ML17292B291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/28/1998
| issue date = 02/28/1998
| title = Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr
| title = Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULAYINFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9803250410 DOC.DATE:
{{#Wiki_filter:CATEGORY 1 REGULA      Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
98/02/28NOTARIZED NOFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPoweAUTH.NAME'UTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.
ACCESSION NBR:9803250410           DOC.DATE: 98/02/28 NOTARIZED NO                      DOCKET FACIL:50-397     WPPSS  Nuclear Project, Unit 2, Washington Public              Powe    05000397 AUTH.NAME     'UTHOR AFFILIATION KASKO,B.             Washington Public Power Supply System SMITH,G.O.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION DOCKET05000397


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforFeb1998forWNP-2.W/980313 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:CAINTERNAL:
Monthly operating rept        for  Feb 1998    for WNP-2.W/980313     ltr.           C DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR         ENCL        SIZE:                   A TITLE: Monthly Operating Report (per Tech Specs)
RECIPIENT IDCODE/NAME PD4-2PDFILECRG4COPIESLTTRENCL11111111RECIPIENT IDCODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPIESLTTRENCL111111EEXTERNAL:
NOTES:
LITCOBRYCE,JHNRCPDR1111NOAC11DUNOTETOALL"RIDS"RECIPIENTS:
E RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME         LTTR ENCL          ID CODE/NAME        LTTR ENCL PD4-2 PD                  1      1      POSLUSNY,C               1    1 INTERNAL:                            1      1      AEOD/SPD/RRAB             1    1 FILE  C                  1      1      OC/DBA/PAD               1    1 RG 4                      1      1 EXTERNAL: LITCO BRYCE,J H            1      1      NOAC                      1    1 NRC PDR                  1      1 D
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
U NOTE TO ALL "RIDS" RECIPIENTS:
LTTR10ENCL10
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              10  ENCL    10
~f WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland, Washington 99352-0968 March13,1998G02-98-055 DocketNo.50-397U.S:NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:
 
~
f
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 March 13, 1998 G02-98-055 Docket No. 50-397 U. S: Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTFEBRUARY1998Transmitted herewithistheMonthlyOperating ReportforthemonthofFebruary1998asrequiredbyTechnical Specification 5.6.4.Respectfully, G.O.SmithPlantGeneralManagerMailDrop927MCC:EWMerschoff
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 1998 Transmitted herewith is the Monthly Operating Report for the month of February 1998 as required by Technical Specification 5.6.4.
-NRCRIVCPoslusny, Jr.-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector
Respectfully, G. O. Smith Plant General Manager Mail Drop 927M CC:     EW Merschoff - NRC RIV C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399
-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/399'P8032504i0 980228iPDRADQCK050003'F7 RPDR
  'P8032504i0 980228          i PDR      ADQCK  050003'F7 R                      PDR
~W&(/I<<">>
 
OPERATING STATUSREPORTforWNP-2Date:March1,19982.3.4.5.Docket:50-397Reporting Period:FEBRUARY1998UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,);115311076.7.8.9.HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MwH)MONTH672.0672.00,0753,683YEAR1,416.01,416.00.01,593,223 CUMULATIVE 83,661.380,915.03,037.578,007,080 10.Challenges tosafety/relief valves:None IA UNITSHUTDOWNS a'CDOCKETNO.:50-397UNITNAME:RfP-2DATE:MarchI,1998COMPLETED BY:BKaskoTELEPHONE:
        ~ W&
(509)377~3REPORTPERIOD:FEBRUARY199SNo.DateTypeF:ForcedS:Scheduled Duration(Hours)Reason(1)Method(2)CauseandCorrective ActionToPreventRecurrence NoneSUMMARY:AttheendofthemonthWNP-2wasoperating at100%power.1REASONA-quipmentFailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-Olherj22METHQD 1-Manual2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other 0~~II}}
(/
I
 
OPERATING STATUS REPORT for WNP-2 Date:   March 1, 1998 Docket: 50-397
: 2. Reporting Period: FEBRUARY 1998
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                   1153
: 5. Maximum Dependable Capacity - summer (Net MW,);                       1107 MONTH      YEAR  CUMULATIVE
: 6. Hours Reactor Critical                        672.0    1,416.0  83,661.3
: 7. Hours Generator On-Line                      672.0    1,416.0  80,915.0
: 8. Unit Reserve Shutdown Hours                    0,0        0.0    3,037.5
: 9. Net Electrical Energy (MwH)                753,683  1,593,223 78,007,080
: 10. Challenges to safety/relief valves:                                   None
 
IA a
                                                                                                                                              'C UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: RfP-2 DATE: March I, 1998 COMPLETED BY: B Kasko TELEPHONE: (509)     377~3 REPORT PERIOD:       FEBRUARY 199S Type F: Forced        Duration No.         Date    S: Scheduled     (Hours)     Reason (1) Method (2)             Cause and Corrective Action To Prevent Recurrence None
 
==SUMMARY==
:                 At the end of the month WNP-2      was operating at 100% power.
1  REASON                                                            j22METHQD A - quipment Failure                E - Operator Training &            1 - Manual B  - Maintenance or Test                    License Examination        2 - Manual Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction         G - Operational Error              4 - Continued H - Olher                          5 - Reduced Load 9 - Other
 
0
    ~ ~
II}}

Latest revision as of 06:55, 4 February 2020

Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr
ML17292B291
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1998
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-98-055, GO2-98-55, NUDOCS 9803250410
Download: ML17292B291 (8)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9803250410 DOC.DATE: 98/02/28 NOTARIZED NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME 'UTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Feb 1998 for WNP-2.W/980313 ltr. C DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: A TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 FILE C 1 1 OC/DBA/PAD 1 1 RG 4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

~

f

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 March 13, 1998 G02-98-055 Docket No. 50-397 U. S: Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT FEBRUARY 1998 Transmitted herewith is the Monthly Operating Report for the month of February 1998 as required by Technical Specification 5.6.4.

Respectfully, G. O. Smith Plant General Manager Mail Drop 927M CC: EW Merschoff - NRC RIV C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library UtilityData Institute DL Williams - BPA / 399

'P8032504i0 980228 i PDR ADQCK 050003'F7 R PDR

~ W&

(/

I

OPERATING STATUS REPORT for WNP-2 Date: March 1, 1998 Docket: 50-397

2. Reporting Period: FEBRUARY 1998
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,); 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 672.0 1,416.0 83,661.3
7. Hours Generator On-Line 672.0 1,416.0 80,915.0
8. Unit Reserve Shutdown Hours 0,0 0.0 3,037.5
9. Net Electrical Energy (MwH) 753,683 1,593,223 78,007,080
10. Challenges to safety/relief valves: None

IA a

'C UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: RfP-2 DATE: March I, 1998 COMPLETED BY: B Kasko TELEPHONE: (509) 377~3 REPORT PERIOD: FEBRUARY 199S Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence None

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

1 REASON j22METHQD A - quipment Failure E - Operator Training & 1 - Manual B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Olher 5 - Reduced Load 9 - Other

0

~ ~

II