ML17212B648: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/26/1982
| issue date = 05/26/1982
| title = Forwards Amend 10 to FSAR
| title = Forwards Amend 10 to FSAR
| author name = UHRIG R E
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = EISENHUT D G
| addressee name = Eisenhut D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000389
| docket = 05000389
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:DOCKET05000389NOTiES;REGUYINFORMATIONDISTRIBUYSTEM('RIDS)-AOCESSIONNBR:8206040197DOO~DATE'2/05/26NOTARIZED:YESFAGIL:50389St.LucitePlant~Unit2<FloridaPower8LightCo.AUTH~NAMEAUTHORAFFILIATIONUHRIGrR,E~FloridaPower5LightCo.~RBCIP,NAMERECIPIENTAFFILIATIONEISENHUTFDBG~AssistantDirectorforLicensing
{{#Wiki_filter:REGU        Y  INFORMATION DISTR      I BU        YSTEM ('R IDS)-
AOCESSION NBR:8206040197                DOO ~ DATE'2/05/26 NOTARIZED: YES                    DOCKET FAGIL:50 389        St. Lucite Plant~ Unit        2< Florida Power 8 Light Co.             05000389 AUTH NAME
        ~                   AUTHOR AFFILIATION UHRIGr R,E   ~           Florida Power 5 Light Co.
  ~RBCIP,NAME              RECIPIENT AFFILIATION EI SENHUT  F D B G ~       Assistant Director for Licensing


==SUBJECT:==
==SUBJECT:==
,ForwardaAmaad10toFSAR,hI14~qhDISTRIBUTIONCODE:80018)COPIES'RECEIVED:LTRENCL-"SIZE:.3j'~,.g/l'.~~TITLE:'PSAR/FSARAMDTSandRelatedCarrespondenceRECIPIKNT-ID.CODE/NAkEA/DLICENSNGLICBRP3LAINTERNAL:ELD/HDS2IE/DEPEPDS35MrANRR/DE/EQB13NRR/DE/HGEB30NRR/DE/MTEB17NRR/DE/SAB24NRR/DHFS/HFEB40NRR/DHFS/OLBI34NRR/DSI/AE826NRR/DSI/OPB10NRR/DSI/ET8812NRR/DSI/PSB'9/RSB23EG:L04EXTERNALaACRS41REMAREPDIV39NRCPDR02NTI'COPIESLTTRENCL10rP1'011"03I'32*211.11111=1111111111101'0111111RECIPIENTIDCODE/NAMELICBRA3BCNERSESgV~01IEFILEIE/DEP/EPLB36NRR/DE/CEB11NRR/DE/GB28NRR/DE/MEB18NRR/DE/QAB21'NRR/DE/SEB25NRR/DHFS/LQB32NRR/DHFS/PTRB20NRR/DSI/ASB27NRR/DSI/CSB09NRR/DSI/ICS816NRR/DSI/RAB22NRR/DST/LGB33RGN2BNL(AMDTSONLY)LPDR03NSIC05:COPIESLTTRENCL10111'331122:-1111111111111111112211111TOTALNUMBER.OFICOPIESREQUIRED'TTR57ENCL52 M0llHtIIn0IhIIWIIIflIKgIM HP.O.BOX529100MIAMI,FL33152Jri~8FLORIDAPOWER&LIGHTCOMPANYf1ay26,1982L-82-222OfficeofNuclearReactorRegulationAttention:t1r.DarrellG.Eisenhut,DirectorDivisionofLicensingU.S.NuclearRegulatoryCommissionWashington,D.C.20555
,Forwarda Amaad 10 to FSAR, DISTRIBUTION CODE: 80018 )COPIES 'RECEIVED:LTR TITLE: 'PSAR/FSAR      AMDTS    and  Related    Carrespondence h I 14~ qh 3  ENCL  j'~, g/l'.~~
SIZE:. .
NOTiES; REC IP IKNT            COPIES              RECIPIENT            :COPIES
              -ID .CODE/NAkE            LTTR ENCL          ID CODE/NAME          LTTR ENCL A/D LICENSNG                  1      0      LIC BR A3 BC                1    0 LIC      BR  P3 LA                  rP      NERSESgV  ~      01        1 INTERNAL: ELD/HDS2                        1    '0      IE FILE                    1    1 IE/DEP EPDS        35        1      1      IE/DEP/EPLB      36        '3    3 Mr A                                "0      NRR/DE/CEB      1 1        1    1 NRR/DE/EQB          13        3    I'3      NRR/DE/GB        28        2    2 NRR/DE/HGEB 30                2    *2      NRR/DE/MEB      18      :-1 NRR/DE/MTEB 17                        1      NRR/DE/QAB      21        1    1 NRR/DE/SAB          24        1    .1      'NRR/DE/SEB      25        1    1 NRR/DHFS/HFEB40                1      1      NRR/DHFS/LQB 32            1    1 NRR/DHFS/OLB I34                      1      NRR/DHFS/PTRB20            1    1 NRR/DSI/AE8 26                1    =1        NRR/DSI/ASB 27              1 NRR/DSI/OPB          10        1      1      NRR/DS I/CSB 09            1    1 NRR/DSI/ET 8 8 NRR/DSI/PSB
                        /RSB
                              '912        1 1
1      NRR/DS I/ICS8 16 NRR/DSI/RAB NRR/DST/LGB 22 33 1
1 1
1 23        1      1                                  1    1 EG: L            04        1      1      RGN2                        2    2 EXTERNALa ACRS                  41        10    1'0      BNL(AMDTS ONLY)             1    1 REMA REP      DIV 39          1      1      LPDR            03        1 NRC PDR            02        1      1      NSIC            05        1    1 NT I'                         1      1 TOTAL NUMBER .OF ICOPIES        REQUIRED'TTR            57  ENCL    52


==DearNr.Eisenhut:==
M 0
Re:St.LucieUnit2DocketNo.50-389Amendment10ToTheFinalSafetAnalsisReortInaccordancewiththerequirementsof10CFR50.30,FloridaPower8LightCompany(FPL)issubmittingsixty(60)copiesofAmendment10totheFinalSafetyAnalysisReport,St.LuciePlantUnit2.Thechangestotheamendmentarecontainedintheattachment.Verytrulyyours,EwRobertE.UhrigVicePresidentAdvancedSystemsandTechnologyREU/RAK/gaAttachmentscc:J.P.O'Reilly,Director,RegionII(w/oattachments)HaroldF.Reis,Esquire(w/oattachments)saosaoolW7iiaszsPDRADOCK05QQQ38'PK.PDRPEOPLE...SERVINGPEOPLE 1Ih STATEOFFLORIDA))COUNTYOFDADE)beingfirstdulysworn,deposesandsays:ThatheisVicePresidentLightCompany,theherein;~ofFloridaPowerThathehasexecutedtheforegoingdocument;thatthestate-mentsmadeinthissaiddocumentaretrueandcorrecttothebestof.hisknowledge,information,andbelief,andthatheisauthorizedtoexecutethedocumentonbehalfofsaidJ.M.l<i11iams,Jr.SubscribedandsworntobeforemethisdayofNOTARY-;PUBLIC,iandfortheCountyofDade,~StateofFloridaNotarypublic,StateofFloridaatLargeMyCommissionExpiresOctober30,-1983Mycommissionexpires:ardBondinAenc
ll H t
/nII ATTACHMENTTOL-82-222DatedMay26,1982ChangesintheStLuciePlantUnit2,FSARasaresultofAmendment10.1).Appendix1.9B-wasrevisedtoincorporatethechangeswhichresultedfromtherecentNRCreviewQuestions/Response(FPLlettersL-81-468,474datedOctober27,1981andNovember10,1981respectively).2)Section2.1.3.9and2.1.4wererevised.toinsertasubsectionontheperiodicupdateofthepopulationdataaroundtheStLucie2siteandtoincludeinformationonthefuturelandusesaroundthesite.TheseitemswereaddedattheNRC'srequest.3)Section2.5wasrevisedtoconformtotheprocessedgeotechnicaldataavailableregardingtheHutchinsonIslandsoilprofile.4)Chapter3containsgeneralrevisionsincludingchangesmadeforcon-sistencywithotherchaptersoftheFSAR,changesmadeforcompletenessandbettercomprehensionandotherchangesmadetocorrecttypographicalerrors.5)Section3.7containsanewSubsectionwhichadequatelydescribestheCEDM's.6)Section3.9wasrevisedtoincludeupdatesofthecomputerprogramsusedintheanalysisattheStLucie2plantandanewsubsectiononDeepDraftPumpOperability.7)Chapter4includesgeneralrevisionstocorrecttypographicalandeditorialerrors.8)Sections4.1,4.2and4.3wererevisedtoindicatethatthePartLengthCEAsarenotcurrentlyplannedtobeusedatStLucie2.9)Section4.4containsinformationthatincludesupdatedinformationontheminimumandmaximumallowablereactorcoolantflowrateandhydraulicloadsoninternalcomponents.10)=Chapter5generalrevisionsincludechangesforconsistencywithotherChaptersoftheFSARalongwithchangestocorrecteditorialandtypo-graphicalerrors.11)Section5.2wasrevisedtoincorporatethenormalandLTOPoperationalconsiderationsofthePORVs.Section5.4wasrevisedtomodifythesubsectionsontheReactorCoolantPumpsandtheResidualHeatRemovalSystemtoreflecttherecentinformationprovidedtotheNRCviavariouscorrespondence.
Ih I
I n
0 I      I    W I
II fl IK g I M


13)Section6.2revisedthecombinedleakagerateofbypassleakageto~27andthissubsectionwasalsorevisedtocorrecteditorialcomments.14)Section6.3revisedthesubsectiontoclarifythesourceofchargingpump-waterwithregardstothesmallbreakECCSanalysis.15)Tables7.3wasrevisedtoa)includethechargingpumpstoactuateonSIASb)fillin"laters"c)andcorrect'.discrepancies.16),Chapter8-correctedtypographicalerrorsandcorrectedreferences.17)Chapter9wasrevisedtoincludeawriteuponchargingpumps.actuationtobeconsistentwiththeinformationprovidedtotheNRCpreviously.18)Chapter12wasrevisedtoincludethePostAccidentSamplingSystemSources.19)Chapter15waschangedtoincludetherevisedAccidentAnalysisandreviseddosecalculationsforlossofcoolantaccident.E20)220SeriesQuestionswererevisedtoaddmissinginformationintothetextthattheNRCstaffhasalreadyreviewedandalsowecorrectedsometypographicalerrors.21)490SeriesQuestionswererevisedtoconformmorecloselywithFSARSection4.2.I22)492SeriesQuestionscontainedthenewQuestions/Responsestothreenewquestionsandalsopresentareeditorialcomments.  
H        P.O. BOX 529100 MIAMI,F L 33152 Jri ~8 FLORIDA POWER & LIGHT COMPANY f1ay 26, 1982 L-82-222 Office of Nuclear Reactor Regulation Attention: t1r. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555


}}
==Dear Nr. Eisenhut:==
 
Re:  St. Lucie Unit    2 Docket No. 50-389 Amendment 10 To The    Final Safet  Anal  sis  Re ort In accordance  with the requirements of 10 CFR 50.30, Florida Power 8 Light Company (FPL) is submitting sixty (60) copies of Amendment 10 to the Final Safety Analysis Report, St. Lucie Plant Unit 2.
The changes  to the  amendment  are contained in the attachment.
Very  truly yours, Robert E. Uhrig Ew Vice President Advanced Systems    and Technology REU/RAK/ga Attachments cc:  J. P. O'Rei  lly, Director, Region II (w/o attachments)
Harold F. Reis, Esquire (w/o attachments) saosaoolW7    iiaszs PDR ADOCK 05QQQ38'P K    .            PDR                                                  PEOPLE... SERVING PEOPLE
 
1I h
 
STATE OF FLORIDA    )
                      )
COUNTY OF DADE      )
being    first      duly sworn, deposes and says:
That he  is            Vice President                          ~
of Florida Power Light  Company, the                herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of.his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said J. M. l<i11iams, Jr.
Subscribed and sworn to before            me    this day of
~
NOTARY-;PUBLIC, State of Florida i  and  for the      County of Dade, Notary public, State of Florida at Large My Commission Expires October 30, -1983 My commission expires:                        ard Bondin A enc
 
      /
n I
I
 
ATTACHMENT TO  L-82-222 Dated May 26, 1982 Changes  in the St Lucie Plant Unit 2,    FSAR as a  result of  Amendment 10.
1). Appendix 1.9B  was revised to incorporate the changes which resulted from the recent NRC review Questions/Response (FPL letters L-81-468, 474 dated October 27, 1981 and November 10, 1981 respectively).
: 2)    Section 2.1.3.9 and 2.1.4 were revised. to insert a subsection on the periodic update of the population data around the St Lucie 2 site and to include information on the future land uses around the site. These items were added at the NRC's request.
: 3)    Section 2.5 was revised to conform to the processed geotechnical data available regarding the Hutchinson Island soil profile.
: 4)    Chapter 3 contains general revisions including changes made        for con-sistency with other chapters of the FSAR, changes made for completeness and better comprehension and other changes made to correct typographical errors.
: 5)    Section 3.7 contains a new Subsection which adequately describes the CEDM's.
: 6)    Section 3.9 was revised to include updates of the computer programs used in the analysis at the St Lucie 2 plant and a new subsection on Deep Draft  Pump  Operability.
: 7)    Chapter 4 includes general revisions to correct typographical and          editorial errors.
: 8)    Sections 4 .1, 4.2 and 4.3 were revised to indicate that the Part Length CEAs are not currently planned to be used at St Lucie 2.
: 9)    Section 4.4    contains information that includes updated information on the minimum and maximum allowable    reactor coolant flow rate and hydraulic loads on internal components.
: 10)  =
Chapter 5 general revisions include changes for consistency with other Chapters of the FSAR along with changes to correct editorial and typo-graphical errors.
Section 5.2 was revised to incorporate the normal and        LTOP  operational 11) considerations of the PORVs.
Coolant Section 5.4 was revised to modify the subsections on the Reactor        information Pumps and the Residual Heat Removal System      to  reflect  the  recent provided to the NRC via various    correspondence.
: 13)  Section 6.2 revised the combined leakage rate of bypass leakage to ~ 27 and  this subsection was also revised to correct editorial comments.
: 14)  Section 6.3 revised the subsection to clarify the source of charging pump-water  with regards to the small break ECCS analysis.
: 15)  Tables 7.3 was revised to a) include the charging pumps to actuate on SIAS b)  fill in "laters" c) and correct '.discrepancies.
: 16) , Chapter 8  corrected typographical errors and corrected references.
: 17)  Chapter  9 was revised to include a writeup on charging pumps. actuation to be consistent with the information provided to the NRC previously.
: 18)  Chapter 12 was revised to include the Post Accident Sampling System Sources.
: 19)  Chapter 15 was changed to include the revised Accident Analysis and revised dose calculations for loss of coolant accident.
E
: 20)  220  Series Questions were revised to add missing information into the text that the NRC staff has already reviewed and also we corrected some typographical errors.
: 21)  490 Series Questions were  revised to conform more closely with  FSAR Section 4.2.
I
: 22)  492 Series Questions contained the  new Questions/Responses to three new questions and also present are  editorial  comments.}}

Latest revision as of 15:35, 4 February 2020

Forwards Amend 10 to FSAR
ML17212B648
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/26/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17212B649 List:
References
L-82-222, NUDOCS 8206040197
Download: ML17212B648 (10)


Text

REGU Y INFORMATION DISTR I BU YSTEM ('R IDS)-

AOCESSION NBR:8206040197 DOO ~ DATE'2/05/26 NOTARIZED: YES DOCKET FAGIL:50 389 St. Lucite Plant~ Unit 2< Florida Power 8 Light Co. 05000389 AUTH NAME

~ AUTHOR AFFILIATION UHRIGr R,E ~ Florida Power 5 Light Co.

~RBCIP,NAME RECIPIENT AFFILIATION EI SENHUT F D B G ~ Assistant Director for Licensing

SUBJECT:

,Forwarda Amaad 10 to FSAR, DISTRIBUTION CODE: 80018 )COPIES 'RECEIVED:LTR TITLE: 'PSAR/FSAR AMDTS and Related Carrespondence h I 14~ qh 3 ENCL j'~, g/l'.~~

SIZE:. .

NOTiES; REC IP IKNT COPIES RECIPIENT :COPIES

-ID .CODE/NAkE LTTR ENCL ID CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR A3 BC 1 0 LIC BR P3 LA rP NERSESgV ~ 01 1 INTERNAL: ELD/HDS2 1 '0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 '3 3 Mr A "0 NRR/DE/CEB 1 1 1 1 NRR/DE/EQB 13 3 I'3 NRR/DE/GB 28 2 2 NRR/DE/HGEB 30 2 *2 NRR/DE/MEB 18  :-1 NRR/DE/MTEB 17 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 .1 'NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB I34 1 NRR/DHFS/PTRB20 1 1 NRR/DSI/AE8 26 1 =1 NRR/DSI/ASB 27 1 NRR/DSI/OPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DSI/ET 8 8 NRR/DSI/PSB

/RSB

'912 1 1

1 NRR/DS I/ICS8 16 NRR/DSI/RAB NRR/DST/LGB 22 33 1

1 1

1 23 1 1 1 1 EG: L 04 1 1 RGN2 2 2 EXTERNALa ACRS 41 10 1'0 BNL(AMDTS ONLY) 1 1 REMA REP DIV 39 1 1 LPDR 03 1 NRC PDR 02 1 1 NSIC 05 1 1 NT I' 1 1 TOTAL NUMBER .OF ICOPIES REQUIRED'TTR 57 ENCL 52

M 0

ll H t

Ih I

I n

0 I I W I

II fl IK g I M

H P.O. BOX 529100 MIAMI,F L 33152 Jri ~8 FLORIDA POWER & LIGHT COMPANY f1ay 26, 1982 L-82-222 Office of Nuclear Reactor Regulation Attention: t1r. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Nr. Eisenhut:

Re: St. Lucie Unit 2 Docket No. 50-389 Amendment 10 To The Final Safet Anal sis Re ort In accordance with the requirements of 10 CFR 50.30, Florida Power 8 Light Company (FPL) is submitting sixty (60) copies of Amendment 10 to the Final Safety Analysis Report, St. Lucie Plant Unit 2.

The changes to the amendment are contained in the attachment.

Very truly yours, Robert E. Uhrig Ew Vice President Advanced Systems and Technology REU/RAK/ga Attachments cc: J. P. O'Rei lly, Director, Region II (w/o attachments)

Harold F. Reis, Esquire (w/o attachments) saosaoolW7 iiaszs PDR ADOCK 05QQQ38'P K . PDR PEOPLE... SERVING PEOPLE

1I h

STATE OF FLORIDA )

)

COUNTY OF DADE )

being first duly sworn, deposes and says:

That he is Vice President ~

of Florida Power Light Company, the herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of.his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said J. M. l<i11iams, Jr.

Subscribed and sworn to before me this day of

~

NOTARY-;PUBLIC, State of Florida i and for the County of Dade, Notary public, State of Florida at Large My Commission Expires October 30, -1983 My commission expires: ard Bondin A enc

/

n I

I

ATTACHMENT TO L-82-222 Dated May 26, 1982 Changes in the St Lucie Plant Unit 2, FSAR as a result of Amendment 10.

1). Appendix 1.9B was revised to incorporate the changes which resulted from the recent NRC review Questions/Response (FPL letters L-81-468, 474 dated October 27, 1981 and November 10, 1981 respectively).

2) Section 2.1.3.9 and 2.1.4 were revised. to insert a subsection on the periodic update of the population data around the St Lucie 2 site and to include information on the future land uses around the site. These items were added at the NRC's request.
3) Section 2.5 was revised to conform to the processed geotechnical data available regarding the Hutchinson Island soil profile.
4) Chapter 3 contains general revisions including changes made for con-sistency with other chapters of the FSAR, changes made for completeness and better comprehension and other changes made to correct typographical errors.
5) Section 3.7 contains a new Subsection which adequately describes the CEDM's.
6) Section 3.9 was revised to include updates of the computer programs used in the analysis at the St Lucie 2 plant and a new subsection on Deep Draft Pump Operability.
7) Chapter 4 includes general revisions to correct typographical and editorial errors.
8) Sections 4 .1, 4.2 and 4.3 were revised to indicate that the Part Length CEAs are not currently planned to be used at St Lucie 2.
9) Section 4.4 contains information that includes updated information on the minimum and maximum allowable reactor coolant flow rate and hydraulic loads on internal components.
10) =

Chapter 5 general revisions include changes for consistency with other Chapters of the FSAR along with changes to correct editorial and typo-graphical errors.

Section 5.2 was revised to incorporate the normal and LTOP operational 11) considerations of the PORVs.

Coolant Section 5.4 was revised to modify the subsections on the Reactor information Pumps and the Residual Heat Removal System to reflect the recent provided to the NRC via various correspondence.

13) Section 6.2 revised the combined leakage rate of bypass leakage to ~ 27 and this subsection was also revised to correct editorial comments.
14) Section 6.3 revised the subsection to clarify the source of charging pump-water with regards to the small break ECCS analysis.
15) Tables 7.3 was revised to a) include the charging pumps to actuate on SIAS b) fill in "laters" c) and correct '.discrepancies.
16) , Chapter 8 corrected typographical errors and corrected references.
17) Chapter 9 was revised to include a writeup on charging pumps. actuation to be consistent with the information provided to the NRC previously.
18) Chapter 12 was revised to include the Post Accident Sampling System Sources.
19) Chapter 15 was changed to include the revised Accident Analysis and revised dose calculations for loss of coolant accident.

E

20) 220 Series Questions were revised to add missing information into the text that the NRC staff has already reviewed and also we corrected some typographical errors.
21) 490 Series Questions were revised to conform more closely with FSAR Section 4.2.

I

22) 492 Series Questions contained the new Questions/Responses to three new questions and also present are editorial comments.