ML17292B291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/28/1998
| issue date = 02/28/1998
| title = Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr
| title = Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9803250410 DOC.DATE: 98/02/28 NOTARIZED NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME'UTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.O.
{{#Wiki_filter:CATEGORY 1 REGULA     Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397
ACCESSION NBR:9803250410           DOC.DATE: 98/02/28 NOTARIZED NO                       DOCKET FACIL:50-397     WPPSS   Nuclear Project, Unit 2, Washington Public             Powe   05000397 AUTH.NAME     'UTHOR AFFILIATION KASKO,B.             Washington Public Power Supply System SMITH,G.O.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Feb 1998 for WNP-2.W/980313 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: C A INTERNAL: RECIPIENT ID CODE/NAME PD4-2 PD FILE C RG 4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 E EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D U NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept         for Feb 1998   for WNP-2.W/980313     ltr.           C DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:                   A TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10  
NOTES:
~f WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 March 13, 1998 G02-98-055 Docket No.50-397 U.S: Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
E RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME          LTTR ENCL          ID CODE/NAME         LTTR ENCL PD4-2 PD                 1     1       POSLUSNY,C                1     1 INTERNAL:                            1     1       AEOD/SPD/RRAB             1    1 FILE  C                  1      1      OC/DBA/PAD               1     1 RG 4                      1     1 EXTERNAL: LITCO BRYCE,J H             1     1       NOAC                      1     1 NRC PDR                  1     1 D
U NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
~
f
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 March 13, 1998 G02-98-055 Docket No. 50-397 U. S: Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT FEBRUARY 1998 Transmitted herewith is the Monthly Operating Report for the month of February 1998 as required by Technical Specification 5.6.4.Respectfully, G.O.Smith Plant General Manager Mail Drop 927M CC: EW Merschoff-NRC RIV C Poslusny, Jr.-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399'P8032504i0 980228 i PDR ADQCK 050003'F7 R PDR  
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 1998 Transmitted herewith is the Monthly Operating Report for the month of February 1998 as required by Technical Specification 5.6.4.
~W&(/I<<">>
Respectfully, G. O. Smith Plant General Manager Mail Drop 927M CC:     EW Merschoff - NRC RIV C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399
OPERATING STATUS REPORT for WNP-2 Date: March 1, 1998 2.3.4.5.Docket: 50-397 Reporting Period: FEBRUARY 1998 Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,);1153 1107 6.7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MwH)MONTH 672.0 672.0 0,0 753,683 YEAR 1,416.0 1,416.0 0.0 1,593,223 CUMULATIVE 83,661.3 80,915.0 3,037.5 78,007,080 10.Challenges to safety/relief valves: None IA UNIT SHUTDOWNS a'C DOCKET NO.: 50-397 UNIT NAME: RfP-2 DATE: March I, 1998 COMPLETED BY: B Kasko TELEPHONE:
  'P8032504i0 980228         i PDR     ADQCK   050003'F7 R                       PDR
(509)377~3 REPORT PERIOD: FEBRUARY 199S No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (1)Method (2)Cause and Corrective Action To Prevent Recurrence None  
 
        ~ W&
(/
I
 
OPERATING STATUS REPORT for WNP-2 Date:   March 1, 1998 Docket: 50-397
: 2. Reporting Period: FEBRUARY 1998
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                   1153
: 5. Maximum Dependable Capacity - summer (Net MW,);                       1107 MONTH      YEAR  CUMULATIVE
: 6. Hours Reactor Critical                        672.0    1,416.0  83,661.3
: 7. Hours Generator On-Line                       672.0   1,416.0   80,915.0
: 8. Unit Reserve Shutdown Hours                    0,0        0.0     3,037.5
: 9. Net Electrical Energy (MwH)                753,683  1,593,223  78,007,080
: 10. Challenges to safety/relief valves:                                   None
 
IA a
                                                                                                                                              'C UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: RfP-2 DATE: March I, 1998 COMPLETED BY: B Kasko TELEPHONE: (509)     377~3 REPORT PERIOD:       FEBRUARY 199S Type F: Forced       Duration No.        Date    S: Scheduled     (Hours)     Reason (1) Method (2)             Cause and Corrective Action To Prevent Recurrence None


==SUMMARY==
==SUMMARY==
: At the end of the month WNP-2 was operating at 100%power.1 REASON A-quipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Olher j22METHQD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other 0~~II}}
:                 At the end of the month WNP-2       was operating at 100% power.
1   REASON                                                           j22METHQD A - quipment Failure               E - Operator Training &            1 - Manual B - Maintenance or Test                   License Examination        2 - Manual Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction         G - Operational Error             4 - Continued H - Olher                         5 - Reduced Load 9 - Other
 
0
    ~ ~
II}}

Latest revision as of 06:55, 4 February 2020

Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr
ML17292B291
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1998
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-98-055, GO2-98-55, NUDOCS 9803250410
Download: ML17292B291 (8)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9803250410 DOC.DATE: 98/02/28 NOTARIZED NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME 'UTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1998 for WNP-2.W/980313 ltr. C DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: A TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 FILE C 1 1 OC/DBA/PAD 1 1 RG 4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~

f

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 March 13, 1998 G02-98-055 Docket No. 50-397 U. S: Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 1998 Transmitted herewith is the Monthly Operating Report for the month of February 1998 as required by Technical Specification 5.6.4.

Respectfully, G. O. Smith Plant General Manager Mail Drop 927M CC: EW Merschoff - NRC RIV C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399

'P8032504i0 980228 i PDR ADQCK 050003'F7 R PDR

~ W&

(/

I

OPERATING STATUS REPORT for WNP-2 Date: March 1, 1998 Docket: 50-397

2. Reporting Period: FEBRUARY 1998
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,); 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 672.0 1,416.0 83,661.3
7. Hours Generator On-Line 672.0 1,416.0 80,915.0
8. Unit Reserve Shutdown Hours 0,0 0.0 3,037.5
9. Net Electrical Energy (MwH) 753,683 1,593,223 78,007,080
10. Challenges to safety/relief valves: None

IA a

'C UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: RfP-2 DATE: March I, 1998 COMPLETED BY: B Kasko TELEPHONE: (509) 377~3 REPORT PERIOD: FEBRUARY 199S Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence None

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

1 REASON j22METHQD A - quipment Failure E - Operator Training & 1 - Manual B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Olher 5 - Reduced Load 9 - Other

0

~ ~

II