ML17311A712: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ENCLOSURE 2 REVISED PAGE FOR THE NOVEMBER 1994 MONTHLY OPERATING REPORTS 05000528 p cy50510 PDR ADOCK PD R  
{{#Wiki_filter:ENCLOSURE 2 REVISED PAGE FOR THE NOVEMBER   1994 MONTHLYOPERATING REPORTS p cy50510 ADOCK 05000528 PDR           PD R
~~v~Jt  
 
~
  ~
v ~ Jt


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH November 1994 DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE 03/10/95 COMPLETED BY B.S.Eckiu TELEPHONE~602 393-6 11/01 0000 11/24 0012 11/24 0023 11.24 0112 11/24 0137 11/25 1956 11/26 0043 11/26 1500 11/26 2131 11/30 2400 Unit began the month in Mode 1, 100%Rx power.Performed a 1%power reduction to 99%as required to perform HI Rate Steam Generator Blow Down.Power is 99%.Commenced power ascension to 100%.Rx power is at 100%.Commenced power reduction for Steam Generator mid-cycle outage.Manually tripped the reactor.Entered Mode 3.Enetered Mode 4.Entered Mode 5.Ended Month in Mode 5, mid-cycle outage.
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.       50-530 UNIT NAME       PVNGS-3 DATE             03/10/95 COMPLETED BY B. S. Eckiu TELEPHONE         ~602 393-6 November 1994 11/01   0000 Unit began the month in Mode 1, 100% Rx power.
11/24    0012  Performed a 1% power reduction to 99% as required to perform HI Rate Steam Generator Blow Down.
11/24    0023  Power is 99%.
11.24    0112  Commenced power ascension to 100%.
11/24    0137  Rx power is at 100%.
11/25    1956  Commenced power reduction for Steam Generator mid-cycle outage.
11/26    0043  Manually tripped the reactor. Entered Mode 3.
11/26    1500  Enetered Mode 4.
11/26    2131  Entered Mode 5.
11/30    2400  Ended Month in Mode 5, mid-cycle outage.
d gl t}}
d gl t}}

Latest revision as of 03:59, 4 February 2020

Revised Monthly Operating Rept for Nov 1994 for Palo Verde Nuclear Plant Unit 3
ML17311A712
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/30/1994
From: Ecklund B
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17311A708 List:
References
NUDOCS 9503170050
Download: ML17311A712 (4)


Text

ENCLOSURE 2 REVISED PAGE FOR THE NOVEMBER 1994 MONTHLYOPERATING REPORTS p cy50510 ADOCK 05000528 PDR PD R

~

~

v ~ Jt

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE 03/10/95 COMPLETED BY B. S. Eckiu TELEPHONE ~602 393-6 November 1994 11/01 0000 Unit began the month in Mode 1, 100% Rx power.

11/24 0012 Performed a 1% power reduction to 99% as required to perform HI Rate Steam Generator Blow Down.

11/24 0023 Power is 99%.

11.24 0112 Commenced power ascension to 100%.

11/24 0137 Rx power is at 100%.

11/25 1956 Commenced power reduction for Steam Generator mid-cycle outage.

11/26 0043 Manually tripped the reactor. Entered Mode 3.

11/26 1500 Enetered Mode 4.

11/26 2131 Entered Mode 5.

11/30 2400 Ended Month in Mode 5, mid-cycle outage.