|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17300B3791999-10-0808 October 1999 Proposed Tech Specs,Waiving Requirement to Perform SR 3.8.4.8 for Unit 1 Channels A,B & C on One Time Basis ML17300B3521999-09-29029 September 1999 Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7 ML17300B3321999-09-14014 September 1999 Marked-up Tech Specs Pages to TS 5.5.2 & 5.6.2,making Noted Administrative Changes ML17313B0601999-08-31031 August 1999 Rev 1 to PVNGS TS Bases Implemented Between Aug 1998 & Jul 1999 ML17313B0081999-07-14014 July 1999 Rev 2 to Inservice Insp Program Summary Manual for PVNGS Unit 1. ML17313A9571999-05-26026 May 1999 Proposed Tech Specs,Reducing Spurious Reactor Trip Hazards Associated with Setpoints While Maintaining Plant Protection ML17313A7511998-12-16016 December 1998 Rev 2 to ISI Program Summary Manual, for PVNGS Unit 3 ML17313A4181998-06-0909 June 1998 Proposed Improved Tech Specs Sections 3.5.1 & 3.5.2,revising Safety Injection tanks-operating & Safety Injection Tanks Shutdown ML17313A1141997-11-0707 November 1997 Improved TS Pages for Section 3.0, LCO & SR Applicability, Section 3.1, Reactivity Control & Section 3.2, Power Distribution Limits. Generic Change to NUREG-1432,Rev 1 Incorporated Into Section 3.0 & 3.1 ML17312B6411997-08-28028 August 1997 Proposed Tech Specs,Allowing one-time Extension of Required Surveillance Interval for Msi Sys Portion Only of ESFAS Logic ML20217Q6801997-08-22022 August 1997 Proposed Tech Specs,Clarifying Wording in TS Bases 3/4.6.1.4, Internal Pressure ML20141H7831997-07-18018 July 1997 Proposed Improved Tech Specs Section 3.8, Electrical Power Sys ML20141H7461997-07-18018 July 1997 Proposed Tech Specs,Providing Addl Info Re Improved TS Section 3.4, Rcs ML17312B0311996-11-0606 November 1996 Proposed Tech Specs 3/4.8.1.1 Re A.C. Sources - Operating ML17300B2651996-06-17017 June 1996 Proposed Tech Specs,Changing Section 1.10 & 3.2.8 & Associated Bases for Obtaining Thyroid Dcfs Used in Definition of Dose Equivalent I-131 ML17312A9451996-05-14014 May 1996 Rev 3 to Significant Condition Investigation. ML17312A6491996-04-0101 April 1996 Proposed Tech Specs,Revising TS 3/4.9.6 to Temporarily Allow Use of Hoist Instead of Refueling Machine for Movement of Fuel Assembly at Core Location A-07 ML17312A6401996-03-26026 March 1996 Proposed Tech Specs 3/4.9.6,increasing Refueling Machine Overload Cut Off Limit to 2,000 Lb,In 50 Lb Increments,For Removal of Stuck Fuel Assembly from Core Location A-06 ML17312A6321996-03-26026 March 1996 Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants. ML17312A6371996-03-23023 March 1996 Proposed Tech Specs,Revising TS SR 4.8.2.1.e, DC Sources, to Suspend Provision of TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Entry Into Mode 4 Following Sixth Refueling Outage ML17312A5691996-03-0505 March 1996 Revised Pages to ISI Program Summary Manual ML17312A5011996-01-17017 January 1996 Revised Page 5-1 Changing Section 5.2.2 to Include Description of Material Used for Control Element Assemblies ML17311B3221995-12-20020 December 1995 Proposed Tech Specs,Reducing Setpoint for MSIS & Rt on Low SG Pressure ML17311B3181995-12-20020 December 1995 Revised Pages to ISI Program Summary Manual ML17311B0301995-07-0303 July 1995 Proposed Tech Specs Re Temp Method to Respond to Sustained Degraded Switchyard Voltage ML17311A9771995-06-21021 June 1995 Proposed Tech Specs,Modifying Tables 3.3-4 & 3.3-5 of Section 3/4.3.2 of Esfa Sys Instrumentation ML17311A8651995-05-0202 May 1995 Proposed TS 3.1.2.6,Figure 3.1-1, Min Borated Water Vols, Relocating Elevations That Correspond to Min Required Water Vols for Spent Fuel Pool Into Site Procedures ML17311A8231995-04-18018 April 1995 Proposed Tech Specs Section 3/4.4.4 Re Sleeving Process for SG Tube Repair ML17312A9381995-02-0303 February 1995 Corrective Action Program. ML17311A5631994-12-28028 December 1994 Proposed TS Sections 3.9.6 & 4.9.6.1 Re Refueling Machine ML17311A5021994-12-0707 December 1994 Proposed Tech Specs,Changing Note 5 to Table 4.3-1 of TS 3/4.3.1 to Allow Verification of Shape Annealing Matrix Elements Used in Core Protection Calculators ML17311A4341994-11-30030 November 1994 Proposed TS 3/4.4.2,changing Pressurizer Code Safety Valve Lift Setting from 2,500 Psia to 2,475 Psia in LCOs 3.4.2.1 & 3.4.2.2 ML17311A3851994-10-31031 October 1994 Proposed Tech Spec Sections 3.9.6 & 4.9.6.1, Refueling Machine. ML17311A3341994-10-0909 October 1994 Proposed Tech Specs Suspending TS 4.0.1 & 4.0.4 for Battery Capacity Testing Requirements Until Mode 4 Following Fifth Refueling Outage ML17311A2171994-08-18018 August 1994 Proposed Tech Specs Adding Analytical Method Suppl Entitled, Calculative Methods for CE Large Break LOCA Evaluation Model for Analysis of CE & W Designed Nsss. ML17310B4511994-07-12012 July 1994 Proposed Tech Specs Amend to Add One Action Statement to Table 3.3-3,entry 8 ML17310B4151994-07-0101 July 1994 Proposed Tech Specs Re Reactor Coolant Cold Leg Temperature Vs Core Power Level of TS 3.2.6 ML17310B4331994-06-20020 June 1994 Proposed Tech Specs Sections 5.3.1 & 5.6.1, & New TS Section 3/4.9.13 & Bases 3/4.9.13 ML17310B4091994-06-17017 June 1994 Proposed Tech Specs Removing Five Tables of Component Lists Per GL-91-08 ML17310B1661994-03-28028 March 1994 Proposed Tech Specs Re Min Condensate Storage Tank Indicated Level ML17310B0911994-03-0202 March 1994 SG Tube Insp Plan. ML17310B0771994-02-24024 February 1994 PVNGS Unit 1 Cycle 5 Startup Rept. ML17310B0611994-02-18018 February 1994 Proposed Tech Specs Figure 3.2-1,Section 3/4.1.1.4 & Bases 3/4.1.1.4,establishing Min Temp for Criticality at 545 F for Facilities ML17310B0251994-01-27027 January 1994 Unit 2 Steam Generator Tube Insp Plan Addendum. ML17310B0001994-01-19019 January 1994 Proposed Tech Specs of AF Automatic Actuation Logic Surveillance Frequency Extension ML17310A8361993-11-16016 November 1993 Proposed Tech Specs Table 4.2-4, Min Staffing Requirements for PVNGS Emergencies, in Support of Proposed Rev to Emergency Plan ML17310A7421993-10-27027 October 1993 Revised Unit 1 SG Tube Insp Plan. ML17310A7351993-10-26026 October 1993 Proposed Tech Specs Changing Maximum Nominal Enrichment of Fuel Allowed to Be Used in Reactor Core ML17310A6501993-09-17017 September 1993 Unit 1 SG Tube Insp Plan. ML17310A6161993-09-0808 September 1993 Proposed Tech Specs Section 6.9.1.10 Re Sys 80 Inletflow Distribution to List of Methods Used to Determine Core Operating Limits 1999-09-29
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17313B0081999-07-14014 July 1999 Rev 2 to Inservice Insp Program Summary Manual for PVNGS Unit 1. ML17313A7511998-12-16016 December 1998 Rev 2 to ISI Program Summary Manual, for PVNGS Unit 3 ML17312A9451996-05-14014 May 1996 Rev 3 to Significant Condition Investigation. ML17312A5691996-03-0505 March 1996 Revised Pages to ISI Program Summary Manual ML17311B3181995-12-20020 December 1995 Revised Pages to ISI Program Summary Manual ML17312A9381995-02-0303 February 1995 Corrective Action Program. ML17310B0911994-03-0202 March 1994 SG Tube Insp Plan. ML17310B0251994-01-27027 January 1994 Unit 2 Steam Generator Tube Insp Plan Addendum. ML17310A7421993-10-27027 October 1993 Revised Unit 1 SG Tube Insp Plan. ML17310A6501993-09-17017 September 1993 Unit 1 SG Tube Insp Plan. ML20056D3951993-08-0909 August 1993 Rev 04.01 to Procedure 41AO-1ZZ08, SG Tube Leak ML20056D3961993-06-16016 June 1993 Rev 00.07 to Procedure 41EP-1R004, Excess Steam Demand, Consisting of CRS Actions & Details on Emergency Notification & Support ML20056G0111993-03-21021 March 1993 Rev 7 to Odcm ML17306A9831992-09-0303 September 1992 Window 2B08B, Rc LO Temp Over Press of Rev 5 to Procedure 40AL-9RK2B ML17306A9841992-09-0303 September 1992 Window 2B08B, SDC Ln Isol VLV Not Fully Closed of Rev 5 to Procedure 40AL-9RK2B ML17306A9851992-09-0303 September 1992 Window 2B09A, SDC Ln Isol Vlvs UV-653/654 Inverter Trbl of Procedure 40AL-9RK2B ML17306A9871992-09-0303 September 1992 Window ES2A01B, LO Press Safety Inj of Rev 2 to Procedure 41AL-1ES2A ML17306A4741991-10-30030 October 1991 Rev 2 to Nuclear Administrative & Technical Manual 76PR-9RW01, Solid Radwaste Process Control Program. ML20085L3671991-10-28028 October 1991 Emergency Response Data Sys (ERDS) Implementation Program Plan for Palo Verde Nuclear Generating Station ML17305B5521991-01-31031 January 1991 Rev 6 to Salt Deposition & Impact Monitoring Plan for Palo Verde Nuclear Generation Stations,Units 1,2 & 3. ML17305B2731990-07-31031 July 1990 PVNGS 1991 Business Plan. ML17306A5181989-10-22022 October 1989 Rev 0 to Nuclear Administrative & Technical Manual 01PR-0QQ02, Employee Concerns Program Policy. ML17306A5161989-09-28028 September 1989 DOL000483, Employee Concerns Program. ML20127J4161989-03-0808 March 1989 Procedure 2-3-89-001, Safety Equipment Status Sys ML20082D9681989-01-18018 January 1989 Rev 1 to Nuclear Administrative & Technical Manual 81AC-OCC07, Cable & Raceway Control & Tracking Sys ML20082D9721988-08-19019 August 1988 Rev 0 to Administrative Change Notice 03 to ES03.03, Cable & Raceway Control & Tracking Sys ML20082E6001988-07-11011 July 1988 Rev 0 to Administrative Change Notice 02 to ES03.03, Cable & Raceway Control & Tracking Sys ML20082D9801988-06-21021 June 1988 Rev 2 to QA02.02, QC Insps ML20082D9871988-06-0202 June 1988 Rev 0 to ES10.00, Sys Engineer Program ML20082D9901988-05-26026 May 1988 Rev 7 to 73AC-OZZ29, Engineering Evaluation Request ML20082E6221988-05-19019 May 1988 Rev 0 to Administrative Change Notice 01 to ES03.03, Cable & Raceway Control & Tracking Sys ML17304A1651988-05-10010 May 1988 Loose Part Monitoring Sys Loose Part Detection Program Rept. W/Eleven Oversize Drawings ML20082E6291987-09-0202 September 1987 Rev 0 to ES03.03A, Cable & Raceway Control & Tracking Sys ML20237H5571987-08-0303 August 1987 Public Version of Revs to Emergency Plan Implementing Procedures,Including Temporary Procedure Change Notice (Tpc) 3 to Rev 5 to EPIP-02, Emergency Classification & Tpc Notice 2 to Rev 11 to EPIP-03.W/870820 Release Memo ML20235X0961987-07-0202 July 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EPIP-56, UHS Emergency Water Supply, Rev 4 to EPIP-33, Offsite Assistance & Rev 5 to EPIP-27, Post-Accident Sampling Analysis ML17300A7801987-04-16016 April 1987 Procedure Change Notice 1 to Rev 0 to Procedure 41AO-1ZZ54, Monitoring Reactor Vessel Inventory W/Reactor Vessel Level Monitoring Sys Inoperable. W/870416 Ltr ML17303A3611987-03-20020 March 1987 Test/Retest Recovery Program Diesel Generator B & Associated Support Equipment. ML17333A1801987-03-13013 March 1987 Diesel Generator B Test Insps. ML20206N4501987-03-0606 March 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure Change Notice 02 to Rev 5 to EPIP-02, Emergency Classification, Closing Out Open Item Noted by NRC ML20212M8121987-01-28028 January 1987 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 11 to EPIP-04 Re Alert,Site Area & General Emergency Implementing Action,Consisting of Temporary Change Notice 02T ML20214U1761986-09-11011 September 1986 Public Version of Procedure Change Notice 3 to Rev 10 to Emergency Plan Implementing Procedure EPIP-3, Notification of Unusual Event Implementing Actions. W/860925 Release Memo ML20205E5391986-07-29029 July 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 4 to EPIP-23, Fire Fighting, Rev 5 to EPIP-02, Emergency Classification & Rev 11 to EPIP-04, Alert,Site Area.. ML20211Q5951986-07-10010 July 1986 Public Version of Rev 10 to EPIP-03, Notification of Unusual Event Implementing Actions & Rev 4 to EPIP-15, Protective Action Guidelines. W/Procedure Change Notices 1 & 2 to EPIP-03 ML20212N2671986-07-0303 July 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 5 to EPIP-02, Emergency Classification & Rev 10 to EPIP-03, Notification of Unusual Event Implementing Actions ML17300A3731986-06-25025 June 1986 Rev 0 to Pump & Valve Inservice Testing Program, for Units 1,2 & 3 ML17300A2611986-05-29029 May 1986 Rev 0 to Inservice Insp Program Summary Manual. ML20155K1011986-04-17017 April 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 10 to EPIP-03 Re Notification of Unusual Event Implementing Actions & Rev 9 to EPIP-04 Re Alert Implementing Actions.W/Grimsley 860521 Release Memo ML20206E5991986-04-0808 April 1986 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Index,Cancellation of Rev 2 to EPIP-28, Personnel Monitoring & Decontamination & Cancellation of Rev 2 to EPIP-29 ML17299B1791986-03-11011 March 1986 Public Version of Revised Emergency Plan Implememting Procedures EPIP 11,EPIP 19 & EPIP 20 & Revs 1 to Administrative Procedures 7N409.08.00 & 7N409.09.00, respectively.W/860409 Release Memo ML17299B0501986-02-21021 February 1986 Rev 2 to Operations Procedure 42AO-2ZZ50, Venting Charging Pumps. 1999-07-14
[Table view] |
Text
~ ~ ~
~ ~ 4
~ ) t r W4
P I ~ ~
R PROCEDURE PALO YERDE NUCLEAR GEi JERATlNG NO.
STATION MANUAL 42AO-2ZZSO REVISION VENTDfG THE CHARGIiNG PUi'IPS Page 2 of 9 REVISION. HISTORY Rev. No. Date Revised Pages Comments U dated Revision Histor P Rewrote ste s 2.2 thru 2.2.2.4 to ensure ravit flow ath available Added caution before ste 2.4.1 and rewrote 2.4.1.
Added ste s 2.14 and 2.15.
'mis ooo aev.sisz(essa)
~
I(
Lg PROCEDURE PALO VERDE NUCLEAR GENERATtNG NO.
~
STATlON MANUAL 42AO-2ZZ50 REVISION VENTING THE CHARGING PUiIPS Page 3 of 9 OBJECTIVE This procedure provides instructions on venting hydrogen gas from the Charging Pumps in the event they should become gas bound and cannot provide makeup flov to the RCS. The Refueling Water Tank is used to provide the head for the venting operation.
TABLE OF CONTENTS SECTION PAGE NmIBER e
1.0 VERIFICATION OF CHARGING PUHP GAS BINDING 2.0 VENTING OPERATIONS APPENDICES Appendix A - References PV218 00D REV. 8/82 (i85P)
'.." : FG&IMFORMATION NLY PROCEOURE PALO VERDE NUCLEAR GENERATING NO.
STATION MANUAL 42AO-2ZZ50 s>
REVISION VENTING THE CHARGING PUHPS Page 4 of 9 1.0 VERIFICATION OF CHARGING PUNP GAS BINDING Charging Pumps are incapable of pumping even when the valve lineup has been determined to be correct.
1.2 The level in the Volume Control Tank is suspected of having dropped to near OX prior to the Charging Pumps becoming gas bound.
1.3 Possible level deviation between the VCT level transmitters CH-LT-226 and CH-LT-227.
2.0 VENTING OPERATIONS e
2.1 Place all Charging Pumps in the pull-to-lock position with their handswitches on B03.
2.2 Provide a gravity flow path from the RMT to the Charging Pump Suctions as follows:
2.2.1 If VCT outlet valve CH-UV-501 can be verified closed, open CH-HV-536 on B03.
OR 2.2.2 If VCT outlet valve CH-UV-501 cannot be verified closed perform the following line up.
2.2.2.1 In Charging Pump room gl, close suction valve CH-V316 and open suction cross-tie valve CH-V755.
2.2.2.2 In Charging Pump room jr2, close suction valve CH-V319 'and open suction cross-tie valve CH-V756.
2.2.2.3 In Charging Pump room g3, close suction vlave CH"V322 and open suction crosstie valve CH-V757.
2.2.2.4 In the East Penetration room, open the Safety Injection header isolation to Charging Pump suction, valve CH-V327.
PV218 000 AEV, 8/b2 (485P)
~ 0
~ ~
~ ~ ~ ~
~ ~ I ' I I~ ~ ~ s ~
~ ~
~ ~ ~ ~
~ ~ ~ ~ ~ ~ I~
~ ~
~
~
~ ~ I I I ~ ~ ~
~ ~ ~ ll ~
~ 4 ~ ~ I I ~
~ ~
~ I ~ ~ ' ~
~ ~ ~ ~ S 0 ~ 4 ~
~ ~ ~
~ ~
' ~ I' ll ~ I I~ ~ ~ II ~ ~ ~
~ '
~ ~ ' ~ ~ ~
~ ' ~
~ ~ ~ ~ ~
~ ~ ~
~ ~ ~
~ ~
~ ~
~ ~ ~ '
~ S ~ 0
~ ~ ' ~
~ ~ ~ ~ ~
~ ~ ~ ' ' ' r
~ ~
~ ~ ~
I ~ . ~
S ~
~ ~
~ ~ ~
I~ .: ~
~ ~ ~ ~
~ ~
~ ~ ~ ~ ~ ~
~ ~ ~ ~ I
~ 1 ~ ~
~
~ ~ ~
~ ~ ~ ~ ~ ~
~ ~
~ ~ ~ ~
S ~ ~ ~
~ ~ S II
~ ~ ~ ~
I~ ~
0 t
FGNFGRMATIGNNLY PROCEDURE PALO VERDE NUCLEAR GENERATING NO.
STATION MANUAL 42AO-2ZZ50 RF VISION VENTING THE CHARGING PUMPS Page 7 of 9 2.8.7 If venting of the charging pumps is complete, then proceed to
~ step 2. 11.
2.9 To vent CHB-P01, perform the following:
2.9.1 Close/Check Closed valves CH-V320, CH-V332 and CH-VY74.
2.9.2 Open CH-V067.
2.9.3 Begin venting operations by opening CH-VY73. Verify flow on flow gage CH-FG-998.
2.9.4 When venting is complete close CH-VY73 and CH-V067.
2.9.5 Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V332. Check for flow on flow gage CH-FG-1002.
2.9.6 When venting is complete, close valve CH-V332.
2.9.7 If venting of the charging pumps is complete, then proceed to step 2.11.
2.10 To vent CHE-P01, perform the following:
2.10.1 Close/Check Closed valves CH-V323, CH-V336 and CH-VY72.
2.10.2 Open CH-V065.
2.10.3 Begin venting operations by opening CH-VY71. Verify flow on flow gage CH-FG-997.
2.10.4 When venting is complete close CH-VY71 and CH-V065.
F 10.5 Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V336. Check for flow on flow gage CH-FG-1001.
2.10.6 When venting is complete, close valve CH-V336.
2.10.7 If venting of the charging pumps is complete, then proceed to step 2..11.
2.11 Open valve CH-VY77.
FQIR IIIMFGIRMATIIQNGIMLY
~ ~ ~
~
~
~ ~
~ ~
~ ~ ~ ~
~ ~
~ S Io-I '
~ ~ ~ ~
I ~
I i le
~
~
I I I
~ ~
~ ~ ~ ~
I' ~ S ~ ~ ~: ~
~ ~
I E'
I FGI INFQRMATIQNNLY PROCEDURE PALO VERDE NUCLEAR GENERATING NO. APPENDIX A STATION MANUAL 42AO-2ZZ50 Page 1 of 1 F
4 REVISION
~ y VENTING THE CHARGING PUMPS Page 9 of 9 REFERENCES 1 ~ 0 Implementing 420P-2CH01, CVCS Normal Operations 2.0 Developmental 2.1 NUREG 0857 Supplement 9, Dec. 1985.
2.2 DCP 20N-CH-226.
2.3 P & ID's:
02-M-CHP-002, Rev 4- DCN's 15, 24, 30, 113, 121, 124 02-M-CHP-003, Rev 3- DCN's 19, 20, 33, 36, 42, 46, 124, 129, 130, 134, 136, 146, 148, 149.
Attachment 3 0 erations Procedure for Ventin of the Char in Pum s (42AO-2ZZ50 Revision 2)
PROCEDURE PALO VERDE NUCLEAR GENERATING NO.
STATION MANUAL A2AO-2ZZ50 REVISION VENTIANG THE CHARGING PUMPS Page 1 of 9 DEPT. HEAD DATE '2- r d PRB/PRG/TRRG REVIEW DATE APPROVED BY DATE. > >(
'FFECTIVE DATE ~ </PG >Pi'~omsosec sho22~
DN-5526C/0765C pgR ADOCK 05000529 P PDR PV21840D RFV. 8/52 (985P)
PALO VERDE NUCLEAR GENERATING PROCEDURE NO.
STATION MANUAL 42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 2 of 9 REVISION HISTORY Rev. No. Date Revised Pages Comments 2-13-86 U dated Revision Histor P '.
Rewrote ste s 2.2 thru 2.2.2.4 to ensure ravit flow ath available Added caution before sten 2.4.1 and rewrote 2.4.1.
Added steos 2.14 and 2.15.
Added ste 2.7.1 and deleted note Added note and added ste 2.12 PV215400 REV. 8/82 (985P)
PROCEDURE PALO VERDE NUCLEAR GENERATING NO.
STATION MANUAL .42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 3 of 9 OB JECTIVE This procedure provides instructions on venting hydrogen gas from the Charging Pumps in the event they should become gas bound and cannot provide makeup flow to the RCS. The Refueling Vater Tank is used to provide the head for the venting operation.
~"
TABLE OF CONTENTS SECTION PAGE NUMBER
, 1.0 VERIFICATION OF CHARGING PUMP GAS BINDING 2.0 VENTING OPERATIONS APPENDICES 1~
Appendix A - Rererences 9
PROCEDURE PALO YERDE NUGLEAR GENERATING NO.
STATION MANUAL ,42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 4 of 9 1.0 VERIFICATION OF CHARGING PUMP GAS BINDING Charging Pumps are incapable of pumping even when the valve lineup has been determined to be correct.
1.2 The level in the Volume Control Tank is suspected of having dropped to near OX prior to the Charging Pumps becoming gas bound:
1.3 Possible level deviation between the VCT level transmitters CH-LT-226 and CH-LT-227.
2.0 VENTING OPERATIONS 2.1 Place all Charging Pumps in the pull-to-lock position with their handswitches on B03.
2.2 Provide a gravity flow path from the RVT to the Charging Pump Suctions as follows:
2.2.1 If VCT outlet valve CH-UV-501 can be verified closed, open CH-HV-536 on B03.
OR 2.2.2 If VCT outlet valve CH-UV-501 cannot be verified closed perform the following line up.
2.2.2.1 In Charging Pump room P/'1, close suction valve CH-V316 and open suction cross-tie valve CH-V755.
2.2.2.2 In Charging Pump room /<2, close suction va'lve CH-V319 and open suction cross-tie valve CH-V756.
2.2.2.3 In Charging Pump room,",3, close suction vlave CH-V322 and open suction crosstie valve CH-V757.
2.2.2.4 In the East Penetration room, open the Safety Injection header isolation to Charging Pump suction, valve CH-V327..
PV21840D REV. 8/N (98SP)
~ g ~
~
~
~
I ~
~ ~
~ ~ I ' I I ~ ~ ~ -' ~ I
~ ~ ~ ~
II ~ ~ 0 ~ ~ 5 I ~ . I I'
~
I ~
~ ~ I I I I I~ ~ ~
I ~ ~ ~ ~ ~ 5 II ~ I: I ~
~ II ~ 0 ~ ~
~ II ~ ~ ~ ~ ~ ~ 0
~ ~
~ ~
II ~ I
~ ~ II ~ ~ ~
~ 5 ~
~ ~ ~ ~ ~
~ ~ ~
~ I ~ ~ ~ 5 ~
I~ ~
PROCEDURE PALO VERDE NUCLEAR GENERATING NO.
STAT(ON MANUAL .42AO-2ZZ50 REVISION VENTING THE CHARGING PUHPS Page 6 of 9 2.7 Establish communications between the Control Room, the Nuclear Operator at the Charging Pumps and the Nuclear Operator at the vent receiving tank.
2.7.1 During the venting operation, the Nuclear Operator at the vent receiver tank should try to maintain the level in the tank at approximately 50%. This is accomplished by throttling open the vent receiver tank drain valve, CH-VY-80, and throttling closed the vent receiver tank inlet valve, CH-VY-78, as necessary.
If the level in the vent receiver tank should increase above 75<o', the Operator at the tank should stop the venting process by closing inlet valve, CH-VY-78, and then informing the Operator at the Charging Pumps that venting has been momentarily stopped. When the tank level has been lowered .
sufficiently, venting should be resumed by reopening inlet valve, CH-VY-78, and informing the Operator at the Charging Pumps.
NOTE Perform step 2.8 if CHA-P01 is the pump to 'be vented. If CHB-P01 is to be vented, then proceed to step 2.9. If CHE-P01 is to be vented, then proceed to step 2.10.
Venting of the charging pumps will be complete when the local flow gages indicate solid flow and level in the vent receiving tank increases.
2.8, To vent CHA-P01, perform the following:
2.8.1 Close/check closed valves CH-V317., CH-V329 and CH-VY76.
2.8.2 Open CH-V069.
2.8.3 venting operations by opening CH-VY75. I'egin Veri:fy flow on flow gage CH-FG-999.
2.8.4 When venting is complete close CH-VY75 and CH-V069.
2.8.5 Ensure all gases are vented from the pump by opening discharge drain isolation valve CH-V329. Check for flow on =-
flow gage CH-FG-1003.
PROCEDURE PALO VERDE NUCLEAR GENERATING NO.
STATION MANUAL 42AO-2ZZ50 REVISlON VENTING THE CHARGING PU.'lPS Page 7 of 9 2.8.6 When venting is complete, close valve CH-V329.
2.8.7 If venting of the charging pumps is complete, then proceed to step F 11.
2.9 To vent, CHB>>P01, perform the following:
2.9.1 Close/Check Closed valves CH-V320, CH-V332 and CH-VY74.
2.9.2 Open CH-V067.
2.9.3 Begin venting operations by opening CH-VY73. Verify flow on flow gage CH-FG-998.
2.9.4 When venting is complete close CH-VY73 and CH-V067.
2.9.5 Ensure all gases are vented" from the pump by opening discharge drain isolat,ion valve CH-V332. Check for flow on flow gage CH-FG-1002.
When venting is complete, close valve CH-V332.
'.9.6 2:9.7 If venting of the charging pumps is complete, then proceed to step 2.11.
2.10 To vent CHE-P01, perform the following 2.10.1 ClosejCheck Closed valves CH-V323, CH-V336 and CH-VY72.
2.10.2 Open CH-V065.
2.10.3 Begin venting operations by opening CH-VY71. Verify flow on flow gage CH-FG-997.
2.10.4 When venting is complete close CH-VY71 and CH-V065. ~
2.10.5 Ensure all gases are vented from the pump by opening discharge drain isolat,ion valve CH-V336. Check for flow on flow gage CH-FG-1001.
2.10.6 When 'venting is complete, close valve CH-V336.
2.10.7 If venting of the charging pumps is complete, then proceed-to 2.11. .'tep 2.11 Open valve CH-VY77.
PROCEOURE PALO VERDE NUCLEAR GENERATING NO.
STATION MANUAL 42AO-2ZZ50 REVISION VENTING THE CHARGING PUMPS Page 8 of 9 2.12 When the vent receiver tank is near empty, close CH-VY-80.
NOTE Flow irregularities on CH-FI-212 may be caused by gas accumulating in the instrument lines.
Inform ISC of the hazards involved, and have them vent the flow transmitter as required.
2.13 Close valve CH-VY78.
2.14 Start Charging Pumps as directed by the Shift Supervisor using 420P-2CH01, CVCS Normal Operations, and verify flow on flow indicator CH-FI-212 on B03.
2.15 Stop the Aux Bldg Ess. AFU started in step 2.3.
HFA-J01/M05/M06 OR HFB-J01/M05/M06 2.16 When conditions have stabilized, restore CVCS system to normal operating conditions at the discretion of the Shift Supervisor, per 420P-2CH01, CVCS Normal Operations.
PV218400 REV. 8/82 (985P) j
PROCEDURE PALO VERDE NUCLEAR GENERATING NO. APPENDIX A STATION MANUAL .42AO-2ZZ50 Page 1 of 1 REVISION VENTING THE CHARGING PU.'iPS 2 Page 9 of 9 REFERENCES 1.0 Implementing I
1.1 420P-2CH01, CVCS Normal Operations 2.0 Developmental 2.1 NUREG 0857 Supplement 9, Dec. 1985.
2.2 DCP 20N-CH"226.
2.3 P & ID's:
02-M-CHP-002, Rev 4 - DCN's 15, 24, 30, 113, 121, 124 02-M-CHP-003, Rev 3 DCN's 19, 20, 33,"36, 42, 46, 124, 129, 130, 134, 136, 146, 148, 149.
'\
'V216400 AEV, 8/82 (985P)
Attachment 4 Sim lified Dia ram of Char in Pum Vent 'Pi in
E'l