ML17313A346: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAR RY INFORMATION DISTRIBUTI SYSTEM (RIDS)DOCKET 05000528 05000529 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power ACCESSION NBR:9804170140 DOC.DATE: 98/03/31 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULAR RY INFORMATION         DISTRIBUTI     SYSTEM (RIDS)
NO FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTH.NAME AUTHOR AFFILIATION FULTON,J.D.
ACCESSION NBR:9804170140           DOC.DATE:   98/03/31     NOTARIZED: NO                 DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi                         05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi                       05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi                       05000530 AUTH. NAME             AUTHOR AFFILIATION FULTON,J.D.           Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R.         Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME             RECIPIENT AFFILIATION SUB JECT: Mo         o crating repts for     Mar 1998   for PVNGS   Units 1,2
Arizona Public Service Co.OVERBECK,G.R.
              .W/980408   ltr.                                                       &:
Arizona Public Service Co.RECIP.NAME RECIPIENT AFFILIATION SUB JECT: Mo o crating repts for Mar 1998 for PVNGS Units 1,2&:.W/980408 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)E NOTES: STANDARDIZED PLANT Standardized plant.Standardized plant..-05000528@05000529 05000530 p RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS E CEN COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME FIELDS,M AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 EZTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D E N NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10  
TITLE: Monthly Operating Report (per Tech Specs)                                                   E NOTES: STANDARDIZED PLANT                                                               .- 05000528@
%~4 1 t I t Commitment.
Standardized plant.                                                                 05000529 Standardized plant.                                                                 05000530 p RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL          ID CODE/NAME         LTTR ENCL PD4-2 PD                 1     1       FIELDS,M                  1     1 INTERNAL: ACRS                        1     1       AEOD/SPD/RRAB             1    1 E CEN                1      1      OC/DBA/PAD               1     1 1     1 EZTERNAL: LITCO BRYCE,J H             1     1       NOAC                      1     1               D NRC PDR                  1     1 E
lanovAlaa&eryy.Palo Verde Nuclear Generating Station Gregg R.Overbeck Vice President Nuclear Production TEL 602/393-51 48 FAX 602/3936077 035-00501-6RO/JDF April 8, 1998 Mail Station 7602 P.O.Box 52034 Phoenix, AZ 85072-2034 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555  
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
  %~
4 1
t I
t
 
Commitment. lanovAlaa &eryy.
Gregg R. Overbeck                             Mail Station 7602 Palo Verde Nuclear            Vice President             TEL 602/393-51 48 P.O. Box 52034 Generating Station            Nuclear Production          FAX 602/3936077   Phoenix, AZ 85072-2034 035-00501-6RO/JDF April 8, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for MARCH 1998 Enclosed, are.the Monthly Operating Reports, for March 1998, prepared and submitted pursuant,to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.-
Palo Verde Nuclear Generating Station (PVNGS)
By copy of this letter, Arizona Public Service Company is also fo'rwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Judy Fulton at (602)250-3549.Sincerely, G RO/JDF/gy  
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MARCH 1998 Enclosed, are. the Monthly Operating Reports, for March 1998, prepared and submitted pursuant,to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.-
By copy of this letter, Arizona Public Service Company is also fo'rwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Judy Fulton at (602) 250-3549.
Sincerely, G RO/JDF/gy


==Enclosures:==
==Enclosures:==
MARCH 1998 Monthly Operating Reports cc:      E. W. Merschoff                            'all w/enclosures)
K. E. Perkins INPO Records Center Utility Data Institute
        <Ip(,'/jg 98041 7O140 980331 PDR      ADQCK 05000528 R                                PDR


MARCH 1998 Monthly Operating Reports cc: E.W.Merschoff K.E.Perkins INPO Records Center Utility Data Institute'all w/enclosures)
t I,IV lt        ~
<Ip(,'/jg 7O140 980331 98041 PDR ADQCK 05000528 R PDR t lt I H I I SI I,IV~j gfhSS NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
j I
50-528 PVNGS-1 4/08/98 J.D.Fulton 602 250-3549 Reporting Period: March 1998 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity(NetMWe):
H SI gfhSS I
1243 Uriit 1:Generating Statistics-Hours Reactor was Critical Hours Generator-was-On-Line Unit Reserve Shutdown Hours-Net-Electrical-Energy Generated (MWh)UNIT SHUTDOWNS This Month 312.1 312.1 0.0 384,888 t Yr.to', Date 1,698.9 1,669.4 0.0 2,043,120 Cumulative
I
'5,695.2 74,480.5 0.0 88,246,388 Outage Duration No.Date Type" Hours Reason2 98-02 3/14/98 S 431.9 C Method of Shutting Down ReactoR Cause and Corrective Action to Prevent Occurrence RX manually tripped to begin seventh refueling outage."F-Forced S-Scheduled
 
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:               50-528 UNIT NAME:               PVNGS-1 DATE:                    4/08/98 COMPLETED BY:            J. D. Fulton TELEPHONE:                602 250-3549 Reporting Period:               March 1998
: 1. Design Electrical Rating (Net MWe):     1265
: 2. Maximum Dependable Capacity(NetMWe):             1243 t
Uriit 1:Generating Statistics                   This Month          Yr. to', Date      Cumulative
      -Hours Reactor was Critical                                           312.1              1,698.9                '5,695.2 Hours Generator- was-On-Line                                         312.1              1,669.4        74,480.5 Unit Reserve Shutdown Hours                                             0.0                    0.0            0.0
      -Net-Electrical-Energy Generated (MWh)                             384,888           2,043,120       88,246,388 UNIT SHUTDOWNS Outage                   Method of Duration               Shutting Down              Cause and Corrective Action No.         Date         Type"       Hours     Reason2       ReactoR                    to Prevent Occurrence 98-02       3/14/98         S         431.9         C                         RX manually tripped to begin seventh refueling outage.
"F-Forced         2Reason:                                          3Method:
S-Scheduled         A-Equipment Failure (Explain)                    1-Manual B-Maintenance or Test                            2-Manual Trip / Scram C-Refueling                                      3-Automatic Trip / Scram D-Regulatory Restriction                        4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
 
J S k h t t NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
J S
50-529 PVNGS-2 4/08/98 J.D.Fulton 602 250-3549 Reporting Period: March 1998 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity(Net MWe): 1243 Unit 2 Generating Statistics 3.Hours Reactor was Critical 4.Hours Generator was On-Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy Generated (MWh)UNIT SHUTDOWNS This Month 744.0 744.0 0.0 946,142 Yr.to Date 2,160.0 2,160.0 0.0 2,747,410 Cumulative 75,585.7 74,392.8 0.0 89,176,969 No.Outage Method of Duration Shutting Down Date Type" Hours Reason>Reactors Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of March 1998.~F-Forced S-Scheduled
k h
 
t NRC MONTHLYOPERATING DATA REPORT t
DOCKET NO.:             50-529 UNIT NAME:               PVNGS-2 DATE:                    4/08/98 COMPLETED BY:            J. D. Fulton TELEPHONE:                602 250-3549 Reporting Period:             March 1998
: 1. Design Electrical Rating (Net MWe):     1265
: 2. Maximum Dependable Capacity(Net MWe):           1243 Unit 2 Generating Statistics                     This Month          Yr. to Date        Cumulative
: 3. Hours Reactor was Critical                                           744.0            2,160.0          75,585.7
: 4. Hours Generator was On-Line                                           744.0            2,160.0          74,392.8
: 5. Unit Reserve Shutdown Hours                                             0.0                  0.0              0.0
: 6. Net Electrical Energy Generated (MWh)                             946,142           2,747,410         89,176,969 UNIT SHUTDOWNS Outage                   Method of Duration               Shutting Down             Cause and Corrective Action No.      Date         Type"       Hours     Reason>       Reactors                   to Prevent Occurrence No reactor shutdowns occurred during the month of March 1998.
~
F-Forced       2Reason:                                          sMethod:
S-Scheduled       A-Equipment Failure (Explain)                    1-Manual B-Maintenance or Test                            2-Manual Trip / Scram C-Refueling                                      3-Automatic Trip / Scram D-Regulatory Restriction                        4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:             50-530 UNIT NAME:               PVNGS-3 DATE:                    4/08/98 COMPLETED BY            J. D. Fulton TELEPHONE:
NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY TELEPHONE:
Reporting Period:             March 1998
50-530 PVNGS-3 4/08/98 J.D.Fulton Reporting Period: March 1998 1.Design Electrical Rating (Net MWe): 1269 2.Maximum Dependable Capacity (Net MWe): 1247 Unit 3 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)UNIT SHUTDOWNS This Month 744.0 744.0 0.0 926,784 Yr.to Date 2,160.0 2,160.0 0.0 2,697,745 Cumulative 71,485.7 70,659.6 0.0 85,450,716 No.Outage Duration Date Type" Hours Reason2 Method of Shutting Down ReactoR Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of March 1998."F-Forced S-Scheduled
: 1. Design Electrical Rating (Net MWe):     1269
: 2. Maximum Dependable Capacity (Net MWe):           1247 Unit 3 Generating Statistics                     This Month          Yr. to Date        Cumulative Hours Reactor was Critical                                             744.0            2,160.0          71,485.7 Hours Generator was On-Line                                           744.0            2,160.0          70,659.6 Unit Reserve Shutdown Hours                                             0.0                  0.0              0.0 Net Electrical Energy Generated (MWh)                               926,784           2,697,745         85,450,716 UNIT SHUTDOWNS Outage                   Method of Duration                Shutting Down             Cause and Corrective Action No.        Date        Type"      Hours      Reason2      ReactoR                    to Prevent Occurrence No reactor shutdowns occurred during the month of March 1998.
"F-Forced         2Reason:                                          sMethod:
S-Scheduled       A-Equipment Failure (Explain)                    1-Manual B-Maintenance or Test                            2-Manual Trip / Scram C-Refueling                                      3-Automatic Trip / Scram D-Regulatory Restriction                        4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) r ,I II II}}
r
  ,I II II}}

Latest revision as of 03:27, 4 February 2020

Monthly Operating Repts for Mar 1998 for PVNGS Units 1,2 & 3.W/980408 Ltr
ML17313A346
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/31/1998
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00501-GRO-J, 35-501-GRO-J, NUDOCS 9804170140
Download: ML17313A346 (9)


Text

CATEGORY 1 REGULAR RY INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9804170140 DOC.DATE: 98/03/31 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION SUB JECT: Mo o crating repts for Mar 1998 for PVNGS Units 1,2

.W/980408 ltr. &:

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) E NOTES: STANDARDIZED PLANT .- 05000528@

Standardized plant. 05000529 Standardized plant. 05000530 p RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 FIELDS,M 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 E CEN 1 1 OC/DBA/PAD 1 1 1 1 EZTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 D NRC PDR 1 1 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

%~

4 1

t I

t

Commitment. lanovAlaa &eryy.

Gregg R. Overbeck Mail Station 7602 Palo Verde Nuclear Vice President TEL 602/393-51 48 P.O. Box 52034 Generating Station Nuclear Production FAX 602/3936077 Phoenix, AZ 85072-2034 035-00501-6RO/JDF April 8, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MARCH 1998 Enclosed, are. the Monthly Operating Reports, for March 1998, prepared and submitted pursuant,to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.-

By copy of this letter, Arizona Public Service Company is also fo'rwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, G RO/JDF/gy

Enclosures:

MARCH 1998 Monthly Operating Reports cc: E. W. Merschoff 'all w/enclosures)

K. E. Perkins INPO Records Center Utility Data Institute

<Ip(,'/jg 98041 7O140 980331 PDR ADQCK 05000528 R PDR

t I,IV lt ~

j I

H SI gfhSS I

I

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-528 UNIT NAME: PVNGS-1 DATE: 4/08/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: March 1998

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(NetMWe): 1243 t

Uriit 1:Generating Statistics This Month Yr. to', Date Cumulative

-Hours Reactor was Critical 312.1 1,698.9 '5,695.2 Hours Generator- was-On-Line 312.1 1,669.4 74,480.5 Unit Reserve Shutdown Hours 0.0 0.0 0.0

-Net-Electrical-Energy Generated (MWh) 384,888 2,043,120 88,246,388 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason2 ReactoR to Prevent Occurrence 98-02 3/14/98 S 431.9 C RX manually tripped to begin seventh refueling outage.

"F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

J S

k h

t NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-529 UNIT NAME: PVNGS-2 DATE: 4/08/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: March 1998

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(Net MWe): 1243 Unit 2 Generating Statistics This Month Yr. to Date Cumulative
3. Hours Reactor was Critical 744.0 2,160.0 75,585.7
4. Hours Generator was On-Line 744.0 2,160.0 74,392.8
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 946,142 2,747,410 89,176,969 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason> Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of March 1998.

~

F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 4/08/98 COMPLETED BY J. D. Fulton TELEPHONE:

Reporting Period: March 1998

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity (Net MWe): 1247 Unit 3 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 2,160.0 71,485.7 Hours Generator was On-Line 744.0 2,160.0 70,659.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 926,784 2,697,745 85,450,716 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason2 ReactoR to Prevent Occurrence No reactor shutdowns occurred during the month of March 1998.

"F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

r

,I II II