PEC Emergency* Plan.
These two facilities are co-located at. IPEC. The ENS communicator was not added to theTSC since the ENS communications is designated to the Engineering Coordinator at IPEC and will remain, In 2011. a 50.S54Q evaluation was performed and approved this difference.
EN-EP-305 REV 3
IPEC will assign dhe Engineering Coordinator to perform the checklist of ENScommunicator.
 
There is one commitment which discusses having directions for relocation to an alternate location as necessary.
ATTACHMENT 9.1                                                    I 0CFRS0.54(q) SCREENING SHELET 4 OF 4 EquipnuentlFacllity/Other:     Indian Point Energy Center
Thesedirections are provided in the EPM checklists in the TSC procedure, IP-EP-220 revision  
 
: 18. Changes made to IP-EP-220 revision 18removed only duplicate tasks. Any tasks site specific and not performed in 610 will remain in 220, revision  
==Title:==
: 18. Utilizing EN-EP-610, revision 2 and IP-EP-220 revision 18 for the TSC will address all tasks required for the TSC ERe and no changes to the responseprocesses of facility activation, response time, and organization responsibilities, addressed by 1OCFRS0.47(b) planning standards will bemade.Summary -No ERO positions changes have been made. No ERO responsibilities have been added or deleted.
Technical Support Center (rSC) Operations Technical Support Center Part Vi, Signatures:
The description, activation and operation of" the TSC as described in the I PEC Emergency Plan have not been changed.
Preparer Name (Print)                               Preparer Signature             Date:
All site specific commitments continue to bemet under the fleet procedure or the use of the site specific facility procedure.
Rebecca A. Martin                                                                               !
This change does not alter the TSC structure, organization or location.
(Optional) Reviewer Name (Print)                     Reviewer SignatureDt:
The revision of the Technical Support Center procedure, IP-EP-220 rev 18 and issuance of the fleet Technical Support Center Operations procedure, EN-EP-610 and site specific fornis screens out.Changes made to IP-EP-220 rev. 18 and EN-EP-610 revision 2 have been reviewed to determine if they affect any of theplanning standards or program elements in Part V of this form. It has been concluded that there Is no affect and no f'urtherevaluation is required and the c:haoges do not reqluire a change to the I]PEC Plan.EN-EP-305 REV 3 ATTACHMENT 9.1SHELET 4 OF 4I 0CFRS0.54(q)
Approver Name (Print)                               AppoerSgature                 Date:"
SCREENING EquipnuentlFacllity/Other:
EP Manager           -.. . ..       ..                                                     _._   _ _ _
Indian Point Energy CenterTitle:Technical Support Center (rSC) Operations Technical Support CenterPart Vi, Signatures:
                                                /
Preparer Name (Print) Preparer Signature Date:Rebecca A. Martin !(Optional)
EN-EP-305 REV 3
Reviewer Name (Print) Reviewer SignatureDt:
 
Approver Name (Print) AppoerSgature Date:"EP Manager -.. ... .._._ _ _ _/EN-EP-305 REV 3 IPEC IMPLEMENTING PROCEDURE Rev:. 1PREPARATION, REWV EW, AND APPROVAL Pae 4of4kTTACHMENT IPEC PROCEDURE REVIEW AND APPROVAL...... ~ ~(Page 1 of 1)... ..Procedure Title: Technical Support CenterProcedure No: IP-EP-220 Existing Rev: 17 New Rev: 18 DRN/EC No: DRN-15-01355 Procedure Activity  
IPEC IMPLEMENTING PROCEDURE                                                               IP-SMM-AD-1*02                Rev:. 1 PREPARATION,                       REWV EW, AND APPROVAL                                                     Pae 4of4 kTTACHMENT 1*0.2                                                                    IPEC PROCEDURE REVIEW AND APPROVAL
..............
                            ......                                     ~ ~(Page 1 of 1)...                                               ..
Temnorarv Procedure Change(MARK Applicable) 0] Converted To I PEC, Replaces:  
Procedure
(fl1ARK Applicable)
 
[] NEW PROCEDURE Unit 1 Procedure No: 03 EDITORIAL Temporary Procedure Change0] GEN ERAL REVISION (Enter Step Number In Revision Summary)O] PARTIAL REVISION Unit 2 Procedure No: [] ADVANCE Temporary Procedure ChangeIJ CONDITIONAL Temporary Procedure ChangeU] EDITORIAL REVISION TerminaingCodition
==Title:==
[] VOID PROCEDURE Unit 3 Procedure No: TriaigCniin
Technical Support Center Procedure No: IP-EP-220                             Existing Rev: 17       New Rev:         18     DRN/EC No:           DRN-15-01355 Procedure Activity..............                                                             Temnorarv Procedure Change (MARK Applicable)                   0] Converted To IPEC, Replaces:                                   (fl1ARK Applicable)
_________
[] NEW PROCEDURE                           Unit 1 Procedure No:                         03 EDITORIAL Temporary Procedure Change 0] GEN ERAL REVISION                                                                         (Enter Step Number In Revision Summary)
O1 SUPERSEDED O] RAPID REVISION Document in Microsoft Word: 0VODDNPCNs)
O] PARTIAL REVISION                         Unit 2 Procedure No:                         [] ADVANCE Temporary Procedure Change IJ CONDITIONAL Temporary Procedure Change U] EDITORIAL REVISION                                                                     TerminaingCodition
.__ ___ ___ _ Yes D].No ___VOIDDRNTPCNos):
[] VOID PROCEDURE                           Unit 3 Procedure No:                         TriaigCniin                   _________
Revision Summary [] N/A -See Revision Summary page.Revised to support implementation of new fleet facility procedures.
O1 SUPERSEDED O] RAPID REVISION                           Document in Microsoft Word:                   0VODDNPCNs)
Removed any duplicate tasks and kept site specificreqluirements and commitrrients..  
___         ___           _ .__                Yes       D].No               ___VOIDDRNTPCNos):
.*
Revision Summary                         [] N/A - See Revision Summary page.
Implementation Plan? 0] Yes 0] No Formal Training? Yes O]No Special Handling?_[]
Revised to support implementation of new fleet facility procedures. Removed any duplicate tasks and kept site specific reqluirements and commitrrients..                          .
Yes []NoRPO Dept: ,Emergency Planning Writer (Print Name! ExtI Sign): Rebecca A. Martin / G (_1~d~Revew and A2revaI (Per Attachment 10.1, IPCReview And A Requirements)
* ImleentationRequiremen*
: 1. 0 Technical Reviewer;*.Casey Karsten/  
Implementation Plan? 0] Yes 0] No Formal Training? 0* Yes O]No Special Handling?_[] Yes []No RPO Dept: ,Emergency Planning                           Writer (Print Name! ExtI Sign): Rebecca A. Martin /                   G (_1~d~
"I / ": :(Print Name! Sidnature/
Revew and A2revaI (Per Attachment 10.1, IPCReview And A _*ve~l Requirements)
Date)2. U] Cross-Disciplinary Reviewers:
: 1. 0 Technical Reviewer;*.Casey Karsten/ "I                                                   /     &*i
Dept: ________Reviewer:
                                                  "::(Print                           Name! Sidnature/ Date)
______________________________
: 2. U]     Cross-Disciplinary Reviewers:
(Print Name! Stgnature Date)Dept: _____ __Reviewer:
Dept: ________Reviewer:                         ______________________________
/,1 / (Prin Name! Signaturel Date)O3 PAD required and is compleX~(/PAD Approver and Reviewer qualifications have been verified)
(Print Name! Stgnature Date)
OPrevious exclusion from further LI-i 00 Review is still validOl PAD not required due to type of change4. 0] Non-Intent Determination Complete:
Dept: _____                 __Reviewer:
NO change of purpose or scopeNO reduction in the level of nuclear safetyNO voiding or canceling of a procedure, unless requirements are incorporated into another procedure or the need for theprocedure was eliminated via an alternate process(Print N]ame! SIgnaturel Date)NO change 10 loss restrictive acceptance criteriaNOQ change to steps previously identified as commitment stepsNO deviation from the Quality Assurance Program ManualNO change that may result in deviations from Technical Specifications.
                                                              /,1
PSAR. plant design requirements, or previously made commitments
                                                                /             (Prin Name! Signaturel Date)
: 5. U] On-Shift Shift M~anager/CRS:
O3 PAD required and is compleX~(/PAD Approver and Reviewer qualifications have been verified)
: 6. [ User Validation:
OPrevious exclusion from further LI-i 00 Review is still valid Ol PAD not required due to type of change
User:(Print Name! Signature!Date)
: 4. 0]     Non-Intent Determination Complete:
Validator:
(Print N]ame! SIgnaturel Date)
: 7. U] Special Handling Requirements Understood:
NO change of purpose or scope                                        NO change 10 loss restrictive acceptance criteria NO reduction in the level of nuclear safety                          NOQ change to steps previously identified as commitment steps NO voiding or canceling of a procedure, unless requirements           NO deviation from the Quality Assurance Program Manual are incorporated into another procedure or the need for the          NO change that may result in deviations from Technical Specifications.
procedure was eliminated via an alternate process                    PSAR. plant design requirements, or previously made commitments
: 5. U]     On-Shift Shift M~anager/CRS:
(Print Name! Signature!Date)
: 6. [       User Validation: User:                                                 Validator:
: 7. U]     Special Handling Requirements Understood:
(IPrint Naein! Signature/)Date)
(IPrint Naein! Signature/)Date)
Emergency Planning Document Change Checklist Form(All sections must be completed, N/A or place a check on the line where applicable)
 
Section 1Doc/Procedure Type: (circle one) Administrative I I.molementino I Doe/Procedure No: IP EP 220 CIA: Yes No CIA No. _______Due Date:_____
Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable)
Doc/Procedure Title: Technical Support Center Rev No: 188 Rev Distribution Date: 01/27/16Reason for EPDCC: New X Revision Cancel Date of EPOCC: 01/13!16Section 2Change Description
Section 1 Doc/Procedure Type: (circle one) Administrative I I.molementino I EPLA*N Doe/Procedure No: IP EP 220       CIA: Yes         No       CIA No. _______Due                 Date:_____
: 1. Originator:
Doc/Procedure
Rebecca A. Martin. C, ,,.V,..2. Class of Change: -Technical Correction
 
___ New Commitment__
==Title:==
Other X3. Page numbers affected and reason for change: Revised to suo10ort imp~lementation of new fleetfacility procedures.
Technical Support Center     Rev No: 188 Rev Distribution Date: 01/27/16 Reason for EPDCC:           New       X     Revision         Cancel       Date of EPOCC: 01/13!16 Section 2 Change Description
Removed any duplicate tasks a~nd kept site spec~ific reqiu!r~em.rents andcommitments.
: 1.     Originator: Rebecca A. Martin.             ,.*      C, ,,.V,..
: 4. Emergency Planning Documents Affected:
: 2.     Class of Change: -Technical     Correction ___   New Commitment__ Other              X
None5. Emergency Planning Procedures Affected:
: 3.     Page numbers affected and reason for change: Revised to suo10ort imp~lementation of new fleet facility procedures. Removed any duplicate tasks a~nd kept site spec~ific reqiu!r~em.rents and commitments.
IP-EP-.220
: 4.     Emergency Planning Documents Affected: None
: 6. ReFerences:
: 5.     Emergency Planning Procedures Affected: IP-EP-.220
Other Procedure(s) 41 Nt Regulatory Document  
: 6.     ReFerences: Other Procedure(s) 41Nt        Regulatory Document # N/A Other:
# N/AOther:7. Reviewed training requirements with department training coordinator
: 7.     Reviewed training requirements with department training coordinator __date:_____
__date:_____
: 8.     The f~ollowing are complete, or are not applicable and are so marked.
: 8. The f~ollowing are complete, or are not applicable and are so marked.Tech Review n/a__ 50.54q. X ENN-Ll.-100:
Tech Review n/a__ 50.54q.         X   ENN-Ll.-100: N/A PL-155         N/A     SMVM-AD-102   X Manager approval     X SRC     N/A
N/A PL-155 N/A SMVM-AD-102 XManager approval X SRC N/A9. Both table of contents and transmittals are complete_______date_________
: 9. Both table of contents and transmittals are complete_______date_________
: 10. Approved dec/procedure delivered to Document Control for distribution
: 10. Approved dec/procedure delivered to Document Control for distribution ___date____
___date____
: 11. Position Binders updated ifapplicable:                                               . date___
: 11. Position Binders updated if applicable:  
: 12. Copy of EPDCC and documentlprocedure placed in EP file                                 date____
.date___12. Copy of EPDCC and documentlprocedure placed in EP file date____Sheet 1 of 1Sheet of IForm EP-AD2-1 Rev. 0 IPEC EMERGENCY PLAN DISTRIBUTION LISTPage 1 of 2" IP3 CONTROL ROOMDELIVERED BYDOCUMENTS IP3 53FT. CCR1 COPY OF ALL EP'SIP3 SHIFT MANAGER DEIEEIYP3 53FT. ELEVATION 1 COPY OF ALL EP'SDOCUMENTS IP2 CONTROL ROOM DEIEEIYP2 53FT. CCR 1 COPY OF ALL EP'SDOCUMENTS IPEC TSC DELIVERED BY IP2 53FT. ELEVATION 1 COPY OF ALL EP'SDOCUMENTS IP2 SIMULATOR DEIEEDBIP2 SIMULATOR BLDG. 1 COPY OF ALL EP'SDOCUMENTS IP2 SIMULATOR  
Sheet 1 of 1                              Sheet of EP-AD2-1 IForm    Rev. 0
-CLASSROOM 4 DEIEEDBIP2 SIMULATOR BLDG. 1 COPY OF ALL EP'SDOCUMENTS DELIVERED BY 3 COPIES OF ALL EP'SIP2 SIMULATOR  
 
-CLASSROOM 5 DOUETIP2 SIMULATOR BLDG. EXPTELANRC RESIDENT INSPECTOR NRC IP2 88FT. ELEVATION 1 COPY OF ALL EP'S1 COPY OF ALL EP'S ANDDOC CONTROL DESK NRC -ROCKVILLE, MD OFFSlTE GENERAL RECORDSADDRESS " EXCEPT IP-EP-1 151 COPY OF ALL EP'S ANDNRC STEVE BARR OFFSlTE GENERAL RECORDSEXCEPT IP-EP-1 151 COPY OF ALL EP'S ANDNRC DEPUTY DIRECTOR OFFSlTE GENERAL RECORDSEXCEPT IP-EP-1 151 COPY OF THEFOLLOWING:
IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2
E-PLAN, IP-EP-115, 120,NEW YORK STATE OEM TED FISCH OFFSlTE 20 5,30 4,30410, 420, 430, 620 & IP-10551 COPY OF E-PLAN,WESTCHESTER COUNTY OEM DENNIS DELBORGO OFFSlTEIPE-1&34 ROCKLAND COUNTY FIRE AND NIHLSLNGIF~T COPY OF E-PLAN,EMERGENCY SERVICES NIHLSLNOOFIEIP-EP-310  
    "   ;;i**LOCATIOP DELIVERED BY IP3 CONTROL ROOM                                            IP3 53FT. CCR        1 COPY OF ALL EP'S DOCUMENTS IP3 SHIFT MANAGER                 DEIEEIYP3                 53FT. ELEVATION       1 COPY OF ALL EP'S DOCUMENTS IP2 CONTROL ROOM                 DEIEEIYP2                     53FT. CCR         1 COPY OF ALL EP'S DOCUMENTS IPEC TSC                         DELIVERED BY           IP2 53FT. ELEVATION       1 COPY OF ALL EP'S DOCUMENTS IP2 SIMULATOR                     DEIEEDBIP2               SIMULATOR BLDG.       1 COPY OF ALL EP'S DOCUMENTS IP2 SIMULATOR   - CLASSROOM 4   DEIEEDBIP2               SIMULATOR BLDG.       1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY                                   3 COPIES OF ALL EP'S IP2 SIMULATOR   - CLASSROOM 5     DOUETIP2                 SIMULATOR BLDG.           EXPTELA NRC RESIDENT INSPECTOR                 NRC               IP2 88FT. ELEVATION       1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND DOC CONTROL DESK               NRC - ROCKVILLE, MD             OFFSlTE           GENERAL RECORDS ADDRESS                                "       EXCEPT IP-EP-1 15 1 COPY OF ALL EP'S AND NRC                                STEVE BARR                   OFFSlTE           GENERAL RECORDS EXCEPT IP-EP-1 15 1 COPY OF ALL EP'S AND NRC                            DEPUTY DIRECTOR                 OFFSlTE           GENERAL RECORDS EXCEPT IP-EP-1 15 1 COPY OF THE FOLLOWING:
& 340ORANGE COUNTY EMERGENCY SHNOIIHE F~T COPY OF E-PLAN,SERVICES CENTER SHNO IHROFIEIP-EP-310  
E-PLAN, IP-EP-115, 120, NEW YORK STATE OEM                 TED FISCH                   OFFSlTE         20 5,30         4,30 410, 420, 430, 620 & IP-1055 1 COPY OF E-PLAN, WESTCHESTER COUNTY OEM         DENNIS DELBORGO                 OFFSlTEIPE-1&34 ROCKLAND COUNTY FIRE AND       NIHLSLNGIF~T                                         COPY OF E-PLAN, EMERGENCY SERVICES             NIHLSLNOOFIEIP-EP-310                                           & 340 ORANGE COUNTY EMERGENCY         SHNOIIHE                         F~T                 COPY OF E-PLAN, SERVICES CENTER                 SHNO       IHROFIEIP-EP-310                                   & 340 PUTNAM COUNTY BUREAU OF         ANHNIUTO                         F~T                 COPY OF E-PLAN, EMERGENCY SERVICES             ATOYUONFSTEIP-EP-310                                           & 340}}
& 340PUTNAM COUNTY BUREAU OF ANHNIUTO F~T COPY OF E-PLAN,EMERGENCY SERVICES ATOYUONFSTEIP-EP-310  
& 340}}

Latest revision as of 05:37, 5 February 2020

Revision 18 to Emergency Plan Implementing Procedures, IP-EP-220, Technical Support Center.
ML16033A406
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/26/2016
From: Martin R
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
IP-EP-220, Rev 18
Download: ML16033A406 (37)


Text

OEntergy Indian Point Energy Center CONTROLLED DOCUMENT Document Control TRANSMITTAL 450 Broadway Buchanan, NY 10511 TO: DISTRIBUTION "'DATE: January 26, 2016 FROM: IPEC DOCUMENT CONTROL - 3 RD FLooR ADMIN BLDG PHONE #: 914-254-6835 TRANSMITTAL #: EP- 16-0002 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).

Sign and return the receipt acknowledgement below within ten (10) working days.

AFFECTED DOCUME.NT: IPEC EMERGENCY PLAN PROCEDURES DOG REV# TILE ISTRUTION THE FOLLOWING PROCEDURE(S) HAS BEEN REVISIED, PLEASE REMOVE YOUR CURRENT COPY AND REPLACE WITH ATTACHED UPDATED PROCEDURE: *,

IP-EP-220: REV.18-EFFECTIVE JAN 2 ? 2C'i3*

DATE RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)

(IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S). r NAME (PRINT). SIGNATURE DATE COPY LOCATION

Revision 18 I

L* P NON-QUALITY RELATED IP-EP-220 l~cy*

erg EMERGENCY PLAN PROCEDURE _____________I

" mPLEMENTING

. ROCEDURES REFE.REN'CE USE Page. 1 of 29 Technical Support Center Prepared by:

  • Print Name .. Signature: Date Approval:

Print Name ig treDate

  • Effective Date: 01/27/16 Procedure extensively revised - no revision bars were used.

lP-EP-220 (Technical Support Center) RI8,doc

__ IPEC NON-QUALITY REL.ATED IiP-EP-220 Revision 18

- EiderJy, EMERGENCY PLANPRCDE

  • IMPLEMENTING S PROCEDURES REFERENCE USE " Page 2 Ot 29.

Table of Contents 1.0 PURPOSE..,.. ....... .... .... ........................................................... 3

2.0 REFERENCES

........................3 3.0 DEFINITIONS,....................................... ,....................................... 3 4.0 RESPONSIBILITiES .................................................. 3 4.1 Emergency Plant Manager....... ..........................................

. 3 4.2 TSC Manager..................... .. 3 5.0 DETAILS...................................... .. 4 6.0 INTERFACES_ ....... . ...................................................................... 5 7.0 RECORDS ....................................... ................. ......... .............. ... 5 8.0 REQUIREMENTS AND COMMITMENT,......"............. ........... ,...... 5 9.0 ATTACHMENTS.:.................. ...................  : ....................... ....... ,........5 9.1 Emergency Plant Manager Checklist............... ............................... 5 9.2 TSC Manager Checklist..................11 9.3 Operations Coordinator Checklist ........................................... ,.....13 9.4 Reactor Engineer Checklist......................................................... 14 9.5 Engineering Coordinator Checklist......................... ...................... 15 9.6 Mechanical and Electrical/l&C Engineer Checklist ........................... ... 16 9.7 IT Specialist Checklist ............................................................. 17 9.8 TSC Communicator Checklist .............................................. 18 9.9 Radiological Coordinator Checklist ...... ................  :.................. 19 9.1t0 TSC Security Coordinator Checklist........................................ 24 9.11 TSC/OSC Layout................................................... ...... 27 9.1 2 TSC/OSC Public Address System Description and Operation.............. 28 9.13 iPEC TSC ERO Staffing................................................... 29

I__IPEC I En*eiy*

- EMERGENCY PLAN iMPLEMENTING NON-QUALITY RELATED PROCEDURE I j

IP-EP-220 Revision 18 IPROCEDURES REFERENCE UsE Page 3 Of 2.99 TECHNICAL SUPPORT CENTER (TSC) 1.0 PURPOSEI To describe site specific actions for the activation and operation of the Technical Support Center (TSC). This procedure will be used in conjunction with the fleet procedure, EN-EP-61 0, Technical Support Center (TSC) Operations.

2.0 REFERENCES

2.1 indian Point Energy Center Emergency Plan 3.0 DEFINITIONS 3.1 See EN-EP-GlO Section 3.0 for definitions.

4.0 RESPONSIBILITIEES 4.1 See EN-EP-610 for Responsibilities.

5.0 DETAILS 5.10 See EN-EP-610 for Details.

6.0 INTERFACES 6.1 IP-EP-1 15, Emergency Plan Forms 6.2 IP-EP-21 0, Central Control Room 6.3 IP-EP-230, Operations Support Center:

6.4 IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite 6.5 IP-EP-5lO, Meteorological, Radiological & Plant Data Acquisition System 6.6 IP-EP-610, Emergency Termination and Recovery 6.7 IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during an Emergency 6.8 0-FSG-100, BDBEEIELAP Emergency Response 6.9 EN-EP-6 10, Technical Support Center (TSC) Operations 7.0 RECORDS All forms and logs completed by the Emergency Response Organization during a declared emergency are Quality Records and shall be maintained for the life of the plant plus twenty (20) years.

-* ll~(?,"2_,EMERGENCY PLAN . PROCEDURE 8.0 REQUIREMEiNTS AND COMMITMENT CROSS-REFERENCE None 9.0 ATTACHMENTS 9.1 Emergency Plant Manager Checklist.

9.2 TSC Manager Checklist 9.3 Operations Coordinator Checklist ....

9.4 Reactor Engineer Checklist 9.5 Engineering Coordinator Checklist 9.8 Mechanical and Electrical / I&C Engineer Checklist 9.7 IT Specialist Checklist 9.8 TSC Communicator Checklist 8.9 Radiological Coordinator Checklist 9.10 TSC Security Coordinator Checklist 9.11 TSCIOSC Layout 9.12 TSCIOSC Public Address System Description and Operation 9.13 'IPEC TSC ERO Staffing

  • 1 SIPEC
  • ~~J~jpj/ergy, EMERGENCY PLAN IMPLEMENTING PROCEDURES REFERENCE UsE Ij..

NCR-QUALITY RELATED I PROCEDURE P-EP-20O Page _5 Revi~ion' 18 of 29 Attachment 9.1 Emergency Plant Manager Checklist Sheet ! of 6 1.0 Initial Responsibili~iI*ii NOTES NOTE:

Procedure refers to an event at Unit 2, Unit 3 or both (i.e.,

Security, Natural event). Ifdetermined to be a Site event, then Unit 2 will be the lead plant for all communications, This is a Core Staffing position..

1.1 Follow. responsibilities/activities in EN-EP-61 0 Attachment 9.1 and the following:

1.2 IF a Beyond Design Basis External Event (BDBEE) occurs that results in an Extended Loss of AC Power (ELAP) to either unit, THEN entry into, 0-FSG-100, BDBEE/ELAP Emergency Response, is required..

"1.3 Assume the position of Emergency Plant Manager (EPM).

A. Announce yourself as the EPM and provide initial briefing to the TSCIOSC staff. Ensure briefing covers the following items;

1. introduction of Self and Facility Managers.
2. Establish clear expectations for:
a. Use of Three-Part Communications by EReO members.
b. Use of phones during facility briefs,
c. Limit excess chaffer during emergency,
d. Review and follow your procedures,
3. Remind personnel to validate information,
4. When ready, announce to the TSC/OSC that the TSC/OSC is operational.

I tEnergy. eMERGENCY PLAN PRoCEDURE I IMPLEMENTING

.. .. ....... PR.......

. ocEDURES. ....... REFERE.. . . .CE. U! j..P........

j==-l . ..... ...

Of 2 Attachment 9.1 Emergency Plant Manager Checklist Sheet 2 ofi6 2.0 Cantinuous ResponsibilitviActivity NOTES IF an emergency classificatio setred due to a security condition, THEN evacuation and accountability may put '

personnel at risk. Therefore, in these situations, evacuation and accountability will be suspended until directed by Security and cleared through the Incident Commander.

NOTE:

After initial accountability has been completed, facility managers are responsible for accountability of individuals assigned to their respective organizations.

2.1 At a Site Area Emergency or higher classification, or if the decision has been made to do so, iNITIATE accountability.

A. Direct the. TSC Security Coordinator/Lead Accountability Officer (LAO) to perform accountability.

Initial accountability shall be completed within approximately 30.,minutes from the declaration of the

- event.

B. L.F anyone is unaccounted for THEN direct the TSC Security Coordinator and the OSO Manager to commence search and rescue operations.

C. Direct TSC Manager, OSC Manager, POM and TSC Security Coordinator to maintain onsite accountability throughout the event.

jPROCEDURES-IPEC IMPLEMENTING

[. NON-QUALITYRELATE RFRCEUSE

" I IP-EP-220 jPage Rvision 18 7_ Of 29

. Attachment 9.1

A. When the Control Room transitions from the EOPs to.

SACRG-1, or only declares an EAL for SFP conditions, ENSURE the TSC Reactor Engineer is ready to take over Severe Accident Management control, as. SAMG evaluator.

6 . Once the SAMG Evaluator(s) is ready to take over Severe Accident Management control ANNOUNCE.

  • yourself as the Severe Accident Management Decision Maker.
  • C.- CONFER with the SAMG Evaluators which. SAM....

guidanc~e should be implemented.

D. NOTIFY the Emergency Director (ED) which guidance:

will be implemented. IF the guidance involves a release to the environment, ENSURE the ED discusses this with the Radiological Assessment Coordinator and the State/Counties prior to implementation.

2.3 Authorize Emergency Exposures I KI issuance A. Inform the TSCIOSC Manager and Radiological.

Coordinator that you authorize emergency exposures up to 1 Remn TEDE for all TSC/OSC and Operations personnel dispatched into the plant. Document this authorization in WebEOC, OR on your ERO Log Sheet (Form E:P-1 0) if WebEOC is unavailable.

B. I.F emergency measures require additional exposure THEN raise the emergency exposure limit 1 Rem at a time up to 5 Remn.

I __I'EC,

  • En*--gy, EMERGENCY PL.AN NON-QUALITY RELATED

-PROCEDURE IP-EP-220 Revision 18 U

I ..

  • iMPLEMENTING PROCEDURES j REFERENCE USE Page 8 of 29 Attchment 9.1 Emergency Plant Manager"Checklist Sheet 4 of 6 Continuous Res~onsibllltvlActivitv (cont.) NOTES C. Review and authorize, when requested by OSO Staff, emergency exposures beyond* 5 Remn on an individual basis using Emergency Exposure Authorization (Form EP-6) guidelines.

D. When requested by Radiological Coordinator, authorize issuance of Potassium Iodine (Ki). (KI is normally issued at 5 Remn ODE projected child thyroid dose or declaration of a General Emergency.)

2.4 Circumstances including, but not lirnited to a power outage, toxic gas condition, or increased radiation levels may necessltate~he need to evacuate the TSCIOSC complex. IF it becomes necessary to evacuate the TSCIOSC complex for any reason, the following guidance shall be followed.  :

A. Work with the Fadiological Coordinator, TSC/OSC Managers and TSC Security Coordinator to determine.

a suitable alternate location(s) for TSC and DSC staffs. i In selecting an alternate location, keep the following in* .

mind:

1. In the event of increased radiation levels or a toxic gas condition, consider relocating individuals to the CR or Outage Control Center. Another possible alternative location for consideration is the EQF..

Although desirable to keep the entire staff together, it may be necessary to utilize more than one facility.

2. In the event of a power outage, there may be additional locations that could be used for relocation. Such possible locations include an IPEC Conference Room within the Protected Area, the.

Outage Control Center, the Indian Point Training Center or even the Generation Support Building.

3. In selecting the facility to which you are relocating to, ensure that you consider the ability for the TSO/OSC staffs to function in the new facility.

ii ___

  • EMRG~cIPEC PL NONQ IY EAE P-EPo22O Revision 18 iMPLEMENTING ,

Attachment 9.1 Emergency Plant Manager Checklist Sheet 5 of 6 Continuous Responsibility/Activity Icont.) NOTES Some items for consideration include:

-Is the required Plant information able to be readily obtained?

- Are the necessary computer resources available?

- ill adequate communications be obtainable with all of the necessary parties?

B. PRIOR to evacuating the TSC/OSC complex, address the following:

1. Ensure that evacuating personnel take their position books with them to the new location.
2. Ensure that all needed data is gathered and transported during the relocation of personnel.

Examples include information on the electronic displays, other charted information, completed logs and the like.

3. Inform the ED and thePOM of your relocation plans. Advise them that yQu will notify them of when you have relocated and are a functioning facility. if relocation will be at two or more sites, direct an individual at each of those sites to advise you when their relocation is complete.
4. Determine the speed at which the relocation of personnel should occur giving consideration to the following items:
a. Consider the impact of immediate relocation vs.

mitigation activities in progress.

b. Current radiological or hazardous conditions within the TSC/OSC.
c. Radiological or hazardous conditions at the proposed TSC/OSC.
d. Radiological or hazardous conditions en route.
e. The adequacy of response from the alternate location.

I negEMERGENCY PLAN PROCEDURES*

.PROCEDURE REFERENCE USE I Page _10 Of _29 Attachment 9.1 Emergency Plant Manager Checklist Sheet 6 of 6 Continuous ResponsibilitvlActivity (cont.) NOTES

f. Determine proper path to take to new locations.
g. Direct personnel to relocate.
h. Notify Security to= instruct incoming personnel to report to the designated alternate TSC/OSC location(s).
5. After arriving at the new TSCIOSC location(s), re-establish this new location as the TSC/OSC.
6. Set up the appropriate equipment such as electronic displays, plant data displays and telephones.
7. Notify the ED and POM when established and ready
  • to commence functioning-~as the TSCIOSC.
8. Obtain an updated briefing on the current status of
  • the emergency., plant conditions and any actions that are in progress or that may have been completed. -
9. Continue functioning as the EPM~.

C. Direct personnel to relocate TSCIOSC personnel.

Enfery.

IPEC EMERGENCY PLAN PROCEDURES NON-QUALITY RELATED PROCEDURE REFERENCE USE 1 IPE20 Page 11 Reion1 of 29 j Attachment 9.2 TSC Manager Checklist Sheet I of 2 This is a core staffing position 1.0 jllj~alRespojsiblliIv/Acivi* NOTES 1.1 Follow responsibiltitieslactivities in EN-EP-Bl0 Attachment 9.2 and the following:

1.2 Activation of the TSC and assume the position of TSC Manager,.

A. Synchronize your time with the ISC/OSC clock. Verify with the EQE andlor CR that the time displayed in the TSC/OSC is the same as it is there.

B. Verify you have the following core staffing prior to declaring the TSC staffed:

a. EPM
b. TSC Manager
c. TSC Communicator
d. Mechanical Engineer"
e. Electrical/Ll&C Engineer
f. Reactor Engineer
g. Rad Coordinator C. Staff the TSC using Form EP-lO-ALL, "Filling an ERO Vacancy During Facility Activation/Operation" D. IF additional personnel are required THENN:
a. IF it is during normal working hours THE=N call or assign someone to call the Assembly Areas for needed personnel.
b. IF needed individuals are not available onsite THEN assign someone to call individuals at home using the Emergency Telephone Directory (ETD).

E. Emergency Response Data System (E=ROS)

a. If requested to verify, EROS is active. Refer to procedure EN-EP-31 1, Emergency Response Data System (ERDS)

Activation via the Virtual Private Network (VPN).

b. I]F ERDS is not functional, designate a person with Operations experience to go to the Control Room to complete Forms 31 A, B, C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57, 58, 59).

j Entergy. IPEC EMERGENCY PLAN NNQAmPREDREAE PE-2 eiin1 SM PLEMENTI NG Puc IPROCEDURE REFERE'NCE USE Page 12 Of 29' Attachment 9.2 TSC Manager Checklist Sheet 2 of 2 Initial ResponsibilitvlActivitv (con=t=) NOTES

c. Once the A, B, C Forms are completed, they' are to be faxed to the NRC within 60 minutes.
d. PICS should be started to display plant data for the affected unit IF both Units are affected utilize multiple computers to display both plants' data.

2.0 Continuous Responsibilitv/Activitv¢ 2.1 Manage the activities of the TSC Staff:

A. Provide a central organization and facility for the accumulation and transmittal of plant information to the EOF and NRC.

8. When applicable, direst the appropriate individuals to implement and perform monitoring and evaluations as directed in the. Shdian Point Severe Accident Management (SAMG) Guidelines.

C. if requested by the NRC to provide an open communications line for plant data , THN direct an individual having sufficient technical knowledge to staff the ENS phone. This person may locate in any facility with ENS phone access. If necessary, request the Security Coordinator to obtain additional personal to

.support this activity.

0. Verify that the Engineering Action Tracking (Admin) Display is updated promptly as new tasks are assigned and old tasks completed and as priorities are changed..

E. Anticipate TSC support requirements from ERe, F. Direct TSC staff to obtain drawings and information as needed to solve plant problems.

2.2 Monitor containment integrity status throughout the event:

A. Initiate a review to determine if any non-automatic containment isolation valves should be closed. (Reference 2-ES-i1.4; 3-ES-i .3; 3-SOP-CEB-Oil)

B. Repeat the above review, approximately every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of event and thereafter at the discretion of the EPM.

~E~rg.

IPEC EMERGENCY PLAN PROCEDURES NON-QUALITY RELATED PROCEDURE REFF-RENCE USE IIP-EP-22O Page 13 Revision 18 of 29 Attachment 9.3 Operations Coordinator Checklist Sheet I of I 1.0 Follow ResponsibilitieslActivities in EN-EP-BlO, Attachment 9.3

- ,#. IPEC

-Ene~ y, *EMERGENCY PLAN IMPLEMENTING NoN-QuALrrY RELATED PROCEDURE I iP-EP'22O Revision 18 PROCEDURES REFERENCE USE [_Page 14 Of 29 Attachment 9.4 Reactor Engineer Checklist Sheet I of I This is a core staffing position.

1.0 ResponsibilitvlActivitv, NOTES 1.1 Follow responsibilitieslactivities in EN-EP-610 Attachment 9.4 and the following:

1.2 Monitor plant conditions for any indications of core damage.

A. Perform and update core damage assessment based on current information using guidance provided in procedure IP-EP-360, Core Damage Assessment.

  • B3. Notify TSC Manager and/or Engineering Coordinator, immediately of any changes in core status.

C. Keep the Radiological Coordinator informed on core status to assist in maintaining radiological controls for plant personnel. i D. Through the TSC Manager and/or the Radiological Coordinator, ensure that the EOF Radiological Assessment Coordinator is kept informed of the latest estimate of the amount of core damage.

E. Maintain the Fission Product Barrier Status Board as needed.

1.3 Assist the 2PM in imnplement~ation of Severe Accident Management Guidelines.

A. When the Control Room transitions from the EOPs to SACRG-1, or only declares an EAL for SFP conditions inform the EPM when you are ready to take over Severe Accident Management (SAM) control.

B. INFORM EPMV which SAM guidance should be implemented.

C. IF guidance involves a release to the environment ENSURE the EPM and Emergency Director discuss it with the Radiological Assessment Coordinator who discusses it with the State/Counties prior to implementation.

"1.4 Receive status updates from the TSC Manager andlor EPM and if directed post updates on the appropriate electronic displays.

I Enlergy EMERGENCY PLAN ,PROCEDURE I I ' PROCEDURES -' REFERENCE USE Page '1 Of 29 j Attachment 9.5 Engineering Coordinator. Checklist Sheet* 1 of 1 1.0 Follow ResponsibilitieslActivities in EN-EP-610, Attachment 9.5.

2.0 if requested to provide information to the. NRC Operations Center follow responsibilities in ENEP-SlO, Attachment 9.12.

~EIery EMERGENCY PLAN PROCEDURE I IPROCEDURES J REFERENCE USE j Page 16 Of0 2.99 Attachment 9.6 Mechanical and Electricall Il&C Engineer Checklist Sheet 1 of 1 1.0 Fallow ResponsibilitieslActivities in EN-EP-610 Attachment 9.6.

PEMREC Y L N POCEDUAU RELr IP.E-2 eiin1

~~En~eIMPLEMERGNCTPLNGPoWR MPROEMUENTN PRCDRSREFERENCE USE I Page 1=7 of 29 j Attchment 9.7 IT Specialist Checklist Sheet I of 1 1.0 Initial Responsibili~tvActiviv NOTES 1.1 Follow responsibilltieslactlivties in EN-EP-BIG Attachment 9.7 and the following:

1,2 Assume the position of IT Specialist

[NOT ERDS is not functional in the Simulator for a Drill A. Emergency Response Data System (ERDS)

1. If requested to verify EROS is activated, refer to procedure EN-EP-31 1, Emergency Response Data System (EROS) Activation via the Virtual Private Network (VPN).
2. IF EROS is not functional, notify the TSC Manager to designate an operations experienced person to go to the Control Room to complete Forms 31 A. E8, C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57, 58, 59). Once the A, B, C Forms are completed,,

they are to be faxed to the NRC within 60 minutes.

3. Inform TSC Communicator of the time EROS was verified of activation O_.R activated and to log in WebEOC.

B3. Ensure computer displays in the TSC and OSC continue to operate properly.

1. IF the PICS displays are NOT functioning THE perform the following:

(a) IF Unit 2 obtain 42A, 42B and 42C data from the CCR (IP-EP-115 EP Forms 53, 54, and 55)

(b) IF Unit 3 obtain 31A, 31B and 31C data from the CCR (IP-EP-1 15 EP Forms 57, 58 and 59).

En~L'y~y PEMREC Y IMPLEMENTING

,.PROCEDURES

-~NON-QUALITY RELATED "REFERENCE-USE 1

,j P-EP-220 JPage :is8 Revision 18 Of 29 Att*achment 9.8 TSC Communicator Checklist Sheet Ilofi1 1.0 Follow Responsibilities/Activities in EN-EP=I0,.

Att(achment 9.8.

2.0 Verify that at least one of the Public Address Systems (Red or Green) in the TSCIOSC is turned on and ready.

for use. Refer to Att*achment 9.12 of this procedure for a description and operation.

SIPEC NON-QUALITY RELATED IP..EP-22O Revision 18

  1. ly EMERGENCY PLAN PROCEOURE IMPLEMENTING I PRCDRS j REFERENCE USE Page 199 of 2.9 J Attachment 9.9 Radiological Coordinator Checklist Sheet 1 of 5 This is a Core Staffing Position.

1.0 Initial Responsibili~tvActivitv NOTES 1.1 Follow responsibilities/activities in EN-EP-610 Attachment 9.9 and the following:

1.2 Assume the position of Radiological Coordinator.

A. Request the Control Room to align the OSCITSC ventilation system for incident operation per procedure, if required.

B. Establish the capability for monitoring of Iodine, should it become necessary. Have a Rad Protection Tech set up the AMS-4 as per Attachment 9A13 of procedure IP EP-230, 2.0 Continuous ResponsibilitvtActivitv 2.1 Establish Radiological Control oversight.

A. Verify that the radiological controls for the TSCIOSC have been set up per sheet 9 of this check list.

2.2 IF there are contaminated injured personnel THEN perform the following:

A. Provide radiological support for the assessment, treatment, and transportation of contaminated injured personnel. Act as the point of contact with the hospital where treatment is executed.

8. Make arrangements to pick up Rad Protection personnel at the hospital.

C. Follow proper procedures to retrieve radioactive waste from offsite treatment locations.

0. Obtain concurrence from the EPM prior to releasing the hospital's Radiological Emergency Room or the ambulance for uncontrolled use.

ml~ey, EMERGENCY PLAN PROCEDURE*

Attachment ,9.

. Radiological Coordinator Checklist Sheet 2 of 5 Continuous Res ponslbtil/Activitv.,(cant.) - NOTES 2.3 Provide oversight to ensure emergency teams receive .proper briefs on radiological conditions .

and requirements.

2.4 IF individuals receive or are expected to receive radiolodine uptakes >~5 REM CDE child thyroid dose or a General Emergency has been declared THEN:

  • A. issue K!to onsite emergency workers applying the following controls:
1. Brief personnel in the protected area on the use of KI and its potential side effects using sheet 11 of this Attachment 9.9..
2. Assure that persons in the TSC/OSC, both CCR's and Security personnel within the protected area are briefed.
3. For R&CA team personnel record KI issuance information on Individual Exposure Tracking Log (Formn EP-29).
4. Have all TSCIOSC personnel and security personnel: within the protected area report to the TSC/OSC for distribution of KI.

2.8 Verify that the decontamination efforts of personnel, equipment, and onsite areas are appropriate.

2.6 Participate in Facility Briefings to announce radiological conditions at the TSC1OSC and also affected locations with an emphasis on status of a radiological release.

Eieiy* EMERGENCY PLAN PREUR IMPLEENTIN Atta*chment 9.9 RadiologicaI Coordinator Checklist Sheet 3 of 5 A ~\ C A

E OSC !N R

C E

TSC P

'N A / Cornpi uter Room

~"' .,

NN 2 A

TSCtOSC Access Points to be posted:

If Hallway Contamination <~100}0 dpm/ 100 sq. cm If Hallway Contamination >' 1000 dpm/ 100 sq. cm A.En~ry/Exit A. No Entry. Exit Only 8, No EntrylNo Exit B. Entry to TSC/iOSC. No Exit. White Step Off Pad C. No Entry/Na Exit and Frisk Shoes before stepping here C. No Entry/No Exit 0, Equipment cabinets. Place sign at top of' stairway 0. Equipment cabinets, Place sign at top of stairwa~y, No Entry/No} Exit without permission from RAD Coordinator. No EntrylNo Exit without permission from RAD E. Air Monitoring Equipment Coordinator E. Air Monitoring Equipment

" Einergy EMERGENCY PLAN PROCEDURE

~iMPLEMENTING PROCEDURES REFERENCE S Pg 2 f2 Attchment 9.9 Radiological Coordinator Checklist Sheet 4 of 5 _

information on use of Potassium Iodide IOSA TT' Tablets Potassium Iodide Tablets o* TAKE POTASSIUM IODIDE ONLY WHEN WARNING PUBLIC HEALTH OFFICIALS TELL YOU. POTASSIUM IODIDE SHOULD NOT BE USED BY iN A RADIATION EMERGENCY PEOPLE ALLERGIC TO IODIDE, Keep oul of the RADIOACT1VE IODINE C OULD BE reach of children. In case of overdose or allergic RELEASED INTO THE AIR, POTASSIUM reaction, so nlact a physician or public health IODIDE ( A FORM OF IODINE) CAN HELP authority, PROTECT YOU.

o IF YOU ARE TOLD TO TAKE THIS HOW POTASSIUM IODIDE WORKS MEDICINE. TAKE IT ONE TIME EVERY 24 Certain forms of iodine help your thyroid gland work HOURS, DO NOT TAKE IT MORE OFTEN. right. Most people get the iodine they need froml MORE WILL NOT HELP YOU AND MAY foods like iodized salt or fish. The thyroid can "store" INCREASE THE RISK OF SIDE EFFECTS. or hold only a certain amount of iodine, NOT TAKE THIS DRUG IF YOU KNOW In a radiation emergency radioactive iodine may be YOU ARE ALLERGIC TO IODIDE (,SEE released In the air. If this air is breathed or SI DE EFFECTS BELOW) swallowed it may enter the Ihyroid and damage it.

DIRECTIONS FOR USE The damage may not show itsef for years. Child ren Use only when directed by Emergency Management, are the most likely to have thyroid damage.

State, Local or Public Health Officials lfyou take potassium iodide, it wiU fill up you thyroid gland. This reduced the chances that radioactive DOSE iodine will enter your thyroid.

ADULTS AND CHILDREN ONE YEAR OF AGE OR OLWER: WHO SHOULD NOT TAKE POTASSIUM IODIDE One (I) tablet once a day. Crush for small The only people who should not take tablets when chiildren. directed to do so are people who know they are BABIES UNDER ONE YEAR OF AGE: allergic to iodine. Pregnantwomen. nursslg women, One-half (1/2) tablet onos a day. Crush first. children and bables may take this drug, HOW AND WHEN DOSAGE Potassium lodide should be taken as soon as Take for 10 days unless directed otherwise. possible after authorities tell you to take ft.

Slore your supply at momn temperature between 590 You should take one dose every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

F and 860 F. Keep package dry and foil packets MORE WILL NOT HELP YOU, AND WILL intact. INCREASE THE CHANCES OF SI DE EFFECTS.

KEEP YOUR SUPPLYV OUT OF REACH OF Continue to take the drug for 10 days.

CHILDREN.

WHAT TO 00 IF SIDE EFFECT OCCUR SIDIE EFFECTS STOP taking the drugs and contact a doctor or public Usually, side effects of potassium iodide happen health officials for instructions.

when people take higher doses for a long time. You should be careful not to lake more than the recommended dose or take it for longer than you are told. Side effects are unlikely because of the low DESCRIPTION AND USE dose and Ihe short tme you will be taking the drug.

Each IOSATTM Tablet contains 130 mg* of Possible sid effects include skin rashes, swelilng of potassium iodide.

the salivary glands, and "icdism' (metaltic tasle, bumlng mouth and throat, sore teeth and gums, Thyroid blocking in *adiatlon emergency only.

symptoms of a head cold, and sometimes stomach upset and diarrhea).

r j

, e'ye Enery MREcIPECPLNNON-QUALITYP EERECYPLNPROCEDURESI C~RRELATED IP-EP-220 Revision 18 IPRCDRSREFERENCE USE Page 2_3 of 299 Attchment 9.9 Radiological Coordinator Checklist Sheet 5 of 5 BRIEFING iNFORMATiON ON USE OF POTASSiUM IODIDE (K!I)

Why is Potassium Iodide being issued? In accordance with the New York State Policy on Potassium iodide, potassium iodide is recommended on a projected thyroid dose of 5 Remn. Potassium Iodide is issued at a declared General Emergency or during an emergency related radioactive airborne release. Taking Potassium iodide is voluntary.

What is Potassium Iodide? Potassium iodide is a thyroid blocking protective action for exposure to radioactive iodine. If you take potassium iodide it will saturate your thyroid gland which will reduce the chances that radioactive iodine-will enter your thyroid. Additional information is available on the information handout with each tablet.

What dosage to take? A 130 milligram tablet. You should take as soon as possible after being told. One (1) tablet every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Take for 10 days. Unless otherwise directed.

Side Effects? Skin rash, swelling of salivary glands, a metallic taste, burning mouth and throat, sore teeth and gums, symptoms of a head cold and sometimes upset stomach or diarrhe~i. This would usually happen when higher doses are taken over long period of time.

WARNING!I Potassium iodide should not be taken by people allergic to iodine or shell fish.

~ En~n'v

  • MERGENCY PLAN EE iMPLEMENTING j PROCEDURE NNUAIYRLTD IPoEP22O Revision 18 OI PROCEDURES REFERENCE USE Page 244 of 299 Attchment 9.10 TSC Security Coordinator Checklist Sheet 1 of 3 1.0 tnitial ResponsibiiltvlActivibt NOTES 1.1 Follow responsibilitieslactivities in EN-EP-4I0 Attchment 9,.10 and the following:

1.2 Assume the duties of the Security Coordinator.

A. Refer to EN-EP-SI0 Attachment 9.10.

B. Secure Site Access at the SITE AREA or GENERAL EMERGENCY level as follows:

(,a) Notify CAS and SAS to secure the site, except for ERe Members, per procedure IP-EP-240, Security.

(b)* -Notify the EPM when this has been done.

1.,3 Assign OSC Log Keeper to the position of Accountabiity*

Coordinator.

A. Report readiness to conduct Accountability to the EPM. Utilize the OSC Log Keeper to assist in Accountability.

Bl. Direct the OSC Log Keeper to support the monitoring of"the Accountability Card Readers while ERe members are carding into the TSC/OSC, direct them to verify badges are properly read by the Accountability Card Reader and to log the name and badge number on an Accountability Roster (Form EP-47) of anyone having diffculty using the proximity card readers.

  • ElIPEC Enierye EMERGENCY PLAN NON-QUALITY RELATED PROCEDURE I iPE-2 ein 18 PROCEDURES REFERENCE USE Page 25 of 29 Attachment 9.10 TSC Security Coordinator Checklist Sheet 2 of 3 2.0 Continuous ResponsibilitvlActivitv NOTES 2.1 iF relocation of personnel ofiite is called for THEN:

A. Follow guidance in IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite.

B. Coordinate with TSC Radiological Coordinator to monitor evacuation routes.

2.2 IF relocating to the Security Administration Offces THEN inform the following individuals.

A. Emergency Plant Manager B. TSC Radiological Coordinator C. Emergency Director D. Lead Accountability Officer (LAO) 2.3 The Lead Accountability Officer (LAO) will generate the list of missing persons. This list will be provided to the Emergency Plant Manager, POM, and/or TSC Security Coordinator.

NOTE During plant shutdowns, when there may be large numbers of workers onsite and within the radiological control areas, a Radiation Protection computer printout may be used to assist in locating missing personnel within the radiological control area after accountability is completed.

1. IF there are individuals who are missing THEN:

(a) Review Accountability Rosters (Form EP-47) used to identify ERO members experiencing difficulty using the proximity card readers and remove them from the Missing Persons List.

(b) Obtain the Radiation Protection Computer Printout of individuals within the Radiological Control Area.

(c) Check off names of possible missing individuals who have left the Protected Area to narrow the list of actual missing

  • E* MEGNY LNPOCEDUArYRELAE IP-EP-220 Revision 18

~~~Entergy IMPLEMENTlNGPLNMREC RCDR ae ~ o Attachment 9.1 0 TSC Security Coordinator Checklist Sheet 3 of 3 Continuous ResponsibilitvlActivitv (cont,) NOTES persons and review RP computer printout for any missing individuals within the Radiological Control Area.

(d) inform the EPM immediately of any personnel discovered missing during accountability process.

4. Assist OSC Staff in maintaining accountability of all OSC personnel through the use of status boards, team assignments, Individual. Exposure Tracking Log (Form EP-29) and ERO Tracking Log (Form EP-42).

2.4 Use the 08C Log Keeper to maintain Continuing Accountability A. Use Onsite ERO Shift Rosters (Form EP-43) to list individuals currently on the Tirst shift in the TSC and OSC.

B. Request EOF Support Staff to identify the current EOF personnel.

C. Work with TSC and OSC Managers to identify personnel to fill.

second shift and ensure all needed positions are identified and establish time second shift is to be called in.

D. Use ETD to identify and contact individuals to fill positions on second shift.* OSC Log-Keeper and EOF Staff may be used to assist in notifications.

E, Inform the TSG and OSO Managers when notifications are completed and if there are any problems filling required positions.

0 0i

  • Enlergy IPEC EMERGENCY PLAN 1 NON-QUALITY RELATED PROCEDURE iP-EP-220 Revision 18 IMPLEMENTING PROCEDURES J REFERENCE USE ,. lPage __of 2 Attachment 9.11t TSC I QSC Layout and NRC Room Sheet 1 of 1 TYPICAL Arrangement (Personnel locations may be changed as needed to facilitate communication and movement without a procedure revision)

--- R MoN.QUALIT IP.EP-220 Revsion 18

'~EIdtgEMERGENCY PLAN RELATED PROCEDOURE iMPLEMENTING-PRCDRSREFSReNCe USE Page 2* Of 299 Attachment 9.1 2 TSCIOSC Public Address System Description and Operation Sheet 1 of 1 1,0 General There are three Public Address Systems (PAs) in the TSC/OSC and they have been color coded for easy identification of microphones and speakers.

2.0 SystemslOperation 2.1 Blue System comprises the plant page system. This page system is only from U2. The Speakers are located in the Halls, the OSC Bull Pen, the R&CA Briefing room, the NRC Conference Room, and the old U2 Records room. Volume controls are typically walls near speakers. Activation is via the normal plant page access.

2.2 Red System is the permanently installed TSCIOSC page system. The speakers are located in the ceilings similar to the Plant Page, system. Speakers are in the Halls, the OSC Bull Pen, the R&CA Briefing room, the TSC/OSC Command room, the NRC Conference room and the old U2 Records room. The speakers are marked with red tape. Each speaker has its own on/off switch and volume control knob. The amplifier and two microphones are on/in the counter separating the TSC and OSC each marked with RED tape. The microphones are wireless and battery powered and simply require that they be turned on to activate the system. Volume control is-via the local speaker or the amplifier on the counter separating the TSC and 0S0.

2.3 Green System consists of wireless portable speakers distributed around the facility. Each speaker must be turned on by a switch on the back and the volume adjusted locally by a switch on the front. The volume should be turned up to full volume and adjusted down as needed. Speakers are located in the 0SC Bull Pen, the TSC/OSC Command room, the NRC Conference room, the Whole Body Count room and the old U2 Records room. There are two microphones on/in the TSC/OSC Counter each marked with GREEN tape. The microphones are wireless and battery powered and simply require that they be turned on to activate the system. Additional batteries are available in the supply boxes. Note that this system does not cover the Hallways.

Attachment 9.13 IPEC TSC STAFFING Sheet 1 of 1 At IPEC, the expectation is that ALL individuals assigned to the Technical Support Center (TSC) report to the facility within 60 minutes of the declaration of an Event.

The TSC is able to be considered STAFFED when the following Core Individuals are present: Emergency Plant Manager (EPM), TSC Manager, TSC Communicator, Rad Coordinator, Mechanical Engineer, Electricalll&C Engineer and Reactor Engineer. Regardless of whoever else is available these positions MUST be filled before the TSC can be considered to be STAFFED.

The IPEC Emergency Plan in Section B (Table B-I) requires the following to respond within .60 minutes: TSC Communicator, a Reactor Engineer, an Electrical Engineer and a Mechanical Engineer.

The TSC may be declared OPERATIONAL whenever Core Individuals are achieved and the TSC Manager determines that the facility is adequately staffed for the event and equipment is set up and available to perform the emergency functions assigned to the TSC.

ATTACHMENT 9.1 IOCFR5O.54{q) SCeswNG SHEET 1 Ot 4 ProcedureiDocument Number: Revision:

EN-EP-SI 0 2 IP-EP-220 t EquipmentiacliitylOther: indian Point Energy Center

Title:

Technical Support Center fTSC) Operations Technical Support Center Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan):

This change issues fleet procedure EN-EP-610, "Technical Support Center (TSC) Operations" and revises IP-EP-220 to remove any duplicate tasks in EN.EP-610; however maintain any site specific requirements or commitments.

Part Ii. Activity Previously Reviewed? NE *N Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3) Continue to Alert and Notification System Design Report? EOT reutioni . ext Enter If YES, identify bounding source document numberlapproval reference and justification ensure the basis for concluding the source document fully bounds the b~ow and proposed change is documented below:, opeePr JustfifcatIon:

[Cs8ounding document attached (optional)

Part ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity. (Refer to EN-LI-i100)

NOTE: For example, when a design change is the proposed activity, consequential actions may include changes to other documents which have a different change control process and are NOT to be included in this 50.54(q)(3)

APPLICABILITY CONCLUSION.

0] If there are no controlling change processes, continue the 50.54(q)( 3) Screening.

[] One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects Ihe implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify he applicable controlling change processes below.

D] One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3)

Evaluation is NOT reguired. Identify controilinq change processes below and complete Part VI.

CONTROLLING CHANGE PROCESSES 10 CFR 50.54q only.

Part IV. Editorial Change []E 0* NO 50 54(q)13) Continu* to =itexi Is this activity an editorial or typographical change such as fornatting, paragraph EValIatUWm is part numbering, spelling, or punctuation that does not change intent? NOT required, Justficaion:Enter J~~~~~ustification wsifim a"nd C*tmplL'ta Part "NO"S Is checked because the procedure revision contains non-editoril vi.

changes.

EN-EP-305 REV 3

ATTACHMENT 9.1 I0CFRSO.54(q) SCREENING SHET 2 OF 4 ProcedurelDocument Number: Revision:

EN-EP-61 0 2 IP-EP-220 18 EqulpmentiFacilitylOther: Indian Point Energy Center

Title:

Technical Support Center (TSC) Operations Technical Support Center Part V. Emergency bracketsl Planning Does this activitv ElementlFunction affect Screen any of the followina, (Associated includina orooram10elements CFR 50.47(b) planning standard function from NUREG-0654/FEMA REP-i identified Section II?in

1. Responsibility for emergency response is assigned. [1] [
2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 [

staffing) in accordance with the emergency plan. [1]

3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2]' LII
4. The process for timely augmentation of onshift staff is established and maintained. 12] Ql
5. Arrangements for requesting and using off site assistance have been made. [3] fJ
6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] [

7/. A standard scheme of emerg;ency classification and action levels is in use. [41 -

8. Procedure's for notification of State and local governmental agencies are capable of alerting them of the [

declared emergency within 15 minutes after declaration of an emergency and providing follow-up Snotifications. [5]

8.' A/dministrative and physical means have been established for alerting and'providing prompt instructions to fJ the public within the plume exposure pathway. (5]

'10. The public ANS meets the design requirements of FEMA-REP°-1 0, Guide for Evaluation of Alert and Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5]

11. Systems are established for prompt communication among principal emergency response organizations. [6] [
12. Systems are established for prompt communication to emergency response personnel. [8] E 13; Emergency preparedne'ss information is made available to the public on a periodic basis within the plume [

exposure pathway emergency planning zone (EPZ). [7]

14. Coordinated dissemination of public information during emergencies is established. [71[
15. dequte re mintaned o suportemerenc fciliies respnse,, 8
16. Adequate equipmet iesr maintained to support emergency response. [8] [

'17. Methods, systems, and equipment for assessment of radioactive releases are in use. (9]1-

18. A range of public PARs is available for implementation during emergencies. [10] [
19. Evacuation time estimates for the population located in the plume exposure pathway EpZ are available to I--

support the formulation of PARs and have been provided to State and local governmental authorities. [10]

20. A range of protective actions is available for plant emergency workers during emergencies, including those LII for hostile action events.[10]

EN-EP-305 REV 3

ATTACHMENT# 9.1 I OCFR50.54(q) SCREENING SHEET 3 0F 4 EquipmentIFac~lityIOther:. indian Point E.nergy Center

Title:

Technical Support Center (TSC) Operations Technical Support Center

21. The resources for controlling radiological exposures for emergency workers are established. [11] [
22. Arrangements are made for medical services for contaminated, injured individuals. [12] [
23. Plans for recovery and reentry are developed. [13] [
24. A drill and exercise program (including radiological, medical, health physics and other program areas) is [

established. [14]

25. Drills, exercises, and training evolutions that provide performance opportunities to develop, maintain, and [

demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]

26. Identified weaknesses are corrected. [14].....
27. Training is provided to emergency responders. [15] "

28, Responsibility for emergency plan development and review is established. [16] [

29. Planners responsible for emergency plan development and maintenance are properly trained. [16] ______

APPLICABILITY CONCLUSION 0] Ifno Part V criteria are checked, a 50.54(q)(3) Evaluation is [OT required; document the basis for condlusion below and complete Part VI, . *.

[] If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation. .. .... ..

BASIS FOR CONCLUSION:

This change issues the new fleet procedure for the Technical Support Center cr[scj at IPEC and revises the site specific facility procedure.

The fleet procedure describes the activation and operation of the TSQ. Introduction of the new fleet procedures does not affect nor change the intent of the facilities and equipment already in existence. The procedure is written to ensure the existing facility and TSC equipment will be used and maintained for any Emergency Response Organization (ERe) response.

IP-EP-220 (220) will be maintained at this time; however, it will be revised to remove any tasks duplicated in EN-EP-610 (610). Fleet standard forms .and site specific forrms will.be used as needed to support 610 and new revision of 220; this will ensure IPEC site-specitlc Emergency Plan requirements and associated processes are retained; The 610, new fleet forms, the revised 220 and current site specific forms were reviewed against the current IPEC TSC procedure, iP-EP-220, "Technical Support Center" revision 17, the Emergency Plan, and IPEC Emergency Plan commitments. Based on this review, there are two standard ERO position titles which were not: adopted by IPEC Emergency Planning; TSC Mechanical Coordinator and ENS Communicator. EN-EP-801 states that the TSC Mechanical Coordinator is optional if the TSC and OSC are co-located. These two facilities are co-located at.IPEC. The ENS communicator was not added to the TSC since the ENS communications is designated to the Engineering Coordinator at IPEC and will remain, In 2011. a 50.S54Q evaluation was performed and approved this difference. IPEC will assign dhe Engineering Coordinator to perform the checklist of ENS communicator. There is one commitment which discusses having directions for relocation to an alternate location as necessary. These directions are provided in the EPM checklists in the TSC procedure, IP-EP-220 revision 18. Changes made to IP-EP-220 revision 18 removed only duplicate tasks. Any tasks site specific and not performed in 610 will remain in 220, revision 18. Utilizing EN-EP-610, revision 2 and IP-EP-220 revision 18 for the TSC will address all tasks required for the TSC ERe and no changes to the response processes of facility activation, response time, and organization responsibilities, addressed by 10CFRS0.47(b) planning standards will be made.

Summary - No ERO positions changes have been made. No ERO responsibilities have been added or deleted. The description, activation and operation of"the TSCas described in the IPEC Emergency Plan have not been changed. All site specific commitments continue to be met under the fleet procedure or the use of the site specific facility procedure. This change does not alter the TSC structure, organization or location.

The revision of the Technical Support Center procedure, IP-EP-220 rev 18 and issuance of the fleet Technical Support Center Operations procedure, EN-EP-610 and site specific fornis screens out.

Changes made to IP-EP-220 rev. 18 and EN-EP-610 revision 2 have been reviewed to determine if they affect any of the planning standards or program elements in Part V of this form. It has been concluded that there Is no affect and no f'urther evaluation is required and the c:haoges do not reqluire a change to the I]PEC Emergency* Plan.

EN-EP-305 REV 3

ATTACHMENT 9.1 I 0CFRS0.54(q) SCREENING SHELET 4 OF 4 EquipnuentlFacllity/Other: Indian Point Energy Center

Title:

Technical Support Center (rSC) Operations Technical Support Center Part Vi, Signatures:

Preparer Name (Print) Preparer Signature Date:

Rebecca A. Martin  !

(Optional) Reviewer Name (Print) Reviewer SignatureDt:

Approver Name (Print) AppoerSgature Date:"

EP Manager -.. . .. .. _._ _ _ _

/

EN-EP-305 REV 3

IPEC IMPLEMENTING PROCEDURE IP-SMM-AD-1*02 Rev:. 1 PREPARATION, REWV EW, AND APPROVAL Pae 4of4 kTTACHMENT 1*0.2 IPEC PROCEDURE REVIEW AND APPROVAL

...... ~ ~(Page 1 of 1)... ..

Procedure

Title:

Technical Support Center Procedure No: IP-EP-220 Existing Rev: 17 New Rev: 18 DRN/EC No: DRN-15-01355 Procedure Activity.............. Temnorarv Procedure Change (MARK Applicable) 0] Converted To IPEC, Replaces: (fl1ARK Applicable)

[] NEW PROCEDURE Unit 1 Procedure No: 03 EDITORIAL Temporary Procedure Change 0] GEN ERAL REVISION (Enter Step Number In Revision Summary)

O] PARTIAL REVISION Unit 2 Procedure No: [] ADVANCE Temporary Procedure Change IJ CONDITIONAL Temporary Procedure Change U] EDITORIAL REVISION TerminaingCodition

[] VOID PROCEDURE Unit 3 Procedure No: TriaigCniin _________

O1 SUPERSEDED O] RAPID REVISION Document in Microsoft Word: 0VODDNPCNs)

___ ___ _ .__ Yes D].No ___VOIDDRNTPCNos):

Revision Summary [] N/A - See Revision Summary page.

Revised to support implementation of new fleet facility procedures. Removed any duplicate tasks and kept site specific reqluirements and commitrrients.. .

  • ImleentationRequiremen*

Implementation Plan? 0] Yes 0] No Formal Training? 0* Yes O]No Special Handling?_[] Yes []No RPO Dept: ,Emergency Planning Writer (Print Name! ExtI Sign): Rebecca A. Martin / G (_1~d~

Revew and A2revaI (Per Attachment 10.1, IPCReview And A _*ve~l Requirements)

1. 0 Technical Reviewer;*.Casey Karsten/ "I / &*i

"::(Print Name! Sidnature/ Date)

2. U] Cross-Disciplinary Reviewers:

Dept: ________Reviewer: ______________________________

(Print Name! Stgnature Date)

Dept: _____ __Reviewer:

/,1

/ (Prin Name! Signaturel Date)

O3 PAD required and is compleX~(/PAD Approver and Reviewer qualifications have been verified)

OPrevious exclusion from further LI-i 00 Review is still valid Ol PAD not required due to type of change

4. 0] Non-Intent Determination Complete:

(Print N]ame! SIgnaturel Date)

NO change of purpose or scope NO change 10 loss restrictive acceptance criteria NO reduction in the level of nuclear safety NOQ change to steps previously identified as commitment steps NO voiding or canceling of a procedure, unless requirements NO deviation from the Quality Assurance Program Manual are incorporated into another procedure or the need for the NO change that may result in deviations from Technical Specifications.

procedure was eliminated via an alternate process PSAR. plant design requirements, or previously made commitments

5. U] On-Shift Shift M~anager/CRS:

(Print Name! Signature!Date)

6. [ User Validation: User: Validator:
7. U] Special Handling Requirements Understood:

(IPrint Naein! Signature/)Date)

Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable)

Section 1 Doc/Procedure Type: (circle one) Administrative I I.molementino I EPLA*N Doe/Procedure No: IP EP 220 CIA: Yes No CIA No. _______Due Date:_____

Doc/Procedure

Title:

Technical Support Center Rev No: 188 Rev Distribution Date: 01/27/16 Reason for EPDCC: New X Revision Cancel Date of EPOCC: 01/13!16 Section 2 Change Description

1. Originator: Rebecca A. Martin. ,.* C, ,,.V,..
2. Class of Change: -Technical Correction ___ New Commitment__ Other X
3. Page numbers affected and reason for change: Revised to suo10ort imp~lementation of new fleet facility procedures. Removed any duplicate tasks a~nd kept site spec~ific reqiu!r~em.rents and commitments.
4. Emergency Planning Documents Affected: None
5. Emergency Planning Procedures Affected: IP-EP-.220
6. ReFerences: Other Procedure(s) 41Nt Regulatory Document # N/A Other:
7. Reviewed training requirements with department training coordinator __date:_____
8. The f~ollowing are complete, or are not applicable and are so marked.

Tech Review n/a__ 50.54q. X ENN-Ll.-100: N/A PL-155 N/A SMVM-AD-102 X Manager approval X SRC N/A

9. Both table of contents and transmittals are complete_______date_________
10. Approved dec/procedure delivered to Document Control for distribution ___date____
11. Position Binders updated ifapplicable: . date___
12. Copy of EPDCC and documentlprocedure placed in EP file date____

Sheet 1 of 1 Sheet of EP-AD2-1 IForm Rev. 0

IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2

"  ;;i**LOCATIOP DELIVERED BY IP3 CONTROL ROOM IP3 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS IP3 SHIFT MANAGER DEIEEIYP3 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS IP2 CONTROL ROOM DEIEEIYP2 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS IPEC TSC DELIVERED BY IP2 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS IP2 SIMULATOR DEIEEDBIP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS IP2 SIMULATOR - CLASSROOM 4 DEIEEDBIP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY 3 COPIES OF ALL EP'S IP2 SIMULATOR - CLASSROOM 5 DOUETIP2 SIMULATOR BLDG. EXPTELA NRC RESIDENT INSPECTOR NRC IP2 88FT. ELEVATION 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND DOC CONTROL DESK NRC - ROCKVILLE, MD OFFSlTE GENERAL RECORDS ADDRESS " EXCEPT IP-EP-1 15 1 COPY OF ALL EP'S AND NRC STEVE BARR OFFSlTE GENERAL RECORDS EXCEPT IP-EP-1 15 1 COPY OF ALL EP'S AND NRC DEPUTY DIRECTOR OFFSlTE GENERAL RECORDS EXCEPT IP-EP-1 15 1 COPY OF THE FOLLOWING:

E-PLAN, IP-EP-115, 120, NEW YORK STATE OEM TED FISCH OFFSlTE 20 5,30 4,30 410, 420, 430, 620 & IP-1055 1 COPY OF E-PLAN, WESTCHESTER COUNTY OEM DENNIS DELBORGO OFFSlTEIPE-1&34 ROCKLAND COUNTY FIRE AND NIHLSLNGIF~T COPY OF E-PLAN, EMERGENCY SERVICES NIHLSLNOOFIEIP-EP-310 & 340 ORANGE COUNTY EMERGENCY SHNOIIHE F~T COPY OF E-PLAN, SERVICES CENTER SHNO IHROFIEIP-EP-310 & 340 PUTNAM COUNTY BUREAU OF ANHNIUTO F~T COPY OF E-PLAN, EMERGENCY SERVICES ATOYUONFSTEIP-EP-310 & 340

OEntergy Indian Point Energy Center CONTROLLED DOCUMENT Document Control TRANSMITTAL 450 Broadway Buchanan, NY 10511 TO: DISTRIBUTION "'DATE: January 26, 2016 FROM: IPEC DOCUMENT CONTROL - 3 RD FLooR ADMIN BLDG PHONE #: 914-254-6835 TRANSMITTAL #: EP- 16-0002 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).

Sign and return the receipt acknowledgement below within ten (10) working days.

AFFECTED DOCUME.NT: IPEC EMERGENCY PLAN PROCEDURES DOG REV# TILE ISTRUTION THE FOLLOWING PROCEDURE(S) HAS BEEN REVISIED, PLEASE REMOVE YOUR CURRENT COPY AND REPLACE WITH ATTACHED UPDATED PROCEDURE: *,

IP-EP-220: REV.18-EFFECTIVE JAN 2 ? 2C'i3*

DATE RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)

(IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S). r NAME (PRINT). SIGNATURE DATE COPY LOCATION

Revision 18 I

L* P NON-QUALITY RELATED IP-EP-220 l~cy*

erg EMERGENCY PLAN PROCEDURE _____________I

" mPLEMENTING

. ROCEDURES REFE.REN'CE USE Page. 1 of 29 Technical Support Center Prepared by:

  • Print Name .. Signature: Date Approval:

Print Name ig treDate

  • Effective Date: 01/27/16 Procedure extensively revised - no revision bars were used.

lP-EP-220 (Technical Support Center) RI8,doc

__ IPEC NON-QUALITY REL.ATED IiP-EP-220 Revision 18

- EiderJy, EMERGENCY PLANPRCDE

  • IMPLEMENTING S PROCEDURES REFERENCE USE " Page 2 Ot 29.

Table of Contents 1.0 PURPOSE..,.. ....... .... .... ........................................................... 3

2.0 REFERENCES

........................3 3.0 DEFINITIONS,....................................... ,....................................... 3 4.0 RESPONSIBILITiES .................................................. 3 4.1 Emergency Plant Manager....... ..........................................

. 3 4.2 TSC Manager..................... .. 3 5.0 DETAILS...................................... .. 4 6.0 INTERFACES_ ....... . ...................................................................... 5 7.0 RECORDS ....................................... ................. ......... .............. ... 5 8.0 REQUIREMENTS AND COMMITMENT,......"............. ........... ,...... 5 9.0 ATTACHMENTS.:.................. ...................  : ....................... ....... ,........5 9.1 Emergency Plant Manager Checklist............... ............................... 5 9.2 TSC Manager Checklist..................11 9.3 Operations Coordinator Checklist ........................................... ,.....13 9.4 Reactor Engineer Checklist......................................................... 14 9.5 Engineering Coordinator Checklist......................... ...................... 15 9.6 Mechanical and Electrical/l&C Engineer Checklist ........................... ... 16 9.7 IT Specialist Checklist ............................................................. 17 9.8 TSC Communicator Checklist .............................................. 18 9.9 Radiological Coordinator Checklist ...... ................  :.................. 19 9.1t0 TSC Security Coordinator Checklist........................................ 24 9.11 TSC/OSC Layout................................................... ...... 27 9.1 2 TSC/OSC Public Address System Description and Operation.............. 28 9.13 iPEC TSC ERO Staffing................................................... 29

I__IPEC I En*eiy*

- EMERGENCY PLAN iMPLEMENTING NON-QUALITY RELATED PROCEDURE I j

IP-EP-220 Revision 18 IPROCEDURES REFERENCE UsE Page 3 Of 2.99 TECHNICAL SUPPORT CENTER (TSC) 1.0 PURPOSEI To describe site specific actions for the activation and operation of the Technical Support Center (TSC). This procedure will be used in conjunction with the fleet procedure, EN-EP-61 0, Technical Support Center (TSC) Operations.

2.0 REFERENCES

2.1 indian Point Energy Center Emergency Plan 3.0 DEFINITIONS 3.1 See EN-EP-GlO Section 3.0 for definitions.

4.0 RESPONSIBILITIEES 4.1 See EN-EP-610 for Responsibilities.

5.0 DETAILS 5.10 See EN-EP-610 for Details.

6.0 INTERFACES 6.1 IP-EP-1 15, Emergency Plan Forms 6.2 IP-EP-21 0, Central Control Room 6.3 IP-EP-230, Operations Support Center:

6.4 IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite 6.5 IP-EP-5lO, Meteorological, Radiological & Plant Data Acquisition System 6.6 IP-EP-610, Emergency Termination and Recovery 6.7 IP-EP-420, Use of Potassium Iodide by Indian Point Personnel during an Emergency 6.8 0-FSG-100, BDBEEIELAP Emergency Response 6.9 EN-EP-6 10, Technical Support Center (TSC) Operations 7.0 RECORDS All forms and logs completed by the Emergency Response Organization during a declared emergency are Quality Records and shall be maintained for the life of the plant plus twenty (20) years.

-* ll~(?,"2_,EMERGENCY PLAN . PROCEDURE 8.0 REQUIREMEiNTS AND COMMITMENT CROSS-REFERENCE None 9.0 ATTACHMENTS 9.1 Emergency Plant Manager Checklist.

9.2 TSC Manager Checklist 9.3 Operations Coordinator Checklist ....

9.4 Reactor Engineer Checklist 9.5 Engineering Coordinator Checklist 9.8 Mechanical and Electrical / I&C Engineer Checklist 9.7 IT Specialist Checklist 9.8 TSC Communicator Checklist 8.9 Radiological Coordinator Checklist 9.10 TSC Security Coordinator Checklist 9.11 TSCIOSC Layout 9.12 TSCIOSC Public Address System Description and Operation 9.13 'IPEC TSC ERO Staffing

  • 1 SIPEC
  • ~~J~jpj/ergy, EMERGENCY PLAN IMPLEMENTING PROCEDURES REFERENCE UsE Ij..

NCR-QUALITY RELATED I PROCEDURE P-EP-20O Page _5 Revi~ion' 18 of 29 Attachment 9.1 Emergency Plant Manager Checklist Sheet ! of 6 1.0 Initial Responsibili~iI*ii NOTES NOTE:

Procedure refers to an event at Unit 2, Unit 3 or both (i.e.,

Security, Natural event). Ifdetermined to be a Site event, then Unit 2 will be the lead plant for all communications, This is a Core Staffing position..

1.1 Follow. responsibilities/activities in EN-EP-61 0 Attachment 9.1 and the following:

1.2 IF a Beyond Design Basis External Event (BDBEE) occurs that results in an Extended Loss of AC Power (ELAP) to either unit, THEN entry into, 0-FSG-100, BDBEE/ELAP Emergency Response, is required..

"1.3 Assume the position of Emergency Plant Manager (EPM).

A. Announce yourself as the EPM and provide initial briefing to the TSCIOSC staff. Ensure briefing covers the following items;

1. introduction of Self and Facility Managers.
2. Establish clear expectations for:
a. Use of Three-Part Communications by EReO members.
b. Use of phones during facility briefs,
c. Limit excess chaffer during emergency,
d. Review and follow your procedures,
3. Remind personnel to validate information,
4. When ready, announce to the TSC/OSC that the TSC/OSC is operational.

I tEnergy. eMERGENCY PLAN PRoCEDURE I IMPLEMENTING

.. .. ....... PR.......

. ocEDURES. ....... REFERE.. . . .CE. U! j..P........

j==-l . ..... ...

Of 2 Attachment 9.1 Emergency Plant Manager Checklist Sheet 2 ofi6 2.0 Cantinuous ResponsibilitviActivity NOTES IF an emergency classificatio setred due to a security condition, THEN evacuation and accountability may put '

personnel at risk. Therefore, in these situations, evacuation and accountability will be suspended until directed by Security and cleared through the Incident Commander.

NOTE:

After initial accountability has been completed, facility managers are responsible for accountability of individuals assigned to their respective organizations.

2.1 At a Site Area Emergency or higher classification, or if the decision has been made to do so, iNITIATE accountability.

A. Direct the. TSC Security Coordinator/Lead Accountability Officer (LAO) to perform accountability.

Initial accountability shall be completed within approximately 30.,minutes from the declaration of the

- event.

B. L.F anyone is unaccounted for THEN direct the TSC Security Coordinator and the OSO Manager to commence search and rescue operations.

C. Direct TSC Manager, OSC Manager, POM and TSC Security Coordinator to maintain onsite accountability throughout the event.

jPROCEDURES-IPEC IMPLEMENTING

[. NON-QUALITYRELATE RFRCEUSE

" I IP-EP-220 jPage Rvision 18 7_ Of 29

. Attachment 9.1

A. When the Control Room transitions from the EOPs to.

SACRG-1, or only declares an EAL for SFP conditions, ENSURE the TSC Reactor Engineer is ready to take over Severe Accident Management control, as. SAMG evaluator.

6 . Once the SAMG Evaluator(s) is ready to take over Severe Accident Management control ANNOUNCE.

  • yourself as the Severe Accident Management Decision Maker.
  • C.- CONFER with the SAMG Evaluators which. SAM....

guidanc~e should be implemented.

D. NOTIFY the Emergency Director (ED) which guidance:

will be implemented. IF the guidance involves a release to the environment, ENSURE the ED discusses this with the Radiological Assessment Coordinator and the State/Counties prior to implementation.

2.3 Authorize Emergency Exposures I KI issuance A. Inform the TSCIOSC Manager and Radiological.

Coordinator that you authorize emergency exposures up to 1 Remn TEDE for all TSC/OSC and Operations personnel dispatched into the plant. Document this authorization in WebEOC, OR on your ERO Log Sheet (Form E:P-1 0) if WebEOC is unavailable.

B. I.F emergency measures require additional exposure THEN raise the emergency exposure limit 1 Rem at a time up to 5 Remn.

I __I'EC,

  • En*--gy, EMERGENCY PL.AN NON-QUALITY RELATED

-PROCEDURE IP-EP-220 Revision 18 U

I ..

  • iMPLEMENTING PROCEDURES j REFERENCE USE Page 8 of 29 Attchment 9.1 Emergency Plant Manager"Checklist Sheet 4 of 6 Continuous Res~onsibllltvlActivitv (cont.) NOTES C. Review and authorize, when requested by OSO Staff, emergency exposures beyond* 5 Remn on an individual basis using Emergency Exposure Authorization (Form EP-6) guidelines.

D. When requested by Radiological Coordinator, authorize issuance of Potassium Iodine (Ki). (KI is normally issued at 5 Remn ODE projected child thyroid dose or declaration of a General Emergency.)

2.4 Circumstances including, but not lirnited to a power outage, toxic gas condition, or increased radiation levels may necessltate~he need to evacuate the TSCIOSC complex. IF it becomes necessary to evacuate the TSCIOSC complex for any reason, the following guidance shall be followed.  :

A. Work with the Fadiological Coordinator, TSC/OSC Managers and TSC Security Coordinator to determine.

a suitable alternate location(s) for TSC and DSC staffs. i In selecting an alternate location, keep the following in* .

mind:

1. In the event of increased radiation levels or a toxic gas condition, consider relocating individuals to the CR or Outage Control Center. Another possible alternative location for consideration is the EQF..

Although desirable to keep the entire staff together, it may be necessary to utilize more than one facility.

2. In the event of a power outage, there may be additional locations that could be used for relocation. Such possible locations include an IPEC Conference Room within the Protected Area, the.

Outage Control Center, the Indian Point Training Center or even the Generation Support Building.

3. In selecting the facility to which you are relocating to, ensure that you consider the ability for the TSO/OSC staffs to function in the new facility.

ii ___

  • EMRG~cIPEC PL NONQ IY EAE P-EPo22O Revision 18 iMPLEMENTING ,

Attachment 9.1 Emergency Plant Manager Checklist Sheet 5 of 6 Continuous Responsibility/Activity Icont.) NOTES Some items for consideration include:

-Is the required Plant information able to be readily obtained?

- Are the necessary computer resources available?

- ill adequate communications be obtainable with all of the necessary parties?

B. PRIOR to evacuating the TSC/OSC complex, address the following:

1. Ensure that evacuating personnel take their position books with them to the new location.
2. Ensure that all needed data is gathered and transported during the relocation of personnel.

Examples include information on the electronic displays, other charted information, completed logs and the like.

3. Inform the ED and thePOM of your relocation plans. Advise them that yQu will notify them of when you have relocated and are a functioning facility. if relocation will be at two or more sites, direct an individual at each of those sites to advise you when their relocation is complete.
4. Determine the speed at which the relocation of personnel should occur giving consideration to the following items:
a. Consider the impact of immediate relocation vs.

mitigation activities in progress.

b. Current radiological or hazardous conditions within the TSC/OSC.
c. Radiological or hazardous conditions at the proposed TSC/OSC.
d. Radiological or hazardous conditions en route.
e. The adequacy of response from the alternate location.

I negEMERGENCY PLAN PROCEDURES*

.PROCEDURE REFERENCE USE I Page _10 Of _29 Attachment 9.1 Emergency Plant Manager Checklist Sheet 6 of 6 Continuous ResponsibilitvlActivity (cont.) NOTES

f. Determine proper path to take to new locations.
g. Direct personnel to relocate.
h. Notify Security to= instruct incoming personnel to report to the designated alternate TSC/OSC location(s).
5. After arriving at the new TSCIOSC location(s), re-establish this new location as the TSC/OSC.
6. Set up the appropriate equipment such as electronic displays, plant data displays and telephones.
7. Notify the ED and POM when established and ready
  • to commence functioning-~as the TSCIOSC.
8. Obtain an updated briefing on the current status of
  • the emergency., plant conditions and any actions that are in progress or that may have been completed. -
9. Continue functioning as the EPM~.

C. Direct personnel to relocate TSCIOSC personnel.

Enfery.

IPEC EMERGENCY PLAN PROCEDURES NON-QUALITY RELATED PROCEDURE REFERENCE USE 1 IPE20 Page 11 Reion1 of 29 j Attachment 9.2 TSC Manager Checklist Sheet I of 2 This is a core staffing position 1.0 jllj~alRespojsiblliIv/Acivi* NOTES 1.1 Follow responsibiltitieslactivities in EN-EP-Bl0 Attachment 9.2 and the following:

1.2 Activation of the TSC and assume the position of TSC Manager,.

A. Synchronize your time with the ISC/OSC clock. Verify with the EQE andlor CR that the time displayed in the TSC/OSC is the same as it is there.

B. Verify you have the following core staffing prior to declaring the TSC staffed:

a. EPM
b. TSC Manager
c. TSC Communicator
d. Mechanical Engineer"
e. Electrical/Ll&C Engineer
f. Reactor Engineer
g. Rad Coordinator C. Staff the TSC using Form EP-lO-ALL, "Filling an ERO Vacancy During Facility Activation/Operation" D. IF additional personnel are required THENN:
a. IF it is during normal working hours THE=N call or assign someone to call the Assembly Areas for needed personnel.
b. IF needed individuals are not available onsite THEN assign someone to call individuals at home using the Emergency Telephone Directory (ETD).

E. Emergency Response Data System (E=ROS)

a. If requested to verify, EROS is active. Refer to procedure EN-EP-31 1, Emergency Response Data System (ERDS)

Activation via the Virtual Private Network (VPN).

b. I]F ERDS is not functional, designate a person with Operations experience to go to the Control Room to complete Forms 31 A, B, C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57, 58, 59).

j Entergy. IPEC EMERGENCY PLAN NNQAmPREDREAE PE-2 eiin1 SM PLEMENTI NG Puc IPROCEDURE REFERE'NCE USE Page 12 Of 29' Attachment 9.2 TSC Manager Checklist Sheet 2 of 2 Initial ResponsibilitvlActivitv (con=t=) NOTES

c. Once the A, B, C Forms are completed, they' are to be faxed to the NRC within 60 minutes.
d. PICS should be started to display plant data for the affected unit IF both Units are affected utilize multiple computers to display both plants' data.

2.0 Continuous Responsibilitv/Activitv¢ 2.1 Manage the activities of the TSC Staff:

A. Provide a central organization and facility for the accumulation and transmittal of plant information to the EOF and NRC.

8. When applicable, direst the appropriate individuals to implement and perform monitoring and evaluations as directed in the. Shdian Point Severe Accident Management (SAMG) Guidelines.

C. if requested by the NRC to provide an open communications line for plant data , THN direct an individual having sufficient technical knowledge to staff the ENS phone. This person may locate in any facility with ENS phone access. If necessary, request the Security Coordinator to obtain additional personal to

.support this activity.

0. Verify that the Engineering Action Tracking (Admin) Display is updated promptly as new tasks are assigned and old tasks completed and as priorities are changed..

E. Anticipate TSC support requirements from ERe, F. Direct TSC staff to obtain drawings and information as needed to solve plant problems.

2.2 Monitor containment integrity status throughout the event:

A. Initiate a review to determine if any non-automatic containment isolation valves should be closed. (Reference 2-ES-i1.4; 3-ES-i .3; 3-SOP-CEB-Oil)

B. Repeat the above review, approximately every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of event and thereafter at the discretion of the EPM.

~E~rg.

IPEC EMERGENCY PLAN PROCEDURES NON-QUALITY RELATED PROCEDURE REFF-RENCE USE IIP-EP-22O Page 13 Revision 18 of 29 Attachment 9.3 Operations Coordinator Checklist Sheet I of I 1.0 Follow ResponsibilitieslActivities in EN-EP-BlO, Attachment 9.3

- ,#. IPEC

-Ene~ y, *EMERGENCY PLAN IMPLEMENTING NoN-QuALrrY RELATED PROCEDURE I iP-EP'22O Revision 18 PROCEDURES REFERENCE USE [_Page 14 Of 29 Attachment 9.4 Reactor Engineer Checklist Sheet I of I This is a core staffing position.

1.0 ResponsibilitvlActivitv, NOTES 1.1 Follow responsibilitieslactivities in EN-EP-610 Attachment 9.4 and the following:

1.2 Monitor plant conditions for any indications of core damage.

A. Perform and update core damage assessment based on current information using guidance provided in procedure IP-EP-360, Core Damage Assessment.

  • B3. Notify TSC Manager and/or Engineering Coordinator, immediately of any changes in core status.

C. Keep the Radiological Coordinator informed on core status to assist in maintaining radiological controls for plant personnel. i D. Through the TSC Manager and/or the Radiological Coordinator, ensure that the EOF Radiological Assessment Coordinator is kept informed of the latest estimate of the amount of core damage.

E. Maintain the Fission Product Barrier Status Board as needed.

1.3 Assist the 2PM in imnplement~ation of Severe Accident Management Guidelines.

A. When the Control Room transitions from the EOPs to SACRG-1, or only declares an EAL for SFP conditions inform the EPM when you are ready to take over Severe Accident Management (SAM) control.

B. INFORM EPMV which SAM guidance should be implemented.

C. IF guidance involves a release to the environment ENSURE the EPM and Emergency Director discuss it with the Radiological Assessment Coordinator who discusses it with the State/Counties prior to implementation.

"1.4 Receive status updates from the TSC Manager andlor EPM and if directed post updates on the appropriate electronic displays.

I Enlergy EMERGENCY PLAN ,PROCEDURE I I ' PROCEDURES -' REFERENCE USE Page '1 Of 29 j Attachment 9.5 Engineering Coordinator. Checklist Sheet* 1 of 1 1.0 Follow ResponsibilitieslActivities in EN-EP-610, Attachment 9.5.

2.0 if requested to provide information to the. NRC Operations Center follow responsibilities in ENEP-SlO, Attachment 9.12.

~EIery EMERGENCY PLAN PROCEDURE I IPROCEDURES J REFERENCE USE j Page 16 Of0 2.99 Attachment 9.6 Mechanical and Electricall Il&C Engineer Checklist Sheet 1 of 1 1.0 Fallow ResponsibilitieslActivities in EN-EP-610 Attachment 9.6.

PEMREC Y L N POCEDUAU RELr IP.E-2 eiin1

~~En~eIMPLEMERGNCTPLNGPoWR MPROEMUENTN PRCDRSREFERENCE USE I Page 1=7 of 29 j Attchment 9.7 IT Specialist Checklist Sheet I of 1 1.0 Initial Responsibili~tvActiviv NOTES 1.1 Follow responsibilltieslactlivties in EN-EP-BIG Attachment 9.7 and the following:

1,2 Assume the position of IT Specialist

[NOT ERDS is not functional in the Simulator for a Drill A. Emergency Response Data System (ERDS)

1. If requested to verify EROS is activated, refer to procedure EN-EP-31 1, Emergency Response Data System (EROS) Activation via the Virtual Private Network (VPN).
2. IF EROS is not functional, notify the TSC Manager to designate an operations experienced person to go to the Control Room to complete Forms 31 A. E8, C OR 42 A, B, C. (Forms EP-53, 54, 55 and EP-57, 58, 59). Once the A, B, C Forms are completed,,

they are to be faxed to the NRC within 60 minutes.

3. Inform TSC Communicator of the time EROS was verified of activation O_.R activated and to log in WebEOC.

B3. Ensure computer displays in the TSC and OSC continue to operate properly.

1. IF the PICS displays are NOT functioning THE perform the following:

(a) IF Unit 2 obtain 42A, 42B and 42C data from the CCR (IP-EP-115 EP Forms 53, 54, and 55)

(b) IF Unit 3 obtain 31A, 31B and 31C data from the CCR (IP-EP-1 15 EP Forms 57, 58 and 59).

En~L'y~y PEMREC Y IMPLEMENTING

,.PROCEDURES

-~NON-QUALITY RELATED "REFERENCE-USE 1

,j P-EP-220 JPage :is8 Revision 18 Of 29 Att*achment 9.8 TSC Communicator Checklist Sheet Ilofi1 1.0 Follow Responsibilities/Activities in EN-EP=I0,.

Att(achment 9.8.

2.0 Verify that at least one of the Public Address Systems (Red or Green) in the TSCIOSC is turned on and ready.

for use. Refer to Att*achment 9.12 of this procedure for a description and operation.

SIPEC NON-QUALITY RELATED IP..EP-22O Revision 18

  1. ly EMERGENCY PLAN PROCEOURE IMPLEMENTING I PRCDRS j REFERENCE USE Page 199 of 2.9 J Attachment 9.9 Radiological Coordinator Checklist Sheet 1 of 5 This is a Core Staffing Position.

1.0 Initial Responsibili~tvActivitv NOTES 1.1 Follow responsibilities/activities in EN-EP-610 Attachment 9.9 and the following:

1.2 Assume the position of Radiological Coordinator.

A. Request the Control Room to align the OSCITSC ventilation system for incident operation per procedure, if required.

B. Establish the capability for monitoring of Iodine, should it become necessary. Have a Rad Protection Tech set up the AMS-4 as per Attachment 9A13 of procedure IP EP-230, 2.0 Continuous ResponsibilitvtActivitv 2.1 Establish Radiological Control oversight.

A. Verify that the radiological controls for the TSCIOSC have been set up per sheet 9 of this check list.

2.2 IF there are contaminated injured personnel THEN perform the following:

A. Provide radiological support for the assessment, treatment, and transportation of contaminated injured personnel. Act as the point of contact with the hospital where treatment is executed.

8. Make arrangements to pick up Rad Protection personnel at the hospital.

C. Follow proper procedures to retrieve radioactive waste from offsite treatment locations.

0. Obtain concurrence from the EPM prior to releasing the hospital's Radiological Emergency Room or the ambulance for uncontrolled use.

ml~ey, EMERGENCY PLAN PROCEDURE*

Attachment ,9.

. Radiological Coordinator Checklist Sheet 2 of 5 Continuous Res ponslbtil/Activitv.,(cant.) - NOTES 2.3 Provide oversight to ensure emergency teams receive .proper briefs on radiological conditions .

and requirements.

2.4 IF individuals receive or are expected to receive radiolodine uptakes >~5 REM CDE child thyroid dose or a General Emergency has been declared THEN:

  • A. issue K!to onsite emergency workers applying the following controls:
1. Brief personnel in the protected area on the use of KI and its potential side effects using sheet 11 of this Attachment 9.9..
2. Assure that persons in the TSC/OSC, both CCR's and Security personnel within the protected area are briefed.
3. For R&CA team personnel record KI issuance information on Individual Exposure Tracking Log (Formn EP-29).
4. Have all TSCIOSC personnel and security personnel: within the protected area report to the TSC/OSC for distribution of KI.

2.8 Verify that the decontamination efforts of personnel, equipment, and onsite areas are appropriate.

2.6 Participate in Facility Briefings to announce radiological conditions at the TSC1OSC and also affected locations with an emphasis on status of a radiological release.

Eieiy* EMERGENCY PLAN PREUR IMPLEENTIN Atta*chment 9.9 RadiologicaI Coordinator Checklist Sheet 3 of 5 A ~\ C A

E OSC !N R

C E

TSC P

'N A / Cornpi uter Room

~"' .,

NN 2 A

TSCtOSC Access Points to be posted:

If Hallway Contamination <~100}0 dpm/ 100 sq. cm If Hallway Contamination >' 1000 dpm/ 100 sq. cm A.En~ry/Exit A. No Entry. Exit Only 8, No EntrylNo Exit B. Entry to TSC/iOSC. No Exit. White Step Off Pad C. No Entry/Na Exit and Frisk Shoes before stepping here C. No Entry/No Exit 0, Equipment cabinets. Place sign at top of' stairway 0. Equipment cabinets, Place sign at top of stairwa~y, No Entry/No} Exit without permission from RAD Coordinator. No EntrylNo Exit without permission from RAD E. Air Monitoring Equipment Coordinator E. Air Monitoring Equipment

" Einergy EMERGENCY PLAN PROCEDURE

~iMPLEMENTING PROCEDURES REFERENCE S Pg 2 f2 Attchment 9.9 Radiological Coordinator Checklist Sheet 4 of 5 _

information on use of Potassium Iodide IOSA TT' Tablets Potassium Iodide Tablets o* TAKE POTASSIUM IODIDE ONLY WHEN WARNING PUBLIC HEALTH OFFICIALS TELL YOU. POTASSIUM IODIDE SHOULD NOT BE USED BY iN A RADIATION EMERGENCY PEOPLE ALLERGIC TO IODIDE, Keep oul of the RADIOACT1VE IODINE C OULD BE reach of children. In case of overdose or allergic RELEASED INTO THE AIR, POTASSIUM reaction, so nlact a physician or public health IODIDE ( A FORM OF IODINE) CAN HELP authority, PROTECT YOU.

o IF YOU ARE TOLD TO TAKE THIS HOW POTASSIUM IODIDE WORKS MEDICINE. TAKE IT ONE TIME EVERY 24 Certain forms of iodine help your thyroid gland work HOURS, DO NOT TAKE IT MORE OFTEN. right. Most people get the iodine they need froml MORE WILL NOT HELP YOU AND MAY foods like iodized salt or fish. The thyroid can "store" INCREASE THE RISK OF SIDE EFFECTS. or hold only a certain amount of iodine, NOT TAKE THIS DRUG IF YOU KNOW In a radiation emergency radioactive iodine may be YOU ARE ALLERGIC TO IODIDE (,SEE released In the air. If this air is breathed or SI DE EFFECTS BELOW) swallowed it may enter the Ihyroid and damage it.

DIRECTIONS FOR USE The damage may not show itsef for years. Child ren Use only when directed by Emergency Management, are the most likely to have thyroid damage.

State, Local or Public Health Officials lfyou take potassium iodide, it wiU fill up you thyroid gland. This reduced the chances that radioactive DOSE iodine will enter your thyroid.

ADULTS AND CHILDREN ONE YEAR OF AGE OR OLWER: WHO SHOULD NOT TAKE POTASSIUM IODIDE One (I) tablet once a day. Crush for small The only people who should not take tablets when chiildren. directed to do so are people who know they are BABIES UNDER ONE YEAR OF AGE: allergic to iodine. Pregnantwomen. nursslg women, One-half (1/2) tablet onos a day. Crush first. children and bables may take this drug, HOW AND WHEN DOSAGE Potassium lodide should be taken as soon as Take for 10 days unless directed otherwise. possible after authorities tell you to take ft.

Slore your supply at momn temperature between 590 You should take one dose every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

F and 860 F. Keep package dry and foil packets MORE WILL NOT HELP YOU, AND WILL intact. INCREASE THE CHANCES OF SI DE EFFECTS.

KEEP YOUR SUPPLYV OUT OF REACH OF Continue to take the drug for 10 days.

CHILDREN.

WHAT TO 00 IF SIDE EFFECT OCCUR SIDIE EFFECTS STOP taking the drugs and contact a doctor or public Usually, side effects of potassium iodide happen health officials for instructions.

when people take higher doses for a long time. You should be careful not to lake more than the recommended dose or take it for longer than you are told. Side effects are unlikely because of the low DESCRIPTION AND USE dose and Ihe short tme you will be taking the drug.

Each IOSATTM Tablet contains 130 mg* of Possible sid effects include skin rashes, swelilng of potassium iodide.

the salivary glands, and "icdism' (metaltic tasle, bumlng mouth and throat, sore teeth and gums, Thyroid blocking in *adiatlon emergency only.

symptoms of a head cold, and sometimes stomach upset and diarrhea).

r j

, e'ye Enery MREcIPECPLNNON-QUALITYP EERECYPLNPROCEDURESI C~RRELATED IP-EP-220 Revision 18 IPRCDRSREFERENCE USE Page 2_3 of 299 Attchment 9.9 Radiological Coordinator Checklist Sheet 5 of 5 BRIEFING iNFORMATiON ON USE OF POTASSiUM IODIDE (K!I)

Why is Potassium Iodide being issued? In accordance with the New York State Policy on Potassium iodide, potassium iodide is recommended on a projected thyroid dose of 5 Remn. Potassium Iodide is issued at a declared General Emergency or during an emergency related radioactive airborne release. Taking Potassium iodide is voluntary.

What is Potassium Iodide? Potassium iodide is a thyroid blocking protective action for exposure to radioactive iodine. If you take potassium iodide it will saturate your thyroid gland which will reduce the chances that radioactive iodine-will enter your thyroid. Additional information is available on the information handout with each tablet.

What dosage to take? A 130 milligram tablet. You should take as soon as possible after being told. One (1) tablet every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Take for 10 days. Unless otherwise directed.

Side Effects? Skin rash, swelling of salivary glands, a metallic taste, burning mouth and throat, sore teeth and gums, symptoms of a head cold and sometimes upset stomach or diarrhe~i. This would usually happen when higher doses are taken over long period of time.

WARNING!I Potassium iodide should not be taken by people allergic to iodine or shell fish.

~ En~n'v

  • MERGENCY PLAN EE iMPLEMENTING j PROCEDURE NNUAIYRLTD IPoEP22O Revision 18 OI PROCEDURES REFERENCE USE Page 244 of 299 Attchment 9.10 TSC Security Coordinator Checklist Sheet 1 of 3 1.0 tnitial ResponsibiiltvlActivibt NOTES 1.1 Follow responsibilitieslactivities in EN-EP-4I0 Attchment 9,.10 and the following:

1.2 Assume the duties of the Security Coordinator.

A. Refer to EN-EP-SI0 Attachment 9.10.

B. Secure Site Access at the SITE AREA or GENERAL EMERGENCY level as follows:

(,a) Notify CAS and SAS to secure the site, except for ERe Members, per procedure IP-EP-240, Security.

(b)* -Notify the EPM when this has been done.

1.,3 Assign OSC Log Keeper to the position of Accountabiity*

Coordinator.

A. Report readiness to conduct Accountability to the EPM. Utilize the OSC Log Keeper to assist in Accountability.

Bl. Direct the OSC Log Keeper to support the monitoring of"the Accountability Card Readers while ERe members are carding into the TSC/OSC, direct them to verify badges are properly read by the Accountability Card Reader and to log the name and badge number on an Accountability Roster (Form EP-47) of anyone having diffculty using the proximity card readers.

  • ElIPEC Enierye EMERGENCY PLAN NON-QUALITY RELATED PROCEDURE I iPE-2 ein 18 PROCEDURES REFERENCE USE Page 25 of 29 Attachment 9.10 TSC Security Coordinator Checklist Sheet 2 of 3 2.0 Continuous ResponsibilitvlActivitv NOTES 2.1 iF relocation of personnel ofiite is called for THEN:

A. Follow guidance in IP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite.

B. Coordinate with TSC Radiological Coordinator to monitor evacuation routes.

2.2 IF relocating to the Security Administration Offces THEN inform the following individuals.

A. Emergency Plant Manager B. TSC Radiological Coordinator C. Emergency Director D. Lead Accountability Officer (LAO) 2.3 The Lead Accountability Officer (LAO) will generate the list of missing persons. This list will be provided to the Emergency Plant Manager, POM, and/or TSC Security Coordinator.

NOTE During plant shutdowns, when there may be large numbers of workers onsite and within the radiological control areas, a Radiation Protection computer printout may be used to assist in locating missing personnel within the radiological control area after accountability is completed.

1. IF there are individuals who are missing THEN:

(a) Review Accountability Rosters (Form EP-47) used to identify ERO members experiencing difficulty using the proximity card readers and remove them from the Missing Persons List.

(b) Obtain the Radiation Protection Computer Printout of individuals within the Radiological Control Area.

(c) Check off names of possible missing individuals who have left the Protected Area to narrow the list of actual missing

  • E* MEGNY LNPOCEDUArYRELAE IP-EP-220 Revision 18

~~~Entergy IMPLEMENTlNGPLNMREC RCDR ae ~ o Attachment 9.1 0 TSC Security Coordinator Checklist Sheet 3 of 3 Continuous ResponsibilitvlActivitv (cont,) NOTES persons and review RP computer printout for any missing individuals within the Radiological Control Area.

(d) inform the EPM immediately of any personnel discovered missing during accountability process.

4. Assist OSC Staff in maintaining accountability of all OSC personnel through the use of status boards, team assignments, Individual. Exposure Tracking Log (Form EP-29) and ERO Tracking Log (Form EP-42).

2.4 Use the 08C Log Keeper to maintain Continuing Accountability A. Use Onsite ERO Shift Rosters (Form EP-43) to list individuals currently on the Tirst shift in the TSC and OSC.

B. Request EOF Support Staff to identify the current EOF personnel.

C. Work with TSC and OSC Managers to identify personnel to fill.

second shift and ensure all needed positions are identified and establish time second shift is to be called in.

D. Use ETD to identify and contact individuals to fill positions on second shift.* OSC Log-Keeper and EOF Staff may be used to assist in notifications.

E, Inform the TSG and OSO Managers when notifications are completed and if there are any problems filling required positions.

0 0i

  • Enlergy IPEC EMERGENCY PLAN 1 NON-QUALITY RELATED PROCEDURE iP-EP-220 Revision 18 IMPLEMENTING PROCEDURES J REFERENCE USE ,. lPage __of 2 Attachment 9.11t TSC I QSC Layout and NRC Room Sheet 1 of 1 TYPICAL Arrangement (Personnel locations may be changed as needed to facilitate communication and movement without a procedure revision)

--- R MoN.QUALIT IP.EP-220 Revsion 18

'~EIdtgEMERGENCY PLAN RELATED PROCEDOURE iMPLEMENTING-PRCDRSREFSReNCe USE Page 2* Of 299 Attachment 9.1 2 TSCIOSC Public Address System Description and Operation Sheet 1 of 1 1,0 General There are three Public Address Systems (PAs) in the TSC/OSC and they have been color coded for easy identification of microphones and speakers.

2.0 SystemslOperation 2.1 Blue System comprises the plant page system. This page system is only from U2. The Speakers are located in the Halls, the OSC Bull Pen, the R&CA Briefing room, the NRC Conference Room, and the old U2 Records room. Volume controls are typically walls near speakers. Activation is via the normal plant page access.

2.2 Red System is the permanently installed TSCIOSC page system. The speakers are located in the ceilings similar to the Plant Page, system. Speakers are in the Halls, the OSC Bull Pen, the R&CA Briefing room, the TSC/OSC Command room, the NRC Conference room and the old U2 Records room. The speakers are marked with red tape. Each speaker has its own on/off switch and volume control knob. The amplifier and two microphones are on/in the counter separating the TSC and OSC each marked with RED tape. The microphones are wireless and battery powered and simply require that they be turned on to activate the system. Volume control is-via the local speaker or the amplifier on the counter separating the TSC and 0S0.

2.3 Green System consists of wireless portable speakers distributed around the facility. Each speaker must be turned on by a switch on the back and the volume adjusted locally by a switch on the front. The volume should be turned up to full volume and adjusted down as needed. Speakers are located in the 0SC Bull Pen, the TSC/OSC Command room, the NRC Conference room, the Whole Body Count room and the old U2 Records room. There are two microphones on/in the TSC/OSC Counter each marked with GREEN tape. The microphones are wireless and battery powered and simply require that they be turned on to activate the system. Additional batteries are available in the supply boxes. Note that this system does not cover the Hallways.

Attachment 9.13 IPEC TSC STAFFING Sheet 1 of 1 At IPEC, the expectation is that ALL individuals assigned to the Technical Support Center (TSC) report to the facility within 60 minutes of the declaration of an Event.

The TSC is able to be considered STAFFED when the following Core Individuals are present: Emergency Plant Manager (EPM), TSC Manager, TSC Communicator, Rad Coordinator, Mechanical Engineer, Electricalll&C Engineer and Reactor Engineer. Regardless of whoever else is available these positions MUST be filled before the TSC can be considered to be STAFFED.

The IPEC Emergency Plan in Section B (Table B-I) requires the following to respond within .60 minutes: TSC Communicator, a Reactor Engineer, an Electrical Engineer and a Mechanical Engineer.

The TSC may be declared OPERATIONAL whenever Core Individuals are achieved and the TSC Manager determines that the facility is adequately staffed for the event and equipment is set up and available to perform the emergency functions assigned to the TSC.

ATTACHMENT 9.1 IOCFR5O.54{q) SCeswNG SHEET 1 Ot 4 ProcedureiDocument Number: Revision:

EN-EP-SI 0 2 IP-EP-220 t EquipmentiacliitylOther: indian Point Energy Center

Title:

Technical Support Center fTSC) Operations Technical Support Center Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan):

This change issues fleet procedure EN-EP-610, "Technical Support Center (TSC) Operations" and revises IP-EP-220 to remove any duplicate tasks in EN.EP-610; however maintain any site specific requirements or commitments.

Part Ii. Activity Previously Reviewed? NE *N Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3) Continue to Alert and Notification System Design Report? EOT reutioni . ext Enter If YES, identify bounding source document numberlapproval reference and justification ensure the basis for concluding the source document fully bounds the b~ow and proposed change is documented below:, opeePr JustfifcatIon:

[Cs8ounding document attached (optional)

Part ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity. (Refer to EN-LI-i100)

NOTE: For example, when a design change is the proposed activity, consequential actions may include changes to other documents which have a different change control process and are NOT to be included in this 50.54(q)(3)

APPLICABILITY CONCLUSION.

0] If there are no controlling change processes, continue the 50.54(q)( 3) Screening.

[] One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects Ihe implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify he applicable controlling change processes below.

D] One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3)

Evaluation is NOT reguired. Identify controilinq change processes below and complete Part VI.

CONTROLLING CHANGE PROCESSES 10 CFR 50.54q only.

Part IV. Editorial Change []E 0* NO 50 54(q)13) Continu* to =itexi Is this activity an editorial or typographical change such as fornatting, paragraph EValIatUWm is part numbering, spelling, or punctuation that does not change intent? NOT required, Justficaion:Enter J~~~~~ustification wsifim a"nd C*tmplL'ta Part "NO"S Is checked because the procedure revision contains non-editoril vi.

changes.

EN-EP-305 REV 3

ATTACHMENT 9.1 I0CFRSO.54(q) SCREENING SHET 2 OF 4 ProcedurelDocument Number: Revision:

EN-EP-61 0 2 IP-EP-220 18 EqulpmentiFacilitylOther: Indian Point Energy Center

Title:

Technical Support Center (TSC) Operations Technical Support Center Part V. Emergency bracketsl Planning Does this activitv ElementlFunction affect Screen any of the followina, (Associated includina orooram10elements CFR 50.47(b) planning standard function from NUREG-0654/FEMA REP-i identified Section II?in

1. Responsibility for emergency response is assigned. [1] [
2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 [

staffing) in accordance with the emergency plan. [1]

3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2]' LII
4. The process for timely augmentation of onshift staff is established and maintained. 12] Ql
5. Arrangements for requesting and using off site assistance have been made. [3] fJ
6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] [

7/. A standard scheme of emerg;ency classification and action levels is in use. [41 -

8. Procedure's for notification of State and local governmental agencies are capable of alerting them of the [

declared emergency within 15 minutes after declaration of an emergency and providing follow-up Snotifications. [5]

8.' A/dministrative and physical means have been established for alerting and'providing prompt instructions to fJ the public within the plume exposure pathway. (5]

'10. The public ANS meets the design requirements of FEMA-REP°-1 0, Guide for Evaluation of Alert and Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5]

11. Systems are established for prompt communication among principal emergency response organizations. [6] [
12. Systems are established for prompt communication to emergency response personnel. [8] E 13; Emergency preparedne'ss information is made available to the public on a periodic basis within the plume [

exposure pathway emergency planning zone (EPZ). [7]

14. Coordinated dissemination of public information during emergencies is established. [71[
15. dequte re mintaned o suportemerenc fciliies respnse,, 8
16. Adequate equipmet iesr maintained to support emergency response. [8] [

'17. Methods, systems, and equipment for assessment of radioactive releases are in use. (9]1-

18. A range of public PARs is available for implementation during emergencies. [10] [
19. Evacuation time estimates for the population located in the plume exposure pathway EpZ are available to I--

support the formulation of PARs and have been provided to State and local governmental authorities. [10]

20. A range of protective actions is available for plant emergency workers during emergencies, including those LII for hostile action events.[10]

EN-EP-305 REV 3

ATTACHMENT# 9.1 I OCFR50.54(q) SCREENING SHEET 3 0F 4 EquipmentIFac~lityIOther:. indian Point E.nergy Center

Title:

Technical Support Center (TSC) Operations Technical Support Center

21. The resources for controlling radiological exposures for emergency workers are established. [11] [
22. Arrangements are made for medical services for contaminated, injured individuals. [12] [
23. Plans for recovery and reentry are developed. [13] [
24. A drill and exercise program (including radiological, medical, health physics and other program areas) is [

established. [14]

25. Drills, exercises, and training evolutions that provide performance opportunities to develop, maintain, and [

demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]

26. Identified weaknesses are corrected. [14].....
27. Training is provided to emergency responders. [15] "

28, Responsibility for emergency plan development and review is established. [16] [

29. Planners responsible for emergency plan development and maintenance are properly trained. [16] ______

APPLICABILITY CONCLUSION 0] Ifno Part V criteria are checked, a 50.54(q)(3) Evaluation is [OT required; document the basis for condlusion below and complete Part VI, . *.

[] If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation. .. .... ..

BASIS FOR CONCLUSION:

This change issues the new fleet procedure for the Technical Support Center cr[scj at IPEC and revises the site specific facility procedure.

The fleet procedure describes the activation and operation of the TSQ. Introduction of the new fleet procedures does not affect nor change the intent of the facilities and equipment already in existence. The procedure is written to ensure the existing facility and TSC equipment will be used and maintained for any Emergency Response Organization (ERe) response.

IP-EP-220 (220) will be maintained at this time; however, it will be revised to remove any tasks duplicated in EN-EP-610 (610). Fleet standard forms .and site specific forrms will.be used as needed to support 610 and new revision of 220; this will ensure IPEC site-specitlc Emergency Plan requirements and associated processes are retained; The 610, new fleet forms, the revised 220 and current site specific forms were reviewed against the current IPEC TSC procedure, iP-EP-220, "Technical Support Center" revision 17, the Emergency Plan, and IPEC Emergency Plan commitments. Based on this review, there are two standard ERO position titles which were not: adopted by IPEC Emergency Planning; TSC Mechanical Coordinator and ENS Communicator. EN-EP-801 states that the TSC Mechanical Coordinator is optional if the TSC and OSC are co-located. These two facilities are co-located at.IPEC. The ENS communicator was not added to the TSC since the ENS communications is designated to the Engineering Coordinator at IPEC and will remain, In 2011. a 50.S54Q evaluation was performed and approved this difference. IPEC will assign dhe Engineering Coordinator to perform the checklist of ENS communicator. There is one commitment which discusses having directions for relocation to an alternate location as necessary. These directions are provided in the EPM checklists in the TSC procedure, IP-EP-220 revision 18. Changes made to IP-EP-220 revision 18 removed only duplicate tasks. Any tasks site specific and not performed in 610 will remain in 220, revision 18. Utilizing EN-EP-610, revision 2 and IP-EP-220 revision 18 for the TSC will address all tasks required for the TSC ERe and no changes to the response processes of facility activation, response time, and organization responsibilities, addressed by 10CFRS0.47(b) planning standards will be made.

Summary - No ERO positions changes have been made. No ERO responsibilities have been added or deleted. The description, activation and operation of"the TSCas described in the IPEC Emergency Plan have not been changed. All site specific commitments continue to be met under the fleet procedure or the use of the site specific facility procedure. This change does not alter the TSC structure, organization or location.

The revision of the Technical Support Center procedure, IP-EP-220 rev 18 and issuance of the fleet Technical Support Center Operations procedure, EN-EP-610 and site specific fornis screens out.

Changes made to IP-EP-220 rev. 18 and EN-EP-610 revision 2 have been reviewed to determine if they affect any of the planning standards or program elements in Part V of this form. It has been concluded that there Is no affect and no f'urther evaluation is required and the c:haoges do not reqluire a change to the I]PEC Emergency* Plan.

EN-EP-305 REV 3

ATTACHMENT 9.1 I 0CFRS0.54(q) SCREENING SHELET 4 OF 4 EquipnuentlFacllity/Other: Indian Point Energy Center

Title:

Technical Support Center (rSC) Operations Technical Support Center Part Vi, Signatures:

Preparer Name (Print) Preparer Signature Date:

Rebecca A. Martin  !

(Optional) Reviewer Name (Print) Reviewer SignatureDt:

Approver Name (Print) AppoerSgature Date:"

EP Manager -.. . .. .. _._ _ _ _

/

EN-EP-305 REV 3

IPEC IMPLEMENTING PROCEDURE IP-SMM-AD-1*02 Rev:. 1 PREPARATION, REWV EW, AND APPROVAL Pae 4of4 kTTACHMENT 1*0.2 IPEC PROCEDURE REVIEW AND APPROVAL

...... ~ ~(Page 1 of 1)... ..

Procedure

Title:

Technical Support Center Procedure No: IP-EP-220 Existing Rev: 17 New Rev: 18 DRN/EC No: DRN-15-01355 Procedure Activity.............. Temnorarv Procedure Change (MARK Applicable) 0] Converted To IPEC, Replaces: (fl1ARK Applicable)

[] NEW PROCEDURE Unit 1 Procedure No: 03 EDITORIAL Temporary Procedure Change 0] GEN ERAL REVISION (Enter Step Number In Revision Summary)

O] PARTIAL REVISION Unit 2 Procedure No: [] ADVANCE Temporary Procedure Change IJ CONDITIONAL Temporary Procedure Change U] EDITORIAL REVISION TerminaingCodition

[] VOID PROCEDURE Unit 3 Procedure No: TriaigCniin _________

O1 SUPERSEDED O] RAPID REVISION Document in Microsoft Word: 0VODDNPCNs)

___ ___ _ .__ Yes D].No ___VOIDDRNTPCNos):

Revision Summary [] N/A - See Revision Summary page.

Revised to support implementation of new fleet facility procedures. Removed any duplicate tasks and kept site specific reqluirements and commitrrients.. .

  • ImleentationRequiremen*

Implementation Plan? 0] Yes 0] No Formal Training? 0* Yes O]No Special Handling?_[] Yes []No RPO Dept: ,Emergency Planning Writer (Print Name! ExtI Sign): Rebecca A. Martin / G (_1~d~

Revew and A2revaI (Per Attachment 10.1, IPCReview And A _*ve~l Requirements)

1. 0 Technical Reviewer;*.Casey Karsten/ "I / &*i

"::(Print Name! Sidnature/ Date)

2. U] Cross-Disciplinary Reviewers:

Dept: ________Reviewer: ______________________________

(Print Name! Stgnature Date)

Dept: _____ __Reviewer:

/,1

/ (Prin Name! Signaturel Date)

O3 PAD required and is compleX~(/PAD Approver and Reviewer qualifications have been verified)

OPrevious exclusion from further LI-i 00 Review is still valid Ol PAD not required due to type of change

4. 0] Non-Intent Determination Complete:

(Print N]ame! SIgnaturel Date)

NO change of purpose or scope NO change 10 loss restrictive acceptance criteria NO reduction in the level of nuclear safety NOQ change to steps previously identified as commitment steps NO voiding or canceling of a procedure, unless requirements NO deviation from the Quality Assurance Program Manual are incorporated into another procedure or the need for the NO change that may result in deviations from Technical Specifications.

procedure was eliminated via an alternate process PSAR. plant design requirements, or previously made commitments

5. U] On-Shift Shift M~anager/CRS:

(Print Name! Signature!Date)

6. [ User Validation: User: Validator:
7. U] Special Handling Requirements Understood:

(IPrint Naein! Signature/)Date)

Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable)

Section 1 Doc/Procedure Type: (circle one) Administrative I I.molementino I EPLA*N Doe/Procedure No: IP EP 220 CIA: Yes No CIA No. _______Due Date:_____

Doc/Procedure

Title:

Technical Support Center Rev No: 188 Rev Distribution Date: 01/27/16 Reason for EPDCC: New X Revision Cancel Date of EPOCC: 01/13!16 Section 2 Change Description

1. Originator: Rebecca A. Martin. ,.* C, ,,.V,..
2. Class of Change: -Technical Correction ___ New Commitment__ Other X
3. Page numbers affected and reason for change: Revised to suo10ort imp~lementation of new fleet facility procedures. Removed any duplicate tasks a~nd kept site spec~ific reqiu!r~em.rents and commitments.
4. Emergency Planning Documents Affected: None
5. Emergency Planning Procedures Affected: IP-EP-.220
6. ReFerences: Other Procedure(s) 41Nt Regulatory Document # N/A Other:
7. Reviewed training requirements with department training coordinator __date:_____
8. The f~ollowing are complete, or are not applicable and are so marked.

Tech Review n/a__ 50.54q. X ENN-Ll.-100: N/A PL-155 N/A SMVM-AD-102 X Manager approval X SRC N/A

9. Both table of contents and transmittals are complete_______date_________
10. Approved dec/procedure delivered to Document Control for distribution ___date____
11. Position Binders updated ifapplicable: . date___
12. Copy of EPDCC and documentlprocedure placed in EP file date____

Sheet 1 of 1 Sheet of EP-AD2-1 IForm Rev. 0

IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2

"  ;;i**LOCATIOP DELIVERED BY IP3 CONTROL ROOM IP3 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS IP3 SHIFT MANAGER DEIEEIYP3 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS IP2 CONTROL ROOM DEIEEIYP2 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS IPEC TSC DELIVERED BY IP2 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS IP2 SIMULATOR DEIEEDBIP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS IP2 SIMULATOR - CLASSROOM 4 DEIEEDBIP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY 3 COPIES OF ALL EP'S IP2 SIMULATOR - CLASSROOM 5 DOUETIP2 SIMULATOR BLDG. EXPTELA NRC RESIDENT INSPECTOR NRC IP2 88FT. ELEVATION 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND DOC CONTROL DESK NRC - ROCKVILLE, MD OFFSlTE GENERAL RECORDS ADDRESS " EXCEPT IP-EP-1 15 1 COPY OF ALL EP'S AND NRC STEVE BARR OFFSlTE GENERAL RECORDS EXCEPT IP-EP-1 15 1 COPY OF ALL EP'S AND NRC DEPUTY DIRECTOR OFFSlTE GENERAL RECORDS EXCEPT IP-EP-1 15 1 COPY OF THE FOLLOWING:

E-PLAN, IP-EP-115, 120, NEW YORK STATE OEM TED FISCH OFFSlTE 20 5,30 4,30 410, 420, 430, 620 & IP-1055 1 COPY OF E-PLAN, WESTCHESTER COUNTY OEM DENNIS DELBORGO OFFSlTEIPE-1&34 ROCKLAND COUNTY FIRE AND NIHLSLNGIF~T COPY OF E-PLAN, EMERGENCY SERVICES NIHLSLNOOFIEIP-EP-310 & 340 ORANGE COUNTY EMERGENCY SHNOIIHE F~T COPY OF E-PLAN, SERVICES CENTER SHNO IHROFIEIP-EP-310 & 340 PUTNAM COUNTY BUREAU OF ANHNIUTO F~T COPY OF E-PLAN, EMERGENCY SERVICES ATOYUONFSTEIP-EP-310 & 340