Monthly Operating Rept for May 1996 for WNP-2.W/960610 Ltr
ML17292A319
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1996
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-118, NUDOCS 9606180720
Download: ML17292A319 (7)


Text

CATEGORY j.

REGULATO INFORMATION DISTRIBUTION STEM (RIDS) r ACCESSXON"NBR:9606180720 DOC.DATE: 96/05/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1996 for WNP-2.W/960610 ltr DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 RG'ENTER 01 1 1 NRR/DRPM/PECB 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE g J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 993S2-0968 ~ (509) 372-SOOO June 10, 1996 G02-96-118 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT MAY 1996 Transmitted herewith is the Monthly Operating Report for the month of May 1996 as required by Technical Specification 6.9.1.6.

Respectfully, G. O. Smith Plant General Manager (Mail Drop 9270)

GOS:DGE CC: LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA /,399 I

x(pg y e> 0 0 Q 0 9606i80720 960531 PDR ADQCK 05000397 PDFI L(

lt

OPERATING STATUS REPORT for WNP-2 Date: June 1, 1996 Docket: 50-397

2. Reporting Period: MAY 1996 Outage + On-line Hours: 744.0
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, ifany (Net MW,): 0
11. Reasons forrestrictions,'if any: Reserve shutdown and annualrefueling outage.

II MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 3,647.0 100,495.2
13. Hours Reactor Critical 0.0 1,485.1 71,120.9
14. Rx Reserve Shutdown Hours 0.0 985.9 1,730.8
15. Hours Generator On-Line 0.0 1,473.6 68,724.1
16. Unit Reserve Shutdown Hours 0.0 997.4 1,956.2
17. Gross Thermal Energy (MWH) 0 4,425,360 204,882,910
18. Gross Electrical Energy (MWH) 0 1,505,290 69,082,770
19. Net Electrical Energy (MWH) -6,642 1,428,791 66,187,109
20. Unit Service Factor 0.0% 40.4% 68.4%
21. Unit Availability Factor 0.0% 67.8% 70.3%
22. Unit Capacity Factor (MDC Net) 0.0% 35.4% 60.3%

23 ~ Unit Capacity Factor (DER Net) 0.0% 34.0% 59.4%

24. Unit Forced Outage Rate 0.0% 0.0% 10.8%
25. Forced Outage Hours 0.0 0.0 8,319.7
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, 4/13/96, 55 days
27. Ifcurrently shutdown, estimated startup date: June 7, 1996 Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

AVIRAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: June 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: MAY 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe)

-9 16 -8

-9 17 -9

-9 18

-8 19 -7 20 -6

-9 21 -9

-7 22 23

-5 24 -9 10 -6 25

-8 26 -9 12 27 -13 13 -7 28 -13 14 -8 29 -14 15 -8 30 -13 31 -13 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum is used for the net electrical rating of the unit, there may be occasions when the daily average power level dependable'apacity exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

'1 e ~

f l

f II

'5 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WP'-2 DATE: June 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: NIAY 1996 No.

9648 Date 4/13/96 Type S

Hours 744.0 Reason Method LER Number NA System RC Component Cause and Corrective Action To Prevent Recurrence Continuation from previous month - Plant entered annual refueling and maintenance outage (R-11) on April 13, 1996.

t

SUMMARY

The plant continued the annual planned refueling/maintenance outage which began on April 13, 1996.

TYPE REASON METHOD SYSTEM & COMPONENT F Torced

- Scheduled

~A- ilmpment Failure E - Operator Training & I - MIMI G+161 Its & H S B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other