ML17313A369: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY j.REGULA RY INFORMATION DISTRXBUTXO SYSTEM (RIDS)ACCESSION NBR:9805200223 DOC.DATE.FACXL:STN-50-528 Palo Verde Nuclear Station, STN-50-529 Palo Verde Nuclear Station, STN-50-530 Palo Verde Nuclear Station, AUTH.NAME AUTHOR AFFILIATION FULTON,J.D.
{{#Wiki_filter:CATEGORY j.
Arizona Public Service Co.OVERBECK,G.R.
REGULA   RY INFORMATION DISTRXBUTXO           SYSTEM (RIDS)
Arizona Public Service Co.RECIP.NAME RECIPIENT AFFILIATION Unit 1, Arizona Publi Unit 2, Arizona Publi Unit 3, Arizona Publi DOCKET 05000528 05000529 05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power
ACCESSION NBR:9805200223           DOC.DATE.                                           DOCKET FACXL:STN-50-528 Palo Verde Nuclear Station,               Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station,             Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station,             Unit 3, Arizona Publi 05000530 AUTH. NAME           AUTHOR AFFILIATION FULTON,J.D.         Arizona Public Service Co.           (formerly Arizona Nuclear Power OVERBECK,G.R.       Arizona Public Service Co.           (formerly Arizona Nuclear Power RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Apr 1998 for PVN.W/980412 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs NOTES: STANDARDIZED PLANT Standardized plant.Standardized plant.RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME FIELDS,M COPIES LTTR ENCL 1 1 05000528 05000529g 05000530 0 INTERNAL: FI ER 0 1 1 1 1 1 1 AEOD/SPD/RRAB OC/DBA/PAD 1 1 1 1 EXTERNAL: LXTCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D E NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts         for Apr   1998   for PVN   .W/980412   ltr.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 tl'4 A Commttment.
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR           ENCL       SIZE:
Inmnmt ten.btett/y.Palo Verde Nuclear Generating Station Gregg R.Overbeck Vice President Nuclear Production TEL 602/39~t48 FAX 602/3936077 Mail Station 7602 P.O.Box 52034 Phoenix, AZ 85072-2034 035-00505-GRO/JDF April 12, 1998 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555  
TITLE: Monthly Operating Report (per Tech Specs NOTES: STANDARDIZED PLANT                                                               05000528 Standardized plant.                                                               05000529g Standardized plant.                                                               05000530 0
RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME         LTTR ENCL        ID  CODE/NAME        LTTR ENCL PD4-2 PD                   1     1       FIELDS,M                 1     1 INTERNAL:                             1     1     AEOD/SPD/RRAB             1    1 FI          ER    0        1      1      OC/DBA/PAD               1     1 1     1 EXTERNAL: LXTCO BRYCE,J H             1     1     NOAC                      1     1 NRC PDR                    1     1                                                       D E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
tl
'4 A
 
Commttment. Inmnmt ten. btett/y.
Gregg R. Overbeck                           Mail Station 7602 Palo Verde Nuclear                  Vice President             TEL 602/39~t48 P.O. Box 52034 Generating Station                  Nuclear Production          FAX 602/3936077 Phoenix, AZ 85072-2034 035-00505-GRO/JDF April 12, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for APRIL 1998 Enclosed are the Monthly Operating Reports for April 1998, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Judy Fulton at (602)250-3549.Sincerely, G RO/JDF/gy  
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for APRIL 1998 Enclosed are the Monthly Operating Reports for April 1998, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Judy Fulton at (602) 250-3549.
Sincerely, G RO/JDF/gy


==Enclosures:==
==Enclosures:==
APRIL 1998 Monthly Operating Reports cc:      E. W. Merschoff                                  (all w/enclosures)
K. E. Perkins INPO Records Center Utility Data Institute 9805200223 980430 PDR      ADGCK 05000528 PDR R


APRIL 1998 Monthly Operating Reports cc: E.W.Merschoff K.E.Perkins INPO Records Center Utility Data Institute (all w/enclosures) 9805200223 980430 PDR ADGCK 05000528 R PDR NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:             50-528 UNIT NAME:               PVNGS-1 DATE:                    4/12/98 COMPLETED BY:            J. D. Fulton TELEPHONE:                602 250-3549 Reporting Period:             April 1998
50-528 PVNGS-1 4/12/98 J.D.Fulton 602 250-3549 Reporting Period: April 1998 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)UNIT SHUTDOWNS This Month 294.0 270.1 0.0 260,882 Yr.to Date 1,992.9 1,939.5 0.0 2,304,003 Cumulative 75,989.2 74,750.6 0.0 88,507,271 Outage Duration Date Type Hours Reason2 98-02 3/14/98 S 881.8 C Method of Shutting Down ReactoR Cause and Corrective Action to Prevent Occurrence RX manually tripped to begin seventh refueling outage.Unit returned to service 4/19/98."F-Forced S-Scheduled
: 1. Design Electrical Rating (Net MWe):     1265
: 2. Maximum Dependable Capacity (Net MWe):           1243 Unit 1 Generating Statistics                     This Month          Yr. to Date        Cumulative Hours Reactor was Critical                                           294.0              1,992.9            75,989.2 Hours Generator was On-Line                                           270.1              1,939.5            74,750.6 Unit Reserve Shutdown Hours                                             0.0                  0.0                  0.0 Net Electrical Energy Generated (MWh)                             260,882           2,304,003         88,507,271 UNIT SHUTDOWNS Outage                   Method of Duration               Shutting Down              Cause and Corrective Action Date         Type       Hours     Reason2       ReactoR                    to Prevent Occurrence 98-02     3/14/98         S         881.8       C                         RX manually tripped to begin seventh refueling outage. Unit returned to service 4/19/98.
"F-Forced         2Reason:                                          3Method:
S-Scheduled       A-Equipment Failure (Explain)                    1-Manual B-Maintenance or Test                            2-Manual Trip I Scram C-Refueling                                      3-Automatic Trip I Scram D-Regulatory Restriction                        4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3Method: 1-Manual 2-Manual Trip I Scram 3-Automatic Trip I Scram 4-Continuation 5-Other-(Explain)


~~NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
                                      ~                                         ~
50-529 PVNGS-2 4/12/98 J.D.Fulton 602 250-3549 Reporting Period: April 1998 1.Design Electrical Rating (Net MWe): 1265 2.MaximumDependable Capacity(NetMWe):
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:             50-529 UNIT NAME:             PVNGS-2 DATE:                  4/12/98 COMPLETED BY:          J. D. Fulton TELEPHONE:              602 250-3549 Reporting Period:             April 1998
1243 Unit 2 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)UNIT SHUTDOWNS This Month 720.0 720.0 0.0 914,633 Yr.to Date 2,880.0 2,880.0 0.0 3,662,043 Cumulative 76,305.7 75,112.8 0.0 90,091,602 Outage Duration Date Type" Hours Reason2 Method of Shutting Down ReactoR Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of April 1998.1F Forced S-Scheduled
: 1. Design Electrical Rating (Net MWe):     1265
: 2. MaximumDependable Capacity(NetMWe):             1243 Unit 2 Generating Statistics                   This Month          Yr. to Date        Cumulative Hours Reactor was Critical                                           720.0            2,880.0          76,305.7 Hours Generator was On-Line                                           720.0            2,880.0          75,112.8 Unit Reserve Shutdown Hours                                             0.0                  0.0              0.0 Net Electrical Energy Generated (MWh)                             914,633           3,662,043         90,091,602 UNIT SHUTDOWNS Outage                   Method of Duration                Shutting Down             Cause and Corrective Action Date        Type"      Hours      Reason2      ReactoR                    to Prevent Occurrence No reactor shutdowns occurred during the month of April 1998.
1F Forced         2Reason:                                        3Method:
S-Scheduled       A-Equipment Failure (Explain)                    1-Manual B-Maintenance or Test                            2-Manual Trip / Scram C-Refueling                                      3-Automatic Trip / Scram D-Regulatory Restriction                        4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) t (~,'jhow e~)II 1 t NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
t
50-530 PVNGS-3 4/12/98 J.D.Fulton 602 250-3549 Reporting Period: April 1998 1.Design Electrical Rating (Net MWe): 1269 2.MaximumDependable Capacity(NetMWe):
( ~,
1247 Unit 3 Generating-Statistics.
'jhow
3.Hours Reactor was Critical 4.Hours Generator was On-Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy Generated (NIWh)UNIT SHUTDOWNS This Month 720.0 720.0 0.0 900,316 Yr.to Date 2,880.0 2,880.0 0.0 3,598,061 Cumulative, 72,205.7 71,379.6 0.0 86,351,032 Outage Method of Duration Shutting Down No.Date Type" Hours Reason~Reactors No reactor shutdowns occurred during the month of April 1998.Cause and Corrective Action to Prevent Occurrence"F-Forced S-Scheduled
 
)      II e   ~                           1 NRC MONTHLYOPERATING DATA REPORT t
DOCKET NO.:                 50-530 UNIT NAME:                 PVNGS-3 DATE:                      4/12/98 COMPLETED BY:              J. D. Fulton TELEPHONE:                  602 250-3549 Reporting Period:                 April 1998
: 1.     Design Electrical Rating (Net MWe):     1269
: 2. MaximumDependable Capacity(NetMWe):               1247 Unit 3 Generating-Statistics.                   This Month          Yr. to Date        Cumulative,
: 3. Hours Reactor was Critical                                             720.0            2,880.0          72,205.7
: 4. Hours Generator was On-Line                                             720.0            2,880.0          71,379.6
: 5. Unit Reserve Shutdown Hours                                               0.0                  0.0              0.0
: 6. Net Electrical Energy Generated (NIWh)                             900,316           3,598,061         86,351,032 UNIT SHUTDOWNS Outage                   Method of Duration               Shutting Down               Cause and Corrective Action No.         Date         Type"       Hours     Reason~       Reactors                     to Prevent Occurrence No reactor shutdowns occurred during the month of April 1998.
"F-Forced           ~Reason:                                          s Method:
S-Scheduled           A-Equipment Failure (Explain)                      1-Manual B-Maintenance or Test                            2-Manual Trip / Scram C-Refueling                                        3-Automatic Trip / Scram D-Regulatory Restriction                          4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
:~Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)s Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
          ~t I
~t I~-t 0 y.P>fCg lP/}}
    ~ - t 0 P y .
                  >fCg lP
/}}

Latest revision as of 03:27, 4 February 2020

Monthly Operating Repts for Apr 1998 for PVNGS.W/980412 Ltr
ML17313A369
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/30/1998
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00505-GRO, 35-505-GRO, NUDOCS 9805200223
Download: ML17313A369 (9)


Text

CATEGORY j.

REGULA RY INFORMATION DISTRXBUTXO SYSTEM (RIDS)

ACCESSION NBR:9805200223 DOC.DATE. DOCKET FACXL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Apr 1998 for PVN .W/980412 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES: STANDARDIZED PLANT 05000528 Standardized plant. 05000529g Standardized plant. 05000530 0

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 FIELDS,M 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 FI ER 0 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LXTCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

tl

'4 A

Commttment. Inmnmt ten. btett/y.

Gregg R. Overbeck Mail Station 7602 Palo Verde Nuclear Vice President TEL 602/39~t48 P.O. Box 52034 Generating Station Nuclear Production FAX 602/3936077 Phoenix, AZ 85072-2034 035-00505-GRO/JDF April 12, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for APRIL 1998 Enclosed are the Monthly Operating Reports for April 1998, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, G RO/JDF/gy

Enclosures:

APRIL 1998 Monthly Operating Reports cc: E. W. Merschoff (all w/enclosures)

K. E. Perkins INPO Records Center Utility Data Institute 9805200223 980430 PDR ADGCK 05000528 PDR R

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-528 UNIT NAME: PVNGS-1 DATE: 4/12/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: April 1998

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 294.0 1,992.9 75,989.2 Hours Generator was On-Line 270.1 1,939.5 74,750.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 260,882 2,304,003 88,507,271 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action Date Type Hours Reason2 ReactoR to Prevent Occurrence 98-02 3/14/98 S 881.8 C RX manually tripped to begin seventh refueling outage. Unit returned to service 4/19/98.

"F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip I Scram C-Refueling 3-Automatic Trip I Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

~ ~

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 UNIT NAME: PVNGS-2 DATE: 4/12/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: April 1998

1. Design Electrical Rating (Net MWe): 1265
2. MaximumDependable Capacity(NetMWe): 1243 Unit 2 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 720.0 2,880.0 76,305.7 Hours Generator was On-Line 720.0 2,880.0 75,112.8 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 914,633 3,662,043 90,091,602 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action Date Type" Hours Reason2 ReactoR to Prevent Occurrence No reactor shutdowns occurred during the month of April 1998.

1F Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

t

( ~,

'jhow

) II e ~ 1 NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 4/12/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: April 1998

1. Design Electrical Rating (Net MWe): 1269
2. MaximumDependable Capacity(NetMWe): 1247 Unit 3 Generating-Statistics. This Month Yr. to Date Cumulative,
3. Hours Reactor was Critical 720.0 2,880.0 72,205.7
4. Hours Generator was On-Line 720.0 2,880.0 71,379.6
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (NIWh) 900,316 3,598,061 86,351,032 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason~ Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of April 1998.

"F-Forced ~Reason: s Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

~t I

~ - t 0 P y .

>fCg lP

/