ML17313A421: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:980 FACIL:STN-50-528 STN-50-529 STN-50-530 AUTH.NAYiE FULTON,J.D.
{{#Wiki_filter:CATEGORY 1 REGULAT     Y INFORMATION     DISTRIBUTIO SYSTEM (RIDS)
OVERBECK,G.R.
ACCESSION NBR:980 6180212            DOC.DATE:                                            DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529.
RECIP.NAME 6180212 DOC.DATE: Palo Verde Nuclear Station, Palo Verde Nuclear Station, Palo Verde Nuclear Station, AUTHOR AFFILIATION Arizona Public Service Co.Arizona Public Service Co.RECIPIENT AFFILIATION Unit 1, Arizona Publi Unit 2, Arizona Publi Unit 3, Arizona Publi DOCKET 05000528 05000529.05000530 (formerly Arizona Nuclear Power (formerly Arizona Nuclear Power SUB JECT: Mo t;hly~.W/98 09 ltr.repts for May 1998 for PVNGS,Units 1,2&DISTRIBUTION CODE: IE24D TITLE: Monthly Operating NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.COPIES RECEIVED:LTR ENCL SIZE: Report (per Tech Specs 05000528@05000529 05000530()
STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAYiE             AUTHOR AFFILIATION FULTON,J.D.           Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R.         Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME            RECIPIENT AFFILIATION SUB JECT:   Mo t;hly~             repts for   May 1998   for PVNGS,Units 1,2     &
RECXPIENT ID CODE/NAME PD4-2 PD INTERNAL: MORSÃRGN4 COPIES LTTR"ENCL 1.1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME FIELDS,M AEOD/SPD/RRAB OC/DBA/PAD COPXES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D E NOTE TO ALL"RIDS" RECIPIENTS:
              .W/98    09 ltr.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I t r b h II 1*I (g  
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR           ENCL       SIZE:
.+'&A Commitmnnt.
TITLE: Monthly Operating Report (per Tech Specs NOTES:STANDARDIZED PLANT                                                                  05000528@
Innovation.
Standardized plant.                                                              05000529 Standardized plant.                                                              05000530()
Aery.Palo Verde Nuclear Generating Station Gregg R.Overbeck Vice President Nuclear Production TEL 60~148 FAX 602/3934077 Mail Station 7602 P.O.Box 52034 Phoenix, AZ 85072-2034 035-00507-6RO/JDF June 9, 1998 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555  
RECXPIENT             COPIES              RECIPIENT            COPXES ID CODE/NAME           LTTR "ENCL        ID  CODE/NAME        LTTR ENCL PD4-2 PD                   1 . 1       FIELDS,M                  1     1 INTERNAL:                              1     1       AEOD/SPD/RRAB             1    1 MORSà                 1    1      OC/DBA/PAD                 1     1 RGN4                      1     1 EXTERNAL: LITCO BRYCE,J H             1     1       NOAC                      1     1               D NRC PDR                    1     1 E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
I t
r b
h II 1*
I (g
 
                .+'&A Commitmnnt. Innovation. Aery.
Gregg R. Overbeck                           Mail Station 7602 Palo Verde Nuclear              Vice President             TEL 60~148       P.O. Box 52034 Generating Station              Nuclear Production          FAX 602/3934077  Phoenix, AZ 85072-2034 035-00507-6RO/JDF June 9, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for MAY 1998 Enclosed are the Monthly Operating Reports for May 1998, prepared and submitted.
Palo Verde Nuclear Generating Station (PVNGS)
pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the-PVNGS Units 1, 2, and 3 Operating Licenses.By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Judy Fulton at (602)250-3549.Sincerely, G RO/JDF/cj  
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MAY 1998 Enclosed are the Monthly Operating Reports for May 1998, prepared and submitted.
pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the-PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Judy Fulton at (602) 250-3549.
Sincerely, G RO/JDF/cj


==Enclosures:==
==Enclosures:==
MAY 1998 Monthly Operating Reports cc:      E. W. Merschoff                                (all w/enclosures)
K. E. Perkins INPO Records Center Utility Data Institute
                                      'ogQ5 980bi802i2 98053i PDR      ADQCK            05000528 R                                PDR
            'I
I P"
I P 1 ~
II
                            '4 P-l''t                  'I 1 gf 4 'I I
I        I 5
        , ~
                                      ,P il W ~
II


MAY 1998 Monthly Operating Reports cc: E.W.Merschoff K.E.Perkins INPO Records Center Utility Data Institute'ogQ5 980bi802i2 98053i PDR ADQCK 05000528 R PDR'I (all w/enclosures)
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:                                         50-528 UNIT NAME:                                           PVNGS-1 DATE:                                                6/9/98 COMPLETED BY:                                        J. D. Fulton TELEPHONE:                                            602 250-3549 Reporting Period:                                           Ma 1998
I I P 1~P"'4 II l''t P-'I 1 gf 4'I I ,~I 5 I ,P il W~II NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
: 1. Design Electrical Rating (Net MWe):                                     1265
50-528 PVNGS-1 6/9/98 J.D.Fulton 602 250-3549 Reporting Period: Ma 1998 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity (Net MWe): 1243'Unit O':Ge'n'eratin
                                                                              'his
'tatistics".-
: 2. Maximum Dependable Capacity (Net MWe):                                               1243
''.','=''" Hours Reactor was Critical'...:,."'.
                                                'Unit O':Ge'n'eratin 'tatistics".- ''.','= '' "               Month'-.-". .',:,.Yj;.to, Date      Cumulative.  ='.
4.Hours Ge'nerator,;was,On-Line"'...','.
Hours Reactor was Critical '...:,."'.                                                                       744.0                2,736.9          76,733.2
Unit Reserve Shutdow'ri Hours','-'his Month'-.-".
: 4. Hours   Ge'nerator,;was,On-Line"'...','.
744.0 744.0 0.0.',:,.Yj;.to, Date 2,736.9 2,683.5 0.0 Cumulative.
744.0                2,683.5          .75,494.6 Unit Reserve Shutdow'ri Hours                                   ', '-
='.76,733.2.75,494.6 0.0 Net Electrical Energy Generated (MWh)','.,'NIT SHUTDOWNS 930,330 3,234,332 89,437,600 Outage Method of Duration Shutting Down No.Date Type'ours Reason Reactot No reactor shutdowns occurred during the month of May 1998.Cause and Corrective Action to Prevent Occurrence
0.0                     0.0             0.0 Net Electrical Energy Generated (MWh)                                       ',                         930,330             3,234,332         89,437,600
'F-Forced S-Scheduled
                                                                                      '.,'NIT SHUTDOWNS Outage                           Method of Duration                         Shutting Down             Cause and Corrective Action No.       Date                                     Type'ours               Reason               Reactot                       to Prevent Occurrence No reactor shutdowns occurred during the month of May 1998.
'F-Forced                                       ~Reason:                                                  sMethod:
S-Scheduled                                     A-Equipment Failure (Explain)                            1-Manual B-Maintenance or Test                                    2-Manual Trip / Scram C-Refueling                                              3-Automatic Trip / Scram D-Regulatory Restriction                                  4-Continuation E-Operator Training / License Examination                5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
:~Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative 6-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
 
I Cw NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
I Cw
50-529 PVNGS-2 6/9/98 J.D.Fulton 602 250-3549 Reporting Period: Ma 1998 1.Design Electrical Rating(Net MWe): 1265 2.Maximum Dependable Capacity (Net MWe): 1243 Unit 2 Generatin Statistics','ours Reactor was Critical'';'ours Gene'rator, was On-Line'This'Month
 
" 744.0 744.0 Yr..to Date.:-''3,624.0 3,624.0 Cumulative 77,049.7 75,856.8 Unit Reserve Shutdown.Hours Net Electrical Energy Generated (MWh)., UNIT SHUTDOWNS Outage Duration No.Date Type'ours Reason 0.0 942,630 Method of Shutting Down Reactor 0.0 0.0 Cause and Corrective Action to Prevent Occurrence 4,604,673 91,034,232 No reactor shutdowns occurred during the month of May 1998.'F-Forced S-Scheduled
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:             50-529 UNIT NAME:             PVNGS-2 DATE:                  6/9/98 COMPLETED BY:          J. D. Fulton TELEPHONE:              602 250-3549 Reporting Period:               Ma 1998
: 1. Design Electrical Rating(Net MWe):         1265
: 2. Maximum Dependable Capacity (Net MWe):               1243 Unit 2 Generatin     Statistics',                   This'Month  "      Yr..to Date .:-''
Cumulative Reactor was Critical   '';             'ours 744.0            3,624.0          77,049.7 Gene'rator, was On-Line '   'ours 744.0             3,624.0         75,856.8 Unit Reserve Shutdown. Hours                                                 0.0                  0.0              0.0 Net Electrical Energy Generated (MWh).,                                 942,630          4,604,673        91,034,232 UNIT SHUTDOWNS Outage                         Method of Duration                     Shutting Down            Cause and Corrective Action No.       Date         Type'ours                 Reason         Reactor                   to Prevent Occurrence No reactor shutdowns occurred during the month of May 1998.
'F-Forced         2Reason:                                              sMethod:
S-Scheduled       A-Equipment Failure (Explain)                          1-Manual B-Maintenance or Test                                  2-Manual Trip / Scram C-Refueling                                            3-Automatic Trip / Scram D-Regulatory Restriction                              4-Continuation E-Operator Training / License Examination              5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative 6-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
    ~,
~,~i''
~i''
l t NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
 
50-530 PI/NGS-3 6/9/98 J.D.Fulton 602 250-3549 Reporting Period: Ma 1998 1.Design Electrical Rating (Net MWe): 1269 2.Maximum Dependable Capacity (Net MWe): 1247'Unit 3 Geneiatin Statistics
l NRC MONTHLYOPERATING DATA REPORT t
..-',~'.Hours Reactoi was Critical', 4.Hours Geneiator was On-Line"" 5.Unit Reserve Shutdown Hours".'his'Month.
DOCKET NO.:           50-530 UNIT NAME:             PI/NGS-3 DATE:                  6/9/98 COMPLETED BY:          J. D. Fulton TELEPHONE:              602 250-3549 Reporting Period:             Ma 1998
744.0 744.0 0.0 Yr.to Date 3,624.0 3,624.0 0.0.Cu'mulative.-
: 1. Design Electrical Rating (Net MWe):     1269
'2,949.7 72,123.6 0.0 6 Net Electrical Energy Generated (MWh)927,347 4,525,408 87,278,379 UNIT SHUTDOWNS No.Outage Method of Duration Shutting Down Date Type'ours Reason Reactor Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of May 1998.'F-Forced S-Scheduled
: 2. Maximum Dependable Capacity (Net MWe):           1247
                    'Unit 3 Geneiatin Hours Reactoi was Critical',
                                            'his'Month.
Statistics ..
                                                      - ', ~
744.0 Yr. to Date 3,624.0 Cu'mulative.-
                                                                                                                            '2,949.7
: 4. Hours Geneiator was On-Line""                                            744.0            3,624.0          72,123.6
: 5. Unit Reserve Shutdown Hours      ".
0.0                  0.0                0.0 6   Net Electrical Energy Generated (MWh)                               927,347           4,525,408         87,278,379 UNIT SHUTDOWNS Outage                       Method of Duration                     Shutting Down             Cause and Corrective Action No.      Date       Type'ours               Reason           Reactor                   to Prevent Occurrence No reactor shutdowns occurred during the month of May 1998.
'F-Forced         2Reason:                                            sMethod:
S-Scheduled         A-Equipment Failure (Explain)                      1-Manual B-Maintenance or Test                              2-Manual Trip / Scram C-Refueling                                        3-Automatic Trip / Scram D-Regulatory Restriction                            4-Continuation E-Operator Training / License Examination          5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative 6-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) 0 ,~0}}
0 ,~
0}}

Latest revision as of 03:26, 4 February 2020

Monthly Operating Repts for May 1998 for Pvngs,Units 1,2 & 3.W/980609 Ltr
ML17313A421
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/31/1998
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00507-GRO-J, 35-507-GRO-J, NUDOCS 9806180212
Download: ML17313A421 (10)


Text

CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:980 6180212 DOC.DATE: DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529.

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAYiE AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION SUB JECT: Mo t;hly~ repts for May 1998 for PVNGS,Units 1,2 &

.W/98 09 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:STANDARDIZED PLANT 05000528@

Standardized plant. 05000529 Standardized plant. 05000530()

RECXPIENT COPIES RECIPIENT COPXES ID CODE/NAME LTTR "ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 . 1 FIELDS,M 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 MORSÃ 1 1 OC/DBA/PAD 1 1 RGN4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 D NRC PDR 1 1 E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I t

r b

h II 1*

I (g

.+'&A Commitmnnt. Innovation. Aery.

Gregg R. Overbeck Mail Station 7602 Palo Verde Nuclear Vice President TEL 60~148 P.O. Box 52034 Generating Station Nuclear Production FAX 602/3934077 Phoenix, AZ 85072-2034 035-00507-6RO/JDF June 9, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MAY 1998 Enclosed are the Monthly Operating Reports for May 1998, prepared and submitted.

pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the-PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, G RO/JDF/cj

Enclosures:

MAY 1998 Monthly Operating Reports cc: E. W. Merschoff (all w/enclosures)

K. E. Perkins INPO Records Center Utility Data Institute

'ogQ5 980bi802i2 98053i PDR ADQCK 05000528 R PDR

'I

I P"

I P 1 ~

II

'4 P-lt 'I 1 gf 4 'I I

I I 5

, ~

,P il W ~

II

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-528 UNIT NAME: PVNGS-1 DATE: 6/9/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: Ma 1998

1. Design Electrical Rating (Net MWe): 1265

'his

2. Maximum Dependable Capacity (Net MWe): 1243

'Unit O':Ge'n'eratin 'tatistics".- .','= " Month'-.-". .',:,.Yj;.to, Date Cumulative. ='.

Hours Reactor was Critical '...:,."'. 744.0 2,736.9 76,733.2

4. Hours Ge'nerator,;was,On-Line"'...','.

744.0 2,683.5 .75,494.6 Unit Reserve Shutdow'ri Hours ', '-

0.0 0.0 0.0 Net Electrical Energy Generated (MWh) ', 930,330 3,234,332 89,437,600

'.,'NIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type'ours Reason Reactot to Prevent Occurrence No reactor shutdowns occurred during the month of May 1998.

'F-Forced ~Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 6-Operational Error (Explain)

H-Other (Explain)

SUMMARY

I Cw

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 UNIT NAME: PVNGS-2 DATE: 6/9/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: Ma 1998

1. Design Electrical Rating(Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243 Unit 2 Generatin Statistics', This'Month " Yr..to Date .:-

Cumulative Reactor was Critical ; 'ours 744.0 3,624.0 77,049.7 Gene'rator, was On-Line ' 'ours 744.0 3,624.0 75,856.8 Unit Reserve Shutdown. Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh)., 942,630 4,604,673 91,034,232 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type'ours Reason Reactor to Prevent Occurrence No reactor shutdowns occurred during the month of May 1998.

'F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 6-Operational Error (Explain)

H-Other (Explain)

SUMMARY

~,

~i

l NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-530 UNIT NAME: PI/NGS-3 DATE: 6/9/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: Ma 1998

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity (Net MWe): 1247

'Unit 3 Geneiatin Hours Reactoi was Critical',

'his'Month.

Statistics ..

- ', ~

744.0 Yr. to Date 3,624.0 Cu'mulative.-

'2,949.7

4. Hours Geneiator was On-Line"" 744.0 3,624.0 72,123.6
5. Unit Reserve Shutdown Hours ".

0.0 0.0 0.0 6 Net Electrical Energy Generated (MWh) 927,347 4,525,408 87,278,379 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type'ours Reason Reactor to Prevent Occurrence No reactor shutdowns occurred during the month of May 1998.

'F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 6-Operational Error (Explain)

H-Other (Explain)

SUMMARY

0 ,~

0