ML17213A622: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 10/29/1982 | | issue date = 10/29/1982 | ||
| title = Forwards Reactor Protection Sys Matrix Mockup Fault Isolation & Surge Withstand Qualification Test Rept,Fl Power & Light,St Lucie Unit 2. | | title = Forwards Reactor Protection Sys Matrix Mockup Fault Isolation & Surge Withstand Qualification Test Rept,Fl Power & Light,St Lucie Unit 2. | ||
| author name = | | author name = Uhrig R | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = Eisenhut D | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000389 | | docket = 05000389 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULATORY | {{#Wiki_filter:h REGULATORY 'OlT ION DISTRIBUTION SY+N +DS) | ||
'OlT ION DISTRIBUTION SY+N+DS) | ACCESSION NBR: 8211040],65 DOC ~ DATE: 8?/10/29 NOTARIZED; f30 DOCKET FACIL:50-389 St ~ Lucie Plant~ Unit 2< Florida Power ff Light Cos 05000389 AUTH ~ NAME AUTHOR AFF jLIATION UKRIGg R ~ E, Florida Power 8 Light Co. | ||
~ | RECIP ~ NAME REc IP I ENT AFFILIATIoN EISENHUTiO G ~ ~ Division of Licensing | ||
==SUBJECT:== | ==SUBJECT:== | ||
Forwards"Reactor Protection Sys Matrix Mockup Fault Isolation L Surge Withstand Qualification Test ReptiFL Power ff LightgSt Lucie Unit 2 | Forwards "Reactor Protection Sys Matrix Mockup Fault Isolation L Surge Withstand Qualification Test ReptiFL Power ff LightgSt Lucie Unit ' 2 DISTRIBUTION CODE: B001S COPIES RECEIVED:LTR ENCL SIZE; iJ+g, TITLE: Li censing Submittal: CESAR/FSAR Amdts ff, Rel ated Correspondence NOTES: | ||
CESAR/FSAR Amdts ff, Rel ated Correspondence NOTES: RECIPIENT IO CODE/NAME A/D LICENSNG LIC BR P3 L'A INTER'; | RECIPIENT COPIES RECIPIENT COPIES IO CODE/NAME LTTR ENCL ID CODE/NAME l TTR ENCL A/D LICENSNG 0 LIC BR 03 BC 1 0 LIC BR P3 L'A 1 0 NERSESg V, 01 1 1 INTER';ALi El 0/HDS2 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 IE/OEP/EPLB 36 3 3 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/OE/EQB 13 3 3 NRR/DE/GB 28 2 2 NRR/OE/HGEB 30 2 2 NRR/DE/HEB 18 1 1 ERR/DE/MTEB 17 1 NRR/DE/QAB 21 1 1 NRR/OE/SAB 24 1 NRR/DF/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/OS I/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CPB 10 1 NRR/OS I/CSB 09 1 1 NRR/OS I/ETSB 1?. 1 1 NRR/DS I/ICSB 16 1 1 NRR/DS I/PSB 19 1 1 NRR/DS I/RAB ?2 1 1 25 1 1 NRR/DST/LGB 33 1 1 EG oz 1 1 RGN2 2 RM/DDAMI/YiI8 1 0 EXTERNAL; ACRS 41 6 6 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA REP DI V 39 1 1 LPOR 05 1 1 NRC PDR 02 1 1 tlfSIC 05 1 1 NTI S 1 1 TOTAL NUMBER OF COPIES REQUIREDI LTTR 55 ENCL 09 | ||
==Dear t1r.Eisenhut:== | ) << | ||
Re: St.Lucie Unit No.2 Docket No.50-389 | t f t I <<<<IH | ||
2)The acceptance criteria described in subsection 7.2.5 of the first supplement of the safety evaluation report has been met.3)Confirmation be provided that the ultra-isolation trans-formers will be installed. | ~ )HV N'<< '1 J:<< ),.'i> ) ) | ||
Florida Power and Light Company, via the attached report, confirms that the testing has been comp1eted in accordance with the program previously submitted-and reviewed by the NRC,ahd that the.acceptance criteria stated in the SSER 1, subsection 7.2.5, which the tlRC pre-viously reviewed and approved, has been met.FPL also reconfirms that the ultra-isolation transformers-will be installed prior to core load.Very truly yours, o ert E.Uhrig Vice President Advanced Systems and Technology REU/RJS/JES/sms Attachment cc: J.P.O'Reilly, Region II Harold F.Reis, Esquire egin l'DR+PL 6S~DOCg pg~lpp9>pop | ~" r) l 'i f l << l'i<<>>(> >>>> | ||
~~}} | r5 f > It tt f 1 | ||
) C>> ')<<<<hi ) a'J it<<' 'I'l :.) l )'H S I <<h ) Ja II << | |||
".I ') 'J it h "Hti h | |||
f s'>>r II 8 $ '>>HHH(H II k<<fl r)nf > o 'I | |||
~ q>><<..tk<<<< | |||
) J f <<g JI 1 I'1t>> I,)1 Ilt ) )>><< | |||
,<<(II ] r; '<<'l',) <<1 0 i<< f)t) f Hfdf ~ ) II l;.. I J i; r~,)I'. >>>>,'V H .ef Jgr> J ~ >'I<<'> isrg | |||
<<(l Il rh) i frit <<Hf g<<$ '1') ii | |||
'i | |||
~ J .<< | |||
f f 'I ) >II <<<<I <)>> f) h | |||
, ', '.<<") 1 | |||
~% | |||
"I >>,<<>>> | |||
) | |||
J J t g I ~ <<J H>> | |||
II II ~ I 1 Iii>> | |||
tl<<g)gf Ili I | |||
.>>f; 3 J)1) | |||
~,tf )).) 'J) f}f ) | |||
<<'f I J ) IAvl<<<<, ) <<)') J) <<4 )f | |||
>g J | |||
~ V H<<H ~ <<I>> <<I <<I 0 4)f i <<4" I3) | |||
') J<<<<3$ | |||
i H'<<<<I''I'>> HI <<Qll,I << | |||
I cl<< << II c;J I<<,J IIX <<<<'<<I~HI | |||
~ | |||
<< I>> r I g t I I << '<<H | |||
<<<< I <<JJ j H g Q > k H"I VH | |||
/7 <<g,, 3,", '<<<< | |||
Ih I i,'l vJ IH HI t>>g i i 'I X i'I r>> I~A | |||
'X <<c>> "~ | |||
>)f 8 "gf,iP | |||
) )>><< i'l" ) )I h ,' ") .< | |||
f II it >>>>i- <<( ) I h>> ri II/ tl f | |||
IL ,,1 <<I" f I'I II ~ | |||
lt | |||
<< f ) > | |||
<<<<<<g <<>> <<><< i Hl j[ 'I ) i >> ri Il ')>I | |||
BOY '00, JUNO BEACH, FL 33408 FLORIDA POWER 8 LIGHT COMPANY October 29, 1982 L-82-470 Office of Nuclear Reactor Regulations Attention: Nr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Comnission Washington, D. C. 20555 | |||
==Dear t1r. Eisenhut:== | |||
Re: St. Lucie Unit No. " 2 Docket No. 50-389 RPS Power Su 1 Test Re ort Section 7.2.5 of the St. Lucie Unit 2 Safety Evaluation Report, Sup-plement 1, dated December 1981, describes the reactor protection system matrix power supply test program and identifies confirmatory items that the NRC required for the surge and fault testing. Spe-cifically, your staff requested that: | |||
: 1) The testing, as described in subsection 7.2.5 of the first supplement of the safety evaluation report, has been completed. | |||
: 2) The acceptance criteria described in subsection 7.2.5 of the first supplement of the safety evaluation report has been met. | |||
: 3) Confirmation be provided that the ultra-isolation trans-formers will be installed. | |||
Florida Power and Light Company, via the attached report, confirms that the testing has been comp1eted in accordance with the program previously submitted-and reviewed by the NRC,ahd that the. acceptance criteria stated in the SSER 1, subsection 7.2.5, which the tlRC pre-viously reviewed and approved, has been met. FPL also reconfirms that the ultra-isolation transformers-will be installed prior to core load. | |||
Very truly yours, o ert E. Uhrig Vice President Advanced Systems and Technology pool REU/RJS/JES/sms Attachment cc: J. P. O'Reilly, Region II Harold F. Reis, Esquire egin l'DR +PL 6S | |||
~DOCg pg~lpp9 | |||
>pop | |||
-- .l'DR PEOPLE... SERVING PEOPLE | |||
~ ~}} |
Latest revision as of 14:26, 4 February 2020
ML17213A622 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 10/29/1982 |
From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
To: | Eisenhut D Office of Nuclear Reactor Regulation |
Shared Package | |
ML17213A623 | List: |
References | |
L-82-470, NUDOCS 8211040165 | |
Download: ML17213A622 (4) | |
Text
h REGULATORY 'OlT ION DISTRIBUTION SY+N +DS)
ACCESSION NBR: 8211040],65 DOC ~ DATE: 8?/10/29 NOTARIZED; f30 DOCKET FACIL:50-389 St ~ Lucie Plant~ Unit 2< Florida Power ff Light Cos 05000389 AUTH ~ NAME AUTHOR AFF jLIATION UKRIGg R ~ E, Florida Power 8 Light Co.
RECIP ~ NAME REc IP I ENT AFFILIATIoN EISENHUTiO G ~ ~ Division of Licensing
SUBJECT:
Forwards "Reactor Protection Sys Matrix Mockup Fault Isolation L Surge Withstand Qualification Test ReptiFL Power ff LightgSt Lucie Unit ' 2 DISTRIBUTION CODE: B001S COPIES RECEIVED:LTR ENCL SIZE; iJ+g, TITLE: Li censing Submittal: CESAR/FSAR Amdts ff, Rel ated Correspondence NOTES:
RECIPIENT COPIES RECIPIENT COPIES IO CODE/NAME LTTR ENCL ID CODE/NAME l TTR ENCL A/D LICENSNG 0 LIC BR 03 BC 1 0 LIC BR P3 L'A 1 0 NERSESg V, 01 1 1 INTER';ALi El 0/HDS2 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 IE/OEP/EPLB 36 3 3 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/OE/EQB 13 3 3 NRR/DE/GB 28 2 2 NRR/OE/HGEB 30 2 2 NRR/DE/HEB 18 1 1 ERR/DE/MTEB 17 1 NRR/DE/QAB 21 1 1 NRR/OE/SAB 24 1 NRR/DF/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/OS I/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CPB 10 1 NRR/OS I/CSB 09 1 1 NRR/OS I/ETSB 1?. 1 1 NRR/DS I/ICSB 16 1 1 NRR/DS I/PSB 19 1 1 NRR/DS I/RAB ?2 1 1 25 1 1 NRR/DST/LGB 33 1 1 EG oz 1 1 RGN2 2 RM/DDAMI/YiI8 1 0 EXTERNAL; ACRS 41 6 6 BNL(AMDTS ONLY) 1 1 DMB/DSS (AMDTS) 1 1 FEMA REP DI V 39 1 1 LPOR 05 1 1 NRC PDR 02 1 1 tlfSIC 05 1 1 NTI S 1 1 TOTAL NUMBER OF COPIES REQUIREDI LTTR 55 ENCL 09
) <<
t f t I <<<<IH
~ )HV N'<< '1 J:<< ),.'i> ) )
~" r) l 'i f l << l'i<<>>(> >>>>
r5 f > It tt f 1
) C>> ')<<<<hi ) a'J it<<' 'I'l :.) l )'H S I <<h ) Ja II <<
".I ') 'J it h "Hti h
f s'>>r II 8 $ '>>HHH(H II k<<fl r)nf > o 'I
~ q>><<..tk<<<<
) J f <<g JI 1 I'1t>> I,)1 Ilt ) )>><<
,<<(II ] r; '<<'l',) <<1 0 i<< f)t) f Hfdf ~ ) II l;.. I J i; r~,)I'. >>>>,'V H .ef Jgr> J ~ >'I<<'> isrg
<<(l Il rh) i frit <<Hf g<<$ '1') ii
'i
~ J .<<
f f 'I ) >II <<<<I <)>> f) h
, ', '.<<") 1
~%
"I >>,<<>>>
)
J J t g I ~ <<J H>>
II II ~ I 1 Iii>>
tl<<g)gf Ili I
.>>f; 3 J)1)
~,tf )).) 'J) f}f )
<<'f I J ) IAvl<<<<, ) <<)') J) <<4 )f
>g J
~ V H<<H ~ <> <<I <<I 0 4)f i <<4" I3)
') J<<<<3$
i H'<<<<II'>> HI <<Qll,I <<
I cl<< << II c;J I<<,J IIX <<<<'<<I~HI
~
<< I>> r I g t I I << '<<H
<<<< I <<JJ j H g Q > k H"I VH
/7 <<g,, 3,", '<<<<
Ih I i,'l vJ IH HI t>>g i i 'I X i'I r>> I~A
'X <<c>> "~
>)f 8 "gf,iP
) )>><< i'l" ) )I h ,' ") .<
f II it >>>>i- <<( ) I h>> ri II/ tl f
IL ,,1 <<I" f I'I II ~
lt
<< f ) >
<<<<<<g <<>> <<><< i Hl j[ 'I ) i >> ri Il ')>I
BOY '00, JUNO BEACH, FL 33408 FLORIDA POWER 8 LIGHT COMPANY October 29, 1982 L-82-470 Office of Nuclear Reactor Regulations Attention: Nr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Comnission Washington, D. C. 20555
Dear t1r. Eisenhut:
Re: St. Lucie Unit No. " 2 Docket No. 50-389 RPS Power Su 1 Test Re ort Section 7.2.5 of the St. Lucie Unit 2 Safety Evaluation Report, Sup-plement 1, dated December 1981, describes the reactor protection system matrix power supply test program and identifies confirmatory items that the NRC required for the surge and fault testing. Spe-cifically, your staff requested that:
- 1) The testing, as described in subsection 7.2.5 of the first supplement of the safety evaluation report, has been completed.
- 2) The acceptance criteria described in subsection 7.2.5 of the first supplement of the safety evaluation report has been met.
- 3) Confirmation be provided that the ultra-isolation trans-formers will be installed.
Florida Power and Light Company, via the attached report, confirms that the testing has been comp1eted in accordance with the program previously submitted-and reviewed by the NRC,ahd that the. acceptance criteria stated in the SSER 1, subsection 7.2.5, which the tlRC pre-viously reviewed and approved, has been met. FPL also reconfirms that the ultra-isolation transformers-will be installed prior to core load.
Very truly yours, o ert E. Uhrig Vice President Advanced Systems and Technology pool REU/RJS/JES/sms Attachment cc: J. P. O'Reilly, Region II Harold F. Reis, Esquire egin l'DR +PL 6S
~DOCg pg~lpp9
>pop
-- .l'DR PEOPLE... SERVING PEOPLE
~ ~