ML17292A476: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY j.REGULARLY INFORMATION DZSTRZBUTIOYSTEM (RIDE)ACCESSIONrNBR:9609230116 DOC.DATE: 96/08/31 NOTARIZED:
{{#Wiki_filter:CATEGORY j.
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITHF'G.O.
REGULARLY INFORMATION DZSTRZBUTIOYSTEM                 (RIDE)
Washington Public Power Supply System RECIP.NAME RECIPIENT.
ACCESSIONrNBR:9609230116             DOC.DATE: 96/08/31     NOTARIZED: NO           DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public           Powe 05000397 AUTH. NAME           AUTHOR AFFILIATION KASKO,B.             Washington Public Power Supply System SMITHF'G.O.         Washington Public Power Supply System RECIP.NAME           RECIPIENT. AFFILIATION
AFFILIATION DOCKET 05000397


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Aug 1996 for WNP-2.W/960912 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)=NOTES: SIZE: E RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME COLBURN,T COPIES LTTR ENCL 1 1 INTERNAL: ACRS CENTER 1 1 1 1 1 1 1 AEOD/SPD/RRAB NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCEFJ H NRC PDR 1 1 1 1 NOAC 1 1 D 0 M NOTE TO ALIi"RIDS" RECIPIENTS:
Monthly operating rept for Aug 1996 for WNP-2.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!i TOTAL NUMBER OF COPIES REQUIRED: LTTR'10,,ENCL'10
W/960912   ltr.
*I 0 a<~8$1 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352-0968
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:
~(509)372-5000 September 12, 1996 G02-96-182 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)=
NOTES:
E RECIPIENT             COPIES          RECIPIENT              COPIES ID CODE/NAME           LTTR ENCL      ID CODE/NAME        LTTR ENCL PD4-2 PD                   1     1     COLBURN,T                 1     1 INTERNAL: ACRS                         1     1     AEOD/SPD/RRAB              1   1 CENTER      1       1     1     NRR/DRPM/PECB             1   1 1     1 EXTERNAL: LITCO BRYCEFJ H             1     1     NOAC                      1   1 NRC PDR                    1     1 D
0 M
NOTE TO ALIi "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
i TOTAL NUMBER OF COPIES REQUIRED: LTTR           '10,,ENCL'10
* I
 
0 a<
        ~ 8 1
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 September 12, 1996 G02-96-182 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT AUGUST 1996 Transmitted herewith is the Monthly Operating Report for the month of August 1996 as required by Technical Specification 6.9;1.6.Respectfully, G.O.Smith Plant General Manager Mail Drop 9270 CC: LJ Callan-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N NS Reynolds-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399 g~9609230i i 6 960832 P PDR ADQCK 05000397 R PDRt 23903' OPERATING STATUS REPORT for WNP-2 Date: September 1, 1996 2.3.4, 5.6.7.8.9.10.11.Outage+On-line Hours: 744.0 3486 1199 1153 1153 1107 none none Docket: 50-397 Reporting Period: AUGUST 1996 Utility Contact: Bernice Kasko (509)377-4473 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 1,665,767 532,550 507,382 100.0%100.0%61.6%59.1%0.0%0.0 YEAR 5,855.0 3,307.8 985.9 3,070.6 997.4 7,804,875 2,563,200 2,424,801 52.4%69.5%37.4%35.9%3.9%123.3 CUMULATIVE 102,703.2 72,943.6 1,730.8 70,321.1 1,956.2 208,262,425 70,140,680 67,183,119 68.5%70.4%59.9%59.0%10.7%8,443.0 26.Shutdowns scheduled over the next 6 months (type, date, duration):
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT AUGUST 1996 Transmitted herewith is the Monthly Operating Report for the month of August 1996 as required by Technical Specification 6.9;1.6.
None 27.If currently shutdown, estimated startup date: Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.
Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 CC:     LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399 g ~
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: AUGUST 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE:
9609230i i6 960832 P PDR     ADQCK 05000397 R                         PDRt 23903'
(509)377M73 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 635 692 694 697 695 691 689 677 666 686 702 682 677 678 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 678 682 686 685 679 683 680 678 677 674 673 668 711 679 669 729 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
r UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: AUGUST 1996 DOCKET NO.: 50-397~UNIT NAME: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE:
OPERATING STATUS REPORT for WNP-2 Date: September 1, 1996 Docket: 50-397
(509)37W473 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None  
: 2. Reporting Period: AUGUST 1996                              Outage   + On-line Hours: 744.0
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473 4,    Licensed Thermal Power (MW, ):                                                             3486
: 5. Nameplate Rating (Gross MW, ):                                                             1199
: 6. Design Electrical Rating (Net MW,):                                                         1153
: 7. Maximum Dependable Capacity - summer (Gross MW,):                                           1153
: 8. Maximum Dependable Capacity - summer (Net MW, ):                                           1107
: 9. Ifchanges  occur above since last report, give reasons:                                   none
: 10. Power to which restricted, if any (Net MW,):                                               none
: 11. Reasons for restrictions, if any:
MONTH                YEAR          CUMULATIVE
: 12. Report Period Hours                              744.0              5,855.0          102,703.2
: 13. Hours Reactor Critical                            744.0              3,307.8          72,943.6
: 14. Rx Reserve Shutdown Hours                          0.0                985.9            1,730.8
: 15. Hours Generator On-Line                           744.0              3,070.6          70,321.1
: 16. Unit Reserve Shutdown Hours                         0.0                997.4            1,956.2
: 17. Gross Thermal Energy (MWH)                   1,665,767            7,804,875        208,262,425
: 18. Gross Electrical Energy (MWH)                 532,550            2,563,200          70,140,680
: 19. Net Electrical Energy (MWH)                   507,382            2,424,801          67,183,119
: 20. Unit Service Factor                            100.0%                 52.4%               68.5%
: 21. Unit Availability Factor                        100.0%               69.5%              70.4%
: 22. Unit Capacity Factor (MDC Net)                  61.6%               37.4%               59.9%
: 23. Unit Capacity Factor (DER Net)                  59.1%               35.9%               59.0%
: 24. Unit Forced Outage Rate                          0.0%                 3.9%              10.7%
: 25. Forced Outage Hours                                0.0                123.3            8,443.0
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):                         None
: 27. Ifcurrently shutdown,     estimated startup date:
Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:              AUGUST 1996 AVERAGE DAILYPOWER LEVEL                                        AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                 DAY                   (Net MWe) 635                                   16                      678 17                     682 692                                    18                     686 694                                    19                     685 697                                  20                       679 695                                  21                       683 691                                  22                       680 689                                  23                       678 677                                  24                       677 10                          666                                  25                       674 686                                  26                       673 12                          702                                  27                       668 13                          682                                  28                       711 14                          677                                  29                       679 15                          678                                   30                      669 31                      729 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
r UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397   ~
UNIT NAME: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 37W473 REPORT PERIOD:      AUGUST 1996 No.         Date   Type     Hours     Reason     Method   LER Number       System Component     Cause and Corrective Action To Prevent Recurrence None


==SUMMARY==
==SUMMARY==
: WNP-2 ramped up to 68%power and held there due to problems encountered during testing of the newly installed ASDs and Digital Feedwater Control Systems.At the end of the month WNP-2 was operating at 69%power and continuing with the ASD and Digital Feedwater test plan.TYPE forced S-Scheduled REASON'AAquipmana Failum B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-01her METHOD anua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT REG-01 1 Extu its&H O.I I~~Y}}
:             WNP-2 ramped up to 68% power and held there due to problems encountered during testing of the newly installed ASDs and Digital Feedwater Control Systems. At the end of the month WNP-2 was operating at 69% power and continuing with the ASD and Digital Feedwater test plan.
TYPE                     REASON                                                          METHOD                  SYSTEM    & COMPONENT forced
                          'AAquipmana Failum                 E - Operator Training &              anua                  REG-01    1 Extu its  &H S  Scheduled            B - Maintenance or Test                   License Examination    2 - Manual Scram C - Refueling                     F - Administration            3 - Auto Scram D - Regulatory Restriction         -
G Operational Error           4 - Continued H - 01her                     5 - Reduced Load 9 - Other
 
O. I I
    ~ ~
Y}}

Latest revision as of 07:03, 4 February 2020

Monthly Operating Rept for Aug 1996 for WNP-2. W/960912 Ltr
ML17292A476
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1996
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-182, NUDOCS 9609230116
Download: ML17292A476 (8)


Text

CATEGORY j.

REGULARLY INFORMATION DZSTRZBUTIOYSTEM (RIDE)

ACCESSIONrNBR:9609230116 DOC.DATE: 96/08/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITHF'G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT. AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1996 for WNP-2.

W/960912 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)=

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 1 NRR/DRPM/PECB 1 1 1 1 EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 M

NOTE TO ALIi "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

i TOTAL NUMBER OF COPIES REQUIRED: LTTR '10,,ENCL'10

  • I

0 a<

~ 8 1

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 September 12, 1996 G02-96-182 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT AUGUST 1996 Transmitted herewith is the Monthly Operating Report for the month of August 1996 as required by Technical Specification 6.9;1.6.

Respectfully, G. O. Smith Plant General Manager Mail Drop 9270 CC: LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399 g ~

9609230i i6 960832 P PDR ADQCK 05000397 R PDRt 23903'

OPERATING STATUS REPORT for WNP-2 Date: September 1, 1996 Docket: 50-397

2. Reporting Period: AUGUST 1996 Outage + On-line Hours: 744.0
3. Utility

Contact:

Bernice Kasko (509) 377-4473 4, Licensed Thermal Power (MW, ): 3486

5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): none
11. Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 5,855.0 102,703.2
13. Hours Reactor Critical 744.0 3,307.8 72,943.6
14. Rx Reserve Shutdown Hours 0.0 985.9 1,730.8
15. Hours Generator On-Line 744.0 3,070.6 70,321.1
16. Unit Reserve Shutdown Hours 0.0 997.4 1,956.2
17. Gross Thermal Energy (MWH) 1,665,767 7,804,875 208,262,425
18. Gross Electrical Energy (MWH) 532,550 2,563,200 70,140,680
19. Net Electrical Energy (MWH) 507,382 2,424,801 67,183,119
20. Unit Service Factor 100.0% 52.4% 68.5%
21. Unit Availability Factor 100.0% 69.5% 70.4%
22. Unit Capacity Factor (MDC Net) 61.6% 37.4% 59.9%
23. Unit Capacity Factor (DER Net) 59.1% 35.9% 59.0%
24. Unit Forced Outage Rate 0.0% 3.9% 10.7%
25. Forced Outage Hours 0.0 123.3 8,443.0
26. Shutdowns scheduled over the next 6 months (type, date, duration): None
27. Ifcurrently shutdown, estimated startup date:

Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: AUGUST 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 635 16 678 17 682 692 18 686 694 19 685 697 20 679 695 21 683 691 22 680 689 23 678 677 24 677 10 666 25 674 686 26 673 12 702 27 668 13 682 28 711 14 677 29 679 15 678 30 669 31 729 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

r UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 ~

UNIT NAME: WNP-2 DATE: September 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 37W473 REPORT PERIOD: AUGUST 1996 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence None

SUMMARY

WNP-2 ramped up to 68% power and held there due to problems encountered during testing of the newly installed ASDs and Digital Feedwater Control Systems. At the end of the month WNP-2 was operating at 69% power and continuing with the ASD and Digital Feedwater test plan.

TYPE REASON METHOD SYSTEM & COMPONENT forced

'AAquipmana Failum E - Operator Training & anua REG-01 1 Extu its &H S Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - 01her 5 - Reduced Load 9 - Other

O. I I

~ ~

Y