ML17292B392: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/1998
| issue date = 04/30/1998
| title = Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr
| title = Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULATINFORMATION DISTRIBUTIO YSTEM(RIDS)ACCESSION NBR:9805210250 DOC.DATE:
{{#Wiki_filter:CATEGORY 1 REGULAT        INFORMATION DISTRIBUTIO           YSTEM (RIDS)
98/04/30NOTARIZED:
ACCESSION NBR:9805210250             DOC.DATE: 98/04/30 NOTARIZED: NO                    DOCKET FACXL:50-397   WPPSS    Nuclear Project, Unit 2, Washington Public              Powe    05000397 AUTH.NAMEg   'UTHOR AFFILIATION    Public Power KASKO,B.             Washington                     Supply System SMITH,G.O.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
NOFACXL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPoweAUTH.NAMEg
'UTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION DOCKET05000397


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforApr1998forWNP-2.W/980513 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:C.A1TRECIPIENT IDCODE/NAME PD4-2PDINTERNAL:
Monthly operating rept        for  Apr 1998    for  WNP-2.W/980513     ltr.           C.
ACRSECENTECOPIESLTTRENCL11111111RECIPIENT IDCODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPXESLTTRENCL111111EEXTERNAL:
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR           ENCL        SIZE:                   A TITLE: Monthly Operating Report (per Tech Specs)                                                     1 T
LITCOBRYCE,JHNRCPDR1111NOAC11DENNOTETOALL"RIDS"RECIPIENTS:
NOTES:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPXESREQUIRED:
E RECIPIENT            COPIES            RECIPIENT            COPXES ID CODE/NAME          LTTR ENCL        ID CODE/NAME         LTTR ENCL PD4-2 PD                  1    1      POSLUSNY,C               1      1 INTERNAL: ACRS                        1    1      AEOD/SPD/RRAB             1      1 E CENTE                1    1      OC/DBA/PAD               1      1 1    1 EXTERNAL: LITCO BRYCE,J H              1    1      NOAC                      1      1 NRC PDR                    1    1 D
LTTR10ENCL10 4
E N
WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland, Washington 99352-0968 May13,1998G02-98-083 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:
NOTE TO ALL  "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPXES REQUIRED: LTTR              10    ENCL    10
 
4 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 May 13, 1998 G02-98-083 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTAPRIL1998Transmitted herewithistheMonthlyOperating ReportforthemonthofApril1998asrequiredbyTechnical Specification 5.6.4.PRespectfully, G.O.SmithPlantGeneralManagerMailDrop927Mcc:EWMerschoff
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL 1998 Transmitted herewith is the Monthly Operating Report for the month        of April 1998 as required by Technical Specification 5.6.4.
-NRCRIVCPoslusny, Jr.-NRRKEPerkins,Jr.-NRCRV,WCFONRCSr.ResidentInspector
P Respectfully, G. O. Smith Plant General Manager Mail Drop 927M cc:     EW Merschoff - NRC RIV C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute
-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute
    , DL Williams - BPA / 399
,DLWilliams-BPA/399i4'IAl49805210250 980430PDRADOCK05000397RPDRpUIV Id,~h)
                      'I i4 Al                                  p U I 4                                                        V 9805210250 980430 PDR      ADOCK 05000397 R                      PDR
OPERATING STATUSREPORTforWNP-2Date:May1,19982.3.45.Docket:50-397Reporting Period:APRIL1998UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,):115311076.7.8.9.HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MwH)MON'TH415.1~409.50.0446,168YEAR2,396.02,352.50,02,570,429 CUMULATIVE 84,641.381,851.53,037.578,984,286 10.Challenges tosafety/relief valves:Seeattachedtable 4ha'I'IIIIIIP4IIII'fiII~h,t~~lh UNITSHUTDOWNS REPORTPERIOD:APRIL1998DOCKETNO.:55-397UNITNAME:WNP-2DATE:May1,1998COMPLETED BY:BKaskoTELEPHONE:
 
(509)377M73No.DateTypeF:ForcedS:Scheduled Duration(Hours)Reason(1)Method(2)CauseandCorrective ActionToPreventRecurrence 98-024/17/98309.5Plantenteredannualrefueling andmaintenance outage(R-13)onApril17,1998SUMMARY:Theplantenteredtheannualplannedrefueling/maintenance outageonApril17,19981REASONA-utpmentFailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-Other2METHOD1-Man2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other 10f~k'Mlh3"4It4c"-LEl~w%4P,II't COMPONENT 0SRVCHALLENGES DATETYPEREASONCOMMENTSMS-RV-1AMS-RV-1CMS-RV-2CMS-RV-2DMS-RV-3AMS-RV-3DMS-RV-4AMS-RV-4CMS-RV-4DMS-RV-5CMS-RV-1BMS-RV-1DMS-RV-3CMS-RV-4B4/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/984/18/98BBBBBBBBBBBBBBBCCCCCCCCCCCCTestingperformed atapproximately 25%power,as-foundsetpressures werewithintolerance SameasaboveSameasaboveSameasaboveSameasaboveSameasaboveSameasaboveSameasaboveSameasaboveSameasaboveTestingperformed atapproximately 25%power,as-foundsetpressures werenotwithintolerance butotherwise strokedasexpected.
I d , ~
TheseSRVsarebeingreplacedandwillberefurbished andretestedSameasaboveSameasaboveSameasaboveeofActuation A=Automatic B=RemoteManualC=SpringReasonA=Overpressure B=ADSorothersafetyC=TestD=Inadvertent (Accidental/Spurious)
h)
E=ManualReliefTherewerenootherSRVchallenges duringtheperiod.  
 
'09r+4'L4'>>CgPg'I'Jk*kTib,}}
OPERATING STATUS REPORT for WNP-2 Date:   May 1, 1998 Docket: 50-397
: 2. Reporting Period: APRIL 1998
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473 4  Design Electrical Rating (Net MW,):                                           1153
: 5. Maximum Dependable Capacity - summer (Net MW,):                               1107 MON'TH      YEAR          CUMULATIVE
: 6. Hours Reactor Critical                        415.1 ~
2,396.0          84,641.3
: 7. Hours Generator On-Line                      409.5      2,352.5          81,851.5
: 8. Unit Reserve Shutdown Hours                    0.0          0,0            3,037.5
: 9. Net Electrical Energy (MwH)                446,168    2,570,429         78,984,286
: 10. Challenges to safety/relief valves:                             See attached table
 
                          'I'I 4
II h  II a        IP 4
II  II' fi II lh
      ~   h, t~~
 
UNIT SHUTDOWNS DOCKET NO.: 55-397 UNIT NAME: WNP-2 DATE: May 1,1998 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:        APRIL 1998 Type F: Forced        Duration No.       Date      S: Scheduled     (Hours)     Reason (1) Method (2)               Cause and Corrective Action To Prevent Recurrence 98-02      4/17/98                      309.5                              Plant entered annual refueling and maintenance outage (R-13) on April 17, 1998
 
==SUMMARY==
:                 The plant entered the annual planned refueling/maintenance outage on April 17, 1998 1  REASON                                                            2 METHOD A-     utpment Failure              E - Operator Training &          1- Man B - Maintenance or Test                      License Examination      2 - Manual Scram C - Refueling                       F - Administration              3 - Auto Scram D - Regulatory Restriction           G - Operational Error            4 - Continued H - Other                        5 - Reduced Load 9 - Other
 
1 0 f ~
k'   M lh c"- t4 3 "4I L
E l w %4P
                        ~
                                          ,II t
 
0          SRV CHALLENGES COMPONENT             DATE        TYPE        REASON                        COMMENTS MS-RV-1A              4/18/98        B                      Testing performed at approximately 25%
power, as-found set pressures were within tolerance MS-RV-1C              4/18/98        B          C          Same as above MS-RV-2C              4/18/98        B          C          Same as above MS-RV-2D              4/18/98        B          C          Same as above MS-RV-3A              4/18/98        B          C          Same as above MS-RV-3D              4/18/98        B          C          Same as above MS-RV-4A              4/18/98        B          C          Same as above MS-RV-4C              4/18/98        B          C          Same as above MS-RV-4D              4/18/98        B            C          Same as above MS-RV-5C              4/18/98        B            C          Same as above B
MS-RV-1B              4/18/98        B                      Testing performed at approximately 25%
power, as-found set pressures were not within tolerance but otherwise stroked as expected. These SRVs are being replaced and will be refurbished and retested MS-RV-1D              4/18/98        B            C          Same as above MS-RV-3C              4/18/98        B            C          Same as above MS-RV-4B              4/18/98        B            C          Same as above e of Actuation                        Reason
  =
A Automatic                              A = Overpressure B = Remote Manual                        B  = ADS or other safety C = Spring                              C  = Test D = Inadvertent (Accidental/Spurious)
E = Manual Relief There were no other SRV challenges during the period.
 
0 9          r+
4
                                      'L 4'>>
C g P
g'I
                                  'J k
k T
ib,}}

Latest revision as of 06:54, 4 February 2020

Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr
ML17292B392
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1998
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-98-083, GO2-98-83, NUDOCS 9805210250
Download: ML17292B392 (10)


Text

CATEGORY 1 REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9805210250 DOC.DATE: 98/04/30 NOTARIZED: NO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAMEg 'UTHOR AFFILIATION Public Power KASKO,B. Washington Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Apr 1998 for WNP-2.W/980513 ltr. C.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: A TITLE: Monthly Operating Report (per Tech Specs) 1 T

NOTES:

E RECIPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 E CENTE 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPXES REQUIRED: LTTR 10 ENCL 10

4 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 May 13, 1998 G02-98-083 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL 1998 Transmitted herewith is the Monthly Operating Report for the month of April 1998 as required by Technical Specification 5.6.4.

P Respectfully, G. O. Smith Plant General Manager Mail Drop 927M cc: EW Merschoff - NRC RIV C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute

, DL Williams - BPA / 399

'I i4 Al p U I 4 V 9805210250 980430 PDR ADOCK 05000397 R PDR

I d , ~

h)

OPERATING STATUS REPORT for WNP-2 Date: May 1, 1998 Docket: 50-397

2. Reporting Period: APRIL 1998
3. Utility

Contact:

Bernice Kasko (509) 377-4473 4 Design Electrical Rating (Net MW,): 1153

5. Maximum Dependable Capacity - summer (Net MW,): 1107 MON'TH YEAR CUMULATIVE
6. Hours Reactor Critical 415.1 ~

2,396.0 84,641.3

7. Hours Generator On-Line 409.5 2,352.5 81,851.5
8. Unit Reserve Shutdown Hours 0.0 0,0 3,037.5
9. Net Electrical Energy (MwH) 446,168 2,570,429 78,984,286
10. Challenges to safety/relief valves: See attached table

'I'I 4

II h II a IP 4

II II' fi II lh

~ h, t~~

UNIT SHUTDOWNS DOCKET NO.: 55-397 UNIT NAME: WNP-2 DATE: May 1,1998 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: APRIL 1998 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence 98-02 4/17/98 309.5 Plant entered annual refueling and maintenance outage (R-13) on April 17, 1998

SUMMARY

The plant entered the annual planned refueling/maintenance outage on April 17, 1998 1 REASON 2 METHOD A- utpment Failure E - Operator Training & 1- Man B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

1 0 f ~

k' M lh c"- t4 3 "4I L

E l w %4P

~

,II t

0 SRV CHALLENGES COMPONENT DATE TYPE REASON COMMENTS MS-RV-1A 4/18/98 B Testing performed at approximately 25%

power, as-found set pressures were within tolerance MS-RV-1C 4/18/98 B C Same as above MS-RV-2C 4/18/98 B C Same as above MS-RV-2D 4/18/98 B C Same as above MS-RV-3A 4/18/98 B C Same as above MS-RV-3D 4/18/98 B C Same as above MS-RV-4A 4/18/98 B C Same as above MS-RV-4C 4/18/98 B C Same as above MS-RV-4D 4/18/98 B C Same as above MS-RV-5C 4/18/98 B C Same as above B

MS-RV-1B 4/18/98 B Testing performed at approximately 25%

power, as-found set pressures were not within tolerance but otherwise stroked as expected. These SRVs are being replaced and will be refurbished and retested MS-RV-1D 4/18/98 B C Same as above MS-RV-3C 4/18/98 B C Same as above MS-RV-4B 4/18/98 B C Same as above e of Actuation Reason

=

A Automatic A = Overpressure B = Remote Manual B = ADS or other safety C = Spring C = Test D = Inadvertent (Accidental/Spurious)

E = Manual Relief There were no other SRV challenges during the period.

0 9 r+

4

'L 4'>>

C g P

g'I

'J k

k T

ib,