ML17311A660: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/31/1995
| issue date = 01/31/1995
| title = Monthly Operating Repts for Jan 1995 for Palo Verde Nuclear Generating Station.W/950210 Ltr
| title = Monthly Operating Repts for Jan 1995 for Palo Verde Nuclear Generating Station.W/950210 Ltr
| author name = ECKLUND B S, LEVINE J M
| author name = Ecklund B, Levine J
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:P RI(GRIMY 1 (ACCELERATED RIDS PROCESSIiC DOCKET 05000528 05000529 05000530 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9502170051 DOC.DATE:~(MKPi.'Y5, NOTARIZED:
{{#Wiki_filter:P   RI(GRIMY (ACCELERATED       RIDS PROCESSIiC 1
NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION ECKLUND,B.S.
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Arizona Public Service Co.(formerly Arizona Nuclear Power LEVINE,J.M.
ACCESSION NBR:9502170051                 DOC.DATE: ~(MKPi.'Y5, NOTARIZED: NO                 DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station,                       Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station,                       Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station,                       Unit 3, Arizona Publi 05000530 AUTH. NAME               AUTHOR AFFILIATION ECKLUND,B.S.           Arizona Public Service Co.               (formerly Arizona Nuclear Power LEVINE,J.M.             Arizona Public Service Co.               (formerly Arizona Nuclear Power RECIP.NAME               RECIPIENT AFFILIATION
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts or Jan 1995 for Palo Verde Nuclear Generating Station.W 950210 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVEDILTR ENCL(SIZE: I&TITLE: Monthly Operating Report (per Tech Specs NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.05000528)05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L INTERNAL: ACRS~ILE-CENTEB 01 NRR/DOPS/OECB EXTERNAL LI TCO BRYCE E J H NRC PDR COPIES LTTR ENCL 1 1 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME HOLIAN, B AEOD/SPD/RRAB NRR/DISP/PIPB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D C U N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts or Jan 1995                       for Palo Verde Nuclear Generating Station.W 950210                   ltr.
PLEASE HELP VS TO REDUCE iVASTE!CONTACT'I'HE DOCL'fENT CONTROL DESK, ROOhi Pl-37 (EXT.504-2083)TO ELIXfl.PATE YOUR NAXfE FROif DISTRI8 O'I'ION LIS'I'S I'OR DOCVh,f EN'I'S YOV DON" I'LZI:DI TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21 JAMES M.LEVINE VICE PRESIDENT NUCLEAR PRODUCTION Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX S2034~PHOENIX, ARIZONA 85072-2034 443-00110-JML/BSE February 10, 1995 U.S.Nuclear Regulatory Commission ATl N: Document Control Desk Mail Station P1-37 Washington, DC 20555  
DISTRIBUTION CODE: IE24D               COPIES RECEIVEDILTR             ENCL(     SIZE:   I&
TITLE: Monthly Operating Report (per Tech Specs NOTES:STANDARDIZED PLANT                                                                     05000528 Standardized plant.                                                                   05000529  )
Standardized plant.                                                                   05000530 RECIPIENT                 COPIES                RECIPIENT          COPIES ID   CODE/NAME             LTTR ENCL            ID  CODE/NAME      LTTR ENCL PD4-2 PD                         1        1      HOLIAN, B              1    1 TRAN,L                           1        1 INTERNAL: ACRS                             10      10      AEOD/SPD/RRAB          1    1
        ~ILE-CENTEB               01       1        1      NRR/DISP/PIPB          1   1 NRR/DOPS/OECB                    1       1     RGN4                    1   1 EXTERNAL    LITCO    BRYCE      J  H        1       1     NOAC                    1   1             D E
NRC PDR                          1       1 C
U N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP VS TO REDUCE iVASTE! CONTACT'I'HE DOCL'fENT CONTROL DESK, ROOhi Pl-37 (EXT. 504-2083 ) TO ELIXfl.PATE YOUR NAXfE FROif DISTRI8 O'I'ION LIS'I'S I'OR DOCVh,f EN'I'S YOV DON"I'LZI:DI TOTAL NUMBER OF COPIES REQUIRED: LTTR                       21   ENCL     21
 
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX S2034 ~ PHOENIX, ARIZONA85072-2034 443-00110-JML/BSE JAMES M. LEVINE VICE PRESIDENT February 10, 1995 NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission ATl N: Document Control Desk Mail Station P1-37 Washington, DC 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for January 1995 File: 95-024<04 95-056-026 Enclosed are the Monthly Operating Reports for January 1995, prepared and submitted pursuant to Specification 6.9.1.6 of'ppendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Brad S.Ecklund at (602)393-6221.Sincerely, JML/BSE/plv
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for January 1995 File: 95-024<04 95-056-026 Enclosed are the Monthly Operating Reports for January 1995, prepared and submitted pursuant to Specification 6.9.1.6 of'ppendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses. By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Brad S. Ecklund at (602) 393-6221.
Sincerely, JML/BSE/plv


==Enclosures:==
==Enclosures:==
January 1995 Monthly Operating Reports cc:      L. J. Callan                    (all w/enclosures)
K. E. Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute t~tn n t v'll.: j 9502i7005i      950i3'i PDR    ADOCK    05000528 PDR


January 1995 Monthly Operating Reports (all w/enclosures) cc: L.J.Callan K.E.Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute t~tn n t v'll.: j 9502i7005i 950i3'i PDR ADOCK 05000528 PDR P l~'lr I P kr I P rk k PIk (K, Irked*'p P.~K>>rf.I I~~,')Wj,)I, ,'"'tl!EKI I""'";Ca.'-tiki":;t.''~t.r<<i:".P>>K)S<kk'"'Q P" ki4~'kK'P~P)
                                                                  'lr P
(~P I k~'k,%1PQK II r~K'k gr Prr'k"<'(,'~'a P~,,~'k,"r,)C rr A~I~~i p E)Klf'I rkk K Kk PK kr" kk I'~~" Il kk kkt I II'l~",lKSP Sgt'KK K>>  
l             ~
~0 NRC MONTHLY OPERATING REPORT 9 DOCKET NO.50-528 UNIT NAME PIGS~DATE~02/0 95 OPE 1.2.3.4.5.6.7.8.9.10.12.13.14.15.TI GS S Unit Name: Palo Verde Nuclear Generatln Station Unit 1 Reporting Period: Janua 1995 Ucensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N/A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N/A KQ+446%0:155}}09f&'f&}
I   P       kr I P
}Iff'i4f9}}-'"M:"%"~4"i&<<
rk Irked*'
<<9<<<<<<f9<<9 a<<9 (h}<HO f%8ea'Cfo~1hQ5~CfQfij54.';jc<~>>43<%~%%<<<ANA@~4:;~:.
k PIk (K, P. ~K>>rf.         I
>>+k~~'+mg&44~~<<@<0@44"<+~~+Ckkj>>P&&~
                                                                                                                                                ~ ~,') Wj, )I, p                I
(.Y4<4<~'cx~A%&#xc3;g~('Ri:8'cto'r@gseNa!8biddkeFiiHoiier5>+k@5~<>i+i::".:'.::4::::."':l%l~f.
                                                                                                                        ,'"'tl!EKI I
+gag,)((((((.9.'<<+pg<<((%gg$
                                                                                    ";Ca.'- tiki":;t.''~     t.r<<i:".
(<<@&'+h'j@NNf.'.Ho'ttrs~eeneietoimiilCiii48w~'<~~K'9k..k:,4e@~ek~;f4'~~.U'0'ff Ri99'iiii&8&<<fft&}I}In:
P>>K)S<kk     '" '
R&iiM>>&W~~4~"'>>>i':
Q P"
"4 744.0 0.0 744.0 0.0 744.0 0.0 744.0 0.0 78,984 51,376.8 0.0 50,400.6 0.0 16.17.18.19.20.21.23.f'ii~i'Mf~
(~P     I k~   'k, %1PQK II ki4~'kK'P~P)
i i%0IIPfii~i'~kf&4~%'~i 2,808,750 970,500 917,521 100 0%100 0%101 0%97.1%0.0%2,808,750 970,500 917,521 100 0%100.0%101.0%97.1%00%181,890,768 63,017,000 59,148,427 63.8%63.8%61.3%59.0%13.4%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): scheduled to be in 4/1/95 with a 70 da duration.Refuelin outa e 25.If Shutdown At End of Report Period, Estimated Date of Start-up: INITIAL CRITICALITY, INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast 05/85 06/85 11/85 Achieved 05/25/85 06/10/85 01/28/86 1 t I' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-528 UNIT NAME~VG~S-DATE 02/10/95 COMPLETED BY B S Ecklund MONTH: January 1995 DAY AVERAGE'DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1248 17 1245 1248 18 1249 1247 19 1248 1246 20 1247 1242 21 1247 1245 1247 1246 23 1247 8 1246 24 1245 9 1246 25 1243 10 1245 26 1244 1245 27 1248 12 1245 28 1250 13 1244 1250 14 1016 30 1250 15 1221 31 1250 16 1242 I~fm REFUELING INFORMATION DOCKET NO.50-528 UNIT NAME~VG~S-DATE 02/10/95 Scheduled date for next refueling shutdown.The 5th refueling outage is tentatively scheduled for 04/01/95.Scheduled date for restart following refueling.
~
OB/1 0/95.Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information.
K 'k gr Prr r                '                                                                                                                          A rr
12/28/94 Important Ucensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevlewed design or performance analysis methods, significant changes ln fuel design, and new operating procedures.
                                                              'a
<The fuel assembly will utilize Erbium as a burnable absorber (as was done for Units 2 and 3).The number of fuel assemblies.
                                                          ~                                                                                                      ~ I k "<'(,'                                                                 P ~,,           ~'k,   "r, )             C
a)In the core.241 b)In the spent fuel storage pool.388 Licensed spent fuel storage capacity.1329 Intended change In spent fuel storage cepactty.~one Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
                                                                                                                                      ~ ~ i E)Klf'I rkk       PK       "
C>4~+I-  
kk     I
                                                                  ~" Il                                                                                   kk kkt I'l p              K Kk      kr                        ~
II            ~ ",lKSP Sgt   '         KK K>>
 
                                        ~                                                                                                                 0 NRC MONTHLYOPERATING REPORT 9
DOCKET NO.         50-528 UNIT NAME           PIGS~
DATE               ~02/ 0 95 OPE     TI GS         S
: 1. Unit Name:         Palo Verde Nuclear Generatln Station Unit 1
: 2. Reporting Period:         Janua       1995
: 3. Ucensed Thermal Power (MWt):               3800
: 4. Nameplate Rating (Gross MWe):                 1403
: 5. Design Electrical Rating (Net MWe):           1270
: 6. Maximum Dependable Capacity (Gross MWe):                                                         1303
: 7. Maximum Dependable Capacity (Net MWe):                                     1221
: 8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:                 N/A
: 9. Power Level to Which Restricted, If Any (Net MWe):                                                                                     None
: 10. Reasons For Restrictions, IfAny:             N/A KQ+446%0:155}}09f&'f&}}Iff'i4f9}}-'"M:"%"~4"i&<<
: 12. }<HO
        <<9     <<<<<<
f%8ea'Cfo f9
                                  <<9             a<<9           (
                      ~1hQ5~CfQfij54.';jc<~>>43<%~%%<<<ANA@~4:;~:.
h 744.0            744.0 78,984 51,376.8
    >>+k~~' +mg&44~~<<@<0@44"<+~~+Ckkj>>P&&~ (. Y4
: 13.                                                    <4<~'cx~A%&#xc3;g~('Ri:8'cto'r@gseNa!8biddkeFiiHoiier5>+k@5~<>i+i::".:'.::4::::."':l%l~f.
0.0              0.0                    0.0 14.
              +gag, ((((   )((     .9.   '<<+pg<<((%gg$( <<@&' + h'j@NNf
    .'.Ho'ttrs~eeneietoimiilCiii48w~'<~~K'9k..k:,4e@~ek~;f4'~~                                                                                         744.0            744.0              50,400.6
: 15. .U'0'ff Ri99'iiii&8&<<fft&}I}In:R&iiM>>&W~~4~"'>>>i':                                                         "4                                       0.0             0.0                   0.0
: 16.                                                                                                                                              2,808,750        2,808,750          181,890,768
: 17.                                                                                                                                                970,500          970,500            63,017,000
: 18.                                                                                                                                                 917,521          917,521            59,148,427
: 19.                                                                                                                                                 100 0%          100 0%                63.8%
: 20.                                                                                                                                                 100 0%          100.0%                63.8%
: 21.                                                                                                                                                 101 0%          101.0%                61.3%
97.1%            97.1%                59.0%
: 23. f'ii~i'Mf~i i%0IIPfii~i'~kf&4~%'~i                                                                                                                 0.0%             00%                 13.4%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):                                                                                             Refuelin outa e scheduled to be in 4/1/95 with a 70 da duration.
: 25. If Shutdown At End of Report Period, Estimated Date of Start-up:
Forecast            Achieved INITIALCRITICALITY,                                                                                                         05/85             05/25/85 INITIALELECTRICITY                                                                                                          06/85             06/10/85 COMMERCIALOPERATION                                                                                                          11/85              01/28/86 1
 
t I'
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME     ~VG~S-DATE         02/10/95 COMPLETED BY B S Ecklund MONTH: January 1995 DAY       AVERAGE'DAILYPOWER LEVEL           DAY   AVERAGE DAILYPOWER LEVEL 1248                     17               1245 1248                     18               1249 1247                     19               1248 1246                     20               1247 1242                     21               1247 1245                                       1247 1246                     23               1247 8                 1246                     24               1245 9                 1246                     25               1243 10                 1245                     26               1244 1245                     27               1248 12                 1245                     28               1250 13                 1244                                       1250 14                 1016                     30               1250 15                 1221                     31               1250 16                 1242
 
I
~ fm
 
REFUELING INFORMATION DOCKET NO.         50-528 UNIT NAME           ~VG~S-DATE               02/10/95 Scheduled date for next refueling shutdown.
The 5th refueling outage is tentatively scheduled for 04/01/95.
Scheduled date for restart following refueling.
OB/1 0/95.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information.
12/28/94 Important Ucensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevlewed design or performance analysis methods, significant changes ln fuel design, and new operating procedures. <
The fuel assembly will utilize Erbium as a burnable absorber (as was done for Units 2 and 3).
The number of fuel assemblies.
a) In the core.       241 b) In the spent fuel storage pool. 388 Licensed spent fuel storage capacity.         1329 Intended change In spent fuel storage cepactty.   ~one Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
C
>4~+
I-


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 02/10/95 COMPLETED BY B.S.Ecklund Janua 1995 01/01 0000 Unit began the month ln Mode 1 with 100%power.01/14 0103 Commence power reduction to 70%for Steam Generator Hide Out return.01/14 0355 Completed power reduction to 70%.01/15 0100 Commenced raising power to 100%.01/15 0700 Rxpowerlsat100%.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.       50-528 UNIT NAME       PVNGS-1 DATE             02/10/95 COMPLETED BY     B. S. Ecklund Janua 1995 01/01   0000 Unit began the month ln Mode 1 with 100% power.
01/19 2317 Reduced Rx power to 99%as required to perform Hl Rate Steam Generator Blow Down.01/20 0132 Restored Rx power to 100%following Hl rate Blow Down completion.
01/14   0103 Commence power reduction to 70% for Steam Generator Hide Out return.
01/21 2310 Commenced lowering Rx power to 98%for Control Valve Testing.01/22 0037 Returned Rxpowerto100%.
01/14   0355 Completed power reduction to 70%.
01/31 2359 Ended month at 100%power.4-  
01/15   0100 Commenced raising power to 100%.
"'I I 0 4 J SHUTDOWNS AND POWER REDUCTIONS-January 1995 DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE 02/10/95 COMPLETED BY B.S.Ecklund No.Date Outage Method of Duration Shutting Down T e1 Hours Reason2 ReactoR LER No.System Component Cause and Corrective Action Code4 Code>to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995.1F-Forced S-Scheduled Reason: A-Equipment Failure(Explain)
01/15   0700 Rxpowerlsat100%.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)Fire (NUREG Otet)Exhibit H-Same Source
01/19   2317 Reduced Rx power to 99% as required to perform Hl Rate Steam Generator Blow Down.
'I F 7 II F~7 7 7 t l NRC MONTHLY OPERATING REPORT DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE 02/10/95 COMPLETED BY B.S Ecklund OPERATING S US 1.2.3.4, 5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 2 Reporting Period: Janua 1995 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N/A Power Level to Which Restricted,'If Any (Net MWe): None Reasons For Restrictions, If Any: N/A>>Fi%:>>>'4@4'i";<<g&>>:
01/20   0132 Restored Rx power to 100% following Hl rate Blow Down completion.
a".'<g@4p.'4>%$4?>>~>>g&Pm+g 18.iw~@'~>>%!g@P)%r:.
01/21   2310 Commenced lowering Rx power to 98% for Control Valve Testing.
$~4@WNNg~~~ij~ji+
01/22   0037 Returned Rxpowerto100%.
j!Pj@~~>:::,-,:,:,'k@~g~~>.!~g@+k+<V~~4~>~>>
01/31   2359 Ended month at 100% power.
P4S~~~>>)~~:jjjg+i~$
4-
'>>j<>>qg>::>W~
 
QN j%pggg@g@@gP"j'~@/"g'/~V~~~
"'I I
'"P',MetlEYeotrtcaj':Ehii
0 4
'<<6enerate'di'NMH k4",'~4~%~",.F.''::.'.':
J
Y 744.0 0.0 744.0 0.0 2,820,387 976,700 918,740 744.0 0.0 744.0 0.0 2,820,387 976,700 918,740 73,368 51,395.7 0.0 50,344.9 0.0 183,064,294 63,708,170 59,612,635 19.(6AItl88fvic?eYFac>>foal Fi$RPe~;"'~wk%'":Mr~kYN~49SN~,"'~OFT
 
~+45gjiki&MW~>~<-'~NP4')4g>~g>4YN>'Sbi4XM@M>'p",~~44m';p';.?'j
SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO             50-528 UNIT NAME             PVNGS-1 DATE                 02/10/95 COMPLETED BY           B. S. Ecklund Outage                   Method of Duration                 Shutting Down                       System Component      Cause and Corrective Action No.          Date        T   e1     Hours     Reason2         ReactoR             LER No.       Code4  Code>       to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995.
">>%~4v~g:4<$
1F-Forced             Reason:                                    3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled             A-Equipment Failure(Explain)               1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                       2-Manual Scram                            Event Report (LER) Fire (NUREG Otet)
@%5+j%4@gpg)%&4~gq~NN?
C-Refueling                                 3-Automatic Scram D-Regulatory Restriction                   4-Continuation from Previous Month E-Operator Training & License               5-Reduction of 20% or Greater in the    Exhibit H-Same Source Examination                                 Past 24 Hours F-Administrative                           9-Other-(Explain)
'<<%Y~j)>>if'~~k'PjP~k>>%?'2..'..Unit:;:Ck ac(-<<Fiifor.:.
G-Operational Error H-Other (Explain)
slii'(GER.:',Net::i~~&@~,:.'.:."'=';5'"X"':..4 100 0%100 0%101.1%97.2%0.0%100.0%100 0%101 1%97.2%0.0%68.6%68.6%66 5%64.0%60%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): scheduled to be in 2/4/95 with a 60 da duration.Refuelin outa e 25.If Shutdown At End of Report Period, Estimated Date of Start-up: N/A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-6-Forecast 03/88 06/86~1/86 Achieved 04/18/86 05/20/86 09/19/BB I~4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE~02/0/95 MONTH: January 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1242 17 1241 1239 18 1244 1241 19 1242 1240 20 1241 1236 21 1242 1239 1241 1240 23 1239 1239 24 1237 1238 25 1234 10 1239 26 1237 1238 27 1242 12 1239 28 1239 1238 29 1237 1241 30 1232 15 1240 1234 16 1240 4'
    'I F
REFUELING INFORMATION DOCKET NO.50-529 UNIT NAME EVNGS-2 DATE 02/10/95 COMPLETED BY B.S.Ecklund Scheduled date for next refueling shutdown.The 5th refueling outage is scheduled for 02/04/95.Scheduled date for restart following refueling.
7 II F
04/05/95.Will refueling or resumption of operation thereafter require a Technical Specification change or other'icense amendment'F b.C.Technical Specification 3.9.6 will be changed to raise the overload cutoff limit to accommodate the new fuel assembly modification.
~
Technical Specification 3.4.2.1 will be modified to lower the PSV lift setting from 2500 psla to 2475 psia.Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.Scheduled date for submitting proposed licensing action and supporting information.
7 7
10/27/94.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures., The fuel assembly will consist of a denser fuel pellet, Erbium burnable absorber and guardian grid.A primary temperature drop of 10'is currently planned.The number of fuel assemblies.
7
a)In the core.241 b)In the spent fuel storage pool.384 Licensed spent fuel storage capacity.1329 Intended change In spent fuel stcrege cepachy.~Nc e Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).  
 
t NRC MONTHLYOPERATING REPORT l  DOCKET NO.              50-529 UNIT NAME                PVNGS-2 DATE                    02/10/95 COMPLETED BY            B. S Ecklund OPERATING S        US
: 1. Unit Name:        Palo Verde Nuclear Generatin Station Unit 2
: 2. Reporting Period:            Janua                    1995
: 3. Licensed Thermal Power (MWt):                                3800 4,  Nameplate Rating (Gross MWe):                                                  1403
: 5. Design Electrical Rating (Net MWe):                                              1270
: 6. Maximum Dependable Capacity (Gross MWe):                                                           1303
: 7. Maximum Dependable Capacity (Net MWe):                                                             1221
: 8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons:                                                 N/A
: 9. Power Level to Which Restricted,'If Any (Net MWe):                                                                                           None
: 10. Reasons For Restrictions, If Any:                                               N/A
                                                                                                                                                                    >>Fi%:>>>'4@4'i";<<g&>>: a".'<g@4p .'4>%$4?>>~>>g&Pm+g 73,368 744.0              744.0                    51,395.7 iw~@'~>>%!g@P)%r:. $~4@WNNg~~~ij~ji+j!Pj@~~>:::,                                                                                                           0.0                  0.0                          0.0
                                                                                                            -,:,:,'k@~g~~>.!~g@+k+<V~~4~>~>>
P4S~~~>>)~~:jjjg+i~$ '>>j<>>qg>::>W~
744.0              744.0                    50,344.9 0.0                  0.0                          0.0 2,820,387          2,820,387                183,064,294 976,700              976,700                  63,708,170 QN j%pggg@g@@gP"j'~@/"g'/~V~~~
: 18.                           '<<6enerate'di'NMH                                        k4",'~4~%~",.F.''::.'.':        Y'"P',MetlEYeotrtcaj':Ehii 918,740              918,740                 59,612,635
: 19. (6AItl88fvic?eYFac>>foal Fi $RPe~;"'~wk%'":Mr~kYN~49SN~,"'~OFT                                                                                        100 0%              100.0%                        68.6%
    ~+45gjiki&MW~>~<-'~NP4')4g>~g>4YN>'Sbi4XM@M>'p",~~44m';p';.?'j ">
100 0%             100 0%                        68.6%
101.1%              101 1%                        66 5%
    >%~4v~g:4<$ @%5+j%4@gpg)%&4~gq~NN?
ac( -<<Fiifor.:. slii '(GER.:',Net::i~~&@~,:.'.:."'=';5'"X"':..4
                                            '<<%Y~j)>>if'~~k'PjP~k>>%?'2..'..Unit:;:Ck 97.2%               97.2%                         64.0%
0.0%                 0.0%                         60%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):                                                                                                   Refuelin outa e scheduled to be in 2/4/95 with a 60 da duration.
: 25. If Shutdown At End of Report Period, Estimated Date of Start-up:                                                                                         N/A Forecast              Achieved INITIALCRITICALITY                                                                                                                03/88                 04/18/86 INITIALELECTRICITY                                                                                                                06/86                 05/20/86 COMMERCIALOPERATION                                                                                                                ~1/86                09/19/BB I
  ~4
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME     PVNGS-2 DATE         ~02/ 0/95 MONTH: January 1995 DAY       AVERAGE DAILYPOWER LEVEL         DAY     AVERAGE DAILYPOWER LEVEL 1242                   17               1241 1239                   18               1244 1241                   19               1242 1240                   20               1241 1236                   21               1242 1239                                     1241 1240                   23               1239 1239                   24               1237 1238                   25               1234 10                 1239                   26               1237 1238                   27               1242 12                 1239                   28               1239 1238                   29               1237 1241                   30               1232 15                 1240                                     1234 16                 1240
 
4
 
REFUELING INFORMATION DOCKET NO.           50-529 UNIT NAME           EVNGS-2 DATE                 02/10/95 COMPLETED BY         B. S. Ecklund Scheduled date for next refueling shutdown.
The 5th refueling outage is scheduled for 02/04/95.
Scheduled date for restart following refueling.
04/05/95.
Will refueling or resumption of operation thereafter require a Technical Specification change or other
'icense   amendment'F Technical Specification 3.9.6 will be changed to raise the overload cutoff limit to accommodate the new fuel assembly modification.
: b.        Technical Specification 3.4.2.1 will be modified to lower the PSV lift setting from 2500 psla to 2475 psia.
C.        Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.
Scheduled date for submitting proposed licensing action and supporting information.
10/27/94.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.,
The fuel assembly will consist of a denser fuel pellet, Erbium burnable absorber and guardian grid. A primary temperature drop of 10' is currently planned.
The number of fuel assemblies.
a) In the core.     241 b) In the spent fuel storage pool. 384 Licensed spent fuel storage capacity.         1329 Intended change In spent fuel stcrege cepachy.   ~Nc   e Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-529 UNIT NAME~VNGS-DATE 02/10/95 COMPLETED BY B.S.Ecklund Janua 1995 01/01 0000 Unit began the month in Mode 1 at 100/o power.01/08 2258 Started reducing Rx power to 99/G as required to perform Hl Rate Steam Generator Blow Down.01/07 0032 Returned Rx power to 100%.01/13 2227 Commenced down power to 98/o for Hl Rate Blow Down and Control Valve Testing.01/14 0034 Returned Rx power to 100 lo.01/28 0141 Commenced power reduction to 99/G as required to perform Hl Rate Steam Generator Blow Down.01/31 2359 Ended month at 100o/o power.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.         50-529 UNIT NAME         ~VNGS-DATE               02/10/95 COMPLETED BY       B. S. Ecklund Janua 1995 01/01   0000 Unit began the month in Mode 1 at 100/o power.
SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE 02/10/95 COMPLETED BY B.S.Ecklund-No.Date Outage Method of Duration Shutting Down T e" Hours Reason>Reactor LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995.a 1F-Forced S-Scheduled 2R A-Equipment Failure(Explain)
01/08   2258 Started reducing Rx power to 99/G as required to perform Hl Rate Steam Generator Blow Down.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source l P>>'!
01/07   0032 Returned Rx power to 100%.
7 NRC MONTHLY OPERATING REPORT 0 ERATING STA US DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE~02/0/95 COMPLETED BY B S Ecklund MW-1.2.3.4, 5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 3 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Glace last Report.Give Reasons: N/A Power Level to Which Rest!let/at, lf Any (Net MWe): None Reasons For Restrictions, If Any: N/A<<.Wo@fi'R~-Ai&#xc3;ie~P.o'itR<HN':-''4~>":":Fi 7~12.lttodoar RM~CilttcatW"'Kik@li'4W~"<'i@it 744 0@Sg&i@<SN'~4%~4'%@&#xc3;~~P8~/<@gj':
01/13   2227 Commenced down power to 98/o for Hl Rate Blow Down and Control Valve Testing.
13.!Risetor'Reserve,sb6tdowii'::Hoiirek~~".'k>I",~zmk'K~<
01/14   0034 Returned Rx power to 100 lo.
0.0 14.!tfc'a~isaGoarfesrart9niiiyraert904r toniVkt!t~i..-::-"L!~ran:.,'i~i~~
01/28   0141 Commenced power reduction to 99/G as required to perform Hl Rate Steam Generator Blow Down.
744.O 15.~vn~i~e.~"'-"WttohWd'"~%~M'-'&e':~~k%eii".."ill o.o 21.o~o, gk+~(~Q~+gQK&~+&>~x++Z~jxc..4N'jxYt@ggggg@pcj.<<
01/31   2359 Ended month at 100o/o power.
8 i nit.-'.Ca iC,Feaetata sf'MOClNet 4%:;"o~''.:::
SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO             50-529 UNIT NAME           PVNGS-2 DATE                 02/10/95 COMPLETED BY           B. S. Ecklund Outage                   Method of Duration                 Shutting Down                       System Component      Cause and Corrective Action No.          Date        T e"       Hours     Reason>       Reactor             LER No.       Code4   Code5       to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995.
-."".-',NS..".".''4 101.8%22 if'tttta Pi'F eet'f"'rtttf!R'aNLat 2'>W~"".:"""~4!i 97 9%17.:.,G%ir ctd t8"%n't""d lilJWH"":'4""""::-::.
a 1F-Forced             2R                                          3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled             A-Equipment Failure(Explain)               1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                       2-Manual Scram                            Event Report (LER) File (NUREG 0161)
&#xc3;o,&#xc3;18.iMitiEhdiicabEom''
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 License              5-Reduction of 20% or Greater in the   Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
",:::Siini.riti8&#xc3;lNNH 4<";~~IV'i,:;;:.:::5 924,654 19.otto" t'!9er'fv" ca~friiitot/
G-Operational Error H-Other (Explain) l P>>'!
'/~i" ymir!vs~a" r!:%%''-"'!.".i"., 100.0%20.+5d~it::AV'alta bill:!vFa'Ctn&!~84~6'kS:":~k~M~.:ti,:,":,'4~+!
 
100 0%744.0 0.0 744.0 0.0 2,805,969 980,000 924,654 100 0%100 0%101.8%97.9%61,944 45,758.0 0.0 45,091.5 0.0 164,582,902 57,511,700 54,047,361 72.8%72.8%71.5%68 7%23, Skri':Fo'roe/dtC/oraWlRa'atei
7 NRC MONTHLYOPERATING REPORT DOCKET NO.       50-530 UNIT NAME         PVNGS-3 DATE             ~02/ 0/95 MW COMPLETED BY B S Ecklund 0  ERATING STA US
'rl's/k@tov.
: 1. Unit Name:           Palo Verde Nuclear Generatin           Station Unit 3 2.
W~~'::::::"'r!,"::." o.o%00%61%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N/A 25.If Shutdown At End of Report Period,,Estimated Date of Start-up: N/A INITIAL CRITICALITY, INITIAL ELECTRICITY, COMMERCIAL OPERATION-11-Forecast 07/87 07/87 09/87 Achieved~to/25/8 11/28/87~008/88  
: 3. Licensed Thermal Power (MWt):                   3800 4,    Nameplate Rating (Gross MWe):                       1403
: 5. Design Electrical Rating (Net MWe):                   1270
: 6. Maximum Dependable Capacity (Gross MWe):                         1303
: 7. Maximum Dependable Capacity (Net MWe):                             1221
: 8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Glace last Report. Give Reasons:                   N/A
: 9. Power Level to Which Rest!let/at, lf Any (Net MWe):                         None
: 10. Reasons For Restrictions, If Any:                   N/A
<<. Wo@fi'R~-Ai&#xc3;ie~P.o'itR<HN':-''4~>":":Fi 7~                                                                       61,944
: 12. lttodoar   RM           ~CilttcatW"'Kik@li'4W~"<'i@it 744                         0           744.0            45,758.0
                          @Sg&i@<SN'~4%~4'%@&#xc3;~~P8~/<@gj':
: 13.   !Risetor'Reserve,sb6tdowii'::Hoiirek~~".'k>I",~zmk'K~< 0.0                                     0.0              0.0
: 14.   !tfc'a~isaGoarfesrart9niiiyraert904r toniVkt!t~i..-::-"L!~ran:.,'i~i~~ 744.O                   744.0            45,091.5
: 15.   ~vn~i~e.~"'-"WttohWd'"~%~M'-'&e':~~k%eii".."ill o.o                                             0.0              0.0 2,805,969        164,582,902 17.:.,G     %ir     ctd     t8     "% n           't""d lilJWH"":'4""""::-::. &#xc3;o,       &#xc3;         980,000          57,511,700
: 18. iMitiEhdiicabEom'' ",:::Siini.riti8&#xc3;lNNH4<";~~IV'i,:;;:.:::5 924,654                           924,654          54,047,361
: 19. otto"t'!9er'fv"ca~friiitot/ '/~i"       ymir!vs~a" r!:%%''-"'!.".i"., 100.0%                   100 0%            72.8%
: 20.   +5d~it::AV'alta bill:!vFa'Ctn&!~84~6'kS:":~k~M~.:ti,:,":,'4~+! 100 0%                         100 0%            72.8%
8 o~o,  gk+~ (~Q~+gQK &~+&> ~x++Z~jxc..4N'jxYt@ggggg@pcj.<<
: 21. i nit.-'.Ca  iC,Feaetata        sf'MOClNet 4%:;"o~''.:::."".-',NS..".".''4 101.8%             101.8%           71.5%
22      if 'tttta Pi'F        eet'      f" 'rtttf!R'aNLat 2'>W~"".:"""~4!i 97 9%                    97.9%            68 7%
Skri':Fo'roe/dtC/oraWlRa'atei       'rl's/k@tov.         W~~'::::::"'r!, "::." o.o%             00%               61%
23,
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):                                       N/A
: 25. If Shutdown At End of Report Period,,Estimated Date of Start-up:                           N/A Forecast            Achieved INITIALCRITICALITY,                                                 07/87             ~to/25/8 INITIALELECTRICITY,                                                07/87              11/28/87 COMMERCIALOPERATION                                                  09/87              ~008/88
 
                              . AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME    PVNGS-3 DATE          02/1 0/95 MONTH: January 1995 DAY        AVERAGE DAILYPOWER LEVEL          DAY      AVERAGE DAILYPOWER LEVEL 1259                      17              1258 1258                      18              1260 1257                      19              1259 125B                      20              1258 1254                      21              1258 1258                                      1255 7                  1255                      23              1258 125B                      24              1258 125B                      25              1254 10                  1256                      26              1255 12 13
        '256            1256 125B 27 28 29 1257 1088 1147 14                  1255                      30              1258 15                  1254                      31              1259 1B                  1259


.AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 02/1 0/95 MONTH: January 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1259 17 1258 1258 18 1260 1257 19 1259 125B 20 1258 1254 21 1258 1258 1255 7 1255 23 1258 125B 24 1258 125B 25 1254 10 1256 26 1255 1256 27 1257 12'256 28 1088 13 125B 29 1147 14 1255 30 1258 15 1254 31 1259 1B 1259
~,
~,
REFUELING INFORMATION DOCKET NO.50-530 UNIT NAME~VGS-3 DATE~02(0 95 Scheduled date for next refueling shutdown.10/14/95 5th refueling.
REFUELING INFORMATION DOCKET NO.       50-530 UNIT NAME       ~VGS-3 DATE             ~02( 0 95 Scheduled date for next refueling shutdown.
10/14/95 5th refueling.
Scheduled date for restart following refueling.
Scheduled date for restart following refueling.
12/23/95.VNII refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined.
12/23/95.
VNII refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined.
Scheduled date for submitting proposed licensing action and supporting information.
Scheduled date for submitting proposed licensing action and supporting information.
June 1995, if required.Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevIewed design or performance analysis methods, significant changes In fuel design, and new operating procedures.,I.
June 1995, if required.
None.The number of fuel assemblies.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevIewed design or performance analysis methods, significant changes In fuel design, and new operating procedures.,I.
a)In the core.241 b)In the spent fuel storage pool.380 Licensed spent fuel storage capacity.1329 Intended change In spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
None.
JA".Cxl IE  
The number of fuel assemblies.
a) In the core.       241 b) In the spent fuel storage pool. 380 Licensed spent fuel storage capacity.       1329 Intended change In spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
JA
".Cxl IE


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 02/10/95 COMPLETED BY B.S.Ecklund Janua 1995 01/01 0000 Began the monthwithunitln Mode1 at100%power.0101 0015 Commenced a 1%power decrease as required to perform Hl Rate Steam Generator Blow Down.01/01 0302 Returned Rx power to 100%.01/07 2045 Commenced lowering Rx power to 99%as required to perform Hl Rate Steam Generator Blow Down.01/07 2216 Returned Rx power to 100%.01/15 0048 Reduced power to 99%as required to perform HI Rate Steam Generator Blow Down.01/15 0220 Returned Rx power to 100%.01/22 0149 Commenced reducing Rx power to 99%as required to perform HI Rate Steam Generator Blow Down.01/22 0352 Restored Rx power to 100%.01/26 0022 Commenced reducing power to 97.2%for Control Valve Testing.01/26 0342 Restored Rx power to 100%.01/28 0100 Commenced a plant down power to 86%for Chemistry Hideout testing.01/28 0224 Completed down power, Unit is now at 86%.01/29 1430 Commenced power increase to 100%at 5%per hour.01/29 1700 Unit restored to 100%power.01/31 2359 Ended month at 100%power.  
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.       50-530 UNIT NAME         PVNGS-3 DATE             02/10/95 COMPLETED BY     B. S. Ecklund Janua 1995 01/01   0000 Began the monthwithunitln Mode1 at100% power.
0101   0015 Commenced a 1% power decrease as required to perform Hl Rate Steam Generator Blow Down.
01/01   0302 Returned Rx power to 100%.
01/07   2045 Commenced lowering Rx power to 99% as required to perform Hl Rate Steam Generator Blow Down.
01/07   2216 Returned Rx power to 100%.
01/15   0048 Reduced power to 99% as required to perform HI Rate Steam Generator Blow Down.
01/15   0220 Returned Rx power to 100%.
01/22   0149 Commenced reducing Rx power to 99% as required to perform HI Rate Steam Generator Blow Down.
01/22   0352 Restored Rx power to 100%.
01/26   0022 Commenced reducing power to 97.2% for Control Valve Testing.
01/26   0342 Restored Rx power to 100%.
01/28   0100 Commenced a plant down power to 86% for Chemistry Hideout testing.
01/28   0224 Completed down power, Unit is now at 86%.
01/29   1430 Commenced power increase to 100% at 5% per hour.
01/29   1700 Unit restored to 100% power.
01/31   2359 Ended month at 100% power.


SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE 02/1 0/95 COMPLETED BY B.S.Ec/0und No.Outage Method of Duration Shutting Down Date T e1 Hours Reason2 ReactoR LER No.System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995."F-Forced S-Scheduled Reason: A-Equipment Failure(Explain)
SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO             50-530 UNIT NAME             PVNGS-3 DATE                   02/1 0/95 COMPLETED BY           B. S. Ec/0und Outage                   Method of Duration                 Shutting Down                       System Component      Cause and Corrective Action No.          Date       T   e1     Hours     Reason2         ReactoR             LER No.       Code4   Code5       to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 Ucense Examination F-Administrative G-Operational Error H-Other (Explain)3Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain)
"F-Forced             Reason:                                    3Method:                                  4Exhibit F - instructions for Preparation S-Scheduled             A-Equipment Failure(Explain)               1-Manual                                  of the Data Entry Sheets for Ucensee B-Maintenance or Test                       2-Manual Scram                            Event Report (LER) File (NUREG 0161)
--15-4Exhibit F-instructions for Preparation of the Data Entry Sheets for Ucensee Event Report (LER)File (NUREG 0161)Exhibit H-Same Source e}}
C-Refueling                                3-Automatic Scram D-Regulatory Restriction                    4-Continuation from Previous Month E-Operator Training 8 Ucense                5-Reduction of 20% or Greater in the   Exhibit H-Same Source Examination                                Past 24 Hours F-Administrative                            9-Other-(Explain)
G-Operational Error H-Other (Explain) e}}

Latest revision as of 03:59, 4 February 2020

Monthly Operating Repts for Jan 1995 for Palo Verde Nuclear Generating Station.W/950210 Ltr
ML17311A660
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/31/1995
From: Ecklund B, James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
443-00110-JML-B, 443-110-JML-B, NUDOCS 9502170051
Download: ML17311A660 (31)


Text

P RI(GRIMY (ACCELERATED RIDS PROCESSIiC 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9502170051 DOC.DATE: ~(MKPi.'Y5, NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION ECKLUND,B.S. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts or Jan 1995 for Palo Verde Nuclear Generating Station.W 950210 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVEDILTR ENCL( SIZE: I&

TITLE: Monthly Operating Report (per Tech Specs NOTES:STANDARDIZED PLANT 05000528 Standardized plant. 05000529 )

Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 HOLIAN, B 1 1 TRAN,L 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1

~ILE-CENTEB 01 1 1 NRR/DISP/PIPB 1 1 NRR/DOPS/OECB 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE J H 1 1 NOAC 1 1 D E

NRC PDR 1 1 C

U N

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP VS TO REDUCE iVASTE! CONTACT'I'HE DOCL'fENT CONTROL DESK, ROOhi Pl-37 (EXT. 504-2083 ) TO ELIXfl.PATE YOUR NAXfE FROif DISTRI8 O'I'ION LIS'I'S I'OR DOCVh,f EN'I'S YOV DON"I'LZI:DI TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX S2034 ~ PHOENIX, ARIZONA85072-2034 443-00110-JML/BSE JAMES M. LEVINE VICE PRESIDENT February 10, 1995 NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission ATl N: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for January 1995 File: 95-024<04 95-056-026 Enclosed are the Monthly Operating Reports for January 1995, prepared and submitted pursuant to Specification 6.9.1.6 of'ppendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses. By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Brad S. Ecklund at (602) 393-6221.

Sincerely, JML/BSE/plv

Enclosures:

January 1995 Monthly Operating Reports cc: L. J. Callan (all w/enclosures)

K. E. Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute t~tn n t v'll.: j 9502i7005i 950i3'i PDR ADOCK 05000528 PDR

'lr P

l ~

I P kr I P

rk Irked*'

k PIk (K, P. ~K>>rf. I

~ ~,') Wj, )I, p I

,'"'tl!EKI I

";Ca.'- tiki":;t.~ t.r<<i:".

P>>K)S<kk '" '

Q P"

(~P I k~ 'k, %1PQK II ki4~'kK'P~P)

~

K 'k gr Prr r ' A rr

'a

~ ~ I k "<'(,' P ~,, ~'k, "r, ) C

~ ~ i E)Klf'I rkk PK "

kk I

~" Il kk kkt I'l p K Kk kr ~

II ~ ",lKSP Sgt ' KK K>>

~ 0 NRC MONTHLYOPERATING REPORT 9

DOCKET NO. 50-528 UNIT NAME PIGS~

DATE ~02/ 0 95 OPE TI GS S

1. Unit Name: Palo Verde Nuclear Generatln Station Unit 1
2. Reporting Period: Janua 1995
3. Ucensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N/A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, IfAny: N/A KQ+446%0:15509f&'f&}}Iff'i4f9}}-'"M:"%"~4"i&<<
12. }<HO
       <<9     <<<<<<

f%8ea'Cfo f9

                                  <<9             a<<9            (
                      ~1hQ5~CfQfij54.';jc<~>>43<%~%%<<<ANA@~4:;~:.

h 744.0 744.0 78,984 51,376.8

   >>+k~~' +mg&44~~<<@<0@44"<+~~+Ckkj>>P&&~ (. Y4
13. <4<~'cx~A%Ãg~('Ri:8'cto'r@gseNa!8biddkeFiiHoiier5>+k@5~<>i+i::".:'.::4::::."':l%l~f.

0.0 0.0 0.0 14.

             +gag, ((((   )((      .9.    '<<+pg<<((%gg$( <<@&' + h'j@NNf
   .'.Ho'ttrs~eeneietoimiilCiii48w~'<~~K'9k..k:,4e@~ek~;f4'~~                                                                                         744.0            744.0              50,400.6
15. .U'0'ff Ri99'iiii&8&<<fft&}I}In:R&iiM>>&W~~4~"'>>>i': "4 0.0 0.0 0.0
16. 2,808,750 2,808,750 181,890,768
17. 970,500 970,500 63,017,000
18. 917,521 917,521 59,148,427
19. 100 0% 100 0% 63.8%
20. 100 0% 100.0% 63.8%
21. 101 0% 101.0% 61.3%

97.1% 97.1% 59.0%

23. f'ii~i'Mf~i i%0IIPfii~i'~kf&4~%'~i 0.0% 00% 13.4%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e scheduled to be in 4/1/95 with a 70 da duration.
25. If Shutdown At End of Report Period, Estimated Date of Start-up:

Forecast Achieved INITIALCRITICALITY, 05/85 05/25/85 INITIALELECTRICITY 06/85 06/10/85 COMMERCIALOPERATION 11/85 01/28/86 1

t I'

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME ~VG~S-DATE 02/10/95 COMPLETED BY B S Ecklund MONTH: January 1995 DAY AVERAGE'DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1248 17 1245 1248 18 1249 1247 19 1248 1246 20 1247 1242 21 1247 1245 1247 1246 23 1247 8 1246 24 1245 9 1246 25 1243 10 1245 26 1244 1245 27 1248 12 1245 28 1250 13 1244 1250 14 1016 30 1250 15 1221 31 1250 16 1242

I ~ fm

REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME ~VG~S-DATE 02/10/95 Scheduled date for next refueling shutdown. The 5th refueling outage is tentatively scheduled for 04/01/95. Scheduled date for restart following refueling. OB/1 0/95. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendments No Scheduled date for submitting proposed licensing action and supporting information. 12/28/94 Important Ucensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevlewed design or performance analysis methods, significant changes ln fuel design, and new operating procedures. < The fuel assembly will utilize Erbium as a burnable absorber (as was done for Units 2 and 3). The number of fuel assemblies. a) In the core. 241 b) In the spent fuel storage pool. 388 Licensed spent fuel storage capacity. 1329 Intended change In spent fuel storage cepactty. ~one Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. 2005 (18 Month reloads and full core discharge capability). C >4~+ I-

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE 02/10/95 COMPLETED BY B. S. Ecklund Janua 1995 01/01 0000 Unit began the month ln Mode 1 with 100% power. 01/14 0103 Commence power reduction to 70% for Steam Generator Hide Out return. 01/14 0355 Completed power reduction to 70%. 01/15 0100 Commenced raising power to 100%. 01/15 0700 Rxpowerlsat100%. 01/19 2317 Reduced Rx power to 99% as required to perform Hl Rate Steam Generator Blow Down. 01/20 0132 Restored Rx power to 100% following Hl rate Blow Down completion. 01/21 2310 Commenced lowering Rx power to 98% for Control Valve Testing. 01/22 0037 Returned Rxpowerto100%. 01/31 2359 Ended month at 100% power. 4-

"'I I 0 4 J

SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE 02/10/95 COMPLETED BY B. S. Ecklund Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date T e1 Hours Reason2 ReactoR LER No. Code4 Code> to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995. 1F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) Fire (NUREG Otet) C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training & License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain) G-Operational Error H-Other (Explain)

    'I F

7 II F ~ 7 7 7

t NRC MONTHLYOPERATING REPORT l DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE 02/10/95 COMPLETED BY B. S Ecklund OPERATING S US

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 2
2. Reporting Period: Janua 1995
3. Licensed Thermal Power (MWt): 3800 4, Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N/A

9. Power Level to Which Restricted,'If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N/A
                                                                                                                                                                   >>Fi%:>>>'4@4'i";<<g&>>: a".'<g@4p .'4>%$4?>>~>>g&Pm+g 73,368 744.0               744.0                     51,395.7 iw~@'~>>%!g@P)%r:. $~4@WNNg~~~ij~ji+j!Pj@~~>:::,                                                                                                           0.0                   0.0                          0.0
                                                                                                            -,:,:,'k@~g~~>.!~g@+k+<V~~4~>~>>

P4S~~~>>)~~:jjjg+i~$ '>>j<>>qg>::>W~ 744.0 744.0 50,344.9 0.0 0.0 0.0 2,820,387 2,820,387 183,064,294 976,700 976,700 63,708,170 QN j%pggg@g@@gP"j'~@/"g'/~V~~~

18. '<<6enerate'di'NMH k4",'~4~%~",.F.::.'.': Y'"P',MetlEYeotrtcaj':Ehii 918,740 918,740 59,612,635
19. (6AItl88fvic?eYFac>>foal Fi $RPe~;"'~wk%'":Mr~kYN~49SN~,"'~OFT 100 0% 100.0% 68.6%
   ~+45gjiki&MW~>~<-'~NP4')4g>~g>4YN>'Sbi4XM@M>'p",~~44m';p';.?'j ">

100 0% 100 0% 68.6% 101.1% 101 1% 66 5%

   >%~4v~g:4<$ @%5+j%4@gpg)%&4~gq~NN?

ac( -<<Fiifor.:. slii '(GER.:',Net::i~~&@~,:.'.:."'=';5'"X"':..4

                                            '<<%Y~j)>>if'~~k'PjP~k>>%?'2..'..Unit:;:Ck 97.2%               97.2%                         64.0%

0.0% 0.0% 60%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e scheduled to be in 2/4/95 with a 60 da duration.
25. If Shutdown At End of Report Period, Estimated Date of Start-up: N/A Forecast Achieved INITIALCRITICALITY 03/88 04/18/86 INITIALELECTRICITY 06/86 05/20/86 COMMERCIALOPERATION ~1/86 09/19/BB I
 ~4

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE ~02/ 0/95 MONTH: January 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 1242 17 1241 1239 18 1244 1241 19 1242 1240 20 1241 1236 21 1242 1239 1241 1240 23 1239 1239 24 1237 1238 25 1234 10 1239 26 1237 1238 27 1242 12 1239 28 1239 1238 29 1237 1241 30 1232 15 1240 1234 16 1240

4

REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME EVNGS-2 DATE 02/10/95 COMPLETED BY B. S. Ecklund Scheduled date for next refueling shutdown. The 5th refueling outage is scheduled for 02/04/95. Scheduled date for restart following refueling. 04/05/95. Will refueling or resumption of operation thereafter require a Technical Specification change or other 'icense amendment'F Technical Specification 3.9.6 will be changed to raise the overload cutoff limit to accommodate the new fuel assembly modification.

b. Technical Specification 3.4.2.1 will be modified to lower the PSV lift setting from 2500 psla to 2475 psia.

C. Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix. Scheduled date for submitting proposed licensing action and supporting information. 10/27/94. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures., The fuel assembly will consist of a denser fuel pellet, Erbium burnable absorber and guardian grid. A primary temperature drop of 10' is currently planned. The number of fuel assemblies. a) In the core. 241 b) In the spent fuel storage pool. 384 Licensed spent fuel storage capacity. 1329 Intended change In spent fuel stcrege cepachy. ~Nc e Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. 2005 (18 Month reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME ~VNGS-DATE 02/10/95 COMPLETED BY B. S. Ecklund Janua 1995 01/01 0000 Unit began the month in Mode 1 at 100/o power. 01/08 2258 Started reducing Rx power to 99/G as required to perform Hl Rate Steam Generator Blow Down. 01/07 0032 Returned Rx power to 100%. 01/13 2227 Commenced down power to 98/o for Hl Rate Blow Down and Control Valve Testing. 01/14 0034 Returned Rx power to 100 lo. 01/28 0141 Commenced power reduction to 99/G as required to perform Hl Rate Steam Generator Blow Down. 01/31 2359 Ended month at 100o/o power. SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE 02/10/95 COMPLETED BY B. S. Ecklund Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date T e" Hours Reason> Reactor LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995. a 1F-Forced 2R 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161) C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain) G-Operational Error H-Other (Explain) l P>>'!

7 NRC MONTHLYOPERATING REPORT DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE ~02/ 0/95 MW COMPLETED BY B S Ecklund 0 ERATING STA US

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 3 2.
3. Licensed Thermal Power (MWt): 3800 4, Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1270
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Glace last Report. Give Reasons: N/A

9. Power Level to Which Rest!let/at, lf Any (Net MWe): None
10. Reasons For Restrictions, If Any: N/A

<<. Wo@fi'R~-AiÃie~P.o'itR<HN':-4~>":":Fi 7~ 61,944

12. lttodoar RM ~CilttcatW"'Kik@li'4W~"<'i@it 744 0 744.0 45,758.0
                         @Sg&i@<SN'~4%~4'%@Ã~~P8~/<@gj':
13. !Risetor'Reserve,sb6tdowii'::Hoiirek~~".'k>I",~zmk'K~< 0.0 0.0 0.0
14. !tfc'a~isaGoarfesrart9niiiyraert904r toniVkt!t~i..-::-"L!~ran:.,'i~i~~ 744.O 744.0 45,091.5
15. ~vn~i~e.~"'-"WttohWd'"~%~M'-'&e':~~k%eii".."ill o.o 0.0 0.0 2,805,969 164,582,902 17.:.,G %ir ctd t8 "% n 't""d lilJWH"":'4""""::-::. Ão, Ã 980,000 57,511,700
18. iMitiEhdiicabEom ",:::Siini.riti8ÃlNNH4<";~~IV'i,:;;:.:::5 924,654 924,654 54,047,361
19. otto"t'!9er'fv"ca~friiitot/ '/~i" ymir!vs~a" r!:%%-"'!.".i"., 100.0% 100 0% 72.8%
20. +5d~it::AV'alta bill:!vFa'Ctn&!~84~6'kS:":~k~M~.:ti,:,":,'4~+! 100 0% 100 0% 72.8%

8 o~o, gk+~ (~Q~+gQK &~+&> ~x++Z~jxc..4N'jxYt@ggggg@pcj.<<

21. i nit.-'.Ca iC,Feaetata sf'MOClNet 4%:;"o~.:::."".-',NS..".".4 101.8% 101.8% 71.5%

22 if 'tttta Pi'F eet' f" 'rtttf!R'aNLat 2'>W~"".:"""~4!i 97 9% 97.9% 68 7% Skri':Fo'roe/dtC/oraWlRa'atei 'rl's/k@tov. W~~'::::::"'r!, "::." o.o% 00% 61% 23,

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): N/A
25. If Shutdown At End of Report Period,,Estimated Date of Start-up: N/A Forecast Achieved INITIALCRITICALITY, 07/87 ~to/25/8 INITIALELECTRICITY, 07/87 11/28/87 COMMERCIALOPERATION 09/87 ~008/88
                             . AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME     PVNGS-3 DATE          02/1 0/95 MONTH: January 1995 DAY        AVERAGE DAILYPOWER LEVEL          DAY      AVERAGE DAILYPOWER LEVEL 1259                      17               1258 1258                      18               1260 1257                      19               1259 125B                      20               1258 1254                      21               1258 1258                                       1255 7                  1255                      23               1258 125B                      24               1258 125B                      25               1254 10                  1256                      26               1255 12 13
        '256            1256 125B 27 28 29 1257 1088 1147 14                  1255                      30               1258 15                  1254                      31               1259 1B                  1259

~, REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME ~VGS-3 DATE ~02( 0 95 Scheduled date for next refueling shutdown. 10/14/95 5th refueling. Scheduled date for restart following refueling. 12/23/95. VNII refueling or resumption of operation thereafter require a Technical Specification change or other license amendments To be determined. Scheduled date for submitting proposed licensing action and supporting information. June 1995, if required. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unrevIewed design or performance analysis methods, significant changes In fuel design, and new operating procedures.,I. None. The number of fuel assemblies. a) In the core. 241 b) In the spent fuel storage pool. 380 Licensed spent fuel storage capacity. 1329 Intended change In spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. 2005 (18 Month reloads and full core discharge capability). JA ".Cxl IE

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE 02/10/95 COMPLETED BY B. S. Ecklund Janua 1995 01/01 0000 Began the monthwithunitln Mode1 at100% power. 0101 0015 Commenced a 1% power decrease as required to perform Hl Rate Steam Generator Blow Down. 01/01 0302 Returned Rx power to 100%. 01/07 2045 Commenced lowering Rx power to 99% as required to perform Hl Rate Steam Generator Blow Down. 01/07 2216 Returned Rx power to 100%. 01/15 0048 Reduced power to 99% as required to perform HI Rate Steam Generator Blow Down. 01/15 0220 Returned Rx power to 100%. 01/22 0149 Commenced reducing Rx power to 99% as required to perform HI Rate Steam Generator Blow Down. 01/22 0352 Restored Rx power to 100%. 01/26 0022 Commenced reducing power to 97.2% for Control Valve Testing. 01/26 0342 Restored Rx power to 100%. 01/28 0100 Commenced a plant down power to 86% for Chemistry Hideout testing. 01/28 0224 Completed down power, Unit is now at 86%. 01/29 1430 Commenced power increase to 100% at 5% per hour. 01/29 1700 Unit restored to 100% power. 01/31 2359 Ended month at 100% power.

SHUTDOWNS AND POWER REDUCTIONS January 1995 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE 02/1 0/95 COMPLETED BY B. S. Ec/0und Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date T e1 Hours Reason2 ReactoR LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of January, 1995. "F-Forced Reason: 3Method: 4Exhibit F - instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Ucensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161) C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 Ucense 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain) G-Operational Error H-Other (Explain) e}}