ML17291B194: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/31/1995
| issue date = 12/31/1995
| title = Monthly Operating Rept for Dec 1995 for WNP-2.W/960111 Ltr
| title = Monthly Operating Rept for Dec 1995 for WNP-2.W/960111 Ltr
| author name = EMBREE D G, PARRISH J V
| author name = Embree D, Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY j.REGULATORINFORMATION DISTRIBUTION ISTEM (RIDE)ACCRSSJOk NBR:9601190110 DOC.DATE: 95/12/31 NOTARIZED:
{{#Wiki_filter:CATEGORY j.
NO DOCKET¹FACIL 50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397AUTH.AAME AUTHOR AFFILIATION EMBREE,D.G.
REGULATORINFORMATION DISTRIBUTION           ISTEM (RIDE)
Washington Public Power Supply System PARRISH,J.V.
ACCRSSJOk NBR:9601190110           DOC.DATE: 95/12/31     NOTARIZED: NO                     DOCKET ¹ FACIL 50-397   WPPSS   Nuclear Project, Unit 2, Washington Public         Powe               05000397 AUTH.AAME           AUTHOR AFFILIATION EMBREE,D.G.         Washington Public Power Supply System PARRISH,J.V.       Washington Public Power Supply System RECIP.NAME         RECIPIENT AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Dec 1995 for WNP-2.W/960111 ltr.'ISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR J ENCL L SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS CENTER RGN4 EXTERNAL: LITCO BRYCEFJ H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept       for Dec 1995   for WNP-2.W/960111 CODE:   IE24D   COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT,.
J  ENCL L  SIZE:
415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBFR OF COPIES REQUIRED: LTTR'9 ENCL'9 V fr vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George'Washington Way~Richland, Washington 99352 January 11, 1996 G02-96-008 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
ltr.'ISTRIBUTION NOTES:
RECIPIENT            COPIES            RECIPIENT         COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME     LTTR ENCL PD4-2 PD                 1    1      CLIFFORD,J            1      1 INTERNAL: ACRS                     10   10     AEOD/SPD/RRAB         1      1 CENTER              1    1      NRR/DRPM/PECB         1       1 RGN4                      1     1 EXTERNAL: LITCO BRYCEFJ H            1     1     NOAC                  1        1 NRC PDR                  1     1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT,. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBFR OF COPIES REQUIRED: LTTR           '9   ENCL '9
 
V fr
 
vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George 'Washington Way ~ Richland, Washington 99352 January 11, 1996 G02-96-008 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT DECEMBER 1995 Transmitted herewith is the Monthly Operating Report for the month of December 1995 as required by Technical Specification 6.9.1.6.Sincerely,.V;Parrish (Mail Drop 1023)Vice President, Nuclear Operations JVP'DGE CC: LJ Callan, NRC R IV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)I'60ii90ii0 95i23i PDR ADGCK 05000397 R PDR 180073 zptI l1 L We (l",i g'";!
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT DECEMBER 1995 Transmitted herewith is the Monthly Operating Report for the month             of December 1995 as required by Technical Specification 6.9.1.6.
OPERATING STATUS REPORT for WNP-2 Date: January 1, 1996 1.2.3.4.5.6.7.8.9.3486 1199 1153 1145 1099 none Docket: 50-397 Reporting Period: DECEMBER 1995 Outage+On-line Hours: 744.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons: 10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours Power to which restricted, if any (Net MW,): about 98%for most of December Reasons for restrictions, if any: administrative limit placed on plant operations until special feedwater flow test results were validated, which resulted in about a 2%decrease in power.Revised electrical ratings in the process of beirig re-calculated.
Sincerely,
MONTH YEAR CUMULATIVE 744.0 8,760.0 96,848.2 744.0 6,935.2 69,635.8 0.0 404.5 744.9 744.0 6,682.9 67,250.5 0.0 577.1 958.8 1,866,688 21,194,710 200,457,550 630,470 7,223,980 67,577,480 603,598 6,933,183 64,758,318 100.0%76.3%69.4%100.0%82.9%70.4%73.8%72.5%61.2%70.3%69.8%60.4%0.0%5.0%11.0%0.0 348.6 8,319.7 26.Shutdowns scheduled over the next 6 months (type, date, duration):
    . V; Parrish     (Mail Drop 1023)
27.If currently shutdown, estimated startup date: Refueling, 4/13/96, 55 days NA Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.
Vice President, Nuclear Operations JVP'DGE CC:     LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: DECEMBER 1995 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
INPO ANI Library Utility Data Institute BPA (399)
50-397 WNP-2 January 1, 1996 D.G.Embree (509)377-8448 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 1119 681 697 893 1143 1147 1080 670 676 675 676 673 672 676 679 16 17 18 19 20 21 22 23 24 25 26 27 29 30 31 680 682 680 680 681 682 684 684 685 684 682 870 1151 1154 1156 1158 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly, UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: NOVEMBER 1995 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: January 1, 1996 COMPLETED BY: D.G.Embree TELEPHONE:
I'60ii90ii0 95i23i PDR     ADGCK     05000397 R                       PDR 180073 zptI l1
(509)3774448 No.Date Type Hours-Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-12 12/01/95 S 72.0 H ZZ ZZZZZZ Economic dispatch (load following) at the request of~the BPA.95-13 12/07/95 S 489.9 H NA ZZ ZZZZZZ Economic dispatch (load following) at the request of the BPA.
 
L We (l",ig'";!
 
OPERATING STATUS REPORT for WNP-2 Date:   January 1, 1996
: 1. Docket: 50-397
: 2. Reporting Period: DECEMBER 1995                           Outage   + On-line Hours: 744.0
: 3. Utility
 
==Contact:==
David G. Embree (509) 377-8448
: 4. Licensed Thermal Power (MW, ):                                                           3486
: 5. Nameplate Rating (Gross MW, ):                                                           1199
: 6. Design Electrical Rating (Net MW,):                                                       1153
: 7. Maximum Dependable Capacity (Gross MW,):                                                 1145
: 8. Maximum Dependable Capacity (Net MW, ):                                                   1099
: 9. If changes occur above since last report, give reasons:                                  none
: 10. Power to which restricted, if any (Net MW,):             about 98% for most of December
: 11. Reasons for restrictions, if any:           administrative limit placed on plant operations until special feedwater flow test results were validated, which resulted in about a 2%
decrease in power. Revised electrical ratings in the process of beirig re-calculated.
MONTH               YEAR           CUMULATIVE
: 12. Report Period Hours                              744.0             8,760.0           96,848.2
: 13. Hours Reactor Critical                            744.0             6,935.2           69,635.8
: 14. Rx Reserve Shutdown Hours                            0.0             404.5               744.9
: 15. Hours Generator On-Line                          744.0             6,682.9           67,250.5
: 16. Unit Reserve Shutdown Hours                          0.0             577.1               958.8
: 17. Gross Thermal Energy (MWH)                    1,866,688       21,194,710           200,457,550
: 18. Gross Electrical Energy (MWH)                  630,470         7,223,980           67,577,480
: 19. Net Electrical Energy (MWH)                    603,598         6,933,183           64,758,318
: 20. Unit Service Factor                            100.0%               76.3%               69.4%
: 21. Unit Availability Factor                        100.0%               82.9%               70.4%
: 22. Unit Capacity Factor (MDC Net)                  73.8%               72.5%               61.2%
: 23. Unit Capacity Factor (DER Net)                  70.3%               69.8%               60.4%
: 24. Unit Forced Outage Rate                          0.0%               5.0%               11.0%
: 25. Forced Outage Hours                                  0.0             348.6             8,319.7
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):                 Refueling, 4/13/96, 55 days
: 27. If currently shutdown, estimated startup date:                                             NA Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:       50-397 UNIT:    WNP-2 DATE:    January 1, 1996 COMPLETED BY:        D. G. Embree TELEPHONE:        (509) 377-8448 REPORT PERIOD:            DECEMBER 1995 AVERAGE DAILYPOWER LEVEL                                      AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                               DAY                 (Net MWe) 1119                                   16                    680 681                                   17                    682 697                                   18                    680 893                                   19                    680 1143                                 20                      681 1147                                 21                      682 1080                                 22                      684 670                                 23                      684 676                                 24                      685 10                        675                                 25                      684 676                                 26                      682 12                        673                                 27                      870 13                        672                                                         1151 14                        676                                 29                    1154 679                                 30                     1156 31                     1158 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly,
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:       50-397 UNIT NAME:       WNP-2 DATE:   January 1, 1996 COMPLETED BY:       D.G. Embree TELEPHONE:       (509) 3774448 REPORT PERIOD:      NOVEMBER 1995 No.         Date   Type     Hours   Reason     Method   LER Number       System Component     Cause and Corrective Action To Prevent Recurrence 95-12     12/01/95     S       72.0       H                                       ZZ   ZZZZZZ       Economic dispatch (load following) at the request the BPA.
of ~
95-13     12/07/95     S       489.9       H                       NA             ZZ   ZZZZZZ       Economic dispatch (load following) at the request of the BPA.


==SUMMARY==
==SUMMARY==
: At the beginning of the month, the plant was operating near full power.The plant was placed in economic dispatch goadfollowing) at the request of the BPA for most of the month.The plant returned to full power operation at the end of the month.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG-0161 Exhibits F&H
:               At the beginning of the month, the plant was operating near full power. The plant was placed in economic dispatch goad following) at the request of the BPA for most of the month. The plant returned to full power operation at the end of the month.
'g}}
TYPE                       REASON                                                          METHOD                  SYSTEM & COMPONENT F - Forced                 A - Equipment Failure             E - Operator Training &       1 - Manual              NUREG-0161 Exhibits F & H S - Scheduled              B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration            3 - Auto Scram D - Regulatory Restriction          -
G Operational Error            4 - Continued H - Other                      5 - Reduced Load 9 - Other
 
g}}

Latest revision as of 07:07, 4 February 2020

Monthly Operating Rept for Dec 1995 for WNP-2.W/960111 Ltr
ML17291B194
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1995
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-008, GO2-96-8, NUDOCS 9601190110
Download: ML17291B194 (8)


Text

CATEGORY j.

REGULATORINFORMATION DISTRIBUTION ISTEM (RIDE)

ACCRSSJOk NBR:9601190110 DOC.DATE: 95/12/31 NOTARIZED: NO DOCKET ¹ FACIL 50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.AAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1995 for WNP-2.W/960111 CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

J ENCL L SIZE:

ltr.'ISTRIBUTION NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1 CENTER 1 1 NRR/DRPM/PECB 1 1 RGN4 1 1 EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT,. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBFR OF COPIES REQUIRED: LTTR '9 ENCL '9

V fr

vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George 'Washington Way ~ Richland, Washington 99352 January 11, 1996 G02-96-008 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT DECEMBER 1995 Transmitted herewith is the Monthly Operating Report for the month of December 1995 as required by Technical Specification 6.9.1.6.

Sincerely,

. V; Parrish (Mail Drop 1023)

Vice President, Nuclear Operations JVP'DGE CC: LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399)

I'60ii90ii0 95i23i PDR ADGCK 05000397 R PDR 180073 zptI l1

L We (l",ig'";!

OPERATING STATUS REPORT for WNP-2 Date: January 1, 1996

1. Docket: 50-397
2. Reporting Period: DECEMBER 1995 Outage + On-line Hours: 744.0
3. Utility

Contact:

David G. Embree (509) 377-8448

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity (Gross MW,): 1145
8. Maximum Dependable Capacity (Net MW, ): 1099
9. If changes occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): about 98% for most of December
11. Reasons for restrictions, if any: administrative limit placed on plant operations until special feedwater flow test results were validated, which resulted in about a 2%

decrease in power. Revised electrical ratings in the process of beirig re-calculated.

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 8,760.0 96,848.2
13. Hours Reactor Critical 744.0 6,935.2 69,635.8
14. Rx Reserve Shutdown Hours 0.0 404.5 744.9
15. Hours Generator On-Line 744.0 6,682.9 67,250.5
16. Unit Reserve Shutdown Hours 0.0 577.1 958.8
17. Gross Thermal Energy (MWH) 1,866,688 21,194,710 200,457,550
18. Gross Electrical Energy (MWH) 630,470 7,223,980 67,577,480
19. Net Electrical Energy (MWH) 603,598 6,933,183 64,758,318
20. Unit Service Factor 100.0% 76.3% 69.4%
21. Unit Availability Factor 100.0% 82.9% 70.4%
22. Unit Capacity Factor (MDC Net) 73.8% 72.5% 61.2%
23. Unit Capacity Factor (DER Net) 70.3% 69.8% 60.4%
24. Unit Forced Outage Rate 0.0% 5.0% 11.0%
25. Forced Outage Hours 0.0 348.6 8,319.7
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, 4/13/96, 55 days
27. If currently shutdown, estimated startup date: NA Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: January 1, 1996 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: DECEMBER 1995 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1119 16 680 681 17 682 697 18 680 893 19 680 1143 20 681 1147 21 682 1080 22 684 670 23 684 676 24 685 10 675 25 684 676 26 682 12 673 27 870 13 672 1151 14 676 29 1154 679 30 1156 31 1158 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: January 1, 1996 COMPLETED BY: D.G. Embree TELEPHONE: (509) 3774448 REPORT PERIOD: NOVEMBER 1995 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-12 12/01/95 S 72.0 H ZZ ZZZZZZ Economic dispatch (load following) at the request the BPA.

of ~

95-13 12/07/95 S 489.9 H NA ZZ ZZZZZZ Economic dispatch (load following) at the request of the BPA.

SUMMARY

At the beginning of the month, the plant was operating near full power. The plant was placed in economic dispatch goad following) at the request of the BPA for most of the month. The plant returned to full power operation at the end of the month.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG-0161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

g