ML17292A701: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT INFORMATION DISTRIBUTIONlSTEM (RIDE)~2 A,.(-'j'lMF~PN.N.!R;9702210005 DOC.DATE: 97/01/31 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULAT       INFORMATION DISTRIBUTIONlSTEM       (RIDE)
NO DOCKET.FACll",50-397 WppSS'Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.hAME'UTHOR AFFILIATION
~ 2 A,. (-'j'lMF~PN .N.!R;9702210005         DOC.DATE: 97/01/31     NOTARIZED: NO           DOCKET
'KASKO,B.Washington Public Power Supply System SMITH, G.v.Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
    .FACll",50-397 WppSS'Nuclear Project, Unit 2, Washington Public Powe                 05000397 AUTH.hAME         'UTHOR AFFILIATION
    'KASKO,B.               Washington Public Power Supply System SMITH, G.v.             Washington Public Power Supply System RECIP.NAME               RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Jan 1996 for WNP-2.W/970212 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS ILE OC DBA PAD EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 0 R D N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept for Jan 1996         for WNP-2.W/970212 ltr.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 0  
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR         ENCL     SIZE:
<TW~~'1 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 February 12, 1997 G02-97-026 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT            COPIES            RECIPIENT         COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME     LTTR ENCL PD4-2   PD               1     1     COLBURN,T              1     1 INTERNAL: ACRS                              1     1     AEOD/SPD/RRAB         1    1            0 ILE                      1    1    NRR/DRPM/PECB         1    1 R
OC DBA PAD                1     1     RGN4                  1     1 EXTERNAL: LITCO BRYCE,J H                  1     1     NOAC                  1     1 NRC PDR                  1     1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               11   ENCL     11
 
0
  < TW ~
            '1
    ~
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 February 12, 1997 G02-97-026 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JANUARY 1997 Transmitted herewith is the Monthly Operating Report for the month of January 1997 as required by Technical Specification 6.9.1.6.Respectfully, Plant General Manager Mail Drop 9270 I CC: LJ Callan-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N NS Reynolds-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399...,97022i0005 970i3i",", (PDR t:'ADQCK 05000397 R''-" PDR OPERATING STATUS REPORT for WNP-2 Date: February 1, 1997 2.3.4.5.6.7.8.9.10.Outage+On-line Hours: 744.0 3486 1199 1153 1153 1107 none none Docket: 50-397 Reporting Period: JANUARY 1997 Utility Contact: Bernice Kasko (509)377-4473 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MwH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 744.0 0.0 744.0 0.0 2,024,281 676,994 652,396 100.0%100.0%79.2%76.0%0.0%0.0 YEAR 744.0 744.0 0.0 744.0 0.0 2,024,281 676,994 652,396 100.0%100.0%79.2%76.0%0.0%0.0 CUMULATIVE 106,376.2 76,616.6 1,730.8 73,994.1 1,956.2 219,870,311 74,061,784 70,960,671 69.6%71.4%61.0%60.1%10.2%8,443.0 26.Shutdowns scheduled over the next 6 months (type, date, duration):
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JANUARY 1997 Transmitted herewith is the Monthly Operating Report for the month         of January 1997 as required by Technical Specification 6.9.1.6.
Refueling outage begins 4/18/97, duration is 60 days 27.If currently shutdown, estimated startup date: Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with wei ghted averages.  
Respectfully, Plant General Manager Mail Drop 9270 I
~y f~l AVj~&AGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE:
CC:     LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399
(509)377-4473 REPORT PERIOD: JANUARY 1997 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 1130 1133 1138 1026 1053 1056 1034 985 1015 1032 786 789 1052 1147 961 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 742 761 750 750 749 747 754 749 752 754 754 755 750 750 705 624 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
...,97022i0005             970i3i
UNIT SHUTDOWNS AND POWER REDUCTIONS
",", PDR
*fj REPORT PERIOD: JANUARY 1997 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE:
( R'    t:'ADQCK
(509)377M73 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 97%1 1/11/97 S 0 H 1 N/A ZZ ZZZZZZ Economic dispatch 97-02 1/16/97 S 0 A 1 N/A CB INSTRU RRC pump A failure due to problems with adjustable speed drives  
                '-"         05000397 PDR
 
OPERATING STATUS REPORT for WNP-2 Date: February 1, 1997 Docket: 50-397
: 2. Reporting Period: JANUARY 1997                              Outage   + On-line Hours:     744.0
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Licensed Thermal Power (MW, ):                                                               3486
: 5. Nameplate Rating (Gross MW, ):                                                               1199
: 6. Design Electrical Rating (Net MW,):                                                         1153
: 7. Maximum Dependable Capacity - summer (Gross MW,):                                           1153
: 8. Maximum Dependable Capacity - summer (Net MW, ):                                             1107
: 9. Ifchanges occur above since last report, give reasons:                                       none
: 10. Power to which restricted, if any (Net MW,):                                                 none Reasons for restrictions, ifany:
MONTH                YEAR          CUMULATIVE
: 12. Report Period Hours                                744.0                744.0          106,376.2
: 13. Hours Reactor Critical                            744.0                744.0          76,616.6
: 14. Rx Reserve Shutdown Hours                            0.0                  0.0            1,730.8
: 15. Hours Generator On-Line                           744.0                744.0          73,994.1
: 16. Unit Reserve Shutdown Hours                         0.0                  0.0            1,956.2
: 17. Gross Thermal Energy (MWH)                   2,024,281            2,024,281          219,870,311
: 18. Gross Electrical Energy (MWH)                 676,994              676,994          74,061,784
: 19. Net Electrical Energy (MwH)                   652,396              652,396          70,960,671
: 20. Unit Service Factor                             100.0%                100.0%              69.6%
: 21. Unit Availability Factor                        100.0%                100.0%               71.4%
: 22. Unit Capacity Factor (MDC Net)                  79.2%                 79.2%               61.0%
: 23. Unit Capacity Factor (DER Net)                  76.0%                76.0%              60. 1%
: 24. Unit Forced Outage Rate                            0.0%                0.0%               10.2%
: 25. Forced Outage Hours                                  0.0                   0.0           8,443.0
: 26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/18/97, duration is 60 days
: 27. Ifcurrently shutdown,     estimated startup date:
Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with wei ghted averages.
 
~
y f   ~l                         AVj~&AGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD:             JANUARY 1997 AVERAGE DAILYPOWER LEVEL                                        AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                 DAY                   (Net MWe) 1130                                   16                      742 1133                                   17                      761 1138                                   18                      750 1026                                   19                      750 1053                                   20                      749 1056                                   21                      747 1034                                   22                      754 985                                   23                      749 1015                                   24                      752 10                        1032                                   25                      754 786                                   26                      754 12                        789                                   27                      755 13                        1052                                   28                      750 14                        1147                                   29                      750 15                        961                                   30                       705 31                     624 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.
These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
fj UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:      JANUARY 1997 No.         Date   Type     Hours     Reason     Method     LER Number       System Component       Cause and Corrective Action To Prevent Recurrence 97%1       1/11/97   S         0         H         1           N/A             ZZ   ZZZZZZ       Economic dispatch 97-02     1/16/97   S         0         A         1           N/A             CB   INSTRU       RRC pump A failure due to problems with adjustable speed drives


==SUMMARY==
==SUMMARY==
TYPE forced S-Scheduled REASON AAqluuluana Faiiuna B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD anua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT G%1 1 1tsF&
 
C l 4 gr~1 1'C}}
TYPE                     REASON                                                          METHOD                  SYSTEM    & COMPONENT forced S -
AAqluuluana Faiiuna               E - Operator Training &              anua                      G%1  1      1tsF&
Scheduled            B - Maintenance or Test                   License Examination    2 - Manual Scram C - Refueling                     F - Administration            3 - Auto Scram D - Regulatory Restriction         -
G Operational Error           4 - Continued H - Other                     5 - Reduced Load 9 - Other
 
C l
gr 4   ~1 1
          'C}}

Latest revision as of 07:01, 4 February 2020

Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr
ML17292A701
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-026, GO2-97-26, NUDOCS 9702210005
Download: ML17292A701 (7)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTIONlSTEM (RIDE)

~ 2 A,. (-'j'lMF~PN .N.!R;9702210005 DOC.DATE: 97/01/31 NOTARIZED: NO DOCKET

.FACll",50-397 WppSS'Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.hAME 'UTHOR AFFILIATION

'KASKO,B. Washington Public Power Supply System SMITH, G.v. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1996 for WNP-2.W/970212 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 0 ILE 1 1 NRR/DRPM/PECB 1 1 R

OC DBA PAD 1 1 RGN4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

0

< TW ~

'1

~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 February 12, 1997 G02-97-026 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JANUARY 1997 Transmitted herewith is the Monthly Operating Report for the month of January 1997 as required by Technical Specification 6.9.1.6.

Respectfully, Plant General Manager Mail Drop 9270 I

CC: LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399

...,97022i0005 970i3i

",", PDR

( R' t:'ADQCK

'-" 05000397 PDR

OPERATING STATUS REPORT for WNP-2 Date: February 1, 1997 Docket: 50-397

2. Reporting Period: JANUARY 1997 Outage + On-line Hours: 744.0
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): none Reasons for restrictions, ifany:

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 744.0 106,376.2
13. Hours Reactor Critical 744.0 744.0 76,616.6
14. Rx Reserve Shutdown Hours 0.0 0.0 1,730.8
15. Hours Generator On-Line 744.0 744.0 73,994.1
16. Unit Reserve Shutdown Hours 0.0 0.0 1,956.2
17. Gross Thermal Energy (MWH) 2,024,281 2,024,281 219,870,311
18. Gross Electrical Energy (MWH) 676,994 676,994 74,061,784
19. Net Electrical Energy (MwH) 652,396 652,396 70,960,671
20. Unit Service Factor 100.0% 100.0% 69.6%
21. Unit Availability Factor 100.0% 100.0% 71.4%
22. Unit Capacity Factor (MDC Net) 79.2% 79.2% 61.0%
23. Unit Capacity Factor (DER Net) 76.0% 76.0% 60. 1%
24. Unit Forced Outage Rate 0.0% 0.0% 10.2%
25. Forced Outage Hours 0.0 0.0 8,443.0
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage begins 4/18/97, duration is 60 days
27. Ifcurrently shutdown, estimated startup date:

Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with wei ghted averages.

~

y f ~l AVj~&AGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD: JANUARY 1997 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1130 16 742 1133 17 761 1138 18 750 1026 19 750 1053 20 749 1056 21 747 1034 22 754 985 23 749 1015 24 752 10 1032 25 754 786 26 754 12 789 27 755 13 1052 28 750 14 1147 29 750 15 961 30 705 31 624 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures willbe used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 1009o line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

fj UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: February 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: JANUARY 1997 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 97%1 1/11/97 S 0 H 1 N/A ZZ ZZZZZZ Economic dispatch 97-02 1/16/97 S 0 A 1 N/A CB INSTRU RRC pump A failure due to problems with adjustable speed drives

SUMMARY

TYPE REASON METHOD SYSTEM & COMPONENT forced S -

AAqluuluana Faiiuna E - Operator Training & anua G%1 1 1tsF&

Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

C l

gr 4 ~1 1

'C