ML17303B056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~~ACCELERATED DISIJ3UTION DEMONSTRA3N SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS)8 FACIL:Si7N-5(-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFXLIATION COLVILLE,J.M.
{{#Wiki_filter:~ ~
Arizona Nuclear Power Project (formerly Arizona Public Serv HAYNES,J.G.
ACCELERATED           DISIJ3UTION         DEMONSTRA3N             SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS) 8 FACIL:Si7N-5( -528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME         AUTHOR AFFXLIATION COLVILLE,J.M.       Arizona Nuclear Power Project (formerly Arizona Public Serv HAYNES,J.G.         Arizona Nuclear Power Project (formerly Arizona Public Serv.
Arizona Nuclear Power Project (formerly Arizona Public Serv.RECXP.NAME RECIPIENT AFFILIATION
RECXP.NAME         RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Mar 1988./880415 l r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR SIZE: l9 TITLE: Monthly Operating Report (per Tech Specs)NOTES:Standardized plant.Standardized plant.Standardized plant.05000528 8 05000529 05000530/RECIPIENT ID CODE/NAME PD5 LA LICITRA,E INTERNAL ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB ll RPB" 10 REG FILE 01 EXTERNAL: EG&G GROH, M NRC PDR NOTES COPIES LTTR ENCL 1 0 1 0 10 10 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NRR/PMAS/ILRB12 RGN5 LPDR NSIC'OPIES LTTR ENCL 5 5 1 0 1 1 2 2 1 1 1 1 1 1 1 1 1 1*A TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 30  
Monthly operating repts   for Mar 1988. /880415 l r.
~~'I l  
DISTRIBUTION CODE: IE24D     COPIES RECEIVED:LTR               SIZE:   l9 TITLE: Monthly Operating Report (per Tech Specs)
~~0~j~NRC MONTHLY OPERATING REPORT DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50"528 PVNGS-1 04/12/88 J.M Col vi l le 602-393-2679 OPERATING STATUS 1 r 2~3 0 4~5~6.7~8.9.10.Unit Name.Palo Verde Nuclear Generating Station Reporting Period: March 1988 Licensed Thermal Power (MMt): 3800 Nameplate Rating (Gross MMe): 1403 Design Electrical Rating (Net MVe): 1270 Maximum Dependable Capacity (Grass MMe): 1303 Unit 1 Maximum Dependable Capacity (Net MMe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons.Power Level to Mhich Restricted, If Any (Net MVe): NONE Reasons For Restrictians, If Any: This Month Yr.-to-Date Cumulative 11.12.13'4.15.16.17 18'ours in Reporting Perio Number of Hours Reactor@as Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit, Reserve Shutdown Hours Gross Thermal Energy Generated (MPH)Gross Electrical Energy Generated (MMH)Net Electrical Energy T44'80.2 0.0 518.7 0'1 667 501 L=L 582 000 2184 580.2 0.0 518.7 0.0 SS7 501 582 000'9056 10 557.4 L~0.0 10 235.8 0.0 36L700L338 12LT25L300 19.20'1'2~23~Generated (MMH)Unit.Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate 24., Shutdowns Scheduled Over of Each): None 530 379 69.7M 69.7R 58 4A 56 1A OLO~Next.6 Months 530 379 L 23.8'A 23 8M 19.9'c 19Lik 69L1~(Type, Date, an 858 304.53.7R 53.7k'1.0R 49.0R 29.5R d Duration 25.26.If Shutdown At, End of Report Period, Estimated Date of Startup'.Units in Test Status (Prior To Commercial Operation):
NOTES:Standardized plant.                                                 05000528 8 Standardized plant.                                               05000529 Standardized plant.                                               05000530/
8804220055 PDR ADOCK R INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 880331 05000528 DCD Forecast ,5/85 6/85 11/85 Achieved 5/25/85 6/10/85 1/28/8S  
RECIPIENT      COPIES          RECIPIENT       'OPIES ID  CODE/NAME    LTTR ENCL      ID CODE/NAME     LTTR ENCL PD5 LA               1    0    PD5 PD                5    5 LICITRA,E           1    0    DAVIS,M              1    0 INTERNAL ACRS                  10  10    AEOD/DOA              1    1 AEOD/DSP/TPAB NRR/DLPQ/PEB RPB" ll 10 1
~'4>>IF't>>''~I 4~Fj g't,pili*~af',t>)ti>>IR il,',, I ill 4 I~>>jf 4'I>>>>l, II Rig il C QR-4 R it'I 4~i~+I>>I.I"Rt R 4 IU t>>ti f!4>>>>Ut>>'kti>>j',t.Igh,'i, Rig g 4,>>(~~U f Dt!t.',.'J't t.''<Oft i>>Ir>>',ILC 3 NIRR~'.Q~>>3U if I.t:, Fi.>N 4 Y<<UUt't-R', U>>t 4"" r>>,4 Fj R<<},p TIF jR>>tg>>lt i ij-),'tlii4Ii>>I'hl UJ C UU>>>>gg, (IT I*tptt'4 4~t>>'i=j 3)5 I L">>I F>>1 tl'J(b p>>'>>h qg>>.g~!6,":~VV Fi'I tt'F>>"I>t4!i~R'a"0 t>>'P A-.>>r 4'X>>TT3a%,g>>,*z pt/'<Vf R'd h'4, S 4 g 4 4>>RI RI Il 4'e.,Qc!:"4 R".R-4C'4 I"~~4'4"k P,I~AID II','Uf"i, 5'.T~~'I Ug'-,4')F'<<P T':tO<;S<,4 Z<<J..4',.<<N>>4 I" kl.Jtr-h 4U>>"'A'4 4'C.<I*>>fr,'t-..'9>I i~t.O~r,lt''1',l t<<r.I,<'0 4>>:,g'QaT>>'U 4, I'*$$ll 4'I i">>g<<S.r&4 t'W Fi~TT(, i>>Nfl ll 4'u<R!I'>>b'rth%'>>
1 1
<<UP>>~~"4hh II R;+I'" 3't.&l." t I'tl'.TR>>1>><l>>4.
1 1
~~~r J>>,4 RRI 4 I"'"f>>r)i'd+i~ii~Tr>>4 ir~'
1 ARM TECH ADV NRR/DOEA/EAB 11 NRR/PMAS/ILRB12 2
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-528 PVNGS-1 04/12/88 J,M, Colyllla ,602-393-2679 MONTH March 1988 DAY AVERAGE DAILY POMER LEVEL DAY AVERAGE DAILY POMER LEVEL I 0 17 1~209 0 0 0 0 0 18 209 C, 1~247 1~268 1~239 1~205 0 23 1~009 24 109 C.10 11 h , 13 0 120 597 810 822 25 26 27 28 30 1~268 1 g 272 1~268 1 g 272 1 g 272 1~276 813 1 g 272 1~130  
1 1
~~~g:Asti jj'<j'ajj"'8""A>+f)+t , t3<<Ii t 0,, ktQ)I)I~4 ft)g ttl''0 ff'i'hC,~3.'9<<" NOD>>~~3E.jt.c
2 1
'., 1 ,~'~ME'k r'-.C'~0.>)lIHOt".
1 REG  FILE      01    1     1   RGN5                  1   1 EXTERNAL: EG&G GROH, M          1     1     LPDR                  1   1 NRC PDR              1     1    NSIC                  1    1 NOTES                            1    1
..'i"'I8 J kid",V~9 Y.Xh~t.arab".3~i>'a Yhef Jd','.>>RB<3("~V, IX'<'~j SxA3V,"'~~Q c, 09 J Wt 0'~0 0~''EV 0~04~0 N 6~\t'QL.L.'~0 I=:~0~'A 0*ZY.Jj',~~0 E\0+IQQE..~~..I..IA~0'0 4 M'~0 5 c~0&~~CJ: 8,t.I 0 REFUELING INFORMATION DOCKET NO.UNIT DATE COMPLETED BY, TELEPHONE ,50-528 PVNGS-1 04/12/88 J.M.Colville 602-393-2679 ll Scheduled date for'ext refueling shutdown.1 03/2X/89 2.Scheduled date for restart following refueling.
                                                                                  *A TOTAL NUMBER OF COPIES REQUIRED: LTTR       33   ENCL   30
05/29/89 3.Mill refueling or resumption or operation thereafter require a Technical Specification change or other license amendment' To be determined 4~Scheduled date.for submitting'proposed.'licensing action and supporting infoxmation.
 
To be determined Important Licensing considerations associated with refueling, e.g.new ox diffexent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, neo operating procedures.
    ~ ~
To be determined p)t>>')V'l" E)E,>>SW>><<w"'ll I CE.w t."<<4''I W>>off C f)a$.".i"'.p)fP~).>>fl:I<<;E~D'JMX v>~l~w Eg AS:)ESP'E~))lI 4 E V<<3:)',)I, p Ewt"''"JD ,I l I k>>>>$E'>>2: '.i'a''>>I~Pl 3, w.E 4,<<)'!a I4<<f: "W",>>.>I l, 9f,+)lA"f,)~,'" EE f'0~.'"XC','I-'>>'>>A.(>>.)~).',...'$)'.I 4)wj)pal,pg>>).l'J<g p<<'gw-g g')$>>>>fg C<<'4<<'I>>
'I l
~~~0 0 REFUELING INFORMATION DOCKET NO UNIT DATE COMPLETED BY TELEPHONE 50-528 PVNGS-1 04/12/88 J.L.Hull 602-393-2679 (Continued) 6.The number of fuel assemblies.
 
a)In the core.241 b)In the spent fuel storage pool.80'~8~Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None Progected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2006 (18 Months reloads and full core discharge capability).
  ~   ~     0
d li Ji*k I';)J ir),~">)li), p)I)ti)~S JJ J)l~J.,')l J  
~
j     ~
NRC MONTHLY OPERATING REPORT DOCKET NO.           50"528 UNIT NAME            PVNGS-1 DATE                04/12/88 COMPLETED BY        J. M Col vi l le TELEPHONE            602-393-2679 OPERATING STATUS 1r      Unit  Name. Palo Verde Nuclear Generating Station                 Unit  1 2~      Reporting Period: March 1988 30      Licensed Thermal Power (MMt): 3800 4~      Nameplate Rating (Gross MMe): 1403 5~      Design Electrical Rating (Net MVe):                   1270
: 6.      Maximum  Dependable   Capacity (Grass     MMe):     1303 7~      Maximum Dependable     Capacity (Net   MMe):         1221
: 8.      If Changes   Occur In Capacity Since Last Report, Give Reasons.
Ratings       (Items Number     3 Through 7)
: 9.     Power Level to Mhich Restricted, If Any: If      Any (Net MVe):       NONE
: 10. Reasons   For Restrictians, This Month         Yr. -to-Date         Cumulative
: 11.             in Reporting Perio            T44                2184 12.
13 Number
                    'ours
                        @as of Hours Reactor Critical Reactor Reserve     Shutdown
                                                                  '80.2 580.2      '905610 L557.4~
Hours                                   0.0                  0.0                0.0
                    '4.
Hours Generator On-Line               518.7              518.7            10 235.8
: 15. Unit, Reserve Shutdown Hours                                   0'                    0.0                0.0
: 16. Gross Thermal Energy Generated (MPH)                       =L501 1 L667                SS7 501          36L700L338 17      Gross Electrical Energy Generated (MMH)                     582 000            582 000          12LT25L300 18    Net Electrical Energy Generated (MMH)                      530 379            530 L379            858 304.
: 19. Unit. Service Factor                  69.7M                23. 8'A            53.7R 20      Unit Availability Factor              69.7R                23  8M            53.7k
                    '1 Unit Capacity Factor                                                            '1.0R
                    '2  (Using MDC Net)                        58 4A                  19. 9'c
                    ~   Unit Capacity Factor (Using DER Net)                       56 1A                  19Lik              49.0R 23 ~    Unit Forced Outage Rate                 OLO~                69L1~              29.5R 24.,   Shutdowns Scheduled     Over Next. 6 Months (Type, Date, an d Duration of Each):      None
: 25. If Shutdown   At, End of Report Period, Estimated Date of Startup'.
: 26. Units in Test Status (Prior To Commercial Operation):
Forecast        Achieved INITIAL CRITICALITY                                   ,5/85           5/25/85 INITIAL ELECTRICITY                                    6/85           6/10/85 COMMERCIAL OPERATION                                  11/85            1/28/8S 8804220055 880331 PDR    ADOCK 05000528 R                  DCD
 
                                    ~
                                      '4>>   I4 ~
Fj IF t>>'' ~
* g't,pili
                              ~ af',t>               )                                                               II    Rig    il C QR-4 i
R it         'I       4 ~
                                                                                        ~   +       I         >>I. I"Rt       R     4     IU   t>>ti ill                                                                                                              t.''<Oft 4        I~>>                                                                        f                                i>>Ir>>
                                                                                                                                                            !4>>
jf                            >>Ut       >> '     kti>>j',t             . Igh,'i,                       ',ILC      3    NIRR ~         '.Q~>>
IR il,',,    ti I
                                                              'I >>          4
                                                                              >>l,  f Dt!t         .
Rig
                                                                                                    ',.'J't g
                                                                                                            >>(~~U 4,
3U     if I.t
:, Fi       .>N Y<<UUt't                                         -R     ',     U>>t       4"" r>>,4
                                                                                                                                                                    'hl Fj   R<<},p           TIF jR>>tg>>
4                                lt ij-),'
i                            tlii4Ii>>I                       UJ   C     UU>>>>gg,       (IT I
* tptt             '
4
                                                                                                                                                            'i=j 3)5                               h qg>>.g I L ">> I F>>1                                                   ~    !6,":~VV
                                                                      ~ t>>                                                                                        tl                                     Fi'I
                                                                                                                                                          'J(   b p>>     '>>
4 tt 'F>> "I >t4 R
                                                                                                                              'a"0                 t>>'P       4   'X>>TT3a                         %,g>>
A -.>>r                                                                        ,*z pt/
                                                              !i ~                                                                                                                            '<Vf R'd P,I~ AID                II h                                                                         ~~
                                                                                                                  ','Uf"i,                 5        '.T~       ~   '
I Ug      '-,4 ')
RI  Il                                                                                                                                                              F
                '4,                                         4'
                                                                                                                  '<<P i'd+
T':tO<;                               S     <,4 Z <<J..4',                 .<<N S                                                  e                                                                            >>4 I         "         kl . Jtr 4
                                                                  .,Qc!                                                            -h 4U>>           'A   '4                   4'C.<I         *>>
                                                                                                                  't g  4 fr,               -..         '9>           I   i ~t             . O~r,lt
                                                                                                                                                                                                      ''1',l
:"4        R".R t <<r. I,<'
0 4>>:,g'QaT>>'U I"-
4                                       4C'4                                                                            4, I'*$$
ll 4'I                     <<S.r& i" 4 t 'W                                   Fi       ~TT(,>>g
                    >>RI                                                              4'4    "k                                                i   >>Nfl ll         4         'u<R!I'>>b'rth%'>>
                                        <<UP>> ~
                                                            ~   "4hh         II R;     +     I'     "   3't       .&           l."   t   I         'tl       '.TR>>1>><l>>4.
                                                                                                                                                              ~             ~     ~     r J>>,4       RRI         4 I               "f>>r )                         i~   ii~         Tr
>>4 ir                           ~ '
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.         50-528 UNIT NAME          PVNGS-1 DATE                04/12/88 COMPLETED BY        J,M, Colyllla TELEPHONE          ,602-393-2679 MONTH   March 1988 DAY AVERAGE DAILY POMER LEVEL         DAY AVERAGE DAILY POMER LEVEL       I 0                     17           1~209 0                     18             C, 209 0                                    1~247 0                                    1~268 0                                    1~239 0                                    1~205 0                     23           1~009 24             C. 109 0                      25            1 ~268 10                                     26           1 g 272 11            120                      27            1 ~268 h                597                      28            1 g 272 13            810                                    1 g 272 822                      30            1 ~276 813                                   1 g 272 1~130
 
                                                                                                                                                                            ~ ~ ~
g:Asti jj '< j'ajj" '8 ""A>+
                                                )I        )I~ 4 ft)     g f)+ t                      ttl''0 ff                                                                                                                 ,
                                                                                                                                                                          ~
                        , t3                                      'i'hC,
                                            ~   3.'9         <<" NOD
        <<Ii t 0,,      ktQ                            >>~~3E.jt.c '., 1
                                                                                                                                    '~ME'k     r'-.C'~0     .>)lIHOt".
..'i "'I8J    kid",V ~9         Y .Xh~t           . arab".3~i>'a         Yhef                 Jd ','.>>             RB<3(" ~         V, IX'<'       ~j SxA3V," '~~Q c,   Wt   0'                 ~   0 09 J 0                             ~ ''EV   0
                              ~04                             ~0                                   N   6 ~     \
t'QL.
                            ~        0 L.'
I=
:~     0
                                                                                                                                      ~'     A           0
* ZY.Jj',
                                                                                                          ~ ~   0   E     \     0
              .. ~   ~.. +IQQE I ..IA
                                                    ~ 0 '0
                                                                                                                                        ~
0 4 M'                           CJ:
0 5
                                                                                                                                    &      c~
                                                                                                                                                ~   ~
8,t.
I   0
 
REFUELING INFORMATION DOCKET NO.     ,50-528 UNIT            PVNGS-1 DATE            04/12/88 COMPLETED BY,  J.M. Colville TELEPHONE      602-393-2679 ll Scheduled date   for'ext refueling shutdown.
1 03/2X/89
: 2. Scheduled date   for restart following refueling.
05/29/89
: 3. Mill refueling or   resumption or operation thereafter require   a Technical Specification change or other license amendment' To be determined 4~ Scheduled date .for submitting'proposed.'licensing action and supporting infoxmation.
To be determined Important Licensing considerations associated with refueling, e.g. new ox diffexent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, neo operating procedures.
To be determined
 
V'p) t>> ')
l" E
E,>>SW>>
                                                                                                                                )
                    <<w" 'll I CE   . w t." <<4''I W>>off C f             )a$     .".i"
                                                        '.p )fP ~ ).>> fl:I <<;E~D'JMX v>~l~w                   Eg AS:   )ESP'E ~                                                                                     V <<3:   ) ',) I, p
                                                                              ))    lI 4  E Ewt  "    ''"JD E'
                                                >>   2:   '.i'a'   '>> I ~Pl                               .) ~  ).',... '$ )'.I 4
    ,I    l I k>>>>$        3,  w .E 4,<<)'!a I4<<   f: "W ",>>.>   I l, 9f,+)lA"f, )                       )      wj  )pal,pg>>
                                                                                            ) .l'J<g p<<'     gw  - g  g  ')$      >>>>fg
                                                ~,'" EE        f '0~.'"XC',  'I-'>> '>>A. (>>         C<<'4<<'I>>
 
0
~ ~ ~ 0 REFUELING INFORMATION DOCKET NO     50-528 UNIT          PVNGS-1 DATE          04/12/88 COMPLETED BY  J.L. Hull TELEPHONE    602-393-2679 (Continued)
: 6. The number of fuel assemblies.
a)   In the core.       241 b) In the spent fuel storage pool.         80'
            ~ Licensed spent fuel storage capacity.       1329 Intended change   in spent fuel storage capacity. None 8 ~  Progected date of last refueling that can be discharged to spent fuel storage pool   assuming present capacity.
2006 (18 Months reloads and   full core discharge capability).
 
d li Ji k
I'; )J ir),~ ">)
li ), p
      )I )
ti
                                    )~S JJ J ) ~ J.,       ')
l l                       J


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH ,DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-528 PVNGS-1 03/07/88 J.L.Hull 602-393-2679 February 1988 03/01 0000 Unit in Node 4 Entered Mode 3.03/01 03/05 03/07 2126 03/08 03/09 03/10 03/10 03/10 03/19 03/22 Entered Node 2-Reactor Critical.Entered Node 3 due to contactor problem with CEDN MG sets.Entered Mode 2-Reactor Critical.0147 0010 1245 Entered Node 0643'ynchronized Main Generator to Grid.1256 Manually tripped Nain Turbine for Overspeed Testing.Synchronized Main Generator to Grid.1532 1000 , Reactor power at 100'.1845 Reactor power reduced to 804 due to SG Chemistry being out of specification as a result of the polishers being out of service for regeneration.
OF OPERATING EXPERIENCE FOR THE MONTH
03/24 1645 Reactor power at 100'.
                                                ,DOCKET NO. 50-528 UNIT          PVNGS-1 DATE          03/07/88 COMPLETED BY  J.L. Hull TELEPHONE      602-393-2679 February 1988 03/01   0000     Unit in Node 4 03/01            Entered Mode 3.
0~~~'~t g 5'l~Q,)l)f 1 A'i~i'Th)V">'k<"~'ft)"~)l,')L 1 U 1 4'll'>air~>>fil,~'P'I li P".~s!f t.').z"$J.4 e"'$<'f'1'%gal" q+v f,~~~~l+>FS'~0 f)'C~XA~>f"~~"~".k)<'r Eg'.3 l X",3')~$'~l)",'it e'gW'I')~".>>'Xw'tD"." 8':t~~flH 6~;Pv''fd'a')l!pie
03/05   2126    Entered Node 2  Reactor Critical.
.'CJ'C/~cs<', a., sN k<<(~'x+~E".s;iver>i,t~3." XF~Ae (w~pl I<<)fsCRl'I 4PXl I 4 lQ w Ql g)~~kg.e G f nfl>Q~)~)l(."v>>~'r.>+'>~".>>~i"'x, v">as<''n~,>'e~a~i
03/07   0147    Entered Node 3 due to contactor problem with   CEDN MG sets.
~v:>>~<;.~.ne,"w~i3:f."..>
03/08    0010    Entered Mode 2   Reactor Critical.
s~, A~~4's"4 6'a+=>4..~1'.>,>J,"~'f~)6 RO ,rQ<Q~XPr~c'.%~,~i~m>'t'~AP f MF>p d&~M9 UNIT.SHUTDOWNS AND'POWER REDUCTIONS DOCKET NO: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
03/09    1245     Entered Node 03/10    0643 'ynchronized     Main Generator to Grid.
50-528 PVNGS-1 4/12/88 J.H.Colville 602.-393-2679 Method of Duration Shutting 3 System4 Component5 No.Date Type Hours Reason'Down Reactor LER NO.Code Code Cause and Corrective Action to Prevent Recurrence 10 (Cont'd-F from 1987)222.7 Unit shutdown to repair an inoperable Control Element Assembly.1 3/10 S 2.6 B N/A N/A N/A Manually tripped Hain Turbine for Overspeed Testing.2 3/22 F B N/A N/A N/A Reactor power reduced to 80X due to SG Chemistry being out of specification as a result of the polishers being out of service for regeneration.
03/10    1256     Manually tripped Nain Turbine   for Overspeed Testing.
1 F-Forced S-Scheduled Reason: A-Equipment Failure (Explain)E-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)Method!1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Honth 5-Reduction of 20X or Greater in the Past 24 l1ours QWrlmr (Exnlnin)4 Exhibit F-Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER)File (NUREG 0161)Exhibit H-Same Source
03/10    1532    Synchronized Main Generator to Grid.
~~
03/19    1000   ,
NRC MONTHLY OPERATING REPORT DOCKET NO.UNXT NAME DATE CONPLETED BY TELEPHONE 50-529 PVNGS-2 04/12/88 J.N.Colville 602-393-2679 OPERATING STATUS 2~3~4 5.6.7~8.Unit Name'Palo Verde Nuclear Generating Station4 Unit 2 Reporting Period: Narch 1988 Licensed Thermal Power (MMt): 3800 Nameplate Rating (Gross MMe): 1403 ,Design Electrical Rating (Net MMe): , 1270 Maximum Dependable Capacity (Gross MMe),: 1303 Maximum Dependable Capacity (Net MMe): 1221 If Changes Occur In Capacity Ratings (Xtems Number 3 Through 7)'ince Last Report, Give Reasons.9.10.Power Level to Vhich Restricted, Xf Any (Net MVe): NONE Reasons For Restrictions, Xf Any-This Month Yr.-to-Date Cumulative
Reactor power at 100'.
.11~12 13'4~15.16'7.18.19.20 21'2.23~24~25.26'44 Hours in.Reporting Period Number of Hours Reactor Mas Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MMH)Gross Electrical Energy Generated (MMH)Net Electrical Energy Generated (MMH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using NDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over of Eich): Currently in R 2184 13 440 4 0 1202 10 477.1 1202 10 32S.2 4 0 0 4 50S 600.4 4 3747154767 II 4 4 588 100.342494370 0 487 775.4 4 0 1244244657 76485 76.8R 55.0R O.OR 55.0~O.OR 7547M 55.8'c'.OX 5346m 7248M 040M 0 OM 5 9M Next 6 Nonths (Type,-Date, and Duration efueling Outage Units in Test Status (Prior To Commercial Operation):
03/22    1845     Reactor power reduced to 804 due   to SG Chemistry being out of specification as a result of the polishers being out of service for regeneration.
If Shutdown At End of Report Period, Estimated Date of Startup.05/15/88 XNITIAL CRITICALITY INITIAL ELECTRICITY COMNERCXAL OPERATXON Forecast 3/86 6/86 11/86 Achieved 4/18/86 5/20/86 9/19/86
03/24   1645     Reactor power at 100'.
<<)f'<<<'"'X))))4>>.Xil If<<'I<<<<t if Xl~I l~2>>3h'-'l4''Vee
 
>>-'e Ife.<<3<<V=I lg e I I It t>>'Ie<<3~4 i ff)*, t,''g+III'$~'r,'>>f.="e e l>>'X$a" l)~)">>X<<eg'<<.<<>>'j)POX, R<r.X+''ALP XX>g ,lfe y f<<~g,.I+R-,<<)I(,)rf e>>~I~~~ef l I%'''f'!off" X X l ef")<<3I>>)>>1~Et m,.', e e WPX'7<<e l'~)>>>><<~f~I>>4>>>>g>>)g~e fl f>>')$g I fi''X 7X)<<XX">>X X,":<<>>.d<<~0 I!,e'"E.SC)f=>>'
0
~<<P I>><<II X, rf>>I':l,l r kf Xe ee Q=~I<<~-~Pf A e X''<<3'X>>~)t<<e il<<'1>>1'e$, Ii<<p', f I~f~<<X," I uP>>~)'-II>><<gs',>>X~e gg,i C.)p)e~~1~>)" W reit l W~'~I g>>I u 4~<',w,<<('~4>>~i,)1I'")'I<<L'X P II,"I')II)3 f IIg'I C))t>3X'L l'V'$9 J)t<<hi)>>Iye)'>>)I)A(.tf.'Ii
                                                                                                                                                                            ~ ~ ~
'*f rf'$'I e'e<<g<<3<<keilli<<<<,",)JX')4e)'<<")I~>>'Xg>>P~)f'>f f,.If 1'<<7>'-'te>>l.l., gg w<<E',')>>e>>>>,<<ra'<<)~i XX4<<r Pg d e>>"<<>>I)t>>>>ib I c<<Xgr U)>>I)1.P q--<e.,<X>b<,,=.>>V~.'ude-,'XX
                '~t   g 5           ' l~   Q,)l               )   f A   'i~i
<<, X+~>X xa 0.'<<X>>''X'e>~C'I')~e.)e<<<e>>0X:~..I~~Sl)t~)I<<<<&#x17d;et<">>'Xe.Xfbl',I>>e I.'1<<$l'll<<'~Ci e.G'1>>J'<<X>>",Xtf'X,>>9<<', XX'$4,.>>XX(>>" e.$.,<<I>>t e~.'eh<<I=.,*j,)*f~'3 fl AVERAGE DAILY UNIT POMER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-529 PVNGS-2 04/12/88 J,M, Ccl yi 1 le 602-393-2679 MONTH: March 1988 DAY AVERAGE DAILY POSER LEVEL DAY AVERAGE DAILY POWER LEVEL 0 0 18 0 0 19 0 0 20 0 0 21 0 22 0 0 23 0 0 24 0 9 10 25 0 0 12 28 29 14 30 0 0 0
                                            'Th         )
'~4 w.44'\4~4 4 4 4~4''I r rr 4 4 4~r r~4~'
1      V"           >'k   < "~'ft)"~
REFUELING INFORMATION DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE SO-529 PVNGS-2 04/12/88 J.M.Colville 602-393-2679 Scheduled date for next refueling shutdown.09/23/89 Scheduled date for restart following refueling.
                                )l,')
12/01/89 Vill refueling or resumption or operation thereafter require&Technical Specification change or other license amendment2 To be determined Scheduled date for submitting proposed licensing action and supporting information.
L1 U 1 4'll '
                                                                                                                >air~>>     fil,               ~'
P
                                                                                                      'I li P"       .~s                                             !                                       f t.')   . z       "$ J     . 4     e
                                                                              $   <'f                     '1'%gal"       q+ v     f,~           '~0                        f)
                                                                                                                                    ~ ~l +>FS
                                                                'C ~       XA~   >f"~ ~"       ~   ".       k)<'r Eg     '.3     l X",3
                                                                                                                  ')~           $ '~l   )",'it                 e'gW'I'
                                        )~   "         .>> 'Xw'tD"."             8':t~~flH               6 ~;         Pv   ''fd'a')l!pie           . 'CJ'C
                          /                                         ~ cs<',     a.,   sN       k   <<(~'     x +       ~ E   ". s; iver>i,t                 ~3." XF~
Ae       (w         ~pl     I <<)fsCRl       'I   4PXl   I4  lQ                                                     w   Ql g
                                                                                                            >Q~)~)                 l(             ,rQ<        Q~XPr
)~~kg . e f  nfl                        .   "v>> ~'r.> +             '> ~     ".> >   ~i"   'x, v" >as<''           n~,>'e~a~i                           ~c'. % ~,
G                                          ~v: >>       ~     <;.~. ne,"w~i3:f."..> s~
                                                , A~     ~
4's"4 6'a+=>           4   ..~   1 '.>,>J,"~'f~)6               RO
                                                                                ~ i~m   > '
t'~       AP     f     MF>p d&~M9
 
UNIT. SHUTDOWNS AND 'POWER REDUCTIONS DOCKET NO:   50-528 UNIT NAME: PVNGS-1 DATE: 4/12/88 COMPLETED BY:   J.H. Colville TELEPHONE: 602.-393-2679 Method   of                                                         Cause and  Corrective Duration                     Shutting                           System4       Component5               Action to No.     Date Type         Hours       Reason       'Down Reactor 3        LER NO. Code               Code         Prevent Recurrence 10 (Cont'd-   F           222.7                                                                                 Unit shutdown to repair an from 1987)                                                                                                  inoperable Control Element Assembly.
1       3/10   S               2.6         B                                   N/A       N/A               N/A   Manually tripped Hain Turbine for Overspeed Testing.
2       3/22     F                           B                                   N/A         N/A             N/A     Reactor power reduced to 80X due to SG Chemistry being out of specification as a result of the polishers being out of service for regeneration.
1                                                             Method!
4 Exhibit  F - Instructions F-Forced     Reason:                                                                 for Preparation of Data A-Equipment Failure (Explain)                   1-Manual S-Scheduled                                                  2-Manual Scram          Entry Sheets for Licensee E-Maintenance or Test                                                  Event Rcport (LER) File C-Refueling                                    3-Automatic Scram 4-Continuation from     (NUREG  0161)
D-Regulatory Restriction E-Operator Training & License Examination        Previous Honth F-Administrative                                5-Reduction of 20X     Exhibit  H-Same Source G-Operational Error (Explain)                    or Greater in the II-Other (Explain)                                Past 24 l1ours QWrlmr (Exnlnin)
 
~ ~
NRC MONTHLY OPERATING REPORT DOCKET NO.               50-529 UNXT NAME                 PVNGS-2 DATE                      04/12/88 CONPLETED BY              J.N. Colville TELEPHONE                602-393-2679 OPERATING STATUS Unit Name'Palo Verde Nuclear Generating Station4 Unit                 2 2~        Reporting Period: Narch 1988 3~        Licensed Thermal Power (MMt): 3800 4        Nameplate Rating (Gross MMe): 1403
: 5.      ,Design Electrical Rating (Net MMe):         , 1270
: 6.        Maximum Dependable Capacity (Gross MMe),: 1303 7~        Maximum Dependable Capacity (Net MMe):         1221
: 8.        If Changes Occur In Capacity Ratings (Xtems Number 3 Through 7)
          'ince Last Report, Give Reasons.
: 9.       Power Level   to Vhich Restricted, Xf   Any   (Net MVe):           NONE
: 10.      Reasons For   Restrictions, Xf Any-
      '44 This Month     Yr.-to-Date             Cumulative
. 11 ~     Hours in. Reporting Period                          2184                13 4 440 12        Number of Hours Reactor Mas Critical                       0              1202                10 477.1 13        Reactor Reserve Shutdown
    '4    Hours
    ~      Hours Generator On-Line                             1202                10 4 32S.2
: 15.      Unit Reserve Shutdown Hours                                                                         0 16        Gross Thermal Energy Generated (MMH)                     0          4 4 50S 4 600.        3747154767 Gross Electrical Energy
    '7.
II Generated (MMH)                     0            4 588 4 100.          342494370
: 18.      Net Electrical Energy Generated (MMH)                     0            4 487 4 775.        1244244657
: 19.      Unit Service Factor               O.OR              55.0R                  76485 20        Unit Availability Factor          O.OR              55.0~                  76.8R 21        Unit Capacity   Factor (Using NDC Net)                                     55.                    7547M
      '2.
Unit Capacity   Factor                                     8'c'.OX (Using DER Net)                                     5346m                  7248M 23 ~      Unit Forced Outage   Rate         040M              0  OM                    5 9M 24 ~      Shutdowns Scheduled   Over Next 6 Nonths  (Type,-Date,          and  Duration of Eich): Currently in R efueling Outage
: 25.      If05/15/88 Shutdown At End of Report Period, Estimated Date of Startup.
26        Units in Test Status (Prior To Commercial Operation):
Forecast          Achieved XNITIAL CRITICALITY                              3/86              4/18/86 INITIAL ELECTRICITY                              6/86              5/20/86 COMNERCXAL OPERATXON                          11/86              9/19/86
 
                            <<)f'<<< '                        .Xil    If<<    'I <<<<t  if 3h'-'l4''Vee X))))4 Xl ~ I    l~
2>>
                                                                                                                                                        <<V
                                                                                                                                                                          *, t,''
Ife        .<<3                          =I        lg          e          I          I  It  t>>                'Ie
                                                                                                                                          <<3~4                  i  ff)                                                       g        +III        '$
                                                                                                                  ~    'r,'>>f            .=
                                                                                                                                                        "e            e l>>        'X      $ a"                      l)~)" >>X            <<
eg    '<<                                                                                                                               ~ )>>>>
                                                                                                                  .<<>>'j) POX, R <r                                        .          X+ ''ALP                                  XX      >g                  ~  f  <<
                                                                                                            ,lfe y f<<             ~
g,            .        I
                                                                                                                                                                +    R  ,<<)                    I(,)                      rf              e>> I
                                                                                                                                                                                                                                            ~ ~ ~ ef
                                                                                                                                                                                                                                                      ~
                                                                                                                                                                                                                                                              ~ I e
I       %'''f'!
ef")<<3I>> )>>1
                                                                                                                                      ~Et      m, off  "
X X e  e l
WPX'7<<e                                        l' l
                                              >>4                                  g>>)                     g    ~   e    fl f >>')            $g                  I        fi                    '              'X    7X
                                                                                                                                )<<XX                "
                                                                                                                                                          >>X    X,": <<>>.                    d<<~ 0                            I!,e'"E.SC)f=>>'            ~ <<P  I
  >><<II X, rf          >>
I':l,l r          kf    Xe ee      Q    =
                                                                      ~
e X      ''<<3 '                           X>>
e
                                                                                                                                                                                                                                                            ~ ~
I
                        <<                                                                                                                                                                   ~     )      t<<
e        il      <<'1>>     1'            e
                                                                                                                                                                                                                                $ ,    Ii  <<p',
                                                                                                ~-
1
                                                                                                        ~ Pf  A f I  ~ f~ <<X,"                     I uP>>                         ~ >)" W
                                                                                                                                              ~ )'-II  >><<gs',>>         X~ e                gg,i                          C.    )p)
                                                                                                                                                                                                                                                "I ')II) reit II,           3 f IIg        'I           C )      )t>3X'L                      l              'V'$ 9      ~ C' t<<hi) >>           Iye)'>>                                )A(.tf.'Ii J)
                                                                                                                                                                                '* f     rf'$'I e'e<<g<<3                                )I l  W
        ~
                                                                                                                                          ~ >>       'Xg>>P
                                                                                                                                                                          <<keilli <<<<,",
                                                                                                                                                                                ~)f      '>f f,
                                                                                                                                                                                                                            )
                                                                                                                                                                                                                          .If      1'<<
JX') 4e) '<<")
7  >  '-'te>>l I
                                                                                                                                                                  .l., gg
              ~                                                                                                                         w   <<E',              ')>>e>>>>,                   <<ra '<<)~i                                                  XX4      I')   ~
                                                                                                                                                                                                    "<<>> I)t r
Pg    d            e>>
                                                                                          '   ~ 4>>
ib  I c
                                                                                                                                                                                                      <<Xgr
                                                                                              ~ i, U)
I g>>         I u  4 ~                                  )                                                                                     >>I) 1.
                                                                                                        'X                      q-                                                <,,
                                                            <',w,
                                                      <<(                                                              P                -<         e.,<X>b 1I'" )
                                                                                                                                                                                                      =.>>V~.'ude-,'XX
                                                                                                    'I<<L P                                <<,   X
                                                                                                                                                          +    ~        >  X xa          0                .                         '<<X>>''         X'e>
e.)
                                                                                        ~ Sl        )t~    )I    <<<<'et< ">>'                                                                                          l'        ll<<'~Ci
                                                                                                                                                                                                                .G'1>> J '<<X>>
                                          <<<e>>       0X: ~
e
                                                                  ..I~        Xe. Xfbl',I>> e            I.'1<<$                                        ",Xtf 'X,        >>       9<<     ',       e XX' $ 4,.>> XX(>>"                      e .$  .,
          << I>> t                      =.,*j,      )*  f
                      'eh
                          <<I e
                ~.                           ~ '3
 
fl AVERAGE DAILY UNIT POMER LEVEL DOCKET NO.     50-529 UNIT            PVNGS-2 DATE            04/12/88 COMPLETED BY    J,M, Ccl yi 1 le TELEPHONE      602-393-2679 MONTH:  March 1988 DAY AVERAGE DAILY POSER LEVEL            DAY AVERAGE  DAILY POWER LEVEL 0
0                            18            0 0                            19            0 0                            20            0 0                            21            0 22            0 0                            23            0 0                            24            0 9                                         25 10                                                      0 0
12                                        28 29 14                                        30 0                                          0 0
 
                      '   ~ 4 w. 44    '
\ 4 ~   4 4 4      4
  ~  4        '  'I         r rr 4    4 4 ~
r r  ~
4
                                          ~ '
 
REFUELING INFORMATION DOCKET NO.     SO-529 UNIT           PVNGS-2 DATE           04/12/88 COMPLETED BY    J.M. Colville TELEPHONE      602-393-2679 Scheduled date  for next refueling  shutdown.
09/23/89 Scheduled date  for restart following refueling.
12/01/89 Vill refueling  or resumption or operation thereafter require    &
Technical Specification change or other license amendment2 To be  determined Scheduled date  for submitting  proposed  licensing action  and supporting information.
To be  determined
            'J Important Licensing considerations associated with refueling, e.g. new or different.,fuel design or supplier, unrevieved design or performance analysis methods, significant changes in fuel design, neo operating procedures.
To be determined
To be determined
'J Important Licensing considerations associated with refueling, e.g.new or different.,fuel design or supplier, unrevieved design or performance analysis methods, significant changes in fuel design, neo operating procedures.
 
To be determined 11~I'IS=.JI SPA 5'yk I4:..~'f;,.'I." f..',I'>.,PPV~l&
11
ll..', 4.'" SI't"1I">C I IV'.S S~II"5a PP~J,~fPJJ'JJJ I QIm 0 b,'P f f f JJ1 P PI1 I, I II g."Itg P~f>P O A a+PI Efki P3 34%@>P X P..~6'JJ II/~y P'f 0 REVELING.INFORMATION DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-529 PVNGS-2 04/12/88 J.M.Colville 602-393-2679 (Continued) 6.The number of fuel assemblies.
                                                                                                                                          ~I
a)In the core.0 b)In the spent fuel storage pool.241 7.Licensed spent.fuel storage capacity.1329 Intended change in spent fuel'storage capacity.None 8.Progected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2006 (18 Months reloads and full core discharge capability).
'IS=.JI SPA 5'yk   I4:..~'f;,.'I." f ..',I'>.,PPV~l& ll..', 4 .' " SI't   "1I"       >C       I IV'         .S   S~ II "5a PP~J,
Off-Load for Refueling Outage Ik" dl~l V~i, jf 8 f$U1 I,'I 11~(ll ,l 4I.ti ref"'E~1 fl,t F'P" 3~Slit.i g~yX', gi lj F)I pt  
                                                                      ~   fPJJ'   JJJ I QIm           0             b,   '
P   f f P
f     JJ1           I, I PI1 II g."Itg P~f   >   P O   A a+
PI Efki       P3 34%@>       P X P..~6 'JJ II/~ y P'f
 
0 REVELING.INFORMATION DOCKET NO. 50-529 UNIT          PVNGS-2 DATE          04/12/88 COMPLETED BY  J.M.Colville TELEPHONE    602-393-2679 (Continued)
: 6. The number   of fuel assemblies.
a)   In the core.     0 b) In the spent fuel storage pool.           241
: 7. Licensed spent. fuel storage capacity.         1329 Intended change in spent fuel 'storage capacity.       None
: 8. Progected date of last refueling that can be discharged       to spent fuel storage pool assuming present capacity.
2006 (18 Months   reloads and   full core discharge capability).
Off-Load   for Refueling Outage
 
Ik" V                 ~ i, jf dl ~                          8 l
f $     U1 I,'I 11
                                        ~ (     ll               ,l 4I .
ti ref "             '
E ~                   1                   fl,t               F
      'P       "
3 ~ Slit.i                     g
                                      ~ yX   ', gi                 lj F
                                                          )I pt


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.UNIT DATE CONPLETED BY TELEPHONE 50-529 PVNGS-2 04/12/88 J.N.Colville 602-393-2679 March 1988 03/01 03/04 03/21 0000'nit in Node 5.1435 Entered Mode 6.0040 Completed Core Off Load-Exited Mode 6.  
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT          PVNGS-2 DATE          04/12/88 CONPLETED BY  J.N. Colville TELEPHONE      602-393-2679 March 1988 03/01   0000 'nit in   Node 5.
~, r f~-7@JAN'li 4 4 , n't hj~4<'t, lr 1 c4'a I k N l 1~l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: UNIT NAME DATE: COMPLETED.
03/04    1435   Entered Mode 6.
BY: TELEPHONE:
03/21    0040   Completed Core Off Load Exited Mode 6.
50-529 PUNGS-2 4 12 88 J.M.'o vz 602-393-2 Method of Duration Shutting 3 System4 Component No.Date Type.Hours Reason Down Reactor LER NO.Code Code 5 Cause and Corrective Action to Prevent Recurrence 2 (Cont'd)S 744 Unit shutdown due to Refueling Outage.1 F-Forced S-Scheduled Reason: A-Equipment Failure (Explain)8-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training g License Examination F-Administrative G-Operational Error (Explain)ll-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20X or Greater in the Post 24 Itours q-Orhr r (Exnlnln)Exhibit F-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (RUREG 0161)Exhibit ll-Same Source NRC NONTHLY OPERATING REPORT DOCKET NO.UNXT NANE DATE CONPLETED BY TELEPHONE 50-530 PVNGS-3 04/12/88 J.N.Col vi 1 le 602-393-2679 OPERATING STATUS 1 0 2~3~4~5~6.7~8.9.10.Unit Name: Palo Verde Nuclear Generating Station4 Unit 3 Reporting Period: Narch 1988 Licensed Thermal Power (NVt): 3800 Nameplate Rating (Gross MMe>: 1403 Design Electrical Rating (Net MMe): 1270 Maximum Dependable Capacity (Gross NMe>:'303 Naximum Dependable Capacity (Net NMe): 1221 If Changes Occur Xn Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons.Power Level to Mhich Restricted, Xf Any (Net NMe): NONE Reasons For Restrictions, If Any.This Month Yr.-to-Date Cumulative 11.12'4.15.16.17'8.19.20.21'2'3 24.Hours in Reporting Period Number of Hours Reactor Has Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MMH)Gross El'ectrical Energy Generated (MMH>Net Electrical Energy Generated (NMH>Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit.Forced Outage Rate Shutdowns Scheduled Over of Each): None 744 744 744 2 811 696.995 400.4 0 941 026.a 100.0L 10040M'0346m 9946~0 Next 6 Months 2016 2016 2016 2016 2016'2016 0 7"587 912.0~4 4 2 682 000.7 587 912.4 2 682 000.~4 4 2 537 784.4 4 100.0:c 100.0'c 2 537 784.4 4 100.0M 10040~103.1'c 103.1~99.1.'c 9941M 0 0 (Type, Date, and Duration 25.Xf Shutdown At End of Report Period, Estimated Date of Startup.26.Units in Test Status (Prior To Commercial Operation):
 
INITIAL CRITICALITY XNITIAL ELECTRICITY CONNERCXAL OPERATION Forecast 07/87 07/87 09/87 Achieved 10/25/87 11/28/87 01/08/88 y<<C~II li le-~-I II a."~.f~<<IIP~f.j f~~i>f>f;P" PS~~I 0 n-CI r.*~r 0$I e~a'fi, y'l.C~far'0 ,ii>~>>'Pf.'.lI~Cr'M J rib>><P 1>>"'fly":1 P+QPlr~~~~)>>f4I1~If 0 0'>>I'f>I\0<<P"'cy'.'><<Xe&#xc3;'lf.'
                                                      ~, r f       ~ -
l I gC'Pftri'pref P I".P I'pi I(f ti~>>Q A f U~P,%II 0 I II$0 0 f P', I gV fi)>>P 3~I)IC e, I~I li 4 I Pt Ip>>Igh'>>J J'~$1 Id&I'Pfi a y~f>>lf<<g Q'$fC I 0<<C, y r rett>r i", I f<<Cj'.<<I f fl>lC J.I,,f" 8J IE<<IP P*
7
AVERAGE DAlLY UNlT POMER LEVEL DOCKET NO.UNlT DATE COMPLETED BY TELEPHONE 50-530 PVNGS-3 04/12/88 J.M, Colyille 602-393-2679 MONTH: March 1988 DAY AVERAGE DAlLY POMER LEVEL DAY AVERAGE DAlLY POMER LEVEL 18 270 1~266 1~262 1~266 1~249 1~249 1~266 8 1~266 9 1~266 10 270 11 1 270 C.1~266 16 19 ,22 23 24 27 1~270 1~266 1~262 1~266 1~270 11 270 1~262 1~266 1~270 1~254 1~270 1~249 13 15 1~270 1~266 28 30 1~258 1~270 1~262 1~270 e~I 4"m,v e fe~Lr e t$v')h (~~i ee fmmme YAt'A~l>mG".Jm>~f'ml''~4 m em t~='e~~e V~e-->>e~Ec cf'&#x17d;e" e w e e L~e~J~,tt;ed','~,g A'W~~4 ,S~m~me e Ci.e~:~L e~\'e rC,'~l'';~e~4 T
    @JAN
~+~REFUELING INFORMATION DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-530 PVNGS-3 04/12/88 J.M.Colville 602-393-2679 Scheduled date for next refueling shutdovn.2~03/03/89 Scheduled date for restart folloving refueling.
                      't li     hj
05/27/89 3~Mill refueling or resumption or operation thereafter require a Technical Specification change or other license amendment2 Not Yet Determined Mhat vill these bet Not Yet Determined 4~Scheduled date for submitting proposed licensing action and supporting information.
, n 4 4
Not Yet Determined 5.Important Licensing considerations associated vith refuelingJ e,g.nev or different fuel design or supplier, unrevieved design or performance analysis methods significant changes in tuel"design, nev operating procedures.
                                ~ 4 < 't,   lr 1 c4'a I k   N l 1       ~l
Not Yet Determined 6.The number of fuel assemblies.
 
a)In the core.241 b)In the spent fuel storage pool.0 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity..None 8.Prospected date of last refueling that can be discharged to spent fuel storage, pool assuming present capacity.M 2007<18 Nonkhs reloads and full core discharge capability).
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-529 UNIT NAME PUNGS-2 DATE: 4 12 88 COMPLETED. BY: J.M. 'o vz TELEPHONE: 602-393-2 Method   of                                                   Cause and  Corrective Duration                   Shutting                         System4       Component 5
'E S<<<<va<<q~g(I 11",I<<<<j 7<<<<1", JlJ jhow))LPfK.Ilh.i J.["I.;<<il>1'&#xc3;J~I jt agj II/"<<yl'i j.jc A ja I jji 4)'i'.)*Ij'4 Iq<<"'@Qg"';,.>>t g~0 V,'..=<<')Cftt J.g~%-1131/a V;'I jjk>.'lt."~<Capt"t<<tP<<.'Vk>S'."@'~fl~$I A<<J<<l+h 1'ff I<<Ej<<4 N'L')Q tiff<<t.f<<l.a<<I t V jJ:O', k~t.'""A'<<jj t~+a'hi~a.Jghj I<<~.I*)',/1-t'i Y;''"1<<gs<<F"C''j'""Ijf" I+j<<~<<)<<<<'l<<'i/Ig<<h r)<<)8ilji<<'I///*j j/~V jh<<.Ihl.'li~''
Action to No.     Date Type         . Hours     Reason       Down Reactor 3        LER NO. Code             Code       Prevent Recurrence 2  (Cont'd)     S           744                                                                                 Unit shutdown due to Refueling Outage.
1             Reason:                                        Method:                Exhibit F - Instructions F-Forced                                                                         for Preparation of Data S-Scheduled A-Equipment Failure (Explain)                 1-Manual 8-Maintenance or Test                         2-Manual Scram        Entry Sheets for Licensee 3-Automatic Scram      Event Report (LER) File C-Rcfucling                                                                  0161)
D-Regulatory Restriction                       4-Continuation from    (RUREG E-Operator Training g License Examination       Previous Month F-Administrative                               5-Reduction of 20X    Exhibit ll-Same Source G-Operational Error (Explain)                   or Greater in the ll-Other (Explain)                               Post 24 Itours q-Orhr r (Exnlnln)
 
NRC NONTHLY OPERATING REPORT DOCKET NO.          50-530 UNXT NANE            PVNGS-3 DATE                04/12/88 CONPLETED BY        J. N. Col vi 1 le TELEPHONE            602-393-2679 OPERATING STATUS 1 0      Unit Name: Palo Verde Nuclear Generating Station4 Unit 3 2~      Reporting Period: Narch 1988 3~      Licensed Thermal Power (NVt): 3800 4~      Nameplate Rating (Gross MMe>: 1403 5 ~      Design Electrical Rating (Net MMe):              1270
: 6.       Maximum Dependable Capacity (Gross NMe>:'303 7~      Naximum Dependable Capacity (Net NMe):            1221
: 8.       If  Changes Occur Xn Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons.
: 9.       Power Level  to Mhich Restricted, Xf      Any (Net NMe):         NONE
: 10.      Reasons For  Restrictions, If Any.
This Month        Yr.-to-Date          Cumulative
: 11.      Hours  in Reporting Period        744                  2016                2016 12      Number of Hours Reactor Has  Critical                      744                  2016                2016 Reactor Reserve Shutdown
    '4.
Hours                                                                        '
Hours Generator On-Line            744                  2016                2016
: 15.      Unit Reserve Shutdown Hours                                                    0
: 16.      Gross Thermal Energy Generated (MMH)               2 811 696.         7 "587 912.0
                                                          ~4                  7 587 4 912.
17      Gross El'ectrical Energy Generated (MMH>                  995 4 400.0      2 682 4 000.         2 682 4 000.
                                                                                ~4 Net Electrical Energy
    '8.
Generated (NMH>                  941 026.a        2 4 537 4 784.       2 4 537 4 784.
: 19.     Unit Service Factor               100.0L              100. 0:c            100.0M
: 20.      Unit Availability Factor                               100. 0'c            10040~
21      Unit Capacity Factor               10040M'0346m
    '2  (Using MDC Net)                                         103. 1'c            103.1~
Unit Capacity Factor
    '3  (Using DER Net)                     9946~                99. 1.'c            9941M Unit. Forced Outage Rate             0                    0                    0
: 24.      Shutdowns   Scheduled Over Next 6 Months      (Type,    Date, and Duration of Each): None
: 25.     Xf Shutdown At End of Report Period, Estimated              Date  of Startup.
: 26.     Units in Test Status (Prior    To Commercial        Operation):
Forecast        Achieved INITIAL CRITICALITY                            07/87          10/25/87 XNITIAL ELECTRICITY                            07/87          11/28/87 CONNERCXAL OPERATION                          09/87          01/08/88
 
y<<C
                                                                                                                                                                                            ~ II far
                                                                                                                              '0
                                                                                                                                  ,ii>~ >>'Pf.                         '.lI Cr'M
                                                                                                                                                                            ~            J li                        i>f> f;P"            PS~
II le    - ~ -I            ~ I  0           n-CI    r.                       rib>> <P 1>>
                                                                                          *~r
                                                                                                                                                            "'fly":1 a."~.f  ~    <<  IIP~  f .j f      0$    I  e ~
P    + QPlr
                                                                                                          'l.C a'fi,
                                                                      ~  ~
y                      ~
                                                                                                                                                                      \
    ~  ~
                                        )>>      f4I1                      0
                                                                                                                                        <<P I
                                                                                                                                                      'cy'.'><<Xe&#xc3;'lf.'
0
      ~ ~
                                                                      ~ If                0  '>>I'f       >                              lI        gC  '
Pftri '
pref P                                            I  ". P I'pi  I(    f ti    ~ >> Q A
f U~    P,          %    II                                            0 I II  $    0       0           f      P        ',    I gV    fi)>>
                                                                                                                >>Igh'>>                    J    J'~
I
                                                  ~  I                                                                                      $
1 Id&I'Pfi e,                li 4    I a y fC I P
3 ~   I )IC                                Pt Ip                                                      ~
f>>                                                               0 lf<<     g      Q    '
y<<C, r        rett>r    i ",
I f<<Cj '.<<        I f fl>lC J                                        .
I,,f"8J IE
<< IP P
* AVERAGE DAlLY UNlT POMER LEVEL DOCKET NO.      50-530 UNlT            PVNGS-3 DATE            04/12/88 COMPLETED BY    J.M, Colyille TELEPHONE        602-393-2679 MONTH: March 1988 DAY AVERAGE  DAlLY POMER LEVEL          DAY AVERAGE  DAlLY POMER LEVEL 18  270                      16          1 ~270 1~266                                      1~266 1~262                                      1~262 1~266                        19          1~266 1~249                                      1 ~270 1~249                                      11 270 1~266                        ,22          1~262 8          1~266                        23          1~266 9          1~266                        24          1~270 10              270                                  1~254 11          1 C. 270                                  1~270 1~266                        27          1~249 13          1~270                        28          1~258 1~270 15          1~266                        30          1~262 1~270
 
                                                                                                                      ~I e
        "m,v e  t e fe ~ Lr 4
                                  $v ')h  (~ ~i ee fmmme  YAt'A                  ~l>mG            ".Jm    >~ f 'ml''
e t        ~ 4 m em
                                                              ~=        ~ ~
                                                                                  'e V
                                                              ~     e-->>e      ~
Ec                                                    cf ''
e" e          w          e e                                                                                L        ~ e
                              ~ J
                              ~,tt                                          ;ed'
                                                                            ,' ~,g                  A 'W  ~
                                                                                    ~4
                    ,S~                               m ~ me e
Ci.
e ~                                                                                       :~                 L
                                                                                            ~\
e                                                                              'e rC, '~
l'';~                                             e ~
4 T
 
~
    + ~
REFUELING INFORMATION DOCKET NO. 50-530 UNIT          PVNGS-3 DATE          04/12/88 COMPLETED BY  J.M. Colville TELEPHONE      602-393-2679 Scheduled date    for next refueling shutdovn.
03/03/89 2~   Scheduled date    for restart folloving refueling.
05/27/89 3 ~   Mill refueling or    resumption or operation thereafter require  a Technical Specification change or other license amendment2 Not Yet Determined Mhat  vill these  bet Not Yet Determined 4~   Scheduled date    for submitting proposed licensing action and supporting information.
Not Yet Determined
: 5. Important Licensing considerations associated vith refuelingJ e,g. nev or different fuel design or supplier, unrevieved design or performance analysis methods significant changes in tuel "design, nev operating procedures.
Not Yet Determined
: 6. The number  of fuel assemblies.
a)    In the core.       241 b) In the spent fuel storage pool.           0
: 7. Licensed spent fuel storage capacity.        1329 Intended change in spent fuel storage capacity.    . None
: 8. Prospected date of last refueling that can be discharged to spent fuel storage, pool assuming present capacity.
2007 <18 Nonkhs reloads and full core discharge capability).
M
 
E S<<<<
va    <<q~        g(            I  11",I<<<<j 7<<<<
1",  JlJ      jhow)       )LPfK. Ilh. i                                                      J.[ "I .;<<il>1    '&#xc3;J    ~
I jt agj II
                                                                                                                                                                          /
                                                                                                                                                                "<<yl'i jji                  j                                                                        '4                                  Qg"'
    .jc A      ja      I     4)'                                    i'.)                                          *Ij            Iq        <<
                                                                                                                                        ;,. >>t g~0 V,'..=<<')Cftt J.
g~%      - 1131/a jjk>      .'lt .             <<t.f <<l. a<<I V;                     " ~
                                      <Capt       "t<<       tP<<.'Vk>             S
          'I
                            ~     fl
                                        ~
                                            $ I A<<J     << l   +   h 1'ff     I     <<Ej     <<4 N 'L')Q       t   V jJ:O',
tiffk    ~t.     '""A'<<                         jj   t ~+a' hi         ~                       a.           Jghj     I<<
                                                                                                                                  ~     .I
                                                            * )       ',   /1- t'i Y;           ''     "1<<gs
                                                                                        <<F "C''j'           ""Ijf" I     +j   <<     ~<<)         <<<<'l<<'
i/ Ig                                                              <<                                                      h r)<<)8ilji
<<'I          /    //*
jj                              jh <<                                                                        ~'          '
                              ~ V
                                    /
                                                                                                  .Ihl   . 'li


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE NONTH DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-530 PVNGS-3 04/12/88 J.N.Colville S02-393-26T9 March 1988 03/01 0000 03/05 2002 03/31 2400 Unit in Node 1-Reactor Power 100M.Power reduction for 43ST-3SF01, CEA Surveillance Testing.Reactor Power approximately 90'.Unit in Node 1-Reactor Power 100'.
OF OPERATING EXPERIENCE FOR THE NONTH DOCKET NO.       50-530 UNIT            PVNGS-3 DATE            04/12/88 COMPLETED BY    J.N. Colville TELEPHONE        S02-393-26T9 March 1988 03/01   0000   Unit in Node 1 - Reactor Power 100M.
II"ie,~g I g%C hi~ti,~I t J f~'M p I II~~ii'.I, Pp=.~p..'I E I't 0 a'l<<~4.~~g<j iw r 1)
03/05    2002  Power reduction for 43ST-3SF01, CEA Surveillance Testing.
UNIT SHUTDOMNS AND POt<tER REDUCTIONS DOCKET NO: UNIT NAME: DATE: COMPLETED BY: TELEPHONEi 50-530 PVNGS-3 J.M.Colville, 602-393-26/9 Method of I Duration Shutting 3 System<Component>
Reactor Power approximately 90'.
No.Date Type.Hours Reason Down Reactor LER NO.Code Code Cause and Corrective Action to Prevent Recurrence NO, UNIT SHUTDOt<tNS OR POSER REDUCTIONS FOR MARCH 1 F-Forced S-Scheduled 2 Reason: A-Equi pmcnt Failure (Explain)8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error (Explain).lt-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20X or Greater in the Past 24 Ilours<t-Art<r (Rxnlnin)4 Exhibit F-Instructions for Preparation of Data Entry Shccts for Liccnsce Event Report (LER)File (NVREG 0161)Exhibit M-Same Source V I Arizona Nuclear Power Project P.o.BOX 52034~PHOENIX, ARIZONA 85072-2034 212-00157-JGH/TJB April 15, 1988 Docket Nos.STN 50-528/529/530 U.S.Nuclear Regulatory Commission washington, D.C.20555 Attention:
03/31    2400  Unit in Node 1 - Reactor Power 100'.
Document Control Desk Gentlemen:
 
II         "ie, ~     g
              ~ I t  J I                                 f~'M g%C hi p
    ~ ti,         ~   ~
I II ii '. I,
    'l
                                          .'I E
                                                            .~  ~
I't
                                                                    <j 0
Pp =. ~ p.
a   << ~ 4                                                     g iw r               1)
 
UNIT SHUTDOMNS AND       POt<tER   REDUCTIONS DOCKET NO: 50-530 UNIT NAME: PVNGS-3 DATE:
COMPLETED BY: J.M. Colville, TELEPHONEi  602-393-26/9 Method of                                                         Cause and  Corrective I     Duration                   Shutting                             System<         Component>         Action to No. Date     Type         .Hours       Reason     Down Reactor 3        LER NO.       Code               Code     Prevent Recurrence NO, UNIT SHUTDOt<tNS OR POSER       REDUCTIONS FOR MARCH 1             2                                                Method:
4 Exhibit  F -  Instructions F-Forced       Reason:                                                                     for Preparation of Data A-Equi pmcnt Failure (Explain)               1-Manual S-Scheduled                                                                                Entry Shccts for Liccnsce 8-Maintenance or Test                         2-Manual Scram 3-Automatic Scram          Event Report (LER) File C-Refueling                                                                         0161)
D-Regulatory Restriction                       4-Continuation from        (NVREG E-Operator Training 8 License Examination         Previous Month F-Administrative                               5-Reduction of 20X          Exhibit  M-Same  Source G-Operational Error (Explain)                     or Greater in the
                .lt-Other (Explain)                               Past 24 Ilours
                                                                <t-Art< r (Rxnlnin)
 
V I
 
Arizona Nuclear Power Project P.o. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 212-00157-JGH/TJB April   15, 1988 Docket Nos. STN 50-528/529/530 U.S. Nuclear Regulatory Commission washington, D.C.     20555 Attention:     Document Control Desk Gentlemen:


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 March Monthly Operating Report File: 88-024-404/88-056-026 Attached are the March Monthly Operating Reports prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses.By copy of this letter, we are also forwarding a copy of the Monthly Operating Reports to the Regional Administrator of the Region V Office.If you have any questions, please contact Mr.T.J.Bloom, at (602)371-4187.Very truly yours, G.Hayn s Vi'ce Pr esident Nuclear Production JGH/TJB/ks r Attachments cc: E.E.Van Brunt, Jr.(all w/a)J.B.Martin E.A.Licitra A.C.Gehr J.A.Amenta INPO Records.Center  
Palo Verde Nuclear Generating Station (PVNGS)
'wg h Hj I Monthly Operating Reports Page 2 212-00157-JGH/TJB April 15, 1988 bcc J~R~0.J~G~W.L~M.R~R.R~A.W.T.J.W.J~W.R.D~M.J.M.W.M.L.L.E~J.E.C~E~D.R.J.D.F.A.Driscoll Butler Zeringue Al 1 en Sower s Simko Henson Clyde.Younger'dney Gouge Rogers Ide Shriver LoCicero Jump Wade Quinn Bernier D.P.D.K.B.D~E.Hardy L.Vogt R~Canady Porter S.Ecklund Wootten E.C.Sterling J.E.Allen F~Buckingham LCTS Coordinator (6125), (6102)(6915)(6932)(6102)(6077)(6078)(6079),(6428)(6070)(6486)(7048)(6452)(6148)(6225)(7346)(7434)(7035)(7048)(>>20)(4161)(6345)(6077)(7035)(7035)(7034)(7106)(6132)(7048)(all w/a) 4Q}}
Units 1, 2 and 3 March Monthly Operating Report File:   88-024-404/88-056-026 Attached are the March Monthly Operating Reports prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses. By copy of this letter, we are also forwarding a copy of the Monthly Operating Reports to the Regional Administrator of the Region V Office.
If you have any questions,   please contact Mr. T. J. Bloom, at (602) 371-4187.
Very   truly   yours, G. Hayn s Vi'ce Pr esident Nuclear Production JGH/TJB/ks r Attachments cc:   E. E. Van Brunt, Jr.   (all   w/a)
J. B. Martin E. A. Licitra A. C. Gehr J. A. Amenta INPO Records. Center
 
wg h Hj I
 
Monthly Operating Reports                           212-00157-JGH/TJB Page 2                                              April 15, 1988 bcc   J ~ D~    Driscoll        (6125)  (all w/a)
R~ M. Butler        ,
(6102)
: 0. J. Zeringue            (6915)
J M. Al 1 en
        ~                       (6932)
G~  W. Sower s          (6102)
W. M. Simko            (6077)
L ~ L. Henson              (6078)
M. L. Clyde                (6079)
R ~ E ~  .Younger          ,(6428)
R. J.            'dney (6070)
R~  E. Gouge              (6486)
A. C~    Rogers          (7048)
W. E~    Ide              (6452)
T. D. Shriver          (6148)
J. R. LoCicero            (6225)
W. J. Jump                (7346)
J ~ D. Wade                (7434)
W. F. Quinn              (7035)
R. A. Bernier          (7048)
D. E. Hardy            (>>20)
P. L. Vogt                (4161)
D. R Canady
            ~                    (6345)
K. Porter                  (6077)
B. S. Ecklund              (7035)
D~  Wootten                (7035)
E. C. Sterling        (7034)
J. E. Allen            (7106)
F ~ Buckingham            (6132)
LCTS    Coordinator        (7048)
 
4Q}}

Latest revision as of 05:30, 4 February 2020

Monthly Operating Repts for Mar 1988.W/880415 Ltr
ML17303B056
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/31/1988
From: Colville J, Haynes J, Hull J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
212-00157-JGH-T, 212-157-JGH-T, NUDOCS 8804220055
Download: ML17303B056 (39)


Text

~ ~

ACCELERATED DISIJ3UTION DEMONSTRA3N SYSTEM REGULATORY INFORMATXON DISTRIBUTION SYSTEM (RIDS) 8 FACIL:Si7N-5( -528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFXLIATION COLVILLE,J.M. Arizona Nuclear Power Project (formerly Arizona Public Serv HAYNES,J.G. Arizona Nuclear Power Project (formerly Arizona Public Serv.

RECXP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Mar 1988. /880415 l r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR SIZE: l9 TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Standardized plant. 05000528 8 Standardized plant. 05000529 Standardized plant. 05000530/

RECIPIENT COPIES RECIPIENT 'OPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 LICITRA,E 1 0 DAVIS,M 1 0 INTERNAL ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB NRR/DLPQ/PEB RPB" ll 10 1

1 1

1 1

1 ARM TECH ADV NRR/DOEA/EAB 11 NRR/PMAS/ILRB12 2

1 1

2 1

1 REG FILE 01 1 1 RGN5 1 1 EXTERNAL: EG&G GROH, M 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES 1 1

  • A TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 30

~ ~

'I l

~ ~ 0

~

j ~

NRC MONTHLY OPERATING REPORT DOCKET NO. 50"528 UNIT NAME PVNGS-1 DATE 04/12/88 COMPLETED BY J. M Col vi l le TELEPHONE 602-393-2679 OPERATING STATUS 1r Unit Name. Palo Verde Nuclear Generating Station Unit 1 2~ Reporting Period: March 1988 30 Licensed Thermal Power (MMt): 3800 4~ Nameplate Rating (Gross MMe): 1403 5~ Design Electrical Rating (Net MVe): 1270

6. Maximum Dependable Capacity (Grass MMe): 1303 7~ Maximum Dependable Capacity (Net MMe): 1221
8. If Changes Occur In Capacity Since Last Report, Give Reasons.

Ratings (Items Number 3 Through 7)

9. Power Level to Mhich Restricted, If Any: If Any (Net MVe): NONE
10. Reasons For Restrictians, This Month Yr. -to-Date Cumulative
11. in Reporting Perio T44 2184 12.

13 Number

'ours

@as of Hours Reactor Critical Reactor Reserve Shutdown

'80.2 580.2 '905610 L557.4~

Hours 0.0 0.0 0.0

'4.

Hours Generator On-Line 518.7 518.7 10 235.8

15. Unit, Reserve Shutdown Hours 0' 0.0 0.0
16. Gross Thermal Energy Generated (MPH) =L501 1 L667 SS7 501 36L700L338 17 Gross Electrical Energy Generated (MMH) 582 000 582 000 12LT25L300 18 Net Electrical Energy Generated (MMH) 530 379 530 L379 858 304.
19. Unit. Service Factor 69.7M 23. 8'A 53.7R 20 Unit Availability Factor 69.7R 23 8M 53.7k

'1 Unit Capacity Factor '1.0R

'2 (Using MDC Net) 58 4A 19. 9'c

~ Unit Capacity Factor (Using DER Net) 56 1A 19Lik 49.0R 23 ~ Unit Forced Outage Rate OLO~ 69L1~ 29.5R 24., Shutdowns Scheduled Over Next. 6 Months (Type, Date, an d Duration of Each): None

25. If Shutdown At, End of Report Period, Estimated Date of Startup'.
26. Units in Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY ,5/85 5/25/85 INITIAL ELECTRICITY 6/85 6/10/85 COMMERCIAL OPERATION 11/85 1/28/8S 8804220055 880331 PDR ADOCK 05000528 R DCD

~

'4>> I4 ~

Fj IF t>> ~

  • g't,pili

~ af',t> ) II Rig il C QR-4 i

R it 'I 4 ~

~ + I >>I. I"Rt R 4 IU t>>ti ill t.<Oft 4 I~>> f i>>Ir>>

!4>>

jf >>Ut >> ' kti>>j',t . Igh,'i, ',ILC 3 NIRR ~ '.Q~>>

IR il,',, ti I

'I >> 4

>>l, f Dt!t .

Rig

',.'J't g

>>(~~U 4,

3U if I.t

, Fi .>N Y<<UUt't -R ', U>>t 4"" r>>,4

'hl Fj R<<},p TIF jR>>tg>>

4 lt ij-),'

i tlii4Ii>>I UJ C UU>>>>gg, (IT I

  • tptt '

4

'i=j 3)5 h qg>>.g I L ">> I F>>1 ~ !6,":~VV

~ t>> tl Fi'I

'J( b p>> '>>

4 tt 'F>> "I >t4 R

'a"0 t>>'P 4 'X>>TT3a  %,g>>

A -.>>r ,*z pt/

!i ~ '<Vf R'd P,I~ AID II h ~~

','Uf"i, 5 '.T~ ~ '

I Ug '-,4 ')

RI Il F

'4, 4'

'<<P i'd+

T':tO<; S <,4 Z <<J..4', .<<N S e >>4 I " kl . Jtr 4

.,Qc! -h 4U>> 'A '4 4'C.>

't g 4 fr, -.. '9> I i ~t . O~r,lt

1',l

"4 R".R t <<r. I,<'

0 4>>:,g'QaT>>'U I"-

4 4C'4 4, I'*$$

ll 4'I <<S.r& i" 4 t 'W Fi ~TT(,>>g

>>RI 4'4 "k i >>Nfl ll 4 'u<R!I'>>b'rth%'>>

<<UP>> ~

~ "4hh II R; + I' " 3't .& l." t I 'tl '.TR>>1>><l>>4.

~ ~ ~ r J>>,4 RRI 4 I "f>>r ) i~ ii~ Tr

>>4 ir ~ '

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE 04/12/88 COMPLETED BY J,M, Colyllla TELEPHONE ,602-393-2679 MONTH March 1988 DAY AVERAGE DAILY POMER LEVEL DAY AVERAGE DAILY POMER LEVEL I 0 17 1~209 0 18 C, 209 0 1~247 0 1~268 0 1~239 0 1~205 0 23 1~009 24 C. 109 0 25 1 ~268 10 26 1 g 272 11 120 27 1 ~268 h 597 28 1 g 272 13 810 1 g 272 822 30 1 ~276 813 1 g 272 1~130

~ ~ ~

g:Asti jj '< j'ajj" '8 ""A>+

)I )I~ 4 ft) g f)+ t ttl0 ff ,

~

, t3 'i'hC,

~ 3.'9 <<" NOD

<<Ii t 0,, ktQ >>~~3E.jt.c '., 1

'~ME'k r'-.C'~0 .>)lIHOt".

..'i "'I8J kid",V ~9 Y .Xh~t . arab".3~i>'a Yhef Jd ','.>> RB<3(" ~ V, IX'<' ~j SxA3V," '~~Q c, Wt 0' ~ 0 09 J 0 ~ EV 0

~04 ~0 N 6 ~ \

t'QL.

~ 0 L.'

I=

~ 0

~' A 0

  • ZY.Jj',

~ ~ 0 E \ 0

.. ~ ~.. +IQQE I ..IA

~ 0 '0

~

0 4 M' CJ:

0 5

& c~

~ ~

8,t.

I 0

REFUELING INFORMATION DOCKET NO. ,50-528 UNIT PVNGS-1 DATE 04/12/88 COMPLETED BY, J.M. Colville TELEPHONE 602-393-2679 ll Scheduled date for'ext refueling shutdown.

1 03/2X/89

2. Scheduled date for restart following refueling.

05/29/89

3. Mill refueling or resumption or operation thereafter require a Technical Specification change or other license amendment' To be determined 4~ Scheduled date .for submitting'proposed.'licensing action and supporting infoxmation.

To be determined Important Licensing considerations associated with refueling, e.g. new ox diffexent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, neo operating procedures.

To be determined

V'p) t>> ')

l" E

E,>>SW>>

)

<<w" 'll I CE . w t." <<4I W>>off C f )a$ .".i"

'.p )fP ~ ).>> fl:I <<;E~D'JMX v>~l~w Eg AS: )ESP'E ~ V <<3: ) ',) I, p

)) lI 4 E Ewt " "JD E'

>> 2: '.i'a' '>> I ~Pl .) ~ ).',... '$ )'.I 4

,I l I k>>>>$ 3, w .E 4,<<)'!a I4<< f: "W ",>>.> I l, 9f,+)lA"f, ) ) wj )pal,pg>>

) .l'J<g p<<' gw - g g ')$ >>>>fg

~,'" EE f '0~.'"XC', 'I-'>> '>>A. (>> C<<'4<<'I>>

0

~ ~ ~ 0 REFUELING INFORMATION DOCKET NO 50-528 UNIT PVNGS-1 DATE 04/12/88 COMPLETED BY J.L. Hull TELEPHONE 602-393-2679 (Continued)

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 80'

~ Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None 8 ~ Progected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2006 (18 Months reloads and full core discharge capability).

d li Ji k

I'; )J ir),~ ">)

li ), p

)I )

ti

)~S JJ J ) ~ J., ')

l l J

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH

,DOCKET NO. 50-528 UNIT PVNGS-1 DATE 03/07/88 COMPLETED BY J.L. Hull TELEPHONE 602-393-2679 February 1988 03/01 0000 Unit in Node 4 03/01 Entered Mode 3.

03/05 2126 Entered Node 2 Reactor Critical.

03/07 0147 Entered Node 3 due to contactor problem with CEDN MG sets.

03/08 0010 Entered Mode 2 Reactor Critical.

03/09 1245 Entered Node 03/10 0643 'ynchronized Main Generator to Grid.

03/10 1256 Manually tripped Nain Turbine for Overspeed Testing.

03/10 1532 Synchronized Main Generator to Grid.

03/19 1000 ,

Reactor power at 100'.

03/22 1845 Reactor power reduced to 804 due to SG Chemistry being out of specification as a result of the polishers being out of service for regeneration.

03/24 1645 Reactor power at 100'.

0

~ ~ ~

'~t g 5 ' l~ Q,)l ) f A 'i~i

'Th )

1 V" >'k < "~'ft)"~

)l,')

L1 U 1 4'll '

>air~>> fil, ~'

P

'I li P" .~s  ! f t.') . z "$ J . 4 e

$ <'f '1'%gal" q+ v f,~ '~0 f)

~ ~~ l +>FS

'C ~ XA~ >f"~ ~" ~ ". k)<'r Eg '.3 l X",3

')~ $ '~l )",'it e'gW'I'

)~ " .>> 'Xw'tD"." 8':t~~flH 6 ~; Pv fd'a')l!pie . 'CJ'C

/ ~ cs<', a., sN k <<(~' x + ~ E ". s; iver>i,t ~3." XF~

Ae (w ~pl I <<)fsCRl 'I 4PXl I4 lQ w Ql g

>Q~)~) l( ,rQ< Q~XPr

)~~kg . e f nfl . "v>> ~'r.> + '> ~ ".> > ~i" 'x, v" >as< n~,>'e~a~i ~c'. % ~,

G ~v: >> ~ <;.~. ne,"w~i3:f."..> s~

, A~ ~

4's"4 6'a+=> 4 ..~ 1 '.>,>J,"~'f~)6 RO

~ i~m > '

t'~ AP f MF>p d&~M9

UNIT. SHUTDOWNS AND 'POWER REDUCTIONS DOCKET NO: 50-528 UNIT NAME: PVNGS-1 DATE: 4/12/88 COMPLETED BY: J.H. Colville TELEPHONE: 602.-393-2679 Method of Cause and Corrective Duration Shutting System4 Component5 Action to No. Date Type Hours Reason 'Down Reactor 3 LER NO. Code Code Prevent Recurrence 10 (Cont'd- F 222.7 Unit shutdown to repair an from 1987) inoperable Control Element Assembly.

1 3/10 S 2.6 B N/A N/A N/A Manually tripped Hain Turbine for Overspeed Testing.

2 3/22 F B N/A N/A N/A Reactor power reduced to 80X due to SG Chemistry being out of specification as a result of the polishers being out of service for regeneration.

1 Method!

4 Exhibit F - Instructions F-Forced Reason: for Preparation of Data A-Equipment Failure (Explain) 1-Manual S-Scheduled 2-Manual Scram Entry Sheets for Licensee E-Maintenance or Test Event Rcport (LER) File C-Refueling 3-Automatic Scram 4-Continuation from (NUREG 0161)

D-Regulatory Restriction E-Operator Training & License Examination Previous Honth F-Administrative 5-Reduction of 20X Exhibit H-Same Source G-Operational Error (Explain) or Greater in the II-Other (Explain) Past 24 l1ours QWrlmr (Exnlnin)

~ ~

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNXT NAME PVNGS-2 DATE 04/12/88 CONPLETED BY J.N. Colville TELEPHONE 602-393-2679 OPERATING STATUS Unit Name'Palo Verde Nuclear Generating Station4 Unit 2 2~ Reporting Period: Narch 1988 3~ Licensed Thermal Power (MMt): 3800 4 Nameplate Rating (Gross MMe): 1403

5. ,Design Electrical Rating (Net MMe): , 1270
6. Maximum Dependable Capacity (Gross MMe),: 1303 7~ Maximum Dependable Capacity (Net MMe): 1221
8. If Changes Occur In Capacity Ratings (Xtems Number 3 Through 7)

'ince Last Report, Give Reasons.

9. Power Level to Vhich Restricted, Xf Any (Net MVe): NONE
10. Reasons For Restrictions, Xf Any-

'44 This Month Yr.-to-Date Cumulative

. 11 ~ Hours in. Reporting Period 2184 13 4 440 12 Number of Hours Reactor Mas Critical 0 1202 10 477.1 13 Reactor Reserve Shutdown

'4 Hours

~ Hours Generator On-Line 1202 10 4 32S.2

15. Unit Reserve Shutdown Hours 0 16 Gross Thermal Energy Generated (MMH) 0 4 4 50S 4 600. 3747154767 Gross Electrical Energy

'7.

II Generated (MMH) 0 4 588 4 100. 342494370

18. Net Electrical Energy Generated (MMH) 0 4 487 4 775. 1244244657
19. Unit Service Factor O.OR 55.0R 76485 20 Unit Availability Factor O.OR 55.0~ 76.8R 21 Unit Capacity Factor (Using NDC Net) 55. 7547M

'2.

Unit Capacity Factor 8'c'.OX (Using DER Net) 5346m 7248M 23 ~ Unit Forced Outage Rate 040M 0 OM 5 9M 24 ~ Shutdowns Scheduled Over Next 6 Nonths (Type,-Date, and Duration of Eich): Currently in R efueling Outage

25. If05/15/88 Shutdown At End of Report Period, Estimated Date of Startup.

26 Units in Test Status (Prior To Commercial Operation):

Forecast Achieved XNITIAL CRITICALITY 3/86 4/18/86 INITIAL ELECTRICITY 6/86 5/20/86 COMNERCXAL OPERATXON 11/86 9/19/86

<<)f'<<< ' .Xil If<< 'I <<<<t if 3h'-'l4Vee X))))4 Xl ~ I l~

2>>

<<V

  • , t,

Ife .<<3 =I lg e I I It t>> 'Ie

<<3~4 i ff) g +III '$

~ 'r,'>>f .=

"e e l>> 'X $ a" l)~)" >>X <<

eg '<< ~ )>>>>

.<<>>'j) POX, R <r . X+ ALP XX >g ~ f <<

,lfe y f<< ~

g, . I

+ R ,<<) I(,) rf e>> I

~ ~ ~ ef

~

~ I e

I  %f'!

ef")<<3I>> )>>1

~Et m, off "

X X e e l

WPX'7<<e l' l

>>4 g>>) g ~ e fl f >>') $g I fi ' 'X 7X

)<<XX "

>>X X,": <<>>. d<<~ 0 I!,e'"E.SC)f=>>' ~ <

><<II X, rf >> I':l,l r kf Xe ee Q = ~ e X <<3 ' X>> e ~ ~ I << ~ ) t<< e il <<'1>> 1' e $ , Ii <<p', ~- 1 ~ Pf A f I ~ f~ <<X," I uP>> ~ >)" W ~ )'-II >><<gs',>> X~ e gg,i C. )p) "I ')II) reit II, 3 f IIg 'I C ) )t>3X'L l 'V'$ 9 ~ C' t<<hi) >> Iye)'>> )A(.tf.'Ii J) '* f rf'$'I e'e<<g<<3 )I l W ~ ~ >> 'Xg>>P <<keilli <<<<,", ~)f '>f f, ) .If 1'<< JX') 4e) '<<") 7 > '-'te>>l I .l., gg ~ w <<E', ')>>e>>>>, <<ra '<<)~i XX4 I') ~ "<<>> I)t r Pg d e>> ' ~ 4>> ib I c <<Xgr ~ i, U) I g>> I u 4 ~ ) >>I) 1. 'X q- <,, <',w, <<( P -< e.,<X>b 1I'" ) =.>>V~.'ude-,'XX 'I<<L P <<, X + ~ > X xa 0 . '<<X>> X'e> e.) ~ Sl )t~ )I <<<<'et< ">>' l' ll<<'~Ci .G'1>> J '<<X>> <<<e>> 0X: ~ e ..I~ Xe. Xfbl',I>> e I.'1<<$ ",Xtf 'X, >> 9<< ', e XX' $ 4,.>> XX(>>" e .$ ., << I>> t =.,*j, )* f 'eh <.,PPV~l& ll..', 4 .' " SI't "1I" >C I IV' .S S~ II "5a PP~J, ~ fPJJ' JJJ I QIm 0 b, ' P f f P f JJ1 I, I PI1 II g."Itg P~f > P O A a+ PI Efki P3 34%@> P X P..~6 'JJ II/~ y P'f 0 REVELING.INFORMATION DOCKET NO. 50-529 UNIT PVNGS-2 DATE 04/12/88 COMPLETED BY J.M.Colville TELEPHONE 602-393-2679 (Continued)

6. The number of fuel assemblies.

a) In the core. 0 b) In the spent fuel storage pool. 241

7. Licensed spent. fuel storage capacity. 1329 Intended change in spent fuel 'storage capacity. None
8. Progected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2006 (18 Months reloads and full core discharge capability). Off-Load for Refueling Outage Ik" V ~ i, jf dl ~ 8 l f $ U1 I,'I 11 ~ ( ll ,l 4I . ti ref " ' E ~ 1 fl,t F 'P " 3 ~ Slit.i g ~ yX ', gi lj F )I pt

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT PVNGS-2 DATE 04/12/88 CONPLETED BY J.N. Colville TELEPHONE 602-393-2679 March 1988 03/01 0000 'nit in Node 5.

03/04 1435 Entered Mode 6.

03/21 0040 Completed Core Off Load Exited Mode 6.

~, r f ~ -

7

@JAN

't li hj

, n 4 4

~ 4 < 't, lr 1 c4'a I k N l 1 ~l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-529 UNIT NAME PUNGS-2 DATE: 4 12 88 COMPLETED. BY: J.M. 'o vz TELEPHONE: 602-393-2 Method of Cause and Corrective Duration Shutting System4 Component 5

Action to No. Date Type . Hours Reason Down Reactor 3 LER NO. Code Code Prevent Recurrence 2 (Cont'd) S 744 Unit shutdown due to Refueling Outage.

1 Reason: Method: Exhibit F - Instructions F-Forced for Preparation of Data S-Scheduled A-Equipment Failure (Explain) 1-Manual 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File C-Rcfucling 0161)

D-Regulatory Restriction 4-Continuation from (RUREG E-Operator Training g License Examination Previous Month F-Administrative 5-Reduction of 20X Exhibit ll-Same Source G-Operational Error (Explain) or Greater in the ll-Other (Explain) Post 24 Itours q-Orhr r (Exnlnln)

NRC NONTHLY OPERATING REPORT DOCKET NO. 50-530 UNXT NANE PVNGS-3 DATE 04/12/88 CONPLETED BY J. N. Col vi 1 le TELEPHONE 602-393-2679 OPERATING STATUS 1 0 Unit Name: Palo Verde Nuclear Generating Station4 Unit 3 2~ Reporting Period: Narch 1988 3~ Licensed Thermal Power (NVt): 3800 4~ Nameplate Rating (Gross MMe>: 1403 5 ~ Design Electrical Rating (Net MMe): 1270

6. Maximum Dependable Capacity (Gross NMe>:'303 7~ Naximum Dependable Capacity (Net NMe): 1221
8. If Changes Occur Xn Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons.

9. Power Level to Mhich Restricted, Xf Any (Net NMe): NONE
10. Reasons For Restrictions, If Any.

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744 2016 2016 12 Number of Hours Reactor Has Critical 744 2016 2016 Reactor Reserve Shutdown

'4.

Hours '

Hours Generator On-Line 744 2016 2016

15. Unit Reserve Shutdown Hours 0
16. Gross Thermal Energy Generated (MMH) 2 811 696. 7 "587 912.0

~4 7 587 4 912.

17 Gross El'ectrical Energy Generated (MMH> 995 4 400.0 2 682 4 000. 2 682 4 000.

~4 Net Electrical Energy

'8.

Generated (NMH> 941 026.a 2 4 537 4 784. 2 4 537 4 784.

19. Unit Service Factor 100.0L 100. 0:c 100.0M
20. Unit Availability Factor 100. 0'c 10040~

21 Unit Capacity Factor 10040M'0346m

'2 (Using MDC Net) 103. 1'c 103.1~

Unit Capacity Factor

'3 (Using DER Net) 9946~ 99. 1.'c 9941M Unit. Forced Outage Rate 0 0 0

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None
25. Xf Shutdown At End of Report Period, Estimated Date of Startup.
26. Units in Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 07/87 10/25/87 XNITIAL ELECTRICITY 07/87 11/28/87 CONNERCXAL OPERATION 09/87 01/08/88

y<<C

~ II far

'0

,ii>~ >>'Pf. '.lI Cr'M

~ J li i>f> f;P" PS~

II le - ~ -I ~ I 0 n-CI r. rib>>

>

  • ~r

"'fly":1 a."~.f ~ << IIP~ f .j f 0$ I e ~ P + QPlr 'l.C a'fi, ~ ~ y ~ \ ~ ~ )>> f4I1 0 <

<<XeÃ'lf.' 0 ~ ~ ~ If 0 '>>I'f > lI gC ' Pftri ' pref P I ". P I'pi I( f ti ~ >> Q A f U~ P,  % II 0 I II $ 0 0 f P ', I gV fi)>> >>Igh'>> J J'~ I ~ I $ 1 Id&I'Pfi e, li 4 I a y fC I P 3 ~ I )IC Pt Ip ~ f>> 0 lf<< g Q ' y<<C, r rett>r i ", I f<<Cj '.<< I f fl>lC J . I,,f"8J IE << IP P

  • AVERAGE DAlLY UNlT POMER LEVEL DOCKET NO. 50-530 UNlT PVNGS-3 DATE 04/12/88 COMPLETED BY J.M, Colyille TELEPHONE 602-393-2679 MONTH: March 1988 DAY AVERAGE DAlLY POMER LEVEL DAY AVERAGE DAlLY POMER LEVEL 18 270 16 1 ~270 1~266 1~266 1~262 1~262 1~266 19 1~266 1~249 1 ~270 1~249 11 270 1~266 ,22 1~262 8 1~266 23 1~266 9 1~266 24 1~270 10 270 1~254 11 1 C. 270 1~270 1~266 27 1~249 13 1~270 28 1~258 1~270 15 1~266 30 1~262 1~270

~I e "m,v e t e fe ~ Lr 4 $v ')h (~ ~i ee fmmme YAt'A ~l>mG ".Jm >~ f 'ml e t ~ 4 m em ~= ~ ~ 'e V ~ e-->>e ~ Ec cf e" e w e e L ~ e ~ J ~,tt ;ed' ,' ~,g A 'W ~ ~4 ,S~ m ~ me e Ci. e ~  :~ L ~\ e 'e rC, '~ l;~ e ~ 4 T ~ + ~ REFUELING INFORMATION DOCKET NO. 50-530 UNIT PVNGS-3 DATE 04/12/88 COMPLETED BY J.M. Colville TELEPHONE 602-393-2679 Scheduled date for next refueling shutdovn. 03/03/89 2~ Scheduled date for restart folloving refueling. 05/27/89 3 ~ Mill refueling or resumption or operation thereafter require a Technical Specification change or other license amendment2 Not Yet Determined Mhat vill these bet Not Yet Determined 4~ Scheduled date for submitting proposed licensing action and supporting information. Not Yet Determined

5. Important Licensing considerations associated vith refuelingJ e,g. nev or different fuel design or supplier, unrevieved design or performance analysis methods significant changes in tuel "design, nev operating procedures.

Not Yet Determined

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 0

7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. . None
8. Prospected date of last refueling that can be discharged to spent fuel storage, pool assuming present capacity.

2007 <18 Nonkhs reloads and full core discharge capability). M E S<<<< va <<q~ g( I 11",I<<<<j 7<<<< 1", JlJ jhow) )LPfK. Ilh. i J.[ "I .;<<il>1 'ÃJ ~ I jt agj II / "<<yl'i jji j '4 Qg"' .jc A ja I 4)' i'.) *Ij Iq <<

,. >>t g~0 V,'..=<<')Cftt J.

g~% - 1131/a jjk> .'lt . <<t.f <<l. a<<I V; " ~ <Capt "t<< tP<<.'Vk> S 'I ~ fl ~ $ I A<<J << l + h 1'ff I <<Ej <<4 N 'L')Q t V jJ:O', tiffk ~t. '""A'<< jj t ~+a' hi ~ a. Jghj I<< ~ .I

  • ) ', /1- t'i Y; "1<<gs

<<F "Cj' ""Ijf" I +j << ~<<) <<<<'l<<' i/ Ig << h r)<<)8ilji <<'I / //* jj jh << ~' ' ~ V / .Ihl . 'li

SUMMARY

OF OPERATING EXPERIENCE FOR THE NONTH DOCKET NO. 50-530 UNIT PVNGS-3 DATE 04/12/88 COMPLETED BY J.N. Colville TELEPHONE S02-393-26T9 March 1988 03/01 0000 Unit in Node 1 - Reactor Power 100M.

03/05 2002 Power reduction for 43ST-3SF01, CEA Surveillance Testing.

Reactor Power approximately 90'.

03/31 2400 Unit in Node 1 - Reactor Power 100'.

II "ie, ~ g

~ I t J I f~'M g%C hi p

~ ti, ~ ~

I II ii '. I,

'l

.'I E

.~ ~

I't

<j 0

Pp =. ~ p.

a << ~ 4 g iw r 1)

UNIT SHUTDOMNS AND POt<tER REDUCTIONS DOCKET NO: 50-530 UNIT NAME: PVNGS-3 DATE:

COMPLETED BY: J.M. Colville, TELEPHONEi 602-393-26/9 Method of Cause and Corrective I Duration Shutting System< Component> Action to No. Date Type .Hours Reason Down Reactor 3 LER NO. Code Code Prevent Recurrence NO, UNIT SHUTDOt<tNS OR POSER REDUCTIONS FOR MARCH 1 2 Method:

4 Exhibit F - Instructions F-Forced Reason: for Preparation of Data A-Equi pmcnt Failure (Explain) 1-Manual S-Scheduled Entry Shccts for Liccnsce 8-Maintenance or Test 2-Manual Scram 3-Automatic Scram Event Report (LER) File C-Refueling 0161)

D-Regulatory Restriction 4-Continuation from (NVREG E-Operator Training 8 License Examination Previous Month F-Administrative 5-Reduction of 20X Exhibit M-Same Source G-Operational Error (Explain) or Greater in the

.lt-Other (Explain) Past 24 Ilours

<t-Art< r (Rxnlnin)

V I

Arizona Nuclear Power Project P.o. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 212-00157-JGH/TJB April 15, 1988 Docket Nos. STN 50-528/529/530 U.S. Nuclear Regulatory Commission washington, D.C. 20555 Attention: Document Control Desk Gentlemen:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 March Monthly Operating Report File: 88-024-404/88-056-026 Attached are the March Monthly Operating Reports prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses. By copy of this letter, we are also forwarding a copy of the Monthly Operating Reports to the Regional Administrator of the Region V Office.

If you have any questions, please contact Mr. T. J. Bloom, at (602) 371-4187.

Very truly yours, G. Hayn s Vi'ce Pr esident Nuclear Production JGH/TJB/ks r Attachments cc: E. E. Van Brunt, Jr. (all w/a)

J. B. Martin E. A. Licitra A. C. Gehr J. A. Amenta INPO Records. Center

wg h Hj I

Monthly Operating Reports 212-00157-JGH/TJB Page 2 April 15, 1988 bcc J ~ D~ Driscoll (6125) (all w/a)

R~ M. Butler ,

(6102)

0. J. Zeringue (6915)

J M. Al 1 en

~ (6932)

G~ W. Sower s (6102)

W. M. Simko (6077)

L ~ L. Henson (6078)

M. L. Clyde (6079)

R ~ E ~ .Younger ,(6428)

R. J. 'dney (6070)

R~ E. Gouge (6486)

A. C~ Rogers (7048)

W. E~ Ide (6452)

T. D. Shriver (6148)

J. R. LoCicero (6225)

W. J. Jump (7346)

J ~ D. Wade (7434)

W. F. Quinn (7035)

R. A. Bernier (7048)

D. E. Hardy (>>20)

P. L. Vogt (4161)

D. R Canady

~ (6345)

K. Porter (6077)

B. S. Ecklund (7035)

D~ Wootten (7035)

E. C. Sterling (7034)

J. E. Allen (7106)

F ~ Buckingham (6132)

LCTS Coordinator (7048)

4Q