ML17305B523: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/1991
| issue date = 04/30/1991
| title = Monthly Operating Repts for Apr 1991 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/910513 Ltr
| title = Monthly Operating Repts for Apr 1991 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/910513 Ltr
| author name = LEVINE J M
| author name = Levine J
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:, ACCELERATED DI TRIBUTION DEMONSTPA,TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:910 FACIL:STN-50-528 STN-50-529 STN-50-530 AUTH.NAME LEVINE,J.M.
{{#Wiki_filter:, ACCELERATED DI TRIBUTION DEMONSTPA,TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
LEVINE,J.M-RECIP.NAME Palo Verde Nuclear Station, Palo Verde Nuclear Station, Palo Verde Nuclear Station, AUTHOR AFFILIATION Arizona Public Service Co.Arizona Public Service Co.RECIPIENT AFFILIATION NOTARIZED:
ACCESSION NBR:910                                               NOTARIZED: NO        DOCKET g FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME           AUTHOR AFFILIATION LEVINE,J.M.             Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M-             Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME            RECIPIENT AFFILIATION                                                I D
NO DOCKET g Unit 1, Arizona Publi 05000528 Unit 2, Arizona Publi 05000529 Unit 3, Arizona Publi 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power I D  


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Apr 1991 for Palo Verde Nuclear Generating Station Units 1,2 6 3 10 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL L SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant./05000528 05000529 05000530 D RECIPIENT ID CODE/NAME PD5 LA TRAMMELL, C INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EGGG BRYCE,J.H NSIC NOTES COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M AEOD/DOA NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts for Apr 1991 for Palo Verde Nuclear Generating Station Units 1,2 6 3               10     tr.
A D D-PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONI'ROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 4 C~j t I f l I Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 254-01532-JNL/KAC May 13, 1991 Docket Nos.STN 50-528/529/530 Document Control Desk U.S.Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.C.20555
DISTRIBUTION CODE: IE24D             COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
ENCL L    SIZE:              /
NOTES:STANDARDIZED PLANT                                                             05000528 Standardized plant.                                                         05000529 Standardized plant.                                                         05000530 D
RECIPIENT               COPIES            RECIPIENT          COPIES ID CODE/NAME             LTTR ENCL      ID CODE/NAME        LTTR ENCL PD5 LA                       3    3      PD5 PD                1    1 TRAMMELL,C                   1    1      THOMPSON,M            1    1 INTERNAL: ACRS                           10    10      AEOD/DOA              1    1 AEOD/DSP/TPAB               1    1                            1    1 NRR/DOEA/OEAB               1    1                            1    1 RGN5                         1    1 EXTERNAL: EGGG BRYCE,J.H                 1     1     NRC PDR NSIC                        1     1 NOTES                                      1     1 D
A D
D-NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONI'ROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 26   ENCL   26


==Dear Sirs:==
4 C~
t I
f j
l I
 
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE                                        254-01532-JNL/KAC VICE PRESIDENT NUCLEAR PRODUCTION                                      May 13,    1991 Docket Nos.      STN  50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.C.        20555
 
==Dear     Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear.Generating Station (PVNGS)Units 1, 2, and 3 Monthly Operating Reports for April 1991 File: 91-024-404 Attached are the Monthly Operating Reports for April 1991, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Operating Licenses.By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.If you have any questions, please contact Mr.Kent A.Chavet, at (602)340-4718'ery truly yours, M.Levine Vice President Nuclear Production JML/KAC/kac Attachment cc: J.B.Martin D.H.Coe A.C.Gehr A.H.Gutterman INPO Records Center Utility Data Institute (all w/attachment) c 9105i50168 910430'i PDR,'O'DOCK 05000528 R'-" PDR  
Palo Verde Nuclear .Generating Station                   (PVNGS)
Units 1, 2,     and     3 Monthly Operating Reports               for April     1991 File:   91-024-404 Attached are the Monthly Operating Reports for April 1991, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Operating Licenses. By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.
If   you have any (602) 340-4718
                                'ery questions,         please contact Mr. Kent A. Chavet, at truly     yours, M. Levine Vice President Nuclear Production JML/KAC/kac Attachment cc:     J. B. Martin                       (all    w/attachment)
D. H. Coe A. C. Gehr A. H. Gutterman INPO Records   Center Utility Data Institute 9105i50168       910430 'i PDR, R
                  'O'DOCK 05000528 PDR


NRC MONTHLY OPERATING REPORT DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A.Chavet OPERATING STATUS 1.2.3.4.5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 1 Reporting Period:~A ril 1991 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A 11.12.13.14.15.16.17.18.19.20.21.22.23.24.Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 N A This Month 20 Yr.-to-Date 2 880 720 0 0.0 20 0 0 0 2 037.5 0.0 2 028 9 0 0 2 731 59 954 400 901 814 100 0 100 0 7 634 98 2 6 0 300 2 511 205 70.4a 0.4 102 6 71 4 98.6a 68.7%Months (Type, Date and Duration of Each): Cumulative 46 056 23 497 7 0.0 0 0 83 029 088 28 842 900 27 023 857 49 5 49 5 48 1 46.2a 23 4 25.If Shutdown At End of Report Period, Estimated Date of Start-up: N A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~05 85 06 85 11 85 Achieved~05 25 85 06 10 85 01/128 86 1 s
NRC MONTHLY OPERATING REPORT DOCKET NO.       50-528 UNIT NAME         PVNGS-1 DATE COMPLETED BY K.A. Chavet OPERATING STATUS
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet MONTH: April 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1255 17 1253 1256 18 1254 1254 19 1254 1252 20 1253 1251 21 1252 1248 22 1253 1251 23 1 53 1253 24 1251 1254 25 1250 10 1 51 26 1246 1256 27 1241 12 1257 28 1254 13 1256 29 1254 14 1256 30 1253 15 1254 16 1253 J 0 REFUELING INFORMATION DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet 1.Scheduled date for next refueling shutdown.02/Ol/92, 3rd refueling.
: 1. Unit Name:   Palo Verde Nuclear Generatin Station Unit 1
2.Scheduled date for restart following refueling.
: 2. Reporting   Period:   ~A ril 1991
04/11/92 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
: 3. Licensed Thermal Power (MWt): 3800
Yes, Sections 3.1.1, 3.1.2, 3.1~3, 3.2'and 3.2.7.4.Scheduled date for submitting proposed licensing action and supporting information.
: 4. Nameplate Rating (Gross MWe):       1403
11/91 5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
: 5. Design Electrical Rating (Net MWe): ~12 0
U1C4 is typical of PVNGS reload cycles.6.The number of fuel assemblies.
: 6. Maximum Dependable Capacity (Gross MWe): 1303
a)In the core.241 b)In the spent fuel storage pool.188 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).
: 7. Maximum Dependable Capacity (Net MWe):         1221
3 III j  
: 8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:     N A
: 9. Power Level   to Which Restricted, If Any (Net       MWe):   None 10  Reasons For   Restrictions, If Any: N A This Month              Yr.-to-Date            Cumulative
: 11. Hours in Reporting Period                       20                  2 880                46 056
: 12. Number of Hours Reactor Was Critical                               720 0                  2  037.5              23 497 7
: 13. Reactor Reserve Shutdown Hours                   0.0                      0.0                  0.0
: 14. Hours Generator On-Line                       20 0                  2 028 9
: 15. Unit Reserve Shutdown Hours                     0 0                      0 0                  0 0
: 16. Gross Thermal Energy Generated (MWH)                           2  731    59            7  634 98            83 029 088
: 17. Gross Electrical Energy Generated (MWH)                             954 400                2 6 0    300          28 842 900
: 18. Net Electrical Energy Generated (MWH)                             901 814                2  511 205            27 023 857
: 19. Unit Service Factor                         100 0                      70.4a                  49 5
: 20. Unit Availability Factor                   100 0                      0.4                  49 5
: 21. Unit Capacity Factor (Using MDC Net)                           102 6                      71 4                  48 1
: 22. Unit Capacity Factor (Using DER Net)                           98.6a                    68.7%                  46.2a
: 23. Unit Forced Outage Rate                                                                       23 4
: 24. Shutdowns Scheduled Over Next     6 Months (Type, Date and Duration           of Each):
N A
: 25. If Shutdown   At End of Report Period, Estimated       Date of Start-up:
N A Forecast                Achieved INITIAL CRITICALITY                             ~05 85                 ~05 25 85 INITIAL ELECTRICITY                                06 85                06 10 85 COMMERCIAL OPERATION                              11 85                01/128 86 1
 
s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME   PVNGS-1 DATE COMPLETED BY K A Chavet MONTH:     April 1991 DAY AVERAGE DAILY POWER LEVEL                       DAY AVERAGE DAILY POWER LEVEL 1255                                   17             1253 1256                                   18             1254 1254                                   19             1254 1252                                   20             1253 1251                                   21             1252 1248                                   22             1253 1251                                   23             1 53 1253                                   24             1251 1254                                   25             1250 10           1 51                                   26             1246 1256                                   27             1241 12           1257                                   28             1254 13           1256                                   29             1254 14           1256                                   30             1253 15           1254 16           1253
 
J 0
 
REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME     PVNGS-1 DATE COMPLETED BY K A Chavet
: 1. Scheduled date   for next refueling   shutdown.
02/Ol/92, 3rd refueling.
: 2. Scheduled date   for restart following refueling.
04/11/92
: 3. Will refueling or resumption of operation thereafter require         a Technical Specification change or other license   amendment?
Yes, Sections 3.1.1, 3.1.2, 3.1 3, 3.2 '
                                      ~          and 3.2.7.
: 4. Scheduled date   for submitting   proposed licensing action and supporting information.
11/91
: 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
U1C4 is typical of PVNGS reload cycles.
: 6. The number of fuel assemblies.
a)   In the core.       241 b)   In the spent fuel storage pool.             188
: 7. Licensed spent fuel storage capacity.             1329 Intended change in spent fuel storage capacity.             None
: 8. Projected date of last refueling that can be discharged           to spent fuel storage pool assuming present capacity.
2004 (18 Month reloads and   full core   discharge capability).
3
 
III j


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A.Chavet A ril 1991 04/01 04/30 00:00 24:00 Unit began the month in Mode 1, 100%RX power.Unit ended the month in Mode 1, 100%RX power.4  
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME   PVNGS-1 DATE COMPLETED BY K.A. Chavet A ril 1991 04/01     00:00 Unit began the month in Mode 1, 100% RX power.
04/30      24:00 Unit ended the month in Mode 1, 100% RX power.
4
 
SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO    50-528 UNIT NAME    PVNGS-1 DATE COMPLETED BY  K.A. Chavet.
Outage                Method  of                                          Cause and Corrective Duration                Shutting                  Code'omponent System                        Action to No.      Date  Type'ours          Reason      Down  Reactor      LER No.                  Code      Prevent Recurrence No  Reactor Shutdowns or  significant  power reductions occurred during the month.
  'F-Forced        Reason:                          Method:                  'Exhibit F-Instructions S-Scheduled    A-Equipment Failure(Explain)      1-Manual                  for Preparation of the Data B-Maintenance or Test              2-Manual Scram            Entry Sheets for Licensee C-Refueling                        3-Automatic Scram          Event Report (LER) File D-Regulatory Restriction          4-Continuation from        (NUREG 0161)
E-Operator Training & License        Previous Month Examination                      5-Reduction of 20% or F-Administrative                    Greater in the Past    Exhibit H-Same Source G-Operational Error                  24 Hours H-Other (Explain)                  9-Other-(Explain) 5
 
~J NRC MONTHLY OPERATING REPORT DOCKET NO.      50-529 UNIT  NAME      PVNGS-2 DATE COMPLETED BY K.A Chavet OPERATING STATUS
: 1. Unit  Name:  Palo Verde Nuclear Generatin Station Unit 2
: 2. Reporting Period: A    ril  1991
: 3. Licensed Thermal Power (MWt): 3800
: 4. Nameplate Rating (Gross MWe):        1403
: 5. Design Electrical Rating (Net MWe): ~12 0
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):          1221
: 8. If  Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:      N A
: 9. Power Level  to Which Restricted, If Any (Net        MWe):  None 10  Reasons For  Restrictions, If Any: N A This Month            Yr.-to-Date            Cumulative 11  Hours  in Reporting Period                      20                  2  880                40 440 12  Number of Hours Reactor Was  Critical                                720.0                2  880 0              27  507.3 13  Reactor Reserve Shutdown Hours                  0.0                    0.0                  0.0 14  Hours Generator On-Line                      720 0                2 880 0                26 903 4 15  Unit Reserve  Shutdown Hours                    0 0                    0.0                  0,0 16  Gross Thermal Energy Generated (MWH)                            2  33 538            10 891 935            98 613 336 17  Gross Electrical Energy Generated (MWH)                              955 500              3  811 500          34 439 070 18  Net Electrical Energy Generated (MWH)                              902 984              3  599  53          32 224 82 19  Unit Service Factor                          100.0                    100.0                66 5 20  Unit Availability Factor                    100    0%                100  0%              66.5a 21  Unit Capacity Factor (Using  MDC Net)                            102                        02 4                65.3a 22  Unit Capacity Factor (Using  DER Net)                              98.8S                    98 4%                62 23  Unit Forced Outage Rate                                                                      7.5%
24  Shutdowns Scheduled Over Next    6 Months (Type, Date and Duration          of Each):
Refuelin outa    e  October  17  1991 70 da s
: 25. If Shutdown  At  End  of Report Period, Estimated      Date of Start-up:
N A Forecast              Achieved INITIAL CRITICALITY                              ~03 86                04/618 86 INITIAL ELECTRICITY                              ~06 86                OS/320 86 COMMERCIAL OPERATION                            ~11 86                ~09 19 86 6
 
I lf f
4 1'
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME    PVNGS-2 DATE COMPLETED BY K A  Chavez MONTH:      April 1991 DAY  AVERAGE DAILY POWER LEVEL                        DAY  AVERAGE DAILY POWER LEVEL 1256                                    17            1256 1259                                    18            1258 1255                                    19            1256 1256                                    20            1239 1256                                    21            1239 1228                                    22            1241 1257                                    23            1241 1260                                    24            1241 1261                                    25            1242 10          1 59                                    26            1243 1263                                    27            1244 12          1263                                    28            1245 13          1262                                    29            1244 14          1262                                    30            1248 15          1259 1256


SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A.Chavet.No.Outage Method of Duration Shutting System Date Type'ours Reason Down Reactor LER No.Code'omponent Code Cause and Corrective Action to Prevent Recurrence No Reactor Shutdowns or significant power reductions occurred during the month.'F-Forced S-Scheduled Reason: Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20%or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)
f REFUELING INFORMATION DOCKET NO. 50-529 UNIT   NAME   PVNGS-2 DATE COMPLETED BY K A Chavet
'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source 5
: 1. Scheduled date   for next refueling   shutdown.
~J NRC MONTHLY OPERATING REPORT DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A Chavet OPERATING STATUS 1.2.3.4.5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Reporting Period: A ril 1991 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A 11 12 13 14 15 16 17 18 19 20 21 22 23 24 This Month 20 Yr.-to-Date 2 880 2 880 0 720.0 0.0 0.0 720 0 2 880 0 0 0 0.0 10 891 935 3 811 500 2 33 538 955 500 902 984 100.0 100 0%3 599 53 100.0 100 0%102 02 4 98.8S 98 4%(Type, Date and Duration of Each): da s Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)Net Electrical Energy Generated (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months Refuelin outa e October 17 1991 70 Cumulative 40 440 27 507.3 0.0 26 903 4 0,0 98 613 336 34 439 070 32 224 82 66 5 66.5a 65.3a 62 7.5%25.If Shutdown At End of Report Period, Estimated Date of Start-up: N A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~03 86~06 86~11 86 Achieved 04/618 86 OS/320 86~09 19 86 6 I lf f 4 1' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavez MONTH: April 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1256 17 1256 1259 18 1258 1255 19 1256 1256 20 1239 1256 21 1239 1228 22 1241 1257 23 1241 1260 24 1241 1261 25 1242 10 1 59 26 1243 1263 27 1244 12 1263 28 1245 13 14 15 1262 1262 1259 29 30 1244 1248 1256 f
10/17/91, 3rd refueling.
REFUELING INFORMATION DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet 1.Scheduled date for next refueling shutdown.10/17/91, 3rd refueling.
: 2. Scheduled date   for restart following refueling.
2.Scheduled date for restart following refueling.
12/26/91
12/26/91 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments Yes, Sections 3.1.1, 3.1.2, 3.1.3, 3.2'and 3.2.7.4.Scheduled date for submitting proposed licensing action and supporting information.
: 3. Will refueling or resumption of operation thereafter require         a Technical Specification change or other license   amendments Yes, Sections 3.1.1, 3.1.2, 3.1.3, 3.2 '       and 3.2.7.
07/91 5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
: 4. Scheduled date   for submitting   proposed licensing action and supporting information.
U2C4 is typical of PVNGS reload cycles.6.The number of fuel assemblies.
07/91
a)In the core.241 b)In the spent fuel storage pool.204 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).
: 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
8  
U2C4 is typical of   PVNGS reload cycles.
: 6. The number of fuel assemblies.
a)   In the core.         241 b)   In the spent fuel storage pool.             204
: 7. Licensed spent fuel storage capacity.             1329 Intended change in spent fuel storage capacity.             None
: 8. Projected date of last refueling that can be discharged           to spent fuel storage pool assuming present capacity.
2004 (18 Month   reloads and   full core discharge capability).
8


t t  
t                               t


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet A ril 1991 04/01 04/30 00'00 24:00 Unit began the month in Mode 1, 100%RX power.Unit ended the month in Mode 1, 100%RX power.9 l l SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A.Chavet.No.Outage Duration Date Type'ours Reason Method of Shutting System Down Reactor LER No.Code'omponent Code Cause and Corrective Action to Prevent Recurrence No Reactor Shutdowns or significant power reductions occurred during the month.'F-Forced S-Scheduled
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME   PVNGS-2 DATE COMPLETED BY K A Chavet A ril 1991 04/01     00'00 Unit began the month in Mode 1, 100% RX power.
'Reason: 'Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test~2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20%or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)
04/30      24:00 Unit ended the month in Mode 1, 100% RX power.
'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)'Exhibit H-Same Source 10-I" l f NRC MONTHLY OPERATING REPORT DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE OPERATING STATUS l.2.3.4, 5.6.7.8.Unit Name: Palo Verde Nuclear Generatin Station Unit 3 Reporting Period:~Artl 199 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A 9.Power Level to Which Restricted, If Any (Net MWe): one 10.Reasons For Restrictions, If Any: N A 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Continuation of 0 da refuelin This Month 20 Yr.-to-Date 2 880 0.0 0 0 0.0 0.0 1 776 8 0 0 1 776 8 0.0 6 436 69 2 263 600 0 0 0 0 2 127 786 61 61 7 0.0%60 5 0.0%Months (Type, Date and Duration of Each): outa e which be an March 16 1991 Cumulative 29 016 19 356 5 0 0 19 100 0 0.0 70 042 924 24 5 1 900 23 127 261 65 8 65 8 65 3 62 8 8 0 25.If Shutdown At End of Report Period, Estimated Date of Start-up: Ma 25 1991 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~07 8~08 09 8 Achieved~10 25 8~11 28 8 01/108 88 11
9


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A Chavet MONTH: April 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16 REFUELING INFORMATION DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chavet 1.Scheduled date for next refueling shutdown.Currently in refueling outage.2.Scheduled date for restart following refueling.
l l
05/25/91 3.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 Yes, Sections 3.1.1, 3'.2, 3.1.3, 3.2.4 and 3.2.7.4.Scheduled date for submitting proposed licensing action and supporting information.
 
02/21/91 5.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO      50-529 UNIT NAME      PVNGS-2 DATE COMPLETED BY K.A. Chavet.
U3C3 is typical of PVNGS reload cycles except that the NRC has asked for the resultant radiological consequences (doses)at the site boundary for a particular transient.
Outage                Method  of                                          Cause and Corrective Duration                Shutting                    Code'omponent System                        Action to No.        Date  Type'ours          Reason      Down  Reactor      LER No.                  Code      Prevent Recurrence No  Reactor Shutdowns or    significant  power reductions occurred during the month.
6.The number of fuel assemblies.
  'F- Forced      'Reason:                          'Method:                  'Exhibit F-Instructions S-Scheduled      A-Equipment Failure(Explain)      1-Manual                    for Preparation of the Data B-Maintenance or Test          ~
a)In the core.241 b)In the spent fuel storage pool.192 7.Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None 8.Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
2-Manual Scram              Entry Sheets for Licensee C-Refueling                        3-Automatic Scram          Event Report (LER) File D-Regulatory Restriction          4-Continuation from        (NUREG 0161)
13  
E-Operator Training & License        Previous Month Examination                      5-Reduction of 20% or F-Administrative                      Greater in the Past    'Exhibit H-Same Source G-Operational Error                  24 Hours H-Other (Explain)                  9-Other-(Explain) 10-
'V 4 l'l  
 
I" l
f
 
NRC MONTHLY OPERATING REPORT DOCKET NO.      50-530 UNIT NAME      PVNGS - 3 DATE OPERATING STATUS
: l. Unit  Name:    Palo Verde Nuclear Generatin Station Unit 3
: 2. Reporting Period: ~Artl 199
: 3. Licensed Thermal Power (MWt): 3800 4,  Nameplate Rating (Gross MWe):      1403
: 5. Design Electrical Rating (Net MWe): 1270
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):        1221
: 8. If  Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:      N A
: 9. Power Level    to Which Restricted, If Any (Net    MWe):    one
: 10. Reasons For    Restrictions, If Any: N A This Month            Yr.-to-Date          Cumulative
: 11. Hours  in Reporting Period                    20                  2  880              29 016
: 12. Number of Hours Reactor Was  Critical                                  0.0                1 776 8            19 356 5
: 13. Reactor Reserve Shutdown Hours                0 0                    0 0                  0 0
: 14. Hours Generator On-Line                        0.0                1  776 8          19 100 0
: 15. Unit Reserve Shutdown Hours                    0.0                    0.0                  0.0
: 16. Gross Thermal Energy Generated (MWH)                                                  6  436 69          70 042 924
: 17. Gross Electrical Energy Generated (MWH)                                                  2 263 600            24 5 1 900
: 18. Net Electrical Energy Generated (MWH)                                                  2  127 786          23 127 261
: 19. Unit Service Factor                          0 0                      61                  65 8
: 20. Unit Availability Factor                    0 0                      61 7              65 8
: 21. Unit Capacity Factor (Using  MDC Net)                            0.0%                      60 5              65 3
: 22. Unit Capacity Factor (Using  DER Net)                                                                        62 8
: 23. Unit Forced Outage Rate                      0.0%                                            8 0
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Continuation of 0 da refuelin outa e which be an March 16 1991
: 25. If Shutdown    At End of Report Period, Estimated  Date  of Start-up:
Ma  25  1991 Forecast              Achieved INITIAL CRITICALITY                          ~07 8                  ~10 25 8 INITIAL ELECTRICITY                          ~08                    ~11 28 8 COMMERCIAL OPERATION                          09 8                01/108 88 11
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME   PVNGS-3 DATE COMPLETED BY K.A Chavet MONTH:     April 1991 DAY AVERAGE DAILY POWER LEVEL                       DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 22 23 24 25 10                                                   26 27 12                                                   28 13                                                   29 14                                                   30 15 16
 
REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME     PVNGS-3 DATE COMPLETED BY K A Chavet
: 1. Scheduled date   for next refueling   shutdown.
Currently in refueling outage.
: 2. Scheduled date   for restart following refueling.
05/25/91
: 3. Will refueling or resumption of operation thereafter require       a Technical Specification change or other license amendment2 Yes, Sections 3.1.1, 3 '.2, 3.1.3, 3.2.4   and 3.2.7.
: 4. Scheduled date   for submitting proposed licensing action and supporting information.
02/21/91
: 5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
U3C3 is typical of PVNGS reload cycles except that the NRC has asked for the resultant radiological consequences (doses) at the site boundary for a particular transient.
: 6. The number of fuel assemblies.
a)   In the core.         241 b)   In the spent fuel storage pool.           192
: 7. Licensed spent   fuel storage capacity.         1329 Intended change in spent fuel storage capacity.           None
: 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and   full core discharge capability).
13
 
'V 4
l'l


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A.Chavet April 1991 04/01 04/01 04/22 04/30 00:00 06:35 04:01 24:00 Unit began the month in Mode 6.Reactor defueled.Unit entered Mode 6 from a defueled condition.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME   PVNGS-3 DATE COMPLETED BY K A. Chavet April 1991 04/01     00:00 Unit began the month in   Mode 6.
Unit ended the month in Mode 6.14 I
04/01      06:35 Reactor defueled.
SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A.Chavet No.Outage Method of Duration Shutting System Date Type'ours Reason~Down Reactor LER No.Code'omponent Code'ause and Corrective Action to Prevent Recurrence 91/03 03/16/91 S 720.0 N/A N/A N/A Continuation of 2nd refueli outage.'F-Forced S-Scheduled Reason: Method: A-Equipment Failure(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from E-Operator Training&License Previous Month Examination 5-Reduction of 20%or F-Administrative Greater in the Past G-Operational Error 24 Hours H-Other (Explain)9-Other-(Explain)'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source-15 II}}
04/22      04:01 Unit entered Mode 6 from a defueled condition.
04/30      24:00 Unit ended the month   in Mode 6.
14
 
I SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO       50-530 UNIT NAME       PVNGS-3 DATE COMPLETED BY K.A. Chavet Outage               Method of                                                   and Corrective Duration               Shutting                   Code'omponent System         Code'ause Action to No.      Date   Type'ours       Reason~     Down Reactor       LER No.                             Prevent Recurrence 91/03   03/16/91 S       720.0                                   N/A       N/A             N/A     Continuation of 2nd refueli outage.
  'F-Forced       Reason:                         Method:                 'Exhibit F-Instructions S-Scheduled    A-Equipment Failure(Explain)   1-Manual                   for Preparation of the Data B-Maintenance or Test           2-Manual Scram             Entry Sheets for Licensee C-Refueling                     3-Automatic Scram           Event Report (LER) File D-Regulatory Restriction       4-Continuation from         (NUREG 0161)
E-Operator Training & License     Previous Month Examination                   5-Reduction of 20% or F-Administrative                   Greater in the Past     Exhibit  H-Same Source G-Operational Error               24 Hours H-Other (Explain)               9-Other- (Explain)
                                                              - 15
 
II}}

Latest revision as of 04:55, 4 February 2020

Monthly Operating Repts for Apr 1991 for Palo Verde Nuclear Generating Station Units 1,2 & 3.W/910513 Ltr
ML17305B523
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/30/1991
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-01532-JML-K, 254-1532-JML-K, NUDOCS 9105150168
Download: ML17305B523 (33)


Text

, ACCELERATED DI TRIBUTION DEMONSTPA,TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:910 NOTARIZED: NO DOCKET g FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M- Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION I D

SUBJECT:

Monthly operating repts for Apr 1991 for Palo Verde Nuclear Generating Station Units 1,2 6 3 10 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

ENCL L SIZE: /

NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 TRAMMELL,C 1 1 THOMPSON,M 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 1 1 NRR/DOEA/OEAB 1 1 1 1 RGN5 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR NSIC 1 1 NOTES 1 1 D

A D

D-NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONI'ROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

4 C~

t I

f j

l I

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE 254-01532-JNL/KAC VICE PRESIDENT NUCLEAR PRODUCTION May 13, 1991 Docket Nos. STN 50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear .Generating Station (PVNGS)

Units 1, 2, and 3 Monthly Operating Reports for April 1991 File: 91-024-404 Attached are the Monthly Operating Reports for April 1991, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Operating Licenses. By copy of this letter, we are also forwarding the Monthly Operating Reports to the Regional Administrator of the Region V Office.

If you have any (602) 340-4718

'ery questions, please contact Mr. Kent A. Chavet, at truly yours, M. Levine Vice President Nuclear Production JML/KAC/kac Attachment cc: J. B. Martin (all w/attachment)

D. H. Coe A. C. Gehr A. H. Gutterman INPO Records Center Utility Data Institute 9105i50168 910430 c 'i PDR, R

'O'DOCK 05000528 PDR

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A. Chavet OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 1
2. Reporting Period: ~A ril 1991
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 20 2 880 46 056
12. Number of Hours Reactor Was Critical 720 0 2 037.5 23 497 7
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 20 0 2 028 9
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 2 731 59 7 634 98 83 029 088
17. Gross Electrical Energy Generated (MWH) 954 400 2 6 0 300 28 842 900
18. Net Electrical Energy Generated (MWH) 901 814 2 511 205 27 023 857
19. Unit Service Factor 100 0 70.4a 49 5
20. Unit Availability Factor 100 0 0.4 49 5
21. Unit Capacity Factor (Using MDC Net) 102 6 71 4 48 1
22. Unit Capacity Factor (Using DER Net) 98.6a 68.7% 46.2a
23. Unit Forced Outage Rate 23 4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

N A Forecast Achieved INITIAL CRITICALITY ~05 85 ~05 25 85 INITIAL ELECTRICITY 06 85 06 10 85 COMMERCIAL OPERATION 11 85 01/128 86 1

s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet MONTH: April 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1255 17 1253 1256 18 1254 1254 19 1254 1252 20 1253 1251 21 1252 1248 22 1253 1251 23 1 53 1253 24 1251 1254 25 1250 10 1 51 26 1246 1256 27 1241 12 1257 28 1254 13 1256 29 1254 14 1256 30 1253 15 1254 16 1253

J 0

REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet

1. Scheduled date for next refueling shutdown.

02/Ol/92, 3rd refueling.

2. Scheduled date for restart following refueling.

04/11/92

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes, Sections 3.1.1, 3.1.2, 3.1 3, 3.2 '

~ and 3.2.7.

4. Scheduled date for submitting proposed licensing action and supporting information.

11/91

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

U1C4 is typical of PVNGS reload cycles.

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 188

7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

3

III j

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A. Chavet A ril 1991 04/01 00:00 Unit began the month in Mode 1, 100% RX power.

04/30 24:00 Unit ended the month in Mode 1, 100% RX power.

4

SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A. Chavet.

Outage Method of Cause and Corrective Duration Shutting Code'omponent System Action to No. Date Type'ours Reason Down Reactor LER No. Code Prevent Recurrence No Reactor Shutdowns or significant power reductions occurred during the month.

'F-Forced Reason: Method: 'Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 5

~J NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A Chavet OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 2
2. Reporting Period: A ril 1991
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None 10 Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative 11 Hours in Reporting Period 20 2 880 40 440 12 Number of Hours Reactor Was Critical 720.0 2 880 0 27 507.3 13 Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14 Hours Generator On-Line 720 0 2 880 0 26 903 4 15 Unit Reserve Shutdown Hours 0 0 0.0 0,0 16 Gross Thermal Energy Generated (MWH) 2 33 538 10 891 935 98 613 336 17 Gross Electrical Energy Generated (MWH) 955 500 3 811 500 34 439 070 18 Net Electrical Energy Generated (MWH) 902 984 3 599 53 32 224 82 19 Unit Service Factor 100.0 100.0 66 5 20 Unit Availability Factor 100 0% 100 0% 66.5a 21 Unit Capacity Factor (Using MDC Net) 102 02 4 65.3a 22 Unit Capacity Factor (Using DER Net) 98.8S 98 4% 62 23 Unit Forced Outage Rate 7.5%

24 Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Refuelin outa e October 17 1991 70 da s

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

N A Forecast Achieved INITIAL CRITICALITY ~03 86 04/618 86 INITIAL ELECTRICITY ~06 86 OS/320 86 COMMERCIAL OPERATION ~11 86 ~09 19 86 6

I lf f

4 1'

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavez MONTH: April 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1256 17 1256 1259 18 1258 1255 19 1256 1256 20 1239 1256 21 1239 1228 22 1241 1257 23 1241 1260 24 1241 1261 25 1242 10 1 59 26 1243 1263 27 1244 12 1263 28 1245 13 1262 29 1244 14 1262 30 1248 15 1259 1256

f REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet

1. Scheduled date for next refueling shutdown.

10/17/91, 3rd refueling.

2. Scheduled date for restart following refueling.

12/26/91

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments Yes, Sections 3.1.1, 3.1.2, 3.1.3, 3.2 ' and 3.2.7.
4. Scheduled date for submitting proposed licensing action and supporting information.

07/91

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

U2C4 is typical of PVNGS reload cycles.

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 204

7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

8

t t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet A ril 1991 04/01 00'00 Unit began the month in Mode 1, 100% RX power.

04/30 24:00 Unit ended the month in Mode 1, 100% RX power.

9

l l

SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet.

Outage Method of Cause and Corrective Duration Shutting Code'omponent System Action to No. Date Type'ours Reason Down Reactor LER No. Code Prevent Recurrence No Reactor Shutdowns or significant power reductions occurred during the month.

'F- Forced 'Reason: 'Method: 'Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test ~

2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past 'Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 10-

I" l

f

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-530 UNIT NAME PVNGS - 3 DATE OPERATING STATUS

l. Unit Name: Palo Verde Nuclear Generatin Station Unit 3
2. Reporting Period: ~Artl 199
3. Licensed Thermal Power (MWt): 3800 4, Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): one
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative
11. Hours in Reporting Period 20 2 880 29 016
12. Number of Hours Reactor Was Critical 0.0 1 776 8 19 356 5
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 0.0 1 776 8 19 100 0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 6 436 69 70 042 924
17. Gross Electrical Energy Generated (MWH) 2 263 600 24 5 1 900
18. Net Electrical Energy Generated (MWH) 2 127 786 23 127 261
19. Unit Service Factor 0 0 61 65 8
20. Unit Availability Factor 0 0 61 7 65 8
21. Unit Capacity Factor (Using MDC Net) 0.0% 60 5 65 3
22. Unit Capacity Factor (Using DER Net) 62 8
23. Unit Forced Outage Rate 0.0% 8 0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Continuation of 0 da refuelin outa e which be an March 16 1991

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

Ma 25 1991 Forecast Achieved INITIAL CRITICALITY ~07 8 ~10 25 8 INITIAL ELECTRICITY ~08 ~11 28 8 COMMERCIAL OPERATION 09 8 01/108 88 11

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A Chavet MONTH: April 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 17 18 19 20 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16

REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chavet

1. Scheduled date for next refueling shutdown.

Currently in refueling outage.

2. Scheduled date for restart following refueling.

05/25/91

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 Yes, Sections 3.1.1, 3 '.2, 3.1.3, 3.2.4 and 3.2.7.
4. Scheduled date for submitting proposed licensing action and supporting information.

02/21/91

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

U3C3 is typical of PVNGS reload cycles except that the NRC has asked for the resultant radiological consequences (doses) at the site boundary for a particular transient.

6. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 192

7. Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

13

'V 4

l'l

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A. Chavet April 1991 04/01 00:00 Unit began the month in Mode 6.

04/01 06:35 Reactor defueled.

04/22 04:01 Unit entered Mode 6 from a defueled condition.

04/30 24:00 Unit ended the month in Mode 6.

14

I SHUTDOWNS AND POWER REDUCTIONS April 1991 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A. Chavet Outage Method of and Corrective Duration Shutting Code'omponent System Code'ause Action to No. Date Type'ours Reason~ Down Reactor LER No. Prevent Recurrence 91/03 03/16/91 S 720.0 N/A N/A N/A Continuation of 2nd refueli outage.

'F-Forced Reason: Method: 'Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other- (Explain)

- 15

II