{{#Wiki_filter:~~~~~4~)t r W4 P I~~R PALO YERDE NUCLEAR GEi JERATlNG STATION MANUAL VENTDfG THE CHARGIiNG PUi'IPS PROCEDURE NO.42AO-2ZZSO REVISION Page 2 of 9 REVISION.HISTORY Rev.No.Date Revised Pages Comments U dated Revision Histor P Rewrote ste s 2.2 thru 2.2.2.4 to ensure ravit flow ath available Added caution before ste 2.4.1 and rewrote 2.4.1.Added ste s 2.14 and 2.15.'mis ooo aev.sisz(essa)  
{{#Wiki_filter:~ ~ ~
.~I(
  ~ ~ 4
Lg PALO VERDE NUCLEAR GENERATtNG
        ~ ) t r W4
~STATlON MANUAL VENTING THE CHARGING PUiIPS PROCEDURE NO.42AO-2ZZ50 REVISION Page 3 of 9 OBJECTIVE This procedure provides instructions on venting hydrogen gas from the Charging Pumps in the event they should become gas bound and cannot provide makeup flov to the RCS.The Refueling Water Tank is used to provide the head for the venting operation.
 
TABLE OF CONTENTS SECTION PAGE NmIBER e 1.0 VERIFICATION OF CHARGING PUHP GAS BINDING 2.0 VENTING OPERATIONS APPENDICES Appendix A-References PV218 00D REV.8/82 (i85P)  
P I ~ ~
'.."'': ''FG&IMFORMATION NLY PALO VERDE NUCLEAR GENERATING STATION MANUAL s>VENTING THE CHARGING PUHPS PROCEOURE NO.42AO-2ZZ50 REVISION Page 4 of 9 1.0 VERIFICATION OF CHARGING PUNP GAS BINDING Charging Pumps are incapable of pumping even when the valve lineup has been determined to be correct.1.2 The level in the Volume Control Tank is suspected of having dropped to near OX prior to the Charging Pumps becoming gas bound.1.3 Possible level deviation between the VCT level transmitters CH-LT-226 and CH-LT-227.
R PROCEDURE PALO YERDE NUCLEAR GEi JERATlNG                 NO.
2.0 VENTING OPERATIONS e 2.1 Place all Charging Pumps in the pull-to-lock position with their handswitches on B03.2.2 Provide a gravity flow path from the RMT to the Charging Pump Suctions as follows: 2.2.1 If VCT outlet valve CH-UV-501 can be verified closed, open CH-HV-536 on B03.OR 2.2.2 If VCT outlet valve CH-UV-501 cannot be verified closed perform the following line up.2.2.2.1 2.2.2.2 In Charging Pump room gl, close suction valve CH-V316 and open suction cross-tie valve CH-V755.In Charging Pump room jr2, close suction valve CH-V319'and open suction cross-tie valve CH-V756.2.2.2.3 In Charging Pump room g3, close suction vlave CH"V322 and open suction crosstie valve CH-V757.2.2.2.4 In the East Penetration room, open the Safety Injection header isolation to Charging Pump suction, valve CH-V327.PV218 000 AEV, 8/b2 (485P)  
STATION MANUAL                     42AO-2ZZSO REVISION VENTDfG THE CHARGIiNG PUi'IPS                                     Page 2 of 9 REVISION. HISTORY Rev. No.             Date     Revised Pages                   Comments U dated Revision Histor     P Rewrote ste s 2.2   thru 2.2.2.4 to ensure     ravit flow ath available Added   caution before ste 2.4.1 and rewrote 2.4.1.
~~0~~~~~~~I'I I~~~s~~~~~~~~~~~~~I~~~~~~~I I I~~~~~~ll~~4~~I I~~~~I~~'~~~~~S 0~4~~~~ll~I~~'~I'I~~~I I~~~~'~~'~~~~'~~~~~~~~~  
Added ste s 2.14 and 2.15.
~~~~~~~~~~'~S~0~~'~~~~~~~~~'''r~~~~~I~.~S~~~~~~I~.:~~~~~~~~~~~~~~~~~I~1~~~~~~~~~~~~~~~~~~S~~~S II~~~~~~I~~
      'mis ooo aev.sisz(essa)
0 t FGNFGRMATIGNNLY PALO VERDE NUCLEAR GENERATING STATION MANUAL VENTING THE CHARGING PUMPS PROCEDURE NO.42AO-2ZZ50 RF VISION Page 7 of 9 2.8.7 If venting of the charging pumps is complete, then proceed to~step 2.11.2.9 To vent CHB-P01, perform the following:
 
2.9.1 Close/Check Closed valves CH-V320, CH-V332 and CH-VY74.2.9.2 Open CH-V067.2.9.3 Begin venting operations by opening CH-VY73.Verify flow on flow gage CH-FG-998.
  ~
2.9.4 When venting is complete close CH-VY73 and CH-V067.2.9.5 Ensure all gases are vented from the pump byopening discharge drain isolation valve CH-V332.Check for flow on flow gage CH-FG-1002.
I(
2.9.6 When venting is complete, close valve CH-V332.2.9.7 If venting of the charging pumps is complete, then proceed to step 2.11.2.10 To vent CHE-P01, perform the following:
 
2.10.1 Close/Check Closed valves CH-V323, CH-V336 and CH-VY72.2.10.2 Open CH-V065.2.10.3 Begin venting operations by opening CH-VY71.Verify flow on flow gage CH-FG-997.
Lg PROCEDURE PALO VERDE NUCLEAR GENERATtNG                         NO.
2.10.4 When venting is complete close CH-VY71 and CH-V065.F 10.5 Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V336.Check for flow on flow gage CH-FG-1001.
                          ~
2.10.6 When venting is complete, close valve CH-V336.2.10.7 If venting of the charging pumps is complete, then proceed to step 2..11.2.11 Open valve CH-VY77."""'"'"'""" FQIR IIIMFGIRMATIIQN GIMLY
STATlON MANUAL                     42AO-2ZZ50 REVISION VENTING THE CHARGING PUiIPS                                     Page 3 of 9 OBJECTIVE This procedure provides instructions on venting hydrogen gas from the Charging Pumps in the event they should become gas bound and cannot provide makeup flov to the RCS. The Refueling Water Tank is used to provide the head for the venting operation.
~~~~~~~~~~~~~~~I'~S Io-~~~~I~I i le~~I I I~~~~~~I'~S~~~:~~~
TABLE OF CONTENTS SECTION                                                           PAGE NmIBER e
1.0     VERIFICATION OF CHARGING PUHP GAS BINDING 2.0     VENTING OPERATIONS APPENDICES Appendix           A - References PV218 00D REV. 8/82 (i85P)
 
    '.." '': ''FG&IMFORMATION                                         NLY PROCEOURE PALO VERDE NUCLEAR GENERATING                                   NO.
STATION MANUAL                                 42AO-2ZZ50 s>
REVISION VENTING THE CHARGING PUHPS                                                   Page 4 of 9 1.0         VERIFICATION OF CHARGING PUNP     GAS BINDING Charging   Pumps are incapable of pumping even     when the valve lineup has been determined to be correct.
1.2     The   level in the Volume Control Tank is suspected of having dropped   to near OX prior to the Charging Pumps becoming gas bound.
1.3     Possible level deviation between the       VCT level transmitters CH-LT-226 and CH-LT-227.
2.0         VENTING OPERATIONS e
2.1       Place all Charging Pumps     in the pull-to-lock position with their handswitches on B03.
2.2       Provide a gravity flow path from the       RMT to the Charging Pump Suctions as follows:
2.2.1     If VCT outlet   valve CH-UV-501 can be verified closed, open CH-HV-536 on B03.
OR 2.2.2     If VCT outlet   valve CH-UV-501 cannot be verified closed perform the following   line up.
2.2.2.1     In Charging Pump room gl, close suction valve     CH-V316 and open suction cross-tie valve CH-V755.
2.2.2.2      In Charging Pump room jr2, close suction valve     CH-V319 'and open suction cross-tie valve CH-V756.
2.2.2.3     In Charging Pump room g3, close suction vlave     CH"V322 and open suction crosstie valve CH-V757.
2.2.2.4     In the East Penetration room, open the Safety Injection header isolation to Charging Pump suction, valve CH-V327.
PV218 000 AEV, 8/b2 (485P)
 
~         0
        ~   ~
                    ~ ~         ~     ~
                                    ~   ~                 I '             I   I~   ~     ~   s             ~
                                                                                                                      ~       ~
                                  ~ ~                                                           ~       ~
                ~ ~                                                                   ~ ~       ~   ~               I~
              ~ ~
                                                            ~
                                                          ~
                                    ~   ~                             I     I   I ~ ~     ~
                                ~ ~                                                             ~ ll     ~
                ~ 4                                                                   ~ ~                         I     I ~
              ~ ~
                                          ~   I                                   ~ ~     '       ~
                                      ~       ~       ~ ~   S                                                 0 ~       4   ~
                          ~ ~ ~
                                                        ~     ~
                                                                  '                ~         I' ll    ~         I I~                                           ~   ~                         II      ~   ~ ~
                        ~   '
                                                                    ~   ~ '   ~           ~ ~
                                              ~ '   ~
                                      ~     ~     ~           ~       ~
  ~ ~ ~
 
~   ~   ~
            ~       ~
                                                                                                            ~   ~
                                                          ~       ~           ~ '
                                                                      ~   S       ~     0
                                                        ~ ~   '           ~
                                              ~     ~   ~                                       ~ ~
                                  ~ ~     ~     '     '     '         r
                                                                                    ~     ~
                                                        ~ ~             ~
I ~ .     ~
S     ~
                                                        ~             ~
                                                                                      ~       ~ ~
I~   .: ~
                                                                                ~       ~     ~   ~
                                                          ~     ~
                      ~   ~     ~   ~                                               ~   ~
                                      ~   ~       ~ ~                       I
                                            ~   1         ~       ~
                                                                                            ~
                                      ~     ~                                                       ~
                                      ~ ~                       ~   ~                                           ~   ~
                                            ~ ~
                                                                                  ~     ~   ~     ~
S     ~                                                                        ~    ~
                        ~   ~ S             II
          ~ ~                               ~ ~
I~ ~
 
0 t
 
FGNFGRMATIGNNLY PROCEDURE PALO VERDE NUCLEAR GENERATING                     NO.
STATION MANUAL                               42AO-2ZZ50 RF VISION VENTING THE CHARGING PUMPS                                          Page 7 of 9 2.8.7     If venting of the charging pumps   is complete, then proceed   to
                    ~ step 2. 11.
2.9   To vent CHB-P01, perform   the following:
2.9.1     Close/Check Closed valves CH-V320, CH-V332 and CH-VY74.
2.9.2     Open CH-V067.
2.9.3     Begin venting operations by opening CH-VY73. Verify flow   on flow gage CH-FG-998.
2.9.4     When venting is complete close   CH-VY73 and CH-V067.
2.9.5     Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V332. Check for flow on flow gage CH-FG-1002.
2.9.6     When venting is complete, close valve CH-V332.
2.9.7     If venting of the charging pumps   is complete, then proceed to step 2.11.
2.10   To vent CHE-P01, perform   the following:
2.10.1     Close/Check Closed valves CH-V323, CH-V336 and CH-VY72.
2.10.2     Open CH-V065.
2.10.3   Begin venting operations by opening CH-VY71. Verify flow   on flow gage CH-FG-997.
2.10.4   When venting is complete close   CH-VY71 and CH-V065.
F 10.5   Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V336. Check for flow on flow gage CH-FG-1001.
2.10.6   When venting is complete, close valve CH-V336.
2.10.7     If venting of the charging pumps   is complete, then proceed to step 2..11.
2.11   Open valve CH-VY77.
FQIR IIIMFGIRMATIIQNGIMLY
 
~ ~ ~
      ~
              ~
                          ~     ~
                                ~ ~
                                    ~     ~       ~ ~
            ~ ~
                                    ~ S   Io-I    '
            ~ ~                 ~ ~
I ~
I       i     le
          ~
      ~
I   I       I
                    ~ ~
      ~   ~                 ~ ~
I'                   ~   S ~ ~ ~:   ~
                                                          ~ ~
 
I E'
I E'
::":"""": FGI INFQRMATIQNNLY I PALO VERDE NUCLEAR GENERATING STATION MANUAL F 4~y VENTING THE CHARGING PUMPS PROCEDURE NO.42AO-2ZZ50 REVISION APPENDIX A Page 1 of 1 Page 9 of 9 REFERENCES 1~0 Implementing 420P-2CH01, CVCS Normal Operations 2.0 Developmental 2.1 NUREG 0857 Supplement 9, Dec.1985.2.2 DCP 20N-CH-226.
2.3 P&ID's: 02-M-CHP-002, Rev 4-02-M-CHP-003, Rev 3-DCN's 15, 24, 30, 113, 121, 124 DCN's 19, 20, 33, 36, 42, 46, 124, 129, 130, 134, 136, 146, 148, 149.
Attachment 3 0 erations Procedure for Ventin of the Char in Pum s (42AO-2ZZ50 Revision 2)


PALO VERDE NUCLEAR GENERATING STATION MANUAL VENTIANG THE CHARGING PUMPS PROCEDURE NO.A2AO-2ZZ50 REVISION Page 1 of 9 DEPT.HEAD PRB/PRG/TRRG REVIEW APPROVED BY'FFECTIVE DATE~</PG DN-5526C/0765C DATE'2-r d DATE DATE.>>(>Pi'~omsosec sho22~pgR ADOCK 05000529 P PDR PV21840D RFV.8/52 (985P)
I FGI INFQRMATIQNNLY PROCEDURE PALO VERDE NUCLEAR GENERATING                         NO.              APPENDIX A STATION MANUAL                               42AO-2ZZ50  Page  1 of 1 F
PALO VERDE NUCLEAR GENERATING STATION MANUAL PROCEDURE NO.42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 2 of 9 REVISION HISTORY Rev.No.Date 2-13-86 Revised Pages Comments U dated Revision Histor P'.Rewrote ste s 2.2 thru 2.2.2.4 to ensure ravit flow ath available Added caution before sten 2.4.1 and rewrote 2.4.1.Added steos 2.14 and 2.15.Added ste 2.7.1 and deleted note Added note and added ste 2.12 PV215400 REV.8/82 (985P)
4                                    REVISION
PALO VERDE NUCLEAR GENERATING STATION MANUAL VENTING THE CHARGING PUMPS PROCEDURE NO..42AO-2ZZ50 REVISION Page 3 of 9 OB JECTIVE This procedure provides instructions on venting hydrogen gas from the Charging Pumps in the event they should become gas bound and cannot provide makeup flowto the RCS.The Refueling Vater Tank is used to provide the head for the venting operation.
              ~ y VENTING THE CHARGING PUMPS                                           Page of 9 REFERENCES 1 ~ 0      Implementing 420P-2CH01,  CVCS Normal Operations 2.0        Developmental 2.1      NUREG  0857 Supplement 9, Dec. 1985.
~" TABLE OF CONTENTS SECTION , 1.0 VERIFICATION OF CHARGING PUMP GAS BINDING 2.0 VENTING OPERATIONS PAGE NUMBER APPENDICES Appendix A-Rererences 1~9 PALO YERDE NUGLEAR GENERATING STATION MANUAL VENTING THE CHARGING PUMPS PROCEDURE NO.,42AO-2ZZ50 REVISION Page 4 of 9 1.0 VERIFICATION OF CHARGING PUMP GAS BINDING 1.2 Charging Pumps are incapable of pumping even when the valve lineup has been determined to be correct.The level in the Volume Control Tank is suspected of having dropped to near OX prior to the Charging Pumps becoming gas bound: 1.3 Possible level deviation between the VCT level transmitters CH-LT-226 and CH-LT-227.
2.2      DCP 20N-CH-226.
2.0 VENTING OPERATIONS 2.1 Place all Charging Pumps in the pull-to-lock position with their handswitches on B03.2.2 Provide a gravity flow path from the RVT to the Charging Pump Suctions as follows: 2.2.1 If VCT outlet valve CH-UV-501 can be verified closed, open CH-HV-536 on B03.OR 2.2.2 If VCT outlet valve CH-UV-501 cannot be verified closed perform the following line up.2.2.2.1 In Charging Pump room P/'1, close suction valve CH-V316 and open suction cross-tie valve CH-V755.2.2.2.2 In Charging Pump room/<2, close suction va'lve CH-V319 and open suction cross-tie valve CH-V756.2.2.2.3 In Charging Pump room,",3, close suction vlave CH-V322 and open suction crosstie valve CH-V757.2.2.2.4 In the East Penetration room, open the Safety Injection header isolation to Charging Pump suction, valve CH-V327..PV21840D REV.8/N (98SP)
2.3      P & ID's:
~g~~~I~~~~~~I'I I~~~-'~I II~~~~0~~~~5 I~.I I'~I~~~I I I I I~~~I~~~~~5 II~I: I~~II~0~~~II~~~~~~0~~~~'II~I~~I I~~~~5~~~~~~~~~~I~~~5~I~~
02-M-CHP-002, Rev  4-  DCN's 15, 24, 30, 113, 121, 124 02-M-CHP-003, Rev  3-  DCN's 19, 20, 33, 36, 42, 46, 124, 129, 130, 134, 136, 146, 148, 149.
PALO VERDE NUCLEAR GENERATING STAT(ON MANUAL PROCEDURE NO..42AO-2ZZ50 REVISION VENTING THE CHARGING PUHPS Page 6 of 9 2.7 Establish communications between the Control Room, the Nuclear Operator at the Charging Pumps and the Nuclear Operator at the vent receiving tank.2.7.1 During the venting operation, the Nuclear Operator at the vent receiver tank should try to maintain the level in the tank at approximately 50%.This is accomplished by throttling open the vent receiver tank drain valve, CH-VY-80, and throttling closed the vent receiver tank inlet valve, CH-VY-78, as necessary.
 
If the level in the vent receiver tank should increase above 75<o', the Operator at the tank should stop the venting process by closing inlet valve, CH-VY-78, and then informing the Operator at the Charging Pumps that venting has been momentarily stopped.When the tank level has been lowered.sufficiently, venting should be resumed by reopening inlet valve, CH-VY-78, and informing the Operator at the Charging Pumps.Perform vented.proceed vented, NOTE step 2.8 if CHA-P01 is the pump to'be If CHB-P01 is to be vented, then to step 2.9.If CHE-P01 is to be then proceed to step 2.10.Venting of the charging pumps will be complete when the local flow gages indicate solid flow and level in the vent receiving tank increases.
Attachment 3 0 erations Procedure for Ventin of the Char in Pum s (42AO-2ZZ50 Revision 2)
2.8, To vent CHA-P01, perform the following:
 
2.8.1 Close/check closed valves CH-V317., CH-V329 and CH-VY76.2.8.2 2.8.3 Open CH-V069.I'egin venting operations by opening CH-VY75.Veri:fy flow on flow gage CH-FG-999.
PROCEDURE PALO VERDE NUCLEAR GENERATING             NO.
2.8.4 When venting is complete close CH-VY75 and CH-V069.2.8.5 Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V329.Check for flow on=-flow gage CH-FG-1003.
STATION MANUAL           A2AO-2ZZ50 REVISION VENTIANG THE CHARGING PUMPS                   Page 1 of             9 DEPT. HEAD                                    DATE  '2- r      d PRB/PRG/TRRG REVIEW                            DATE APPROVED BY                                    DATE.  > >(
PALO VERDE NUCLEAR GENERATING STATION MANUAL VENTING THE CHARGING PU.'lPS PROCEDURE NO.42AO-2ZZ50 REVISlON Page 7 of 9 2.8.6 When venting is complete, close valve CH-V329.2.8.7 If venting of the charging pumps is complete, then proceed to step F 11.2.9 To vent, CHB>>P01, perform the following:
      'FFECTIVE          DATE ~   </PG                                  >Pi'~omsosec sho22~
2.9.1 Close/Check Closed valves CH-V320, CH-V332 and CH-VY74.2.9.2 Open CH-V067.2.9.3 Begin venting operations by opening CH-VY73.Verify flow on flow gage CH-FG-998.
DN-5526C/0765C                      pgR    ADOCK  05000529 P                  PDR PV21840D RFV. 8/52 (985P)
2.9.4 When venting is complete close CH-VY73 and CH-V067.2.9.5 Ensure all gases are vented" from the pump by opening discharge drain isolat,ion valve CH-V332.Check for flow on flow gage CH-FG-1002.
 
'.9.6 When venting is complete, close valve CH-V332.2:9.7 If venting of the charging pumps is complete, then proceed to step 2.11.2.10 To vent CHE-P01, perform the following 2.10.1 ClosejCheck Closed valves CH-V323, CH-V336 and CH-VY72.2.10.2 Open CH-V065.2.10.3 Begin venting operations by opening CH-VY71.Verify flow on flow gage CH-FG-997.
PALO VERDE NUCLEAR GENERATING                        PROCEDURE NO.
2.10.4 When venting is complete close CH-VY71 and CH-V065.~2.10.5 Ensure all gases are vented from the pump by opening discharge drain isolat,ion valve CH-V336.Check for flow on flow gage CH-FG-1001.
STATION MANUAL                      42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS                                   Page of 9 REVISION HISTORY Rev. No.                Date      Revised Pages                  Comments 2-13-86                        U  dated Revision Histor      P '.
2.10.6 When'venting is complete, close valve CH-V336.2.10.7 If venting of the charging pumps is complete, then proceed-to
Rewrote ste s 2.2 thru 2.2.2.4 to ensure      ravit flow ath available Added  caution before sten 2.4.1 and rewrote 2.4.1.
.'tep 2.11.2.11 Open valve CH-VY77.
Added steos    2.14 and 2.15.
PALO VERDE NUCLEAR GENERATING STATION MANUAL PROCEOURE NO.42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 8 of 9 2.12 When the vent receiver tank is near empty, close CH-VY-80.NOTE Flow irregularities on CH-FI-212 may be caused by gas accumulating in the instrument lines.Inform ISC of the hazards involved, and have them vent the flow transmitter as required.2.13 Close valve CH-VY78.2.14 Start Charging Pumps as directed by the Shift Supervisor using 420P-2CH01, CVCS Normal Operations, and verify flow on flow indicator CH-FI-212 on B03.2.15 Stop the Aux Bldg Ess.AFU started in step 2.3.HFA-J01/M05/M06 OR HFB-J01/M05/M06 2.16 When conditions have stabilized, restore CVCS system to normal operating conditions at the discretion of the Shift Supervisor, per 420P-2CH01, CVCS Normal Operations.
Added  ste  2.7.1 and  deleted note Added note and added ste    2.12 PV215400 REV. 8/82 (985P)
PV218400 REV.8/82 (985P)j PALO VERDE NUCLEAR GENERATING STATION MANUAL VENTING THE CHARGING PU.'iPS PROCEDURE NO..42AO-2ZZ50 REVISION 2 APPENDIX A Page 1 of 1 Page 9 of 9 REFERENCES 1.0 Implementing I 1.1 420P-2CH01, CVCS Normal Operations 2.0 Developmental 2.1 NUREG 0857 Supplement 9, Dec.1985.2.2 DCP 20N-CH"226.
 
2.3 P&ID's: 02-M-CHP-002, Rev 4-DCN's 15, 24, 30, 113, 121, 124 02-M-CHP-003, Rev 3 DCN's 19, 20, 33,"36, 42, 46, 124, 129, 130, 134, 136, 146, 148, 149.'\'V216400 AEV, 8/82 (985P)
PROCEDURE PALO VERDE NUCLEAR GENERATING                    NO.
Attachment 4 Sim lified Dia ram of Char in Pum Vent'Pi in E'l}}
STATION MANUAL                          .42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS                                  Page 3  of 9 OB JECTIVE This procedure provides instructions on venting hydrogen gas from the Charging Pumps in the event they should become gas bound and cannot provide makeup flow to the RCS. The Refueling Vater Tank is used to provide the head for the venting operation.
    ~"
TABLE OF CONTENTS SECTION                                                            PAGE NUMBER
,  1.0  VERIFICATION  OF CHARGING PUMP GAS  BINDING 2.0  VENTING OPERATIONS APPENDICES 1~
Appendix A - Rererences                                                9
 
PROCEDURE PALO YERDE NUGLEAR GENERATING                                  NO.
STATION MANUAL                                ,42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS                                          Page 4  of 9 1.0        VERIFICATION OF CHARGING      PUMP GAS  BINDING Charging   Pumps are incapable of pumping even    when the  valve lineup has been determined to be correct.
1.2       The  level in the Volume Control Tank is suspected of having dropped  to near OX prior to the Charging Pumps becoming gas bound:
1.3       Possible level deviation between the      VCT level transmitters CH-LT-226 and CH-LT-227.
2.0        VENTING OPERATIONS 2.1        Place all Charging Pumps    in the pull-to-lock position with their handswitches on B03.
2.2        Provide a gravity flow path from the      RVT to the Charging  Pump Suctions as follows:
2.2.1      If VCT outlet    valve CH-UV-501 can be verified closed, open CH-HV-536 on B03.
OR 2.2.2      If VCT outlet    valve CH-UV-501 cannot be verified closed perform  the  following  line up.
2.2.2.1    In Charging Pump room P/'1, close suction valve    CH-V316 and open suction cross-tie valve CH-V755.
2.2.2.2    In Charging Pump room /<2, close suction va'lve    CH-V319 and open  suction cross-tie valve CH-V756.
2.2.2.3    In Charging Pump room,",3, close suction vlave      CH-V322 and open  suction crosstie valve CH-V757.
2.2.2.4    In the East Penetration room, open the Safety Injection header  isolation to Charging Pump suction, valve CH-V327..
PV21840D REV. 8/N (98SP)
 
~  g  ~
          ~
                  ~
                            ~
I        ~
                                                                                                                ~    ~
                                ~ ~                  I  '         I    I ~ ~  ~  -'      ~      I
                              ~ ~                                                      ~          ~
II ~ ~                                                              0 ~        ~ 5  I ~ . I        I'
            ~
I ~
                                ~ ~            I    I I          I    I~  ~  ~
I ~ ~                                                              ~ ~        ~ 5 II ~      I:      I ~
                                    ~  II                                  ~ 0        ~    ~
                  ~    II          ~    ~          ~  ~                                                    ~        ~ 0
                  ~ ~
                                                    ~      ~
II    ~    I
                  ~ ~                                                                    II          ~  ~  ~
                                            ~  5  ~
                                                              ~    ~ ~        ~ ~
                                        ~      ~ ~
                                      ~    I ~ ~            ~  5 ~
I~  ~
 
PROCEDURE PALO VERDE NUCLEAR GENERATING                      NO.
STAT(ON MANUAL                                .42AO-2ZZ50 REVISION VENTING THE CHARGING PUHPS                                              Page 6  of 9 2.7    Establish communications between the Control Room, the Nuclear Operator at the Charging Pumps and the Nuclear Operator at the vent receiving tank.
2.7.1    During the venting operation, the Nuclear Operator at the vent receiver tank should try to maintain the level in the tank at approximately 50%. This is accomplished by throttling open the vent receiver tank drain valve, CH-VY-80, and throttling closed the vent receiver tank inlet valve, CH-VY-78, as necessary.
If the    level in the vent receiver tank should increase above 75<o', the Operator at the tank should stop the venting process by closing inlet valve, CH-VY-78, and then informing the Operator at the Charging Pumps that venting has been momentarily stopped. When the tank level has been lowered .
sufficiently, venting should be resumed by reopening inlet valve, CH-VY-78, and informing the Operator at the Charging Pumps.
NOTE Perform step 2.8   if CHA-P01 is the pump to 'be vented. If CHB-P01 is to be vented, then proceed to step 2.9. If  CHE-P01 is to be vented, then proceed to step 2.10.
Venting of the charging pumps will be complete when the local flow gages indicate solid flow and level in the vent receiving tank increases.
2.8,  To  vent CHA-P01, perform the following:
2.8.1      Close/check closed valves CH-V317., CH-V329 and CH-VY76.
2.8.2      Open CH-V069.
2.8.3              venting operations by opening    CH-VY75. I'egin Veri:fy flow on flow gage CH-FG-999.
2.8.4    When  venting is complete close    CH-VY75 and CH-V069.
2.8.5    Ensure    all gases are vented from the    pump by       opening discharge drain isolation valve      CH-V329. Check      for flow   on =-
flow gage CH-FG-1003.
 
PROCEDURE PALO VERDE NUCLEAR GENERATING                          NO.
STATION MANUAL                                    42AO-2ZZ50 REVISlON VENTING THE CHARGING PU.'lPS                                        Page  7 of 9 2.8.6    When   venting is complete, close valve CH-V329.
2.8.7    If  venting of the charging      pumps  is complete, then proceed to step F 11.
2.9     To vent, CHB>>P01, perform the        following:
2.9.1    Close/Check Closed valves CH-V320, CH-V332 and CH-VY74.
2.9.2     Open CH-V067.
2.9.3    Begin venting operations by opening CH-VY73.            Verify flow  on flow gage CH-FG-998.
2.9.4    When    venting is complete close      CH-VY73 and CH-V067.
2.9.5    Ensure    all gases are vented" from the pump by opening discharge drain isolat,ion valve CH-V332. Check for flow on flow gage CH-FG-1002.
When   venting is complete, close valve CH-V332.
                                            '.9.6 2:9.7      If venting    of the charging    pumps  is complete, then proceed to step 2.11.
2.10  To  vent CHE-P01, perform the following 2.10.1    ClosejCheck Closed valves CH-V323, CH-V336 and CH-VY72.
2.10.2   Open CH-V065.
2.10.3    Begin venting operations by opening CH-VY71.           Verify flow  on flow gage CH-FG-997.
2.10.4    When   venting is complete close       CH-VY71 and CH-V065.             ~
2.10.5    Ensure    all gases are vented from the pump by opening discharge drain isolat,ion valve CH-V336. Check for flow on flow gage CH-FG-1001.
2.10.6    When  'venting is complete, close valve CH-V336.
2.10.7    If venting    of the charging    pumps  is complete, then proceed-to 2.11.                                                             .'tep 2.11    Open    valve CH-VY77.
 
PROCEOURE PALO VERDE NUCLEAR GENERATING                                NO.
STATION MANUAL                              42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS                                        Page 8 of 9 2.12        When the vent receiver tank is near empty, close CH-VY-80.
NOTE Flow irregularities on CH-FI-212 may be caused by gas accumulating in the instrument lines.
Inform ISC of the hazards involved, and have them vent the flow transmitter as required.
2.13      Close valve CH-VY78.
2.14      Start Charging  Pumps as directed by the  Shift Supervisor using 420P-2CH01,   CVCS Normal Operations, and  verify flow on flow indicator  CH-FI-212 on B03.
2.15      Stop the Aux Bldg Ess. AFU  started in step 2.3.
HFA-J01/M05/M06 OR HFB-J01/M05/M06 2.16      When  conditions have stabilized, restore CVCS system to normal operating conditions at the discretion of the Shift Supervisor, per 420P-2CH01, CVCS Normal Operations.
PV218400 REV. 8/82 (985P) j
 
PROCEDURE PALO VERDE NUCLEAR GENERATING                                NO.                APPENDIX A STATION MANUAL                                  .42AO-2ZZ50    Page 1 of  1 REVISION VENTING THE CHARGING PU.'iPS                                          2      Page 9 of 9 REFERENCES 1.0          Implementing I
1.1      420P-2CH01, CVCS Normal Operations 2.0          Developmental 2.1      NUREG  0857 Supplement 9, Dec. 1985.
2.2      DCP  20N-CH"226.
2.3      P &  ID's:
02-M-CHP-002, Rev 4 - DCN's 15, 24, 30, 113, 121, 124 02-M-CHP-003, Rev 3    DCN's 19, 20,        33,"36, 42, 46, 124, 129, 130, 134, 136, 146, 148, 149.
                                                  '\
                                                    'V216400 AEV, 8/82 (985P)
 
Attachment 4 Sim lified Dia ram of  Char in Pum Vent 'Pi in
 
E'l}}

Latest revision as of 05:57, 4 February 2020

Rev 1 to Operations Procedure 42AO-2ZZ50, Venting Charging Pumps.
ML17299B047
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/10/1986
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17299B045 List:
References
42AO-2ZZ50, TAC-61875, NUDOCS 8602260191
Download: ML17299B047 (25)


Text

~ ~ ~

~ ~ 4

~ ) t r W4

P I ~ ~

R PROCEDURE PALO YERDE NUCLEAR GEi JERATlNG NO.

STATION MANUAL 42AO-2ZZSO REVISION VENTDfG THE CHARGIiNG PUi'IPS Page 2 of 9 REVISION. HISTORY Rev. No. Date Revised Pages Comments U dated Revision Histor P Rewrote ste s 2.2 thru 2.2.2.4 to ensure ravit flow ath available Added caution before ste 2.4.1 and rewrote 2.4.1.

Added ste s 2.14 and 2.15.

'mis ooo aev.sisz(essa)

~

I(

Lg PROCEDURE PALO VERDE NUCLEAR GENERATtNG NO.

~

STATlON MANUAL 42AO-2ZZ50 REVISION VENTING THE CHARGING PUiIPS Page 3 of 9 OBJECTIVE This procedure provides instructions on venting hydrogen gas from the Charging Pumps in the event they should become gas bound and cannot provide makeup flov to the RCS. The Refueling Water Tank is used to provide the head for the venting operation.

TABLE OF CONTENTS SECTION PAGE NmIBER e

1.0 VERIFICATION OF CHARGING PUHP GAS BINDING 2.0 VENTING OPERATIONS APPENDICES Appendix A - References PV218 00D REV. 8/82 (i85P)

'.." : FG&IMFORMATION NLY PROCEOURE PALO VERDE NUCLEAR GENERATING NO.

STATION MANUAL 42AO-2ZZ50 s>

REVISION VENTING THE CHARGING PUHPS Page 4 of 9 1.0 VERIFICATION OF CHARGING PUNP GAS BINDING Charging Pumps are incapable of pumping even when the valve lineup has been determined to be correct.

1.2 The level in the Volume Control Tank is suspected of having dropped to near OX prior to the Charging Pumps becoming gas bound.

1.3 Possible level deviation between the VCT level transmitters CH-LT-226 and CH-LT-227.

2.0 VENTING OPERATIONS e

2.1 Place all Charging Pumps in the pull-to-lock position with their handswitches on B03.

2.2 Provide a gravity flow path from the RMT to the Charging Pump Suctions as follows:

2.2.1 If VCT outlet valve CH-UV-501 can be verified closed, open CH-HV-536 on B03.

OR 2.2.2 If VCT outlet valve CH-UV-501 cannot be verified closed perform the following line up.

2.2.2.1 In Charging Pump room gl, close suction valve CH-V316 and open suction cross-tie valve CH-V755.

2.2.2.2 In Charging Pump room jr2, close suction valve CH-V319 'and open suction cross-tie valve CH-V756.

2.2.2.3 In Charging Pump room g3, close suction vlave CH"V322 and open suction crosstie valve CH-V757.

2.2.2.4 In the East Penetration room, open the Safety Injection header isolation to Charging Pump suction, valve CH-V327.

PV218 000 AEV, 8/b2 (485P)

~ 0

~ ~

~ ~ ~ ~

~ ~ I ' I I~ ~ ~ s ~

~ ~

~ ~ ~ ~

~ ~ ~ ~ ~ ~ I~

~ ~

~

~

~ ~ I I I ~ ~ ~

~ ~ ~ ll ~

~ 4 ~ ~ I I ~

~ ~

~ I ~ ~ ' ~

~ ~ ~ ~ S 0 ~ 4 ~

~ ~ ~

~ ~

' ~ I' ll ~ I I~ ~ ~ II ~ ~ ~

~ '

~ ~ ' ~ ~ ~

~ ' ~

~ ~ ~ ~ ~

~ ~ ~

~ ~ ~

~ ~

~ ~

~ ~ ~ '

~ S ~ 0

~ ~ ' ~

~ ~ ~ ~ ~

~ ~ ~ ' ' ' r

~ ~

~ ~ ~

I ~ . ~

S ~

~ ~

~ ~ ~

I~ .: ~

~ ~ ~ ~

~ ~

~ ~ ~ ~ ~ ~

~ ~ ~ ~ I

~ 1 ~ ~

~

~ ~ ~

~ ~ ~ ~ ~ ~

~ ~

~ ~ ~ ~

S ~ ~ ~

~ ~ S II

~ ~ ~ ~

I~ ~

0 t

FGNFGRMATIGNNLY PROCEDURE PALO VERDE NUCLEAR GENERATING NO.

STATION MANUAL 42AO-2ZZ50 RF VISION VENTING THE CHARGING PUMPS Page 7 of 9 2.8.7 If venting of the charging pumps is complete, then proceed to

~ step 2. 11.

2.9 To vent CHB-P01, perform the following:

2.9.1 Close/Check Closed valves CH-V320, CH-V332 and CH-VY74.

2.9.2 Open CH-V067.

2.9.3 Begin venting operations by opening CH-VY73. Verify flow on flow gage CH-FG-998.

2.9.4 When venting is complete close CH-VY73 and CH-V067.

2.9.5 Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V332. Check for flow on flow gage CH-FG-1002.

2.9.6 When venting is complete, close valve CH-V332.

2.9.7 If venting of the charging pumps is complete, then proceed to step 2.11.

2.10 To vent CHE-P01, perform the following:

2.10.1 Close/Check Closed valves CH-V323, CH-V336 and CH-VY72.

2.10.2 Open CH-V065.

2.10.3 Begin venting operations by opening CH-VY71. Verify flow on flow gage CH-FG-997.

2.10.4 When venting is complete close CH-VY71 and CH-V065.

F 10.5 Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V336. Check for flow on flow gage CH-FG-1001.

2.10.6 When venting is complete, close valve CH-V336.

2.10.7 If venting of the charging pumps is complete, then proceed to step 2..11.

2.11 Open valve CH-VY77.

FQIR IIIMFGIRMATIIQNGIMLY

~ ~ ~

~

~

~ ~

~ ~

~ ~ ~ ~

~ ~

~ S Io-I '

~ ~ ~ ~

I ~

I i le

~

~

I I I

~ ~

~ ~ ~ ~

I' ~ S ~ ~ ~: ~

~ ~

I E'

I FGI INFQRMATIQNNLY PROCEDURE PALO VERDE NUCLEAR GENERATING NO. APPENDIX A STATION MANUAL 42AO-2ZZ50 Page 1 of 1 F

4 REVISION

~ y VENTING THE CHARGING PUMPS Page 9 of 9 REFERENCES 1 ~ 0 Implementing 420P-2CH01, CVCS Normal Operations 2.0 Developmental 2.1 NUREG 0857 Supplement 9, Dec. 1985.

2.2 DCP 20N-CH-226.

2.3 P & ID's:

02-M-CHP-002, Rev 4- DCN's 15, 24, 30, 113, 121, 124 02-M-CHP-003, Rev 3- DCN's 19, 20, 33, 36, 42, 46, 124, 129, 130, 134, 136, 146, 148, 149.

Attachment 3 0 erations Procedure for Ventin of the Char in Pum s (42AO-2ZZ50 Revision 2)

PROCEDURE PALO VERDE NUCLEAR GENERATING NO.

STATION MANUAL A2AO-2ZZ50 REVISION VENTIANG THE CHARGING PUMPS Page 1 of 9 DEPT. HEAD DATE '2- r d PRB/PRG/TRRG REVIEW DATE APPROVED BY DATE. > >(

'FFECTIVE DATE ~ </PG >Pi'~omsosec sho22~

DN-5526C/0765C pgR ADOCK 05000529 P PDR PV21840D RFV. 8/52 (985P)

PALO VERDE NUCLEAR GENERATING PROCEDURE NO.

STATION MANUAL 42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 2 of 9 REVISION HISTORY Rev. No. Date Revised Pages Comments 2-13-86 U dated Revision Histor P '.

Rewrote ste s 2.2 thru 2.2.2.4 to ensure ravit flow ath available Added caution before sten 2.4.1 and rewrote 2.4.1.

Added steos 2.14 and 2.15.

Added ste 2.7.1 and deleted note Added note and added ste 2.12 PV215400 REV. 8/82 (985P)

PROCEDURE PALO VERDE NUCLEAR GENERATING NO.

STATION MANUAL .42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 3 of 9 OB JECTIVE This procedure provides instructions on venting hydrogen gas from the Charging Pumps in the event they should become gas bound and cannot provide makeup flow to the RCS. The Refueling Vater Tank is used to provide the head for the venting operation.

~"

TABLE OF CONTENTS SECTION PAGE NUMBER

, 1.0 VERIFICATION OF CHARGING PUMP GAS BINDING 2.0 VENTING OPERATIONS APPENDICES 1~

Appendix A - Rererences 9

PROCEDURE PALO YERDE NUGLEAR GENERATING NO.

STATION MANUAL ,42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 4 of 9 1.0 VERIFICATION OF CHARGING PUMP GAS BINDING Charging Pumps are incapable of pumping even when the valve lineup has been determined to be correct.

1.2 The level in the Volume Control Tank is suspected of having dropped to near OX prior to the Charging Pumps becoming gas bound:

1.3 Possible level deviation between the VCT level transmitters CH-LT-226 and CH-LT-227.

2.0 VENTING OPERATIONS 2.1 Place all Charging Pumps in the pull-to-lock position with their handswitches on B03.

2.2 Provide a gravity flow path from the RVT to the Charging Pump Suctions as follows:

2.2.1 If VCT outlet valve CH-UV-501 can be verified closed, open CH-HV-536 on B03.

OR 2.2.2 If VCT outlet valve CH-UV-501 cannot be verified closed perform the following line up.

2.2.2.1 In Charging Pump room P/'1, close suction valve CH-V316 and open suction cross-tie valve CH-V755.

2.2.2.2 In Charging Pump room /<2, close suction va'lve CH-V319 and open suction cross-tie valve CH-V756.

2.2.2.3 In Charging Pump room,",3, close suction vlave CH-V322 and open suction crosstie valve CH-V757.

2.2.2.4 In the East Penetration room, open the Safety Injection header isolation to Charging Pump suction, valve CH-V327..

PV21840D REV. 8/N (98SP)

~ g ~

~

~

~

I ~

~ ~

~ ~ I ' I I ~ ~ ~ -' ~ I

~ ~ ~ ~

II ~ ~ 0 ~ ~ 5 I ~ . I I'

~

I ~

~ ~ I I I I I~ ~ ~

I ~ ~ ~ ~ ~ 5 II ~ I: I ~

~ II ~ 0 ~ ~

~ II ~ ~ ~ ~ ~ ~ 0

~ ~

~ ~

II ~ I

~ ~ II ~ ~ ~

~ 5 ~

~ ~ ~ ~ ~

~ ~ ~

~ I ~ ~ ~ 5 ~

I~ ~

PROCEDURE PALO VERDE NUCLEAR GENERATING NO.

STAT(ON MANUAL .42AO-2ZZ50 REVISION VENTING THE CHARGING PUHPS Page 6 of 9 2.7 Establish communications between the Control Room, the Nuclear Operator at the Charging Pumps and the Nuclear Operator at the vent receiving tank.

2.7.1 During the venting operation, the Nuclear Operator at the vent receiver tank should try to maintain the level in the tank at approximately 50%. This is accomplished by throttling open the vent receiver tank drain valve, CH-VY-80, and throttling closed the vent receiver tank inlet valve, CH-VY-78, as necessary.

If the level in the vent receiver tank should increase above 75<o', the Operator at the tank should stop the venting process by closing inlet valve, CH-VY-78, and then informing the Operator at the Charging Pumps that venting has been momentarily stopped. When the tank level has been lowered .

sufficiently, venting should be resumed by reopening inlet valve, CH-VY-78, and informing the Operator at the Charging Pumps.

NOTE Perform step 2.8 if CHA-P01 is the pump to 'be vented. If CHB-P01 is to be vented, then proceed to step 2.9. If CHE-P01 is to be vented, then proceed to step 2.10.

Venting of the charging pumps will be complete when the local flow gages indicate solid flow and level in the vent receiving tank increases.

2.8, To vent CHA-P01, perform the following:

2.8.1 Close/check closed valves CH-V317., CH-V329 and CH-VY76.

2.8.2 Open CH-V069.

2.8.3 venting operations by opening CH-VY75. I'egin Veri:fy flow on flow gage CH-FG-999.

2.8.4 When venting is complete close CH-VY75 and CH-V069.

2.8.5 Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V329. Check for flow on =-

flow gage CH-FG-1003.

PROCEDURE PALO VERDE NUCLEAR GENERATING NO.

STATION MANUAL 42AO-2ZZ50 REVISlON VENTING THE CHARGING PU.'lPS Page 7 of 9 2.8.6 When venting is complete, close valve CH-V329.

2.8.7 If venting of the charging pumps is complete, then proceed to step F 11.

2.9 To vent, CHB>>P01, perform the following:

2.9.1 Close/Check Closed valves CH-V320, CH-V332 and CH-VY74.

2.9.2 Open CH-V067.

2.9.3 Begin venting operations by opening CH-VY73. Verify flow on flow gage CH-FG-998.

2.9.4 When venting is complete close CH-VY73 and CH-V067.

2.9.5 Ensure all gases are vented" from the pump by opening discharge drain isolat,ion valve CH-V332. Check for flow on flow gage CH-FG-1002.

When venting is complete, close valve CH-V332.

'.9.6 2:9.7 If venting of the charging pumps is complete, then proceed to step 2.11.

2.10 To vent CHE-P01, perform the following 2.10.1 ClosejCheck Closed valves CH-V323, CH-V336 and CH-VY72.

2.10.2 Open CH-V065.

2.10.3 Begin venting operations by opening CH-VY71. Verify flow on flow gage CH-FG-997.

2.10.4 When venting is complete close CH-VY71 and CH-V065. ~

2.10.5 Ensure all gases are vented from the pump by opening discharge drain isolat,ion valve CH-V336. Check for flow on flow gage CH-FG-1001.

2.10.6 When 'venting is complete, close valve CH-V336.

2.10.7 If venting of the charging pumps is complete, then proceed-to 2.11. .'tep 2.11 Open valve CH-VY77.

PROCEOURE PALO VERDE NUCLEAR GENERATING NO.

STATION MANUAL 42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 8 of 9 2.12 When the vent receiver tank is near empty, close CH-VY-80.

NOTE Flow irregularities on CH-FI-212 may be caused by gas accumulating in the instrument lines.

Inform ISC of the hazards involved, and have them vent the flow transmitter as required.

2.13 Close valve CH-VY78.

2.14 Start Charging Pumps as directed by the Shift Supervisor using 420P-2CH01, CVCS Normal Operations, and verify flow on flow indicator CH-FI-212 on B03.

2.15 Stop the Aux Bldg Ess. AFU started in step 2.3.

HFA-J01/M05/M06 OR HFB-J01/M05/M06 2.16 When conditions have stabilized, restore CVCS system to normal operating conditions at the discretion of the Shift Supervisor, per 420P-2CH01, CVCS Normal Operations.

PV218400 REV. 8/82 (985P) j

PROCEDURE PALO VERDE NUCLEAR GENERATING NO. APPENDIX A STATION MANUAL .42AO-2ZZ50 Page 1 of 1 REVISION VENTING THE CHARGING PU.'iPS 2 Page 9 of 9 REFERENCES 1.0 Implementing I

1.1 420P-2CH01, CVCS Normal Operations 2.0 Developmental 2.1 NUREG 0857 Supplement 9, Dec. 1985.

2.2 DCP 20N-CH"226.

2.3 P & ID's:

02-M-CHP-002, Rev 4 - DCN's 15, 24, 30, 113, 121, 124 02-M-CHP-003, Rev 3 DCN's 19, 20, 33,"36, 42, 46, 124, 129, 130, 134, 136, 146, 148, 149.

'\

'V216400 AEV, 8/82 (985P)

Attachment 4 Sim lified Dia ram of Char in Pum Vent 'Pi in

E'l