ML17313A973: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/31/1999
| issue date = 05/31/1999
| title = Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr
| title = Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr
| author name = FULTON J D, OVERBECK G R
| author name = Fulton J, Overbeck G
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)*N FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 ST¹50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION FULTON,J.D.
{{#Wiki_filter:CATEGORY 1 REGULAT     Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
Arizona Public Service Co.(formerly Arizona Nuclear Power OVERBECK,G.R.
                                                                                                  *N FACIL:STN-50-528 Palo Verde Nuclear Station,               Unit 1, Arizona Publi 05000528 ST¹50-529 Palo Verde Nuclear Station,               Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station,               Unit 3, Arizona Publi 05000530 AUTH. NAME           AUTHOR AFFILIATION FULTON,J.D.         Arizona Public Service Co.           (formerly Arizona Nuclear Power OVERBECK,G.R.       Arizona Public Service Co.           (formerly Arizona Nuclear Power RECIP.NAME           RECIPIENT AFFILIATION
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION e ts for May 1999 for PVNGS,Units 1,2'&NOTES: STANDARDIZED PLANT Standardized plant.Standardized plant.


==SUBJECT:==
==SUBJECT:==
Mon.With 0608 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)05000528 05000529 05000530 RECIPIENT ID CODE/NAME LPD4-2 INTERNAL: AC FILE CENTER 01 EXTERNAL: LMITCO MARSHALL NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME FIELDS,M AEOD/SPD/RRAB OC/DBA/PAD NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D'E NOTE TO ALL"RIDS" RECIPIENTS:
Mon                         e  ts for  May 1999  for  PVNGS,Units 1,2      '&
PLEASE HELP US TO REDUCE WASTETH'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 10 ENCL 10 0 C l II  
              .With     0608   ltr.
~~Commitment.
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR           ENCL       SIZE:
InnornttmL Fnergy.Palo Verde Nuclear'enerating Station Greg g R.Overbeck Vice President Nuclear Production TEL 602I39341 48 FAX 602/3934077 Mail Station 7602 P.O.Box 52034 Phoenix, AZ 85072-2034 035-00540-G RO/J DF June 08, 1999 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555  
TITLE: Monthly Operating Report (per Tech Specs)
NOTES: STANDARDIZED PLANT                                                                05000528 Standardized plant.                                                                05000529 Standardized plant.                                                                05000530 RECIPIENT             COPIES              RECIPIENT            COPIES ID CODE/NAME           LTTR ENCL          ID  CODE/NAME        LTTR ENCL LPD4-2                     1     1       FIELDS,M                  1     1 INTERNAL: AC                            1     1       AEOD/SPD/RRAB             1      1 FILE  CENTER    01        1    1      OC/DBA/PAD               1     1 1     1 EXTERNAL: LMITCO MARSHALL              1     1       NOAC                      1     1               D NRC PDR                    1    1
                                                                                                      'E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH 'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR               10   ENCL     10
 
0   C l
II
 
~ ~
Commitment. InnornttmL Fnergy.
Greg g R. Overbeck                             Mail Station 7602 Palo Verde Nuclear                        Vice President             TEL 602I39341 48   P.O. Box 52034 Station    'enerating Nuclear Production          FAX 602/3934077    Phoenix, AZ 85072-2034 035-00540-G RO/J DF June 08, 1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for MAY 1999 Enclosed are the Monthly Operating Reports for May 1999, prepared and submitted pursuant'to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.If you have any questions, please contact Judy Fulton at (602)250-3549.Sincerely, G RO/JDF/cj  
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MAY 1999 Enclosed are the Monthly Operating Reports for May 1999, prepared and submitted pursuant'to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Judy Fulton at (602) 250-3549.
Sincerely, G RO/JDF/cj


==Enclosures:==
==Enclosures:==
MAY 1999 Monthly Operating Reports cc:        E. W. Merschoff                                        (all w/encl'osures)
P. H. Harrell INPO Records Center Utility Data Institute 1
9906f50007 99053i                          "
PDR      ADOCK          05000528, R                                        PDR  L


MAY 1999 Monthly Operating Reports cc: E.W.Merschoff P.H.Harrell INPO Records Center Utility Data Institute (all w/encl'osures) 1 9906f50007 99053i" PDR ADOCK 05000528, R PDR L NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:             50-528 UNIT NAME:             PVNGS-1 DATE:                  6/07/99 COMPLETED BY:          J. D. Fulton TELEPHONE:              602 250-3549 Reporting Period:             May 1999
50-528 PVNGS-1 6/07/99 J.D.Fulton 602 250-3549 Reporting Period: May 1999 1.Design Electrical Rating (Net MWe): 1265 2.MaximumDependabie Capacity(NetMWe):
: 1. Design Electrical Rating (Net MWe):     1265
1243 Unit 1 Generating Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWh)UNIT SHUTDOWNS This Month 744.0 744.0 0.0 936,174 Yr.to Date 3,571.8 3,564.1 0.0 4,446,243 Cumulative 85,441.0 84,194.7 0.0 100,224,524 Outage Duration No.Date Type" Hours Reason2 Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of May 1999."F-Forced S-Scheduled
: 2. MaximumDependabie Capacity(NetMWe):             1243 Unit 1 Generating Statistics                   This Month          Yr. to Date        Cumulative Hours Reactor was Critical                                           744.0            3,571.8          85,441.0 Hours Generator was On-Line                                           744.0            3,564.1          84,194.7 Unit Reserve Shutdown Hours                                             0.0                  0.0              0.0 Net Electrical Energy Generated (MWh)                             936,174           4,446,243       100,224,524 UNIT SHUTDOWNS Outage                   Method of Duration               Shutting Down              Cause and Corrective Action No.       Date       Type"       Hours     Reason2       Reactor3                   to Prevent Occurrence No reactor shutdowns occurred during the month of May 1999.
"F-Forced         2Reason:                                        3Method:
S-Scheduled       A-Equipment Failure (Explain)                    1-Manual B-Maintenance or Test                            2-Manual Trip / Scram C-Refueling                                      3-Automatic Trip / Scram D-Regulatory Restriction                        4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
 
NRC MONTHLY OPERATING DATA REPORT 6/07/99 J.D.Fulton DOCKET NO.: 50-529 UNIT NAME: PVNGS-2 DATE: COMPLETED BY: Reporting Period: May 1999 1.Design Electrical Rating (Net MWe): 1265 2.MaximumDependable Capacity(NetMWe):
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:             50-529 UNIT NAME:             PVNGS-2 DATE:                   6/07/99 COMPLETED BY:           J. D. Fulton Reporting Period:             May 1999
1243 Unit 2 Generating Statistics 3.Hours Reactor was Critical 4.Hours Generator was On-Line 5.Unit Reserve Shutdown Hours This Month 742.5 717.2 0.0 Yr.to Date 2,782.5 2,757.2 0.0 Cumulative 84,968.2 83,750.0 0.0 6.Net Electrical Energy Generated (MWh)UNIT SHUTDOWNS 839,429 3,415,015 100,929,400 No.Outage Method of Duration Shutting Down Date Type~Hours Reason2 ReactoR Cause and Corrective Action to Prevent Occurrence 99-01 3/27 S 866.8 C 1 Unit completed eighth refueling outage on 5/2 at 02:50." 1F-Forced S-Scheduled
: 1. Design Electrical Rating (Net MWe):     1265
: 2. MaximumDependable Capacity(NetMWe):             1243 Unit 2 Generating Statistics                     This Month          Yr. to Date        Cumulative
: 3. Hours Reactor was Critical                                           742.5              2,782.5          84,968.2
: 4. Hours Generator was On-Line                                           717.2             2,757.2           83,750.0
: 5. Unit Reserve Shutdown Hours                                              0.0                  0.0               0.0
: 6. Net Electrical Energy Generated (MWh)                             839,429           3,415,015       100,929,400 UNIT SHUTDOWNS Outage                   Method of Duration               Shutting Down               Cause and Corrective Action No.      Date         Type~       Hours     Reason2       ReactoR                     to Prevent Occurrence 99-01       3/27           S         866.8         C               1         Unit completed eighth refueling outage on 5/2 at 02:50.
1F-Forced       2Reason:                                          3Method:
S-Scheduled       A-Equipment Failure (Explain)                    1-Manual B-Maintenance or Test                            2-Manual Trip / Scram C-Refueling                                      3-Automatic Trip / Scram D-Regulatory Restriction                        4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) l t t NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY TELEPHONE:
l t
50-530 PVNGS-3 6/07/99 J.D.Fulton Reporting Period: May 1999 1.Design Electrical Rating (Net MWe): 1269 2.MaximumDependableCapacity(Net MWe): 1247 Unit 3 Generating!
NRC MONTHLYOPERATING DATA REPORT t
Statistics Hours Reactor was Critical Houis Generator was',On;Line,, Unit Reserve Shutdown Hours , Net Electrical'n'orgy Generated:(MWh)
DOCKET NO.:               50-530 UNIT NAME:               PVNGS-3 DATE:                    6/07/99 COMPLETED BY              J. D. Fulton TELEPHONE:
'.UNIT SHUTDOWNS This Month 744.0 744.0 0.0 924,763'Yr.to Date'', 3,624.0 3,624.0 0.0 4,532,579 , Cumulative
Reporting Period:               May 1999
'",','0,8 I 9.6 79,959.7 0.0 96,886,456 No.Outage Method of Duration Shutting Down Date Type" Hours Reason2 Reactors Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of May 1999."F-Forced S-Scheduled
: 1. Design Electrical Rating (Net MWe):     1269
: 2. MaximumDependableCapacity(Net MWe):             1247 Unit 3 Generating! Statistics                    This Month          'Yr. to Date '',  , Cumulative
                                                                                                                          '",','0,8 Hours Reactor was Critical                                           744.0              3,624.0                I 9.6 Houis Generator was',On;Line,,                                       744.0              3,624.0          79,959.7 Unit Reserve Shutdown Hours                                             0.0                  0.0                0.0
      , Net Electrical'n'orgy Generated:(MWh)     '.
924,763           4,532,579         96,886,456 UNIT SHUTDOWNS Outage                   Method of Duration               Shutting Down             Cause and Corrective Action No.        Date         Type"       Hours     Reason2       Reactors                   to Prevent Occurrence No reactor shutdowns occurred during the month of May 1999.
"F-Forced         2Reason:                                          sMethod:
S-Scheduled         A-Equipment Failure (Explain)                    1-Manual B-Maintenance or Test                            2-Manual Trip / Scram C-Refueling                                      3-Automatic Trip / Scram D-Regulatory Restriction                        4-Continuation E-Operator Training / License Examination        5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain)
Aoba8 >~~
%$Aoba8>~~g a))Ly sR}}
g a))Ly sR}}

Latest revision as of 03:23, 4 February 2020

Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr
ML17313A973
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/31/1999
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00540-GRO-J, 35-540-GRO-J, NUDOCS 9906150007
Download: ML17313A973 (8)


Text

CATEGORY 1 REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

  • N FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 ST¹50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mon e ts for May 1999 for PVNGS,Units 1,2 '&

.With 0608 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 1 1 FIELDS,M 1 1 INTERNAL: AC 1 1 AEOD/SPD/RRAB 1 1 FILE CENTER 01 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 D NRC PDR 1 1

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH 'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 10 ENCL 10

0 C l

II

~ ~

Commitment. InnornttmL Fnergy.

Greg g R. Overbeck Mail Station 7602 Palo Verde Nuclear Vice President TEL 602I39341 48 P.O. Box 52034 Station 'enerating Nuclear Production FAX 602/3934077 Phoenix, AZ 85072-2034 035-00540-G RO/J DF June 08, 1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MAY 1999 Enclosed are the Monthly Operating Reports for May 1999, prepared and submitted pursuant'to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, G RO/JDF/cj

Enclosures:

MAY 1999 Monthly Operating Reports cc: E. W. Merschoff (all w/encl'osures)

P. H. Harrell INPO Records Center Utility Data Institute 1

9906f50007 99053i "

PDR ADOCK 05000528, R PDR L

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-528 UNIT NAME: PVNGS-1 DATE: 6/07/99 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: May 1999

1. Design Electrical Rating (Net MWe): 1265
2. MaximumDependabie Capacity(NetMWe): 1243 Unit 1 Generating Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 3,571.8 85,441.0 Hours Generator was On-Line 744.0 3,564.1 84,194.7 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Energy Generated (MWh) 936,174 4,446,243 100,224,524 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of May 1999.

"F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 UNIT NAME: PVNGS-2 DATE: 6/07/99 COMPLETED BY: J. D. Fulton Reporting Period: May 1999

1. Design Electrical Rating (Net MWe): 1265
2. MaximumDependable Capacity(NetMWe): 1243 Unit 2 Generating Statistics This Month Yr. to Date Cumulative
3. Hours Reactor was Critical 742.5 2,782.5 84,968.2
4. Hours Generator was On-Line 717.2 2,757.2 83,750.0
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWh) 839,429 3,415,015 100,929,400 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reason2 ReactoR to Prevent Occurrence 99-01 3/27 S 866.8 C 1 Unit completed eighth refueling outage on 5/2 at 02:50.

1F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

l t

NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 6/07/99 COMPLETED BY J. D. Fulton TELEPHONE:

Reporting Period: May 1999

1. Design Electrical Rating (Net MWe): 1269
2. MaximumDependableCapacity(Net MWe): 1247 Unit 3 Generating! Statistics This Month 'Yr. to Date , , Cumulative

'",','0,8 Hours Reactor was Critical 744.0 3,624.0 I 9.6 Houis Generator was',On;Line,, 744.0 3,624.0 79,959.7 Unit Reserve Shutdown Hours 0.0 0.0 0.0

, Net Electrical'n'orgy Generated:(MWh) '.

924,763 4,532,579 96,886,456 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason2 Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of May 1999.

"F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Aoba8 >~~

g a))Ly sR