| issue date = 05/31/1989
| issue date = 05/31/1989
| title = Monthly Operating Repts for May 1989 for Palo Verde Nuclear Generating Station Units 1,2 & 3
| title = Monthly Operating Repts for May 1989 for Palo Verde Nuclear Generating Station Units 1,2 & 3
| author name = HAYNES J G, PORTER K F
| author name = Haynes J, Porter K
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~y" gCCELZP>TED D1SlBU'EON DEMONSTR+OY, SY~Eg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)ACCESSION NBR:890 FACIL:STN-50-528 STN-50-529.STN-50-530 AUTH.NAME PORTER,K.F.
{{#Wiki_filter:~y
HAYNES,J.G.
" gCCELZP>TED             D1SlBU'EON                           DEMONSTR+OY,               SY~Eg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
RECIP.NAME 6200079 DOC.DATE: 89/05/31 NOTARIZED:
ACCESSION NBR:890 6200079                       DOC.DATE:   89/05/31   NOTARIZED: NO           DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station,                         Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station,                       Unit 2, Arizona Publi 05000529
NO DOCKET Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTHOR AFFILIATION Arizona Public Service Co.(formerly Arizona Nuclear Power Arizona Public Service Co.(formerly Arizona Nuclear Power R RECIPIENT AFFILIATION I  
        .STN-50-530 Palo Verde Nuclear Station,                       Unit 3, Arizona Publi 05000530 AUTH. NAME          AUTHOR AFFILIATION PORTER,K.F.          Arizona Public Service Co.                     (formerly Arizona Nuclear Power HAYNES,J.G.          Arizona Public Service Co.                     (formerly Arizona Nuclear Power     R RECIP.NAME          RECIPIENT AFFILIATION I


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for May 1989 for PVNGS Units 1,2&3.W/890614 ltr.DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs NOTES:Standardized plant.Standardized plant.Standardized plant.05000528 05000529 A 05000530 D RECIPIENT ID CODE/NAME PD5 LA CHAN,T DAVXS,M.INTERNAL ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRg4DR-RPB 10 G FXCE 01 EXTERNAL'G&G S IMPSON I F NRC PDR NOTES: COPIES LTTR ENCL 4 4 1 1 1 1 10 10 1 1 1 1 1 1 1 1 1 1.1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 2 2 1 1 1 1 1'1 1 1 1 D NOTE'IO ALL"RIES" RECIPIENIS'LEASE HELP US 10 REDUCE WASTE.'ONI'ACT
Monthly operating repts for                     May 1989   for PVNGS Units 1,2   &
'IHE DOCUMENI'XNIBDL DESK, ROOM Pl-37 (EXT.20079)K)ELIMINATE YOUR NAME PKH DISTIGKlTIGN LISTS FOR DOCUMENIS YOU DON'T NEED)TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33  
3.W/890614     ltr.
/f Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O, BOX 52034~PHOENIX.ARIZONA 85072-2034 254-00256-JGH/KFP June 14, 1989 Docket Nos.STN 50-528/529/530 Document Control Desk U.S.Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.20555
DISTRIBUTXON CODE: IE24D                     COPIES RECEIVED:LTR       ENCL     SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:Standardized plant.                                                                     05000528 Standardized plant.                                                                     05000529 A Standardized plant.                                                                     05000530 D
RECIPIENT                        COPIES            RECIPIENT         COPIES ID   CODE/NAME                     LTTR ENCL        ID CODE/NAME      LTTR ENCL PD5 LA                                 4    4      PD5 PD                  1    1 CHAN,T                                 1    1      DAVIS,M                1    1 DAVXS,M.                               1    1 INTERNAL ACRS                                     10    10      AEOD/DOA                1    1 AEOD/DSP/TPAB                         1    1      IRM TECH ADV            2    2 NRR/DLPQ/PEB 10                       1    1      NRR/DOEA/EAB 11        1    1 NRg4DR   -
RPB 10                     1    1      NUDOCS-ABSTRACT        1    1 G FXCE         01                   1    1      RGN5                    1' EXTERNAL 'G&G S IMPSON I F                         1     1. LPDR                    1     1 NRC PDR                                1     1     NSIC                   1     1 NOTES:                                            1     1 D
NOTE 'IO ALL "RIES" RECIPIENIS'LEASE HELP US 10 REDUCE WASTE.'ONI'ACT 'IHE DOCUMENI'XNIBDLDESK, ROOM Pl-37 (EXT. 20079) K) ELIMINATE YOUR               NAME PKH DISTIGKlTIGN LISTS FOR DOCUMENIS               YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED: LTTR                         33   ENCL   33


==Dear Sirs:==
  /
f
 
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O, BOX 52034  ~ PHOENIX. ARIZONA 85072-2034 254-00256-JGH/KFP June 14, 1989 Docket Nos. STN  50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C. 20555
 
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Monthly Operating Reports for May 1989 File'9-024-404 89-056-026 Attached are the Monthly Operating Reports for May 1989 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses.By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.If you have any questions, please contact Mr.K.F.Porter, at (602)371-4187.Very truly yours, J.G.Haynes Vice President Nuclear Production JGH/KFP/dim Attachments cc: M.J.Davis J~B.Martin T.J.Polich J.A.Amenta INPO Records Center (all w/attachments) 3906200079 390531 PDR ADOCK 05000528 PDC 0~1 Monthly Page 2 Operating Report bcc: E.D.A.R.J.J.D.R.F.M.K.B.R.D.D.D.L.W.J.W.R.K.W~A.S~J~T.K~G.E.C.C.P.S.P.D.R.D.W.J.B.E.B.C.J.E.M.B.A.C.L.B.S.E.A.E.R.L.E.R.C.W.F.F.C.L.J.D.M.W.F.R.H.L.Lawson J.Wiley Wootten E.Younger Kahler F.Conway T.Reilly W.McCaskey Van Brunt, Jr.Karner Gehr Adney Allen Allen Andrews Bernier Buckingham Clyde Contois Ecklund Gouge Hackbert Hardy Heinicke Henson Ide LoCicero Marsh Page Porter Quinn Rogers Schey Scott Shriver Johnson Sowers Spaw Stevens Teeter Vogt (7040)(9012)(4141)(6915)(7106)(6123)(6345)(7048)(6451)(6079)(6985)(7035)(6486)(6795)(8038)(6452)(6078)(6932)(6144)(6123)(7102)(7035)(7035)(7048),(6231)"(6428)(6148)(6077)(6081)(2208)(7006)(7102)(4161)(7434)(6920)(7035)(6070)(6345)(9012)(6102)(6086)(all w/attachments) li I(
Palo Verde Nuclear Generating Station (PVNGS)
NRC MONTHLY OPERATING REPORT DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE.06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 OPERATING STATUS l.2.3.5.6.7.8~9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 1 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A 11.12.13 14 15 16 17 18.19 20 21 22.23 24 Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capaci.ty Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next N A This Month 44 Yr.-to-Date 3 624.0 1 522 0 Cumulative 29 280 0 1 262 1 1 522.0 16 826 9 5 565 298.0 60 931 221.0 1 933 700.0 21 163 100 0 1 796.575 0 42 0%42.0 19 93 190.0 57 5 57 5 40 6%55 4 53 2 28 1 39.0a 6 Months (Type, Date, and Duration of Each): 25.If Shutdown At End of Report Period, Estimated Date of Startup: Au ust 26 1989 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved~05 85~05 25 85~06 85~06 10 85~11 85,~01 28 86  
Units 1, 2 and 3 Monthly Operating Reports         for   May 1989 File'9-024-404         89-056-026 Attached are the Monthly Operating Reports for May 1989 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses. By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.
)l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 371-418 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY 17 AVERAGE DAILY POWER LEVEL I 18 19 0 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 31 16 1
If you have   any questions,     please contact Mr. K. F. Porter, at (602) 371-4187.
REFUELING INFORMATION DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418 1.Scheduled date for next refueling shutdown.03/01/91, 3rd refueling.
Very   truly yours, J. G. Haynes Vice President Nuclear Production JGH/KFP/dim Attachments cc:   M. J. Davis             (all  w/attachments)
2.Scheduled date for restart following refueling.
J B. Martin
06/03/91 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
        ~
To be determined.
T. J. Polich J. A. Amenta INPO Records Center 3906200079 390531 PDR   ADOCK 05000528 PDC
4.Scheduled date for submitting proposed licensing action and supporting information.
 
To be determined.
0 ~
5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
1
The fuel vendor for the next reload will be Combustion Engineering.
 
6.The number of fuel assemblies a)In the core.241 b)In the spent fuel storage pool.80 7.Licensed spent fuel storage capacity.1329'Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming'present capacity.2004 (18 Month reloads and full core discharge capability).  
Monthly Operating Report Page 2 bcc: E. E. Van Brunt, Jr.   (7040) (all w/attachments)
'1 H li (0  
D. B. Karner          (9012)
A. C. Gehr            (4141)
R. J. Adney            (6915)
J. E. Allen            (7106)
J. M. Allen          (6123)
D. B. Andrews          (6345)
R. A. Bernier          (7048)
F. C. Buckingham      (6451)
M. L. Clyde           (6079)
K. B. Contois          (6985)
B. S. Ecklund          (7035)
R. E. Gouge          (6486)
D. A. Hackbert        (6795)
D. E. Hardy          (8038)
D. R. Heinicke        (6452)
L. L. Henson          (6078)
W. E. Ide              (6932)
J. R. LoCicero        (6144)
W. C. Marsh            (6123)
R. W. Page            (7102)
K. F. Porter          (7035)
W~  F. Quinn          (7035)
A. C. Rogers          (7048)
S ~ L. Schey        ,(6231)
J J. Scott
      ~                  "(6428)
T. D. Shriver        (6148)
K M. Johnson
      ~                  (6077)
G. W. Sowers          (6081)
E. F. Spaw            (2208)
C. R. Stevens        (7006)
C. H. Teeter          (7102)
P. L. Vogt          (4161)
S. Lawson            (7434)
P. J. Wiley          (6920)
D. Wootten          (7035)
R. E. Younger        (6070)
D. Kahler            (6345)
W. F. Conway        (9012)
J. T. Reilly          (6102)
B. W. McCaskey        (6086)
 
li I(
 
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-528 UNIT NAME     PVNGS-1 DATE     .
06 06 89 COMPLETED BY K F Porter TELEPHONE       602 3 1-4187 OPERATING STATUS
: l. Unit Name:   Palo Verde Nuclear Generatin   Station Unit     1 2.
: 3. Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403
: 5. Design Electrical Rating (Net MWe):         ~12 0
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):       1221 8 ~  If Changes Occur In Capacity Ratings (Items Number     3 Through 7)
Since Last Report, Give Reasons:     N A
: 9. Power Level   to Which Restricted, If Any (Net   MWe):   None
: 10. Reasons For   Restrictions, If Any: N A This Month            Yr.-to-Date          Cumulative
: 11. Hours   in Reporting Period             44                    3  624.0            29 280 0
: 12. Number   of Hours Reactor Was Critical                                                 1 522 0            1  262 1 13  Reactor Reserve Shutdown Hours 14  Hours Generator On-Line                                       1  522.0            16 826 9 15  Unit Reserve Shutdown Hours 16  Gross Thermal Energy Generated (MWH)                                           5  565 298.0        60 931  221.0 17  Gross Electrical Energy Generated (MWH)                                           1 933  700.0        21 163 100 0
: 18. Net Electrical Energy Generated (MWH)                                           1  796.575 0        19  93 190.0 19  Unit Service Factor                                           42  0%                57 5 20  Unit Availability Factor                                       42.0                  57 5 21  Unit Capacity Factor (Using MDC Net)                                               40  6%                55 4
: 22. Unit Capaci.ty Factor (Using DER Net)                                               39.0a                53 2 23  Unit Forced Outage Rate                                                             28 1 24  Shutdowns Scheduled Over Next   6 Months (Type, Date, and Duration     of Each):
N A
: 25. If Shutdown   At End of Report Period, Estimated Date   of Startup:
Au ust 26 1989 Forecast      Achieved INITIAL CRITICALITY                                 ~05 85       ~05 25 85
                                                                  ~06 85           10 85 INITIAL ELECTRICITY COMMERCIAL OPERATION                                ~11 85,     ~06
                                                                                ~01 28 86
 
)l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME   PVNGS-1 DATE         06 06 89 COMPLETED BY K F Porter TELEPHONE     602 371-418 MONTH: MAY 1989 DAY     AVERAGE DAILY POWER LEVEL             DAY       AVERAGE DAILY POWER LEVEL I
17 18 19                     0 20 21 22 23 24 25 10                                           26 27 12                                           28 13                                           29 14                                           30 31 16
 
1 REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME     PVNGS-1 DATE         06 06 89 COMPLETED BY K F Porter TELEPHONE     602 3 1-418
: 1. Scheduled date   for next refueling   shutdown.
03/01/91, 3rd refueling.
: 2. Scheduled date   for restart following refueling.
06/03/91
: 3. Will refueling or resumption           of operation thereafter       require   a   Technical Specification   change or other license amendment?
To be   determined.
: 4. Scheduled date   for submitting   proposed licensing action and supporting information.
To be   determined.
: 5. Important Licensing         considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
The fuel vendor for the next reload will be         Combustion Engineering.
: 6. The number   of fuel assemblies a)     In the core.         241 b)     In the spent fuel storage pool.             80
: 7. Licensed spent fuel storage capacity.               1329
  'Intended change in spent fuel storage capacity.               None
: 8. Projected   date of last refueling that can be discharged to spent fuel storage pool assuming   'present   capacity.
2004 (18 Month   reloads and   full core discharge capability).
'1 H
li
 
(0


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F.Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 05/12 05/31 0000 1130 2400 Unit begins month in Mode 5, 2nd Refueling Outage.Unit'ntered Mode 6.Unit ends month in Mode 6.  
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME     PVNGS-1 DATE           06 06 89 COMPLETED BY K F. Porter TELEPHONE       602 3 1-4187 MAY 1989 05/01   0000 Unit begins month in Mode 5, 2nd Refueling Outage.
05/12    1130  Unit'ntered Mode 6.
05/31    2400  Unit ends month in Mode 6.
 
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-528 UNIT NAME    PVNGS-1 DATE COMPLETED BY K. F. Porter Method  of                                        Cause and Corrective Duration                Shutting                  System  Component          Action to No. Date    Type        Hours    Reason    Down  Reactor    LER No. Code      Code          Prevent Recurrence 89/03    04/08/89  S          744                                N/A          N/A      N/A      2nd  refueling outage.
F-Forced          Reason:                                        Method:                    Exhibit F-Instructions S-Scheduled      A-Equipment Failure (Explain)                  1-Manual                    for Preparation of the Data B-Maintenance or Test                          2-Manual Scram              Entry Sheets for Licensee C-Refueling                                    3-Automatic Scram          Event Report (LER) File D-Regulatory Restriction                        4-Continuation from        (NUREG  0161)
E-Operator Training & License Examination        Previous Month F-Administrative                                5-Reduction of 20%
G-Operational Error                              or Greater in the        Exhibit  H-Same Source H-Other (Explain)                                Past 24 Hours 9-Other-(Explain)


SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.F.Porter Method of Duration Shutting System Component No.Date Type Hours Reason Down Reactor LER No.Code Code Cause and Corrective Action to Prevent Recurrence 89/03 04/08/89 S 744 N/A N/A N/A 2nd refueling outage.F-Forced S-Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)-5-Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain)
0 h
Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source 0 h NRC MONTHLY OPERATING REPORT DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE , 06 06 89 COMPLETED BY K'F Porter TELEPHONE 602 3 1-4187 OPERATING STATUS 1.2.3.4.5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A ll 12 13 14 15 16 17 18 19.20.21.22 23 24 This Month Cumulative 23 664 0 Yr.-to-Date 3 624 0 1453 16 500 4 1 461 1 16 201 8 0 0 0.0 0 0 59 414 317 0 5 487 540.0 1 911 100.0 1 762 088.0 40.3 20 779 570.0 19 446 141.0 68 5 68 5 40.3 6 3 39.8a 64 38 3s (Type, Date, and Duration of Each): 15 Hours in Reporting Period 744 0 Number of Hours Reactor Was Critical 0 Reactor Reserve Shutdown Hours 0 Hours Generator On-Line 0 Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)0 Gross Electrical Energy Generated (MWH)0 Net Electrical Energy Generated (MWH)0 Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)0 Unit Forced Outage Rate 100 Shutdowns Scheduled Over Next 6 Months Refuelin Outa e-02 90-58 Da s 25.If Shutdown At End of Report Period, Estimated Date of Startup: June 12 1989 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-6-Forecast~03 86~06 86~11 86 Achieved~04 18 86 05 20 86 09 19 86 t  
 
,0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16 i I 1 ,V REFUELING INFORMATION DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418 1.Scheduled date for next refueling shutdown.01/13/90, 2nd refueling.
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNIT NAME   PVNGS-2 DATE     ,   06 06 89 COMPLETED BY K 'F Porter TELEPHONE       602 3 1-4187 OPERATING STATUS
2~Scheduled date for restart following refueling.
: 1. Unit Name:   Palo Verde Nuclear Generatin   Station Unit     2 2.
04/17/90 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'l To be determined 4.Scheduled date for submitting proposed licensing action and supporting information.
: 3. Licensed Thermal Power (MWt): 3800
09/89 5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
: 4. Nameplate Rating (Gross MWe): 1403
To be determined 6.The number of fuel assemblies a)In the core.241 b)In the spent fuel storage pool.7.Licensed spent fuel storage capacity.108 1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).
: 5. Design Electrical Rating (Net MWe):           ~12 0
e'  
: 6. Maximum Dependable Capacity (Gross MWe): 1303
!
: 7. Maximum Dependable Capacity (Net MWe):       1221
: 8. If Changes Occur In Capacity Ratings (Items Number     3 Through 7)
Since Last Report, Give Reasons:   N A
: 9. Power Level   to Which Restricted, If Any (Net   MWe):   None 10  Reasons For   Restrictions, If Any: N A This Month             Yr.-to-Date         Cumulative ll 12 Hours Number in Reporting Period of Hours Reactor 744 0                      3 624 0          23 664 0 Was Critical                           0                         1453              16 500 4 13  Reactor Reserve Shutdown Hours                                   0 14  Hours Generator On-Line                 0                         1 461 1          16 201 8 15  Unit Reserve Shutdown Hours                                   0 0                          0.0                0 0 16  Gross Thermal Energy Generated (MWH)                         0                  5  487 540.0        59 414 317 0 17  Gross Electrical Energy Generated (MWH)                         0                   1 911  100.0        20 779 570.0 18  Net Electrical Energy Generated (MWH)                         0                   1 762  088.0        19 446 141.0
: 19. Unit Service Factor                                             40.3                  68 5
: 20. Unit Availability Factor                                       40.3                  68 5
: 21. Unit Capacity Factor (Using MDC Net)                                               39.8a                6  3 22  Unit Capacity Factor (Using   DER Net)                       0                       38 3s                64 23  Unit Forced   Outage Rate             100                                             15 24  Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration          of Each):
Refuelin Outa e - 02 90 - 58 Da s
: 25. If Shutdown At End of Report Period, Estimated   Date   of Startup:
June 12 1989 Forecast      Achieved INITIAL CRITICALITY                                   ~03 86       ~04 18 86 INITIAL ELECTRICITY                                    ~06 86       05 20 86 COMMERCIAL OPERATION                                  ~11 86        09 19 86 t
                          ,0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME   PVNGS-2 DATE         06 06 89 COMPLETED BY K F Porter TELEPHONE     602 3 1-418 MONTH: MAY 1989 DAY     AVERAGE DAILY POWER LEVEL             DAY       AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10                                           26 27 12                                           28 13                                           29 14                                           30 15                                           31 16
 
i I
1
  ,V
 
REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME     PVNGS-2 DATE         06 06 89 COMPLETED BY K F Porter TELEPHONE     602 3 1-418
: 1. Scheduled date   for next refueling   shutdown.
01/13/90, 2nd refueling.
2 ~ Scheduled date   for restart following refueling.
04/17/90
: 3. Will refueling or resumption         of operation     thereafter   require   a   Technical Specification   change or other license   amendment'l To be determined
: 4. Scheduled date   for submitting proposed licensing action and supporting information.
09/89
: 5. Important     Licensing   considerations     associated   with refueling,   e.g.,   new or different fuel design or supplier, unreviewed design or performance                   analysis methods, significant changes in fuel design, new operating procedures.
To be determined
: 6. The number   of fuel assemblies a)     In the core.       241 b)     In the spent fuel storage pool.           108
: 7. Licensed spent fuel storage capacity.           1329 Intended change in spent fuel storage capacity.             None
: 8. Projected   date   of last refueling that   can be discharged to spent   fuel storage pool assuming present capacity.
2004 (18 Month reloads and   full core discharge capability).
e'


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-529 ,UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 05/31 0000 2400 Unit began month in Mode 5, ADV repair outage.Unit ended month in Mode 5.  
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529
]I If J f ill'I J' SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.F.Porter Method of Duration Shutting System Component No.Date Type Hours Reason Down Reactor LER No.Code Code5 Cause and Corrective Action to Prevent Recurrence 89/02 03/15/89 F 744 N/A N/A N/A Continuation of outage from the previous month.F-Forced S-Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source 0 i'i I 1[
                                                  ,UNIT NAME   PVNGS-2 DATE         06 06 89 COMPLETED BY K F Porter TELEPHONE     602 3 1-4187 MAY 1989 05/01   0000 Unit began month in Mode 5, ADV repair outage.
NRC MONTHLY OPERATING REPORT DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 371-4187 OPERATING STATUS 1.2.3.4.5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 3 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative 11.12.13.14 15 16 17.18'9 20 21 22.23 24 Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next N A 44 0 3 6240 1 106.1 12 240 0 9 307 8 1 095.0 9 273 0 Og Og 4 090 086.0 1 420 500.0 1 327 990.0 30 2%30 2a 34 402 824 0 12 06 00.0 11 363 465.0 5 8 75 8 ,0 30 0 76 0%73 1 9 1 Oa Oa 31.1%6 Months (Type, Date, and Duration of Each): 25.If Shutdown At End of Report Period, Estimated Date of Startup: Au ust 6 1989 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-ll-Forecast 07787~07 87 09 87 Achieved~10 25 8 11 28 87 01 08 88 i 0'  
05/31    2400  Unit ended month in Mode 5.
,0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F.Porter TELEPHONE 602 3 1-4187 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16 i I\4 f kI t[
    ]
0 REFUELING INFORMATION DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F.Porter TELEPHONE 602 3 1-418 1.Scheduled date for next refueling shutdown.ll/17/90, 2nd refueling.
I If J
2.Scheduled date for restart following refueling.
f ill
02/19/91 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'E To be determined.
'I J'
4.Scheduled date for submitting proposed licensing action and supporting information.
 
To be determined.
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-529 UNIT NAME     PVNGS-2 DATE COMPLETED BY K. F. Porter Method of                                       Cause and  Corrective Duration               Shutting                 System   Component           Action to No. Date     Type         Hours     Reason   Down Reactor   LER No.     Code     Code5       Prevent Recurrence 89/02     03/15/89   F           744                               N/A           N/A     N/A     Continuation   of outage from the previous month.
5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
F-Forced         Reason:                                        Method:                    Exhibit F-Instructions S-Scheduled       A-Equipment Failure (Explain)                   1-Manual                    for Preparation of the Data B-Maintenance or Test                           2-Manual Scram              Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram          Event Report (LER)  File D-Regulatory Restriction                       4-Continuation from        (NUREG 0161)
E-Operator Training & License Examination         Previous Month F-Administrative                               5-Reduction of 20%
G-Operational Error                               or Greater in the        Exhibit  H-Same Source H-Other (Explain)                                 Past 24 Hours 9-Other-(Explain) 0 i'i I
1[
 
NRC MONTHLY OPERATING REPORT DOCKET NO.       50-530 UNIT NAME       PVNGS-3 DATE             06 06 89 COMPLETED BY K F Porter TELEPHONE         602 371-4187 OPERATING STATUS
: 1. Unit Name:   Palo Verde Nuclear Generatin   Station Unit     3 2.
: 3. Licensed Thermal Power (MWt): 3800
: 4. Nameplate Rating (Gross MWe): 1403
: 5. Design Electrical Rating (Net MWe):           ~12 0
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):         1221
: 8. If Changes Occur In Capacity Ratings (Items Number       3 Through 7)
Since Last Report, Give Reasons:     N A
: 9. Power Level   to Which Restricted, If Any (Net   MWe):   None 10    Reasons For   Restrictions, If Any: N A This Month             Yr.-to-Date           Cumulative
: 11. Hours   in Reporting Period               44 0                  3  6240                12 240 0
: 12. Number   of Hours Reactor Was Critical                                                   1  106.1                9  307 8
: 13. Reactor Reserve Shutdown Hours 14    Hours Generator On-Line                                         1  095.0                9  273 0 15    Unit Reserve Shutdown Hours 16    Gross Thermal Energy Generated (MWH)                                               4 090 086.0          34 402 824 0
: 17. Gross Electrical Energy Generated (MWH)                                               1  420 500.0          12 06      00.0 18    Net Electrical Energy
  '9 Generated (MWH)                                               1 327    990.0        11 363    465.0 Unit Service Factor                       Og                      30 2%                    5 8 20    Unit Availability Factor                   Og                      30 2a                  75 8 21    Unit Capacity Factor (Using   MDC Net)                       ,0                      30 0                    76  0%
: 22. Unit Capacity Factor (Using   DER Net)                         Oa                                              73 1 23    Unit Forced   Outage Rate                 Oa                      31.1%                   9 1 24    Shutdowns Scheduled Over Next    6 Months (Type, Date, and Duration         of Each):
N A
: 25. If Shutdown   At End of Report Period, Estimated   Date   of Startup:
Au ust 6   1989 Forecast        Achieved INITIAL CRITICALITY                                     07787          ~10 25 8 INITIAL ELECTRICITY                                   ~07 87           11 28 87 COMMERCIAL OPERATION                                    09 87          01 08 88
                                                -ll-
 
i 0'
                          ,0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME   PVNGS-3 DATE         06 06 89 COMPLETED BY K F. Porter TELEPHONE     602 3 1-4187 MONTH: MAY 1989 DAY     AVERAGE DAILY POWER LEVEL             DAY       AVERAGE DAILY POWER LEVEL 17 19 20 21 22 23 24 25 10                                             26 27 12                                             28 13                                             29 14                                             30 15                                             31 16
 
I
      \
i 4
f kI t[
 
0 REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME     PVNGS-3 DATE         06 06 89 COMPLETED BY K F. Porter TELEPHONE     602 3 1-418
: 1. Scheduled date   for next refueling   shutdown.
ll/17/90,   2nd refueling.
: 2. Scheduled date   for restart following refueling.
02/19/91
: 3. Will refueling or resumption         of operation     thereafter   require   a   Technical Specification   change or other license amendment'E To be determined.
: 4. Scheduled date   for submitting   proposed licensing action and supporting information.
To be determined.
: 5. Important     Licensing     considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
The fuel vendor for the next reload will be Combustion Engineering.
The fuel vendor for the next reload will be Combustion Engineering.
6.The number of fuel assemblies a)In the core.241 b)In the spent fuel storage pool.104 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
: 6. The number   of fuel assemblies a)     In the core.         241 b)     In the spent fuel storage pool.             104
1 II E I,  
: 7. Licensed spent fuel storage capacity.             1329 Intended change in spent fuel storage capacity.             None
,0  
: 8. Projected   date   of last refueling that   can be discharged to spent   fuel storage pool assuming present capacity.
2005 (18 Month   reloads and   full core discharge capability).
1   E II I,
 
                  ,0


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 05/31 0000 2400 Unit began month in Mode 6, 1st Refueling Outage.Unit ended month in Mode 6.  
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME     PVNGS-3 DATE         06 06 89 COMPLETED BY K F Porter TELEPHONE     602 3 1-4187 MAY 1989 05/01   0000 Unit began month in Mode 6, 1st Refueling Outage.
05/31    2400  Unit ended month in Mode 6.


SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.F.Porter No.Date Typel Duration Hours Method of Shutting System Component Reason Down Reactor LER No.Code Code Cause and Corrective Action to Prevent Recurrence 89/03 03/08/89 S 744 N/A N/A N/A C ontinuation of unit refueling outage.F-Forced S-Scheduled Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source}}
SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-530 UNIT NAME     PVNGS-3 DATE COMPLETED BY K. F. Porter Method  of                                        Cause and  Corrective Duration                Shutting                  System  Component            Action to No. Date     Typel       Hours     Reason   Down Reactor   LER No.     Code     Code         Prevent Recurrence 89/03     03/08/89   S         744                               N/A           N/A     N/A     C ontinuation   of unit refueling outage.
F-Forced         Reason:                                        Method:                    Exhibit F-Instructions S-Scheduled     A-Equipment Failure (Explain)                   1-Manual                    for Preparation of the Data B-Maintenance or Test                           2-Manual Scram              Entry Sheets for Licensee C-Refueling                                     3-Automatic Scram          Event Report (LER)    File D-Regulatory Restriction                       4-Continuation from        (NUREG  0161)
E-Operator Training & License Examination         Previous Month F-Administrative                               5-Reduction of 20%
G-Operational Error                               or Greater in the        Exhibit  H-Same Source H-Other (Explain)                                 Past 24 Hours 9-Other-(Explain)
                                                                  }}

Latest revision as of 05:15, 4 February 2020

Monthly Operating Repts for May 1989 for Palo Verde Nuclear Generating Station Units 1,2 & 3
ML17304B254
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/31/1989
From: Haynes J, Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-00256-JGH-K, 254-256-JGH-K, NUDOCS 8906200079
Download: ML17304B254 (36)


Text

~y

" gCCELZP>TED D1SlBU'EON DEMONSTR+OY, SY~Eg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:890 6200079 DOC.DATE: 89/05/31 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529

.STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION PORTER,K.F. Arizona Public Service Co. (formerly Arizona Nuclear Power HAYNES,J.G. Arizona Public Service Co. (formerly Arizona Nuclear Power R RECIP.NAME RECIPIENT AFFILIATION I

SUBJECT:

Monthly operating repts for May 1989 for PVNGS Units 1,2 &

3.W/890614 ltr.

DISTRIBUTXON CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:Standardized plant. 05000528 Standardized plant. 05000529 A Standardized plant. 05000530 D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 4 4 PD5 PD 1 1 CHAN,T 1 1 DAVIS,M 1 1 DAVXS,M. 1 1 INTERNAL ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 NRg4DR -

RPB 10 1 1 NUDOCS-ABSTRACT 1 1 G FXCE 01 1 1 RGN5 1' EXTERNAL 'G&G S IMPSON I F 1 1. LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 D

NOTE 'IO ALL "RIES" RECIPIENIS'LEASE HELP US 10 REDUCE WASTE.'ONI'ACT 'IHE DOCUMENI'XNIBDLDESK, ROOM Pl-37 (EXT. 20079) K) ELIMINATE YOUR NAME PKH DISTIGKlTIGN LISTS FOR DOCUMENIS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 33

/

f

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O, BOX 52034 ~ PHOENIX. ARIZONA 85072-2034 254-00256-JGH/KFP June 14, 1989 Docket Nos. STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Monthly Operating Reports for May 1989 File'9-024-404 89-056-026 Attached are the Monthly Operating Reports for May 1989 prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2 and 3 Operating Licenses. By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.

If you have any questions, please contact Mr. K. F. Porter, at (602) 371-4187.

Very truly yours, J. G. Haynes Vice President Nuclear Production JGH/KFP/dim Attachments cc: M. J. Davis (all w/attachments)

J B. Martin

~

T. J. Polich J. A. Amenta INPO Records Center 3906200079 390531 PDR ADOCK 05000528 PDC

0 ~

1

Monthly Operating Report Page 2 bcc: E. E. Van Brunt, Jr. (7040) (all w/attachments)

D. B. Karner (9012)

A. C. Gehr (4141)

R. J. Adney (6915)

J. E. Allen (7106)

J. M. Allen (6123)

D. B. Andrews (6345)

R. A. Bernier (7048)

F. C. Buckingham (6451)

M. L. Clyde (6079)

K. B. Contois (6985)

B. S. Ecklund (7035)

R. E. Gouge (6486)

D. A. Hackbert (6795)

D. E. Hardy (8038)

D. R. Heinicke (6452)

L. L. Henson (6078)

W. E. Ide (6932)

J. R. LoCicero (6144)

W. C. Marsh (6123)

R. W. Page (7102)

K. F. Porter (7035)

W~ F. Quinn (7035)

A. C. Rogers (7048)

S ~ L. Schey ,(6231)

J J. Scott

~ "(6428)

T. D. Shriver (6148)

K M. Johnson

~ (6077)

G. W. Sowers (6081)

E. F. Spaw (2208)

C. R. Stevens (7006)

C. H. Teeter (7102)

P. L. Vogt (4161)

S. Lawson (7434)

P. J. Wiley (6920)

D. Wootten (7035)

R. E. Younger (6070)

D. Kahler (6345)

W. F. Conway (9012)

J. T. Reilly (6102)

B. W. McCaskey (6086)

li I(

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE .

06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 OPERATING STATUS

l. Unit Name: Palo Verde Nuclear Generatin Station Unit 1 2.
3. Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221 8 ~ If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 44 3 624.0 29 280 0
12. Number of Hours Reactor Was Critical 1 522 0 1 262 1 13 Reactor Reserve Shutdown Hours 14 Hours Generator On-Line 1 522.0 16 826 9 15 Unit Reserve Shutdown Hours 16 Gross Thermal Energy Generated (MWH) 5 565 298.0 60 931 221.0 17 Gross Electrical Energy Generated (MWH) 1 933 700.0 21 163 100 0
18. Net Electrical Energy Generated (MWH) 1 796.575 0 19 93 190.0 19 Unit Service Factor 42 0% 57 5 20 Unit Availability Factor 42.0 57 5 21 Unit Capacity Factor (Using MDC Net) 40 6% 55 4
22. Unit Capaci.ty Factor (Using DER Net) 39.0a 53 2 23 Unit Forced Outage Rate 28 1 24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Startup:

Au ust 26 1989 Forecast Achieved INITIAL CRITICALITY ~05 85 ~05 25 85

~06 85 10 85 INITIAL ELECTRICITY COMMERCIAL OPERATION ~11 85, ~06

~01 28 86

)l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 371-418 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I

17 18 19 0 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 31 16

1 REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418

1. Scheduled date for next refueling shutdown.

03/01/91, 3rd refueling.

2. Scheduled date for restart following refueling.

06/03/91

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

To be determined.

4. Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

The fuel vendor for the next reload will be Combustion Engineering.

6. The number of fuel assemblies a) In the core. 241 b) In the spent fuel storage pool. 80
7. Licensed spent fuel storage capacity. 1329

'Intended change in spent fuel storage capacity. None

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming 'present capacity.

2004 (18 Month reloads and full core discharge capability).

'1 H

li

(0

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE 06 06 89 COMPLETED BY K F. Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 0000 Unit begins month in Mode 5, 2nd Refueling Outage.

05/12 1130 Unit'ntered Mode 6.

05/31 2400 Unit ends month in Mode 6.

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K. F. Porter Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code Prevent Recurrence 89/03 04/08/89 S 744 N/A N/A N/A 2nd refueling outage.

F-Forced Reason: Method: Exhibit F-Instructions S-Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction of 20%

G-Operational Error or Greater in the Exhibit H-Same Source H-Other (Explain) Past 24 Hours 9-Other-(Explain)

0 h

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE , 06 06 89 COMPLETED BY K 'F Porter TELEPHONE 602 3 1-4187 OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 2 2.
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative ll 12 Hours Number in Reporting Period of Hours Reactor 744 0 3 624 0 23 664 0 Was Critical 0 1453 16 500 4 13 Reactor Reserve Shutdown Hours 0 14 Hours Generator On-Line 0 1 461 1 16 201 8 15 Unit Reserve Shutdown Hours 0 0 0.0 0 0 16 Gross Thermal Energy Generated (MWH) 0 5 487 540.0 59 414 317 0 17 Gross Electrical Energy Generated (MWH) 0 1 911 100.0 20 779 570.0 18 Net Electrical Energy Generated (MWH) 0 1 762 088.0 19 446 141.0
19. Unit Service Factor 40.3 68 5
20. Unit Availability Factor 40.3 68 5
21. Unit Capacity Factor (Using MDC Net) 39.8a 6 3 22 Unit Capacity Factor (Using DER Net) 0 38 3s 64 23 Unit Forced Outage Rate 100 15 24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelin Outa e - 02 90 - 58 Da s

25. If Shutdown At End of Report Period, Estimated Date of Startup:

June 12 1989 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY ~06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 t

,0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16

i I

1

,V

REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-418

1. Scheduled date for next refueling shutdown.

01/13/90, 2nd refueling.

2 ~ Scheduled date for restart following refueling.

04/17/90

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'l To be determined
4. Scheduled date for submitting proposed licensing action and supporting information.

09/89

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

To be determined

6. The number of fuel assemblies a) In the core. 241 b) In the spent fuel storage pool. 108
7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

e'

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529

,UNIT NAME PVNGS-2 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 0000 Unit began month in Mode 5, ADV repair outage.

05/31 2400 Unit ended month in Mode 5.

]

I If J

f ill

'I J'

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K. F. Porter Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code5 Prevent Recurrence 89/02 03/15/89 F 744 N/A N/A N/A Continuation of outage from the previous month.

F-Forced Reason: Method: Exhibit F-Instructions S-Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction of 20%

G-Operational Error or Greater in the Exhibit H-Same Source H-Other (Explain) Past 24 Hours 9-Other-(Explain) 0 i'i I

1[

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 371-4187 OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 3 2.
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 44 0 3 6240 12 240 0
12. Number of Hours Reactor Was Critical 1 106.1 9 307 8
13. Reactor Reserve Shutdown Hours 14 Hours Generator On-Line 1 095.0 9 273 0 15 Unit Reserve Shutdown Hours 16 Gross Thermal Energy Generated (MWH) 4 090 086.0 34 402 824 0
17. Gross Electrical Energy Generated (MWH) 1 420 500.0 12 06 00.0 18 Net Electrical Energy

'9 Generated (MWH) 1 327 990.0 11 363 465.0 Unit Service Factor Og 30 2% 5 8 20 Unit Availability Factor Og 30 2a 75 8 21 Unit Capacity Factor (Using MDC Net) ,0 30 0 76 0%

22. Unit Capacity Factor (Using DER Net) Oa 73 1 23 Unit Forced Outage Rate Oa 31.1% 9 1 24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Startup:

Au ust 6 1989 Forecast Achieved INITIAL CRITICALITY 07787 ~10 25 8 INITIAL ELECTRICITY ~07 87 11 28 87 COMMERCIAL OPERATION 09 87 01 08 88

-ll-

i 0'

,0 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F. Porter TELEPHONE 602 3 1-4187 MONTH: MAY 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 31 16

I

\

i 4

f kI t[

0 REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F. Porter TELEPHONE 602 3 1-418

1. Scheduled date for next refueling shutdown.

ll/17/90, 2nd refueling.

2. Scheduled date for restart following refueling.

02/19/91

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment'E To be determined.
4. Scheduled date for submitting proposed licensing action and supporting information.

To be determined.

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

The fuel vendor for the next reload will be Combustion Engineering.

6. The number of fuel assemblies a) In the core. 241 b) In the spent fuel storage pool. 104
7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

1 E II I,

,0

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE 06 06 89 COMPLETED BY K F Porter TELEPHONE 602 3 1-4187 MAY 1989 05/01 0000 Unit began month in Mode 6, 1st Refueling Outage.

05/31 2400 Unit ended month in Mode 6.

SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K. F. Porter Method of Cause and Corrective Duration Shutting System Component Action to No. Date Typel Hours Reason Down Reactor LER No. Code Code Prevent Recurrence 89/03 03/08/89 S 744 N/A N/A N/A C ontinuation of unit refueling outage.

F-Forced Reason: Method: Exhibit F-Instructions S-Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction of 20%

G-Operational Error or Greater in the Exhibit H-Same Source H-Other (Explain) Past 24 Hours 9-Other-(Explain)