ML17342A911: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 OFF-NORMAL OPERATING PROCEDURE 3208.1 NOVEMBER 18 1986 1.0 Title: MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 2.0 A royal and List of Effective Pa es: 2.1~Arova1:~l 1 1 1 1 6 1<<: 86.86 and Approved by Plant Manager-Nuclear: ll/18/86 2.2 List of Effective Pa es:~Pa e Date Pa<ac Date~a<ac Date~Pa e Date 1 11/18/86 4 3/28/86 7 11/18/86 10 11/18/86 2 11/18/86 5 11/18/86 8 11/18/86 3 3/28/86 6 11/18/86 9 11/18/86 3.0 Pur ose and Discussion 3.1~Por oae: This procedure provides instructions to follow in the event of an RCS leak from an RHR system component.
{{#Wiki_filter:FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 OFF-NORMAL OPERATING PROCEDURE             3208.1 NOVEMBER 18     1986
It also provides instructions for a loss of CCW to the RHR system.If a loss of RHR flow has occured, Procedure 3/4-ONOP-050, Loss of RHR, should be refered to.3.2 Discussion:
 
3.2.1 The failure or malfunction of one RHR pump under any system condition will not put the system in jeopardy, however, the loss of the second RHR pump or the loss of component cooling water flow to the RHR heat exchangers can affect the ability to remove system decay heat.3.2.2 Every effort shall be utilized to maintain two trains of RHR available when the system is drained and opened for maintenance.
==1.0 Title==
It is realized that certain maintenance requires the loss of both RHR pumps, under these conditions special controls will be established prior to commencing work that will ensure the equipment ability to be restarted as'needed for decay heat removal.RTS 86-1874/jm/tf asoooaso PDR ADOCN, 050 PDR P OFF-NO AL OPERATING PROCEDURE 3208.1, GE 2 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 11/18/86 3.2.3 Whenever possible, maintenance on the RHR system should be done when the following conditions exist: 1.The reactor Head is in place, and the steam generator manways are on, or-2.The reactor refueling cavity is flooded.This will allow for an alternate method of decay heat removal to be utilized.3.2.4 3.2.5 When equipment malfunctions occurs, alternate equipment, if available, should be placed in service as required.MOV's, are constructed such that they can be hand operated when the motor operator fails.Hand operation of these valves can be done as long as it is safe for the personnel operating them, and all interlock provisions are complied with.3.2.6 Coolant loop redundancy as per Technical Specifications 1.23 and 3.4 shall be maintained.
MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 2.0   A   royal     and List of Effective         Pa es:
3.2.7 MOV-*-872 has been set at 2 Q inches of valve travel to maintain the require ifferential pressure across the pumps during single pump operation when utilizing the alternate RHR line.The pump discharge valve (*-754A or B)should not require throttling when using the alternate RHR line.If valve throttling during single pump operation is required the Technical Department is to be notified to investigate the throttle position of MOV-*-872.
2.1   ~Arova1:
A differential pressure across the pump must be maintained in accordance with the following formula: PSID=107.2-.039T+10 PSID-0 PSID 4.0 Syyrm mtoms: Where T=RCS temperature
and Approved by
'F from 60'350'F Normal pump differential pressure should be between 105 to 115~psig.4.1 Any of the following alarms may indicate a leak in or a loss of CCW to the RHR system.4.1.1 Residual Heat Removal Room A Sump High Level 4.1.2 Residual Heat Removal Room B Sump High Level 4.1.3 Residual Heat Removal Heat Exchanger Room Sump High Level 4.1.4 Residual Heat Exchanger Low Flow P  
                                  ~l                   1 Plant Manager - Nuclear:
~~~~OFF-NORMAL OPERATING PROCEOURE 3208.1, PAGE 3 MALFUNCTION OF RESIOUAL HEAT REMOVAL SYSTEM 3/28/86 4.1.5 Residual Heat Removal Pumps A CC Water Low Flow 6.2 m FIA*637 4.1.6 Residual Heat Removal Pumps B CC Water Low Flow 6.2 m FIA~638 4.2 Malfunction of motor operated valves can be detected in the control room by observing the operation of the indicating lights.4.2.1 When valve is closed, Green Light should be on.4.2.2 When valve is open, Red Light should be on.4.2.3 Whenever the valve is not fully closed or open, both red and green lights should be on.NOTE: Lights could be burned out.4.3 Both A and B RHR pumps are equipped with an alarm that actuates on high'temperature of the pump seal water leaving the seal water cooler.The temperature indication TA-*-679A and/or B for these alarms is at the individual pump.4.4 The increased running frequency of sump pumps located in the RHR pump rooms A and B or the heat exchanger room may indicate RCS leakage from an RHR component at one of these locations.
1           1 ll/18/86 1   6     1<<:   86.86 2.2   List of Effective         Pa   es:
4.5 Increased running frequency of the containment sump pumps may indicate RCS leakage from RHR components inside the containment.
                ~Pa   e       Date         Pa<ac         Date         ~a<ac       Date       ~Pa e     Date 1         11/18/86       4         3/28/86         7         11/18/86     10       11/18/86 2         11/18/86         5         11/18/86         8         11/18/86 3         3/28/86         6         11/18/86       9         11/18/86 3.0   Pur ose and Discussion 3.1   ~Por   oae:
4.6 An abnormal change in the RCS heatup or cooldown rate when no changes have been made in the operation of the RHR system, may indicate a malfunction of an RHR system component or an interruption of, or change in, component cooling water flow to the RHR heat exchangers.
This procedure         provides instructions to follow in the event of                 an RCS leak from an       RHR   system component.         It also provides instructions for a loss of CCW to the RHR system.                 If a loss of RHR flow has occured, Procedure 3/4-ONOP-050, Loss of RHR, should be refered to.
4.7 An abnormal change in the indication of FI-*-605 RHR loop flow indicator, when no operating changes have been made on the system, is an indication of the malfunction of an RHR system component.
 
4,8 An abnormal variation of the RHR pump discharge temperatures and/or the heat exchanger outlet temperatures recorded on temp.recorder TR-*-604, vertical panel B, when no operating changes have been made on the system, is"an indication of the malfunction of an RHR system component or an interruption.of, or change in, component cooling water flow to the RHR heat exchangers.
===3.2 Discussion===
4.9 A high level alarm on the component cooling water surge tank and/or a high activity radiation alarm in the component cooling water system is an indication of a possible RCS leak to the component cooling system which may be from the RHR heat exchangers, or the RHR pump seal water coolers.
3.2.1       The   failure or malfunction of           one RHR pump under any system condition will   not put the system in jeopardy, however, the loss of the second RHR pump or the loss of component cooling water flow to the RHR heat exchangers can affect the ability to remove system decay heat.
Wl V'I>
3.2.2       Every     effort shall         be   utilized to maintain         two   trains of   RHR available     when   the system is drained       and opened   for maintenance.
h~OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 4 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 3/28/86 4.10 RCS leakage from the RHR system to the atmosphere may be detected by;4.10.1 Plant Vent Radiation Monitor R-14.4.10.2 Containment Radioactive Gas Monitor and Air Particulate Monitor Rll and R12.4.10.3 Visual, observation.
It is realized that certain maintenance requires the loss of both RHR pumps,   under these conditions special controls will be established prior to commencing work that will ensure the equipment ability to be restarted as 'needed for decay heat removal.
4.11 Cavitation of an RHR pump is an indication of either low suction head, or air/steam binding in either the pump or Heat Exchanger.
RTS 86-1874
  /jm/tf PDR   ADOCN,   asoooaso 050 PDR P
 
11/18/86 OFF-NO AL OPERATING PROCEDURE 3208.1,               GE 2 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 3.2.3     Whenever   possible, maintenance     on   the   RHR system should be done when the following conditions exist:
: 1. The   reactor   Head is in place,     and   the steam generator     manways   are on, or-
: 2. The reactor refueling cavity is flooded.               This will allow for     an alternate method of decay heat removal to be utilized.
3.2.4   When     equipment available, should malfunctions be placed occurs, in service     as alternate required.
equipment,    if 3.2.5    MOV's, are constructed such that they can be hand operated when the motor operator fails. Hand operation of these valves can be done as long as     it   is safe for the personnel operating them, and all interlock provisions are complied with.
3.2.6   Coolant loop redundancy       as per Technical Specifications 1.23 and 3.4 shall be   maintained.
3.2.7     MOV-*-872 has been set     at 2 ifferential pressureQ across the pumps during inches of valve travel to maintain the require                                                                 single pump operation     when utilizing the alternate RHR line.             The pump discharge valve (*-754A or B) should not require throttling when using the alternate RHR line. If valve throttling during single pump operation is required the Technical Department is to be notified to investigate the throttle position of MOV-*-872. A differential pressure across the pump must be   maintained in accordance with the following formula:
PSID   =   107.2   -.039T   + 10 PSID
                                                - 0 PSID Where T = RCS     temperature 'F from 60'         350'F Normal pump     differential pressure     should be between 105 to 115 ~psig.
 
==4.0 mtoms==
Syyrm 4.1   Any of the following alarms may indicate           a leak in or   a loss of   CCW to the RHR system.
4.1.1   Residual Heat Removal     Room A Sump   High Level 4.1.2   Residual Heat Removal     Room B Sump   High Level 4.1.3   Residual Heat Removal Heat Exchanger         Room Sump   High Level 4.1.4   Residual Heat Exchanger Low Flow
 
P
~ ~ ~ ~
3/28/86 OFF-NORMAL OPERATING PROCEOURE 3208.1, PAGE 3 MALFUNCTION OF RESIOUAL HEAT REMOVAL SYSTEM 4.1.5   Residual Heat Removal     Pumps A CC Water Low     Flow   6.2 m FIA*637 4.1.6   Residual Heat Removal     Pumps   B CC Water Low Flow     6.2 m FIA~638 4.2   Malfunction of motor operated valves can be detected in the control             room by observing the operation of the indicating lights.
4.2.1   When   valve is closed, Green Light should       be on.
4.2.2   When   valve is open,   Red Light should   be on.
4.2.3   Whenever     the valve is not     fully closed or open, both red and green lights should     be on.
NOTE:       Lights could be burned   out.
4.3 Both   A   and   B RHR pumps   are equipped with an alarm that actuates on high
            'temperature     of the pump seal water leaving the seal water cooler.               The temperature       indication TA-*-679A and/or B for these alarms is at the individual   pump.
4.4 The   increased     running frequency of sump pumps located in the RHR pump rooms A and   B   or the heat exchanger room may indicate RCS leakage from an RHR component at one of these locations.
4.5   Increased running frequency of the containment sump pumps may indicate             RCS leakage from RHR components inside the containment.
4.6 An abnormal change in the RCS heatup or cooldown             rate when no changes have been made in the operation of the RHR system, may             indicate a malfunction of an RHR system component or an interruption of,                 or change in, component cooling water flow to the       RHR   heat exchangers.
4.7 An   abnormal   change in the indication of FI-*-605 RHR loop flow indicator, when no   operating changes have been made on the system, is an indication of the malfunction of an RHR system component.
4,8 An abnormal     variation of the RHR pump discharge temperatures and/or the heat exchanger outlet temperatures recorded on temp. recorder TR-*-604, vertical panel B, when no operating changes have been made on the system, is "an indication of the malfunction of an RHR system component or an interruption
            .of, or change in, component cooling water flow to the RHR heat exchangers.
4.9 A high level alarm on the component cooling water surge tank and/or a high activity radiation         alarm in the component cooling water system is an indication of a possible RCS leak to the component cooling system which may be from the RHR heat exchangers, or the RHR pump seal water coolers.
 
Wl V
    'I>
 
h ~
3/28/86 OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 4 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 4.10   RCS   leakage from the     RHR   system   to the atmosphere may be   detected by; 4.10.1     Plant Vent Radiation Monitor R-14.
4.10.2     Containment   Radioactive     Gas   Monitor and Air Particulate Monitor Rll and R12.
4.10.3     Visual, observation.
4.11   Cavitation of an RHR pump is an indication of either low suction head, or air/steam binding in either the pump or Heat Exchanger.


==5.0 Instructions==
==5.0 Instructions==
5.1 Immediate Automatic Action: 5.1.1 RCS leakage to containment from RHR Containment purge supply and exhaust duct valves and pressure relief line valves are closed on actuation of the high containment air particulate monitor alarm or the high radioactive gas monitor alarm due to leakage from the RCS.5.1.2 RCS leakage to CC.through RHR component.
5.1   Immediate Automatic Action:
Component cooling water surge tank vent valve RCV*609 closes on high activity alarm from the component cooling loop radiation monitor R-17A and 8 due to leakage from the RCS.5.2 Immediate Operator Action: 5.2.1 Upon receiving indication of RCS leak through the RHR system, the operator will immediately take steps to verify that the correct automatic actions occurred as listed in Section 5.1.If these actions are required, but have not occurred, the operator will take steps to manua11y execute the actions required.J P1ant Supervisor
5.1.1   RCS leakage to containment from         RHR Containment purge supply and exhaust duct valves and pressure relief line valves are closed on actuation of the high containment air particulate monitor alarm or the high radioactive gas monitor alarm due to leakage from the RCS.
-~nuclear shall be notified immediateiy.
5.1.2   RCS leakage to   CC. through   RHR component.
NOTE: RHR malfunctions may require notification of a significant event to the NRCOC..5.2.2 If the indication of the RHR malfunction is such that no automatic actions are required, the operator must evaluate the available information on the condition of the system in order to perform the necessary actions to assure the safety of personnel and equipment.
Component   cooling water surge tank vent valve RCV*609 closes on high activity   alarm from the component cooling loop radiation monitor R-17A and 8   due to leakage from the RCS.
5.2.3 If TR-*-604 indicates an increasing temperature on the outlet of the RHR heat exchanger, verify the following:
5.2   Immediate Operator Action:
1.RHR flow exists as indicated by FI-*-685.  
5.2.1   Upon receiving indication of RCS leak through the RHR system, the operator will immediately take steps to verify that the correct automatic actions occurred as listed in Section 5. 1.                   If these actions are required, but have not occurred, the operator will take steps to manua11y execute the actions required.               J P1ant Supervisor
~~h OFF-NO L OPERATING PROCEDURE 3208.1, 5 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 11/18/86 2.3.Veri f component cool ing water fl ow on FI-*-613A ("A" CCW ea er and FI-*-6138 ("B" CCW Header).NOTE: Wi th"A" RHR heat exchanger in servi ce, fl ow on"A" header should be greater than 4,500 gpm..With"B" RHR heat exchanger in service flow on"B" header should be greater than 9,000 gpm.Verify MOV-*-749A and MOV-*-7498 are open, Vertical Panel B.CAUTION: The position of valves*-748A and B is preset as determined by the CCW System flow testing.If the position of these valves is changed;the Technical Department Supervisor shall be notified immediately.
                        -~nuclear shall be notified immediateiy.
Notify the Nuclear Operator to visually verify*-748A and*-7488 heat exchanger outlet butterfly valves, in the pipe and valve'room, are throttled to the required preset positions*-748A approx 35%and*-7488 approx 38%and RHR heat exchanger, CCW, Inlet Valves*-746A and+-746B open.(Reach Rods)NOTE: If malfunction exists in the component cooling water system, refer to 3/4-0NOP-030, Loss of Component Cooling Water System.5.2.4 If an RHR pump exhibits signs of cavitation immediately stop the pump and take the following actions: Verify proper CCW System Operation per 5.2.3 above.2~3.Increase pumps suction head by cycling open, then closed, MOV-872 (RWST to RCS)to increase the RCS inventory 500 gallons.Repeat as necessary.
NOTE:     RHR   malfunctions     may   require notification of     a significant event to the     NRCOC.
Start the pump and throt tl e the bypass fl ow around the heat exchangers via FCV-605.Re-establish normal cooling rates.5.3 Subsequent Operator Action: 5.3.1 If both MOV-*-744 A and B, RHR to RCS cold legs,,fails to open, an alternate path may be provided as follows: Close valve*-887 (normally locked approximately 3(5 open)2.3.Unit 4 only)-Throttle the applicable RHR Pump Discharge Valve*-754A or*-7548 to 95 turns from full open.NOTE: MOV-*-872 has been set at 2 lp inches of valve travel to prevent pump runout during alternate RHR line use with a single pump operating.
              .5.2.2   If the indication of the RHR malfunction is such that no automatic actions are required, the operator must evaluate the available information on the condition of the system in order to perform the necessary actions to assure the safety of personnel and equipment.
Open MOV-*-872 Open MOV-*-863A and MOV-*-8638  
5.2.3   If TR-*-604     indicates   an   increasing temperature   on the outlet of the RHR heat exchanger,     verify the following:
~~'e~~OFF-N AL OPERATING PROCEDURE 3208.1, E 6 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 11/18/86~Close HCV-*-758 and FCY-*-605 NOTE: MOV-*-872 has been set at 2 1/2 inches valve travel to prevent pump runout during alternate RHR line use with a single pump operating.
: 1. RHR flow exists     as indicated by FI-*-685.
This should maintain the required differential pressure without throttling the discharge valves.If the discharge valves (*754A or B)are throttled to obtain proper pressure, the Technical.
 
~ ~ h                                                                                           11/18/86 OFF-NO     L OPERATING PROCEDURE 3208.1,               5 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM
: 2. Veri ea er f     component and cool ing water flow FI-*-6138 ("B" CCW Header).
on  FI-*-613A ("A"       CCW NOTE:     Wi th   "A" RHR heat exchanger in servi ce, fl ow on "A" header should be greater than 4,500 gpm.. With "B" RHR heat exchanger in service flow on "B" header should be greater than 9,000 gpm.
: 3. Verify   MOV-*-749A and MOV-*-7498 are open,           Vertical   Panel   B.
CAUTION:         The   position of valves *-748A and B is preset as determined     by the CCW System flow testing.             If the position of these valves is changed; the Technical Department Supervisor shall be notified immediately.
Notify the Nuclear Operator to visually verify *-748A and *-7488 heat exchanger outlet butterfly valves, in the pipe and valve
                      'room, are throttled to the required preset positions *-748A approx   35% and *-7488 approx 38% and RHR heat exchanger,                     CCW, Inlet   Valves *-746A and +-746B open. (Reach Rods)
NOTE:     If   malfunction exists       in the     component cooling water system, refer     to 3/4-0NOP-030,     Loss of Component Cooling Water System.
5.2.4   If an   RHR pump exhibits signs of cavitation immediately stop the                   pump and take the following actions:
Verify proper     CCW System Operation per     5.2.3 above.
2 ~ Increase pumps suction head by cycling open, then closed, MOV-872 (RWST to RCS) to increase the RCS inventory 500 gallons.                   Repeat as necessary.
: 3. Start the       pump   and   throt tl e the   bypass   flow  around   the heat exchangers     via FCV-605.
Re-establish normal cooling rates.
5.3 Subsequent   Operator Action:
5.3.1   If both MOV-*-744       A and   B, RHR to RCS cold       legs,,fails to     open,   an alternate path     may be   provided as follows:
Close valve *-887 (normally locked approximately 3(5 open)
: 2. Unit   4 only) - Throttle the applicable           RHR Pump Discharge Valve
                      *-754A or *-7548 to 95 turns from           full open.
NOTE:     MOV-*-872 has       been set at   2 lp inches of valve travel to prevent     pump runout during     alternate   RHR line use   with   a single   pump operating.
: 3. Open MOV-*-872 Open MOV-*-863A and MOV-*-8638
 
~ ~ 'e ~ ~                                                                             11/18/86 OFF-N     AL OPERATING PROCEDURE 3208.1,         E 6 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM
                    ~Close HCV-*-758 and FCY-*-605 NOTE:   MOV-*-872 has     been set at 2 1/2 inches valve travel         to prevent pump runout during alternate RHR         line use with a single pump operating. This should maintain the required differential pressure without throttling the discharge valves.     If the discharge valves (*754A or B) are throttled to obtain proper pressure, the Technical.
Department is to be notified to investigate throttle position of MOV-*-872.
Department is to be notified to investigate throttle position of MOV-*-872.
6.Ensure that the differential pressure across the RHR-pump is being maintained at 105 to 115 psig.Throttle the applicable RHR Pump Discharge valve*-754A or*-754B as required to maintain differential pressure.CAUTION: By not closely monitoring the differential pressure across an RHR pump in a range of 105 to 115 psig, RHR pump damage may occur.CAUTION: The position of valves*-748A and B is preset as determined by the CCW System flow testing.If the position of these.valves is changed, the Technical Department Supervisor shall be notified immediately.
: 6. Ensure that the differential pressure across the RHR- pump is being maintained at 105 to 115 psig. Throttle the applicable RHR Pump Discharge valve *-754A or *-754B as required to maintain differential pressure.
7.Cooldown rate must now be controlled by throttling the component cooling water outlet valves on the RHR heat exchanger,'valves No.*-748A and/or*-7488.CAUTION: 1)Caution must be used so as not to reduce CC flow to a point that CC will generate steam in RHR HX.Return the above valves to their original position when MOV-*-744A and B are operable and are required to be put back in service.2)Maintain a close watch on RWST level in case valve*-887 leaks.5.3.2 If there is a leak in the line between MOV-*-751 and V-*-752 A and B, RHR pump suction valves, 741B and MOV-~-862B, RWST to RHR: 1.Shutdown RHR pumps.2.Close MOV-*-750 and MOV-*-751 C (Unit 3), A (Unit 4)hot leg to RHR.3.Close MOV-*-744A.and B RHR to cold legs.4.Verify closed MOV-*-862A and B RWST to RHR.5.Verify closed MOV-*-863A and B'HR rec.and alt.SIS 6.Close HCV-*-758 RHR HX Outlet control~valve.  
CAUTION:       By not closely monitoring the differential pressure across an RHR pump in a range of 105 to 115 psig, RHR pump   damage may   occur.
~~e~OFF-NO AL OPERATING PROCEDURE 3208.1, E 7 MALFUNCTION OF RESIDUAL HEAT REMOYAL SYSTEM 11/18/86 7.JC1ose FCV-*-605 RHR HX bypass.8.Close V-*-752A and B,RHR pump suction (locked open).9.Close V-*-741A and 8 RHR rec.(locked open).10.If continued cooldown is required then fully isolate RHR and use charging and letdown to bring pressure up so a RCP can be put in service in accordance with 3/4-0P-041.1, Reactor Coolant Pump.Then use steam dump to complete cooldown.NOTE: When starting a RCP, it may be necessary to manually'perate the PROV's for pressure control if they do not respond automatically.
CAUTION:       The   position of valves *-748A and B is preset as determined   by the CCW System flow testing.
A pressure spike may result when starting a RCP, if a 4T exists between the steam generators and primary system temperature.
position of these. valves is changed, the Technical If the Department Supervisor shall be notified immediately.
5.3.3 If there is a leak in the C (Unit 3), A (Unit 4)loop hot leg line between MOV-*-750 and MOY-*-751.
: 7. Cooldown rate must now be controlled by throttling the component cooling water outlet valves on the RHR heat exchanger,'valves No.
\1.Shutdown RHR pumps.2.Close both MOV-*-750 and MOV-*-751 immediately.
                    *-748A and/or *-7488.
3.If continued cooldown is required, then fully isolate the RHR system and bring RCS pressure to 400-450 psig;put one RCP in service according to 3/4-0P-041.1, Reactor Coolant Pump;and use steam dump for cooldown.NOTE: When starting a RCP, it may be necessary to manually operate the PROV's for pressure control if they do not respond automatically.
CAUTION: 1)   Caution must be used so as not to reduce CC flow to a point that CC will generate             steam in RHR HX.
A pressure spike may result when starting a RCP, if a hT exists between the steam generators and primary system temperature.
Return the above valves to their original position when MOV-*-744A and B are operable and are required to be put back in service.
5.3.4 If there is a leak in the RHR pump suction line, pump casing, and/or pump discharge line, including instrument lines, between valves*-752A and*-754A and 861A for A pump and*-7528 and*-7548 and 8618 for 8 pump: 1.Stop the RHR pump involved.2.Isolate the pump and its suction and discharge lines by closing V-*752A and (8),*-861A and (8), and V-*754A and (8).5.3.5 If there is a leak in the RHR cold leg line between the following valves: MOV's-*-744A and 8, and HCV-*-758, and FCV-*-605, V-*-734 and-*-741A.1.Shutdown both RHR pumps.2.Close MOV-*-750 and MOV-*-751 C (Unit 3), A (Unit 4}hot leg to RHR.3.Close MOV-*-744A and 8, check to be closed V-*-734 RHR to refueling~cana'I.
: 2) Maintain a close watch       on RWST   level in case valve
E~I  
                                    *-887 leaks.
.OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 8 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 11/18/86 4.(Close*-757 C and 0 RHR HX bypass 5.Close*-760 RHR to CVCS.6.Close*-741A and B (locked open)RHR recirculating line.CAUTION: The position of valves*-748A and B is preset as determined by the CCW System flow testing.If the position of these valves is changed, the Technical.Department Supervisor shall be notified immediately.
5.3.2 If there   is a leak in the line between MOV-*-751 and V-*-752         A and B, RHR pump suction valves, 741B and MOV-~-862B, RWST to RHR:
7.RHR system is now shutdown.Use alternate path if RHR system operation is still required For cooldown purposes..
: 1. Shutdown   RHR pumps.
8.Close valves*-759A and B (normally locked open).9.Open MOV's*-750 and*-751.10.Close valve*-887.(normally locked approximately open 30%open)11.Throttle the applicable RHR Pump Discharge valve*-754A or*-7548 to 95 turns from full open.I NOTE: HOY-*-872 has been set at 2 I/2 inches of valve travel to prevent pump runout during alternate RHR line use with a single pump operating.
: 2. Close MOV-*-750 and MOV-*-751       C (Unit 3),   A (Unit 4) hot leg to RHR.
12.Open MOV-+-872.
: 3. Close MOV-*-744A .and   B RHR   to cold legs.
13.Open MOV-*-863A and MOV-*-863B 14.Verify close HCV-*-758 and Close FCV-*-605 15.Start RHR pump or pumps By not closely monitoring the differential pressure across on RHR pump in a range of 105 to 115 pi sg, RHR pump damage may occur.CAUTION: The position of valves*-748A and 8 is preset as determined by the CCW System flow testing.If the position of these valves is changed, the Technical Department Supervisor shall be notified immediately.
: 4. Verify closed   MOV-*-862A and   B RWST to RHR.
17.Cooldown rate must now be controlled by throttling the component cooling water discharge valves from the RHR heat exchangers, valves*-748A and/or B.Caution must be used so as not to reduce CC flow to a point that CC will generate steam in~RHR HX.CAUTION: 16.-Ensure that the differential pressure across the RHR pump is being maintained at 105 to 115 psig.Throttle the applicable RHR Pump Discharge valve*-754A or*-7548 as required to maintain differential pressure.
: 5. Verify closed   MOV-*-863A and B'HR     rec. and alt. SIS
OFF-NOR L OPERATING PROCEDURE 3208.1, P E 9 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 11/18/86 5.3.6 J If there is a leak in any line, or in the heat exchanger, between t e following valves: A side (B side)heat exchanger inlet valve*-757A (*-757B), heat exchanger outlet valve*-759A (*-7598)and alternate low head SIS MOV-*-863B (MOV-*-863A):
: 6. Close HCV-*-758   RHR HX   Outlet control ~valve.
1.Stop RHR pumps.2.If the failure is in the A side (B side)equipment or lines, close valves*-757A (*-757B),*-759A (*-759B), and MOV-*-8638 (MOV-"-863A) to isolate the equipment and lines.3.If the failure is a RHR HX, close the component cooling water inlet valve*-746A, (*-746B)and outlet valve*-748A (*-7488), MOV-*-749A (MOV-*-749B) on RHR heat exchanger where failure occurred.5.3.7 If there is a leak in the RHR heat exchanger bypass line, between valves*-757 C and D and FCV-*-605.
 
1.Close valves*-757C and D and FCV-*-605.
~ ~ e ~
2.RHR heat exchanger bypass line is now out of service.CAUTION: The position of valves*-748A and B is preset as determined by the CCW System flow testing.If the position of these valves is changed, the Technical Department Supervisor shall be notified immediately.
11/18/86 OFF-NO AL OPERATING PROCEDURE 3208.1,                       E 7 MALFUNCTION OF RESIDUAL HEAT REMOYAL SYSTEM
3.Cooldown rate must now be controlled by throttling the component cooling water discharge valves*-748A and B at the RHR heat exchangers.
: 7. JC1ose   FCV-*-605   RHR HX     bypass.
Caution must be used'o as not to reduce CC f'low to a point that CC will generate steam in RHR HX.NOTE: MOV-*-872 has been set at 2 I/2 inches valve travel to maintain the required differential pressure across the pumps during single pump operation when utilizing the alternate RHR line.The pump discharge valves (*-754A or B)should not require throttling when using the alternate RHR line.If valve throttling during single pump operation is requi red the Technical Department is to be notified to investigate the throttle position of MOV-*-872.4.If FCV-*-605 fails to hold, the alternate RHR line must be used via MOV-*-872 with MOV-*-759A and B (normally locked open)closed.5.3.8 If a sump pump fails in RHR A pump room sump, B pump room sump or heat exchanger room sump, and room is flooding:.
: 8. Close V-*-752A and B,RHR pump suction (locked open).
1.If possible, locate source of leak and stop it.2.Obtain portable sump pump, route its discharge to the waste holdup tank, via nearest floor drain and pump out the flooded area.6.0  
: 9. Close V-*-741A and 8         RHR   rec. (locked open).
: 10. If continued cooldown is required then fully isolate RHR and use charging and letdown to bring pressure up so a RCP can be put in service in accordance with 3/4-0P-041.1, Reactor Coolant Pump.
Then use steam dump to complete cooldown.
NOTE:     When   starting     a   RCP,   it   may   be   necessary   to manually
                            'perate     the PROV's for pressure control                 if they do not respond automatically.             A pressure spike       may result   when starting     a   RCP,     if   a   4T   exists   between     the   steam generators     and primary system temperature.
5.3.3 If there     is a leak in the       C   (Unit 3),     A (Unit 4) loop hot leg line between MOV-*-750 and MOY-*-751.
                                                \
: 1. Shutdown   RHR   pumps.
: 2. Close both MOV-*-750 and MOV-*-751 immediately.
: 3. If   continued cooldown is required, then fully isolate the RHR system and bring RCS pressure to 400 - 450 psig; put one RCP in service according to 3/4-0P-041.1, Reactor Coolant Pump; and use steam dump for cooldown.
NOTE:     When   starting     a RCP,       it   may   be   necessary to manually operate   the   PROV's for       pressure control       if they do not respond automatically.             A pressure spike may result when starting a RCP,           if   a hT exists         between the steam generators and primary system temperature.
5.3.4 If there   is a leak in the RHR pump suction line, pump casing, and/or pump   discharge line, including instrument lines, between valves
              *-752A and *-754A and 861A for A pump and *-7528 and *-7548 and 8618 for 8 pump:
: 1. Stop the   RHR pump   involved.
: 2. Isolate the     pump   and   its suction       and discharge     lines   by   closing V-*752A and     (8), *-861A and         (8),   and V-*754A and     (8).
5.3.5 If there is a leak in the RHR cold leg line between the following valves:     MOV's-*-744A and 8, and HCV-*-758, and FCV-*-605, V-*-734 and -*-741A.
: 1. Shutdown both     RHR pumps.
: 2. Close MOV-*-750 and MOV-*-751             C   (Unit 3),     A (Unit 4} hot leg to RHR.
: 3. Close   MOV-*-744A and         8,   check     to   be   closed   V-*-734     RHR   to refueling   ~cana'I.
 
E
~ I
 
11/18/86 OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 8 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM
: 4.     (Close *-757     C and 0     RHR HX bypass
: 5. Close *-760   RHR   to   CVCS.
: 6. Close *-741A and     B   (locked open)   RHR recirculating line.
CAUTION:         The   position of valves *-748A and B is preset as determined     by the CCW System flow testing.       If the position of these valves is changed, the Technical           .
Department Supervisor shall be notified immediately.
: 7. RHR   system   is now shutdown.       Use   alternate path   if RHR system operation is     still   required For cooldown purposes..
: 8. Close valves *-759A and         B (normally locked open).
: 9. Open MOV's   *-750 and *-751.
: 10. Close valve *-887.         (normally locked approximately     open 30% open)
: 11. Throttle the applicable RHR         Pump Discharge valve *-754A or *-7548 to 95 turns from full open.
I NOTE:     HOY-*-872 has been set at 2         I/2 inches of valve travel to prevent   pump   runout during alternate RHR line use with a single pump operating.
: 12. Open MOV-+-872.
: 13. Open MOV-*-863A and MOV-*-863B
: 14. Verify close   HCV-*-758 and Close FCV-*-605
: 15. Start   RHR pump   or   pumps
: 16.  -
Ensure    that the differential pressure across the RHR pump is being maintained at 105 to 115 psig. Throttle the applicable RHR Pump Discharge valve *-754A or *-7548 as required to maintain differential pressure.
CAUTION:        By not closely monitoring the differential pressure across on RHR pump in a range of 105 to 115 pi sg, RHR pump      damage may  occur.
CAUTION:        The    position of valves *-748A and 8 is preset as determined      by the CCW System flow testing.
position of these valves is changed, the Technical If the Department Supervisor shall be notified immediately.
: 17. Cooldown rate must now be controlled by throttling the component cooling water discharge valves from the RHR heat exchangers, valves *-748A and/or B. Caution must be used so as not to reduce CC flow to a point that CC will generate           steam in ~RHR HX.
 
11/18/86 OFF-NOR      L OPERATING PROCEDURE 3208.1, P      E 9 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 5.3.6 J  If there      is a leak in any line, or in the heat exchanger, between t  e    following valves: A side (B side) heat exchanger inlet valve *-
757A (*-757B), heat exchanger              outlet valve *-759A (*-7598) and alternate low head SIS MOV-*-863B (MOV-*-863A):
: 1. Stop  RHR  pumps.
: 2.     If the failure is in the A side (B side) equipment or lines, close valves *-757A (*-757B), *-759A (*-759B), and MOV-*-8638 (MOV-"-863A) to isolate the equipment and lines.
: 3.     If the failure is a        RHR HX, close the component      cooling water inlet valve *-746A,      (*-746B) and outlet valve *-748A (*-7488),
MOV-*-749A (MOV-*-749B) on RHR heat exchanger where failure occurred.
5.3.If there is       a leak in the RHR heat exchanger        bypass  line, between valves *-757      C  and  D and FCV-*-605.
: 1. Close valves *-757C and      D and FCV-*-605.
: 2. RHR   heat exchanger bypass     line is  now out of service.
CAUTION:         The position of valves *-748A and B is preset as determined   by the CCW System flow testing.
position of these valves is changed, the Technical If the Department Supervisor shall be notified immediately.
: 3.     Cooldown rate must now be controlled by throttling the component cooling water discharge valves *-748A and B at the RHR heat exchangers.     Caution must be used'o as not to reduce CC f'low to a point that CC will generate steam in RHR HX.
NOTE:     MOV-*-872 has been set at 2 I/2 inches valve travel to maintain the required differential pressure across the pumps during single pump operation when utilizing the alternate RHR line. The pump discharge valves (*-754A or B) should not require throttling when using the alternate RHR   line.     If valve throttling during single pump operation is requi red the Technical Department is to be notified to investigate the throttle position of MOV-*-
872.
: 4.     If FCV-*-605 fails to hold, the alternate RHR line must be used via MOV-*-872 with MOV-*-759A and B (normally locked open) closed.
5.3.8   If   a   sump   pump   fails in RHR   A pump room sump,   B pump room sump or heat exchanger room sump, and room is flooding:.
: 1. If possible, locate source of leak and stop             it.
: 2. Obtain portable sump pump, route its discharge to the waste holdup tank, via nearest floor drain and pump out the flooded area.
6.0  


==References:==
==References:==


6.1 Technical Specifications Section~3.4.
6.1   Technical Specifications Section ~3.4.
C~~OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 10 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 11/18/86 6.2 Westin house System Description FPL-200/C/4, Aux.Coolant System, RHR.6.3 FSAR, Figures 6.2-1 and 9.3-2.6.4 3/4-0P-041.1, Reactor Coolant Pump 6.5 JPES-PTP-85-076, Turkey Point Plant Alternate Low Head Safety Injection Line Isolation Valve,*-872, January 29, 1985.7.0 Records Re orts and Notification:
 
7.1 The date, time and section started and the date, time and section completed shall be logged in the Reactor Control Operator (RCO)and the Plant Supervisor-Nuclear (PSN)logbook.Also, any problems encountered while performing the procedure should be logged, i.e;, malfunctioning equipment, delays due to a change in plant conditions, etc.7.2 Completed copies of the below listed section(s) enclosure(s), and/or attachment(s) constitute guality Assurance Records, and therefore, shall be transmitted to Document Control and be retained for a minimum of 5 years in accordance with guality Assurance Record Requirements:
C
None 7.3 Ensure all notifications are made in accordance with the following procedures:
~   ~
7.3.1 Reporting Reportable Events to NRC 7.3.2 Reports Required Technical Specifications and 10 CFR 7.3.3 Notification of Significant Event to~NRC}}
11/18/86 OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 10 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 6.2   Westin house System Description FPL-200/C/4, Aux. Coolant System, RHR.
6.3   FSAR,   Figures 6.2-1 and 9.3-2.
6.4   3/4-0P-041.1, Reactor Coolant     Pump 6.5 JPES-PTP-85-076,     Turkey Point Plant Alternate   Low Head Safety Injection Line Isolation Valve, *-872, January 29, 1985.
7.0 Records   Re orts and Notification:
7.1   The date, time and section started and the date, time and section completed shall be logged in the Reactor Control Operator (RCO) and the Plant Supervisor-Nuclear (PSN) logbook.           Also, any problems encountered while performing the procedure should be logged, i.e;, malfunctioning equipment, delays due to a change in plant conditions, etc.
7.2 Completed     copies of the below listed section(s) enclosure(s),             and/or attachment(s) constitute guality Assurance Records, and therefore, shall be transmitted to Document Control and be retained for a minimum of 5 years in accordance with guality Assurance Record Requirements:
None 7.3 Ensure     all   notifications are   made   in accordance     with the following procedures:
7.3.1     Reporting Reportable Events to   NRC 7.3.2     Reports Required Technical Specifications and 10     CFR 7.3.3     Notification of Significant   Event to ~NRC}}

Latest revision as of 22:41, 3 February 2020

Off-Normal Operating Procedure 3208.1, Malfunction of RHR Sys.
ML17342A911
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/18/1986
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17342A910 List:
References
3208.1, NUDOCS 8709220527
Download: ML17342A911 (13)


Text

FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 OFF-NORMAL OPERATING PROCEDURE 3208.1 NOVEMBER 18 1986

1.0 Title

MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 2.0 A royal and List of Effective Pa es:

2.1 ~Arova1:

and Approved by

~l 1 Plant Manager - Nuclear:

1 1 ll/18/86 1 6 1<<: 86.86 2.2 List of Effective Pa es:

~Pa e Date Pa<ac Date ~a<ac Date ~Pa e Date 1 11/18/86 4 3/28/86 7 11/18/86 10 11/18/86 2 11/18/86 5 11/18/86 8 11/18/86 3 3/28/86 6 11/18/86 9 11/18/86 3.0 Pur ose and Discussion 3.1 ~Por oae:

This procedure provides instructions to follow in the event of an RCS leak from an RHR system component. It also provides instructions for a loss of CCW to the RHR system. If a loss of RHR flow has occured, Procedure 3/4-ONOP-050, Loss of RHR, should be refered to.

3.2 Discussion

3.2.1 The failure or malfunction of one RHR pump under any system condition will not put the system in jeopardy, however, the loss of the second RHR pump or the loss of component cooling water flow to the RHR heat exchangers can affect the ability to remove system decay heat.

3.2.2 Every effort shall be utilized to maintain two trains of RHR available when the system is drained and opened for maintenance.

It is realized that certain maintenance requires the loss of both RHR pumps, under these conditions special controls will be established prior to commencing work that will ensure the equipment ability to be restarted as 'needed for decay heat removal.

RTS 86-1874

/jm/tf PDR ADOCN, asoooaso 050 PDR P

11/18/86 OFF-NO AL OPERATING PROCEDURE 3208.1, GE 2 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 3.2.3 Whenever possible, maintenance on the RHR system should be done when the following conditions exist:

1. The reactor Head is in place, and the steam generator manways are on, or-
2. The reactor refueling cavity is flooded. This will allow for an alternate method of decay heat removal to be utilized.

3.2.4 When equipment available, should malfunctions be placed occurs, in service as alternate required.

equipment, if 3.2.5 MOV's, are constructed such that they can be hand operated when the motor operator fails. Hand operation of these valves can be done as long as it is safe for the personnel operating them, and all interlock provisions are complied with.

3.2.6 Coolant loop redundancy as per Technical Specifications 1.23 and 3.4 shall be maintained.

3.2.7 MOV-*-872 has been set at 2 ifferential pressureQ across the pumps during inches of valve travel to maintain the require single pump operation when utilizing the alternate RHR line. The pump discharge valve (*-754A or B) should not require throttling when using the alternate RHR line. If valve throttling during single pump operation is required the Technical Department is to be notified to investigate the throttle position of MOV-*-872. A differential pressure across the pump must be maintained in accordance with the following formula:

PSID = 107.2 -.039T + 10 PSID

- 0 PSID Where T = RCS temperature 'F from 60' 350'F Normal pump differential pressure should be between 105 to 115 ~psig.

4.0 mtoms

Syyrm 4.1 Any of the following alarms may indicate a leak in or a loss of CCW to the RHR system.

4.1.1 Residual Heat Removal Room A Sump High Level 4.1.2 Residual Heat Removal Room B Sump High Level 4.1.3 Residual Heat Removal Heat Exchanger Room Sump High Level 4.1.4 Residual Heat Exchanger Low Flow

P

~ ~ ~ ~

3/28/86 OFF-NORMAL OPERATING PROCEOURE 3208.1, PAGE 3 MALFUNCTION OF RESIOUAL HEAT REMOVAL SYSTEM 4.1.5 Residual Heat Removal Pumps A CC Water Low Flow 6.2 m FIA*637 4.1.6 Residual Heat Removal Pumps B CC Water Low Flow 6.2 m FIA~638 4.2 Malfunction of motor operated valves can be detected in the control room by observing the operation of the indicating lights.

4.2.1 When valve is closed, Green Light should be on.

4.2.2 When valve is open, Red Light should be on.

4.2.3 Whenever the valve is not fully closed or open, both red and green lights should be on.

NOTE: Lights could be burned out.

4.3 Both A and B RHR pumps are equipped with an alarm that actuates on high

'temperature of the pump seal water leaving the seal water cooler. The temperature indication TA-*-679A and/or B for these alarms is at the individual pump.

4.4 The increased running frequency of sump pumps located in the RHR pump rooms A and B or the heat exchanger room may indicate RCS leakage from an RHR component at one of these locations.

4.5 Increased running frequency of the containment sump pumps may indicate RCS leakage from RHR components inside the containment.

4.6 An abnormal change in the RCS heatup or cooldown rate when no changes have been made in the operation of the RHR system, may indicate a malfunction of an RHR system component or an interruption of, or change in, component cooling water flow to the RHR heat exchangers.

4.7 An abnormal change in the indication of FI-*-605 RHR loop flow indicator, when no operating changes have been made on the system, is an indication of the malfunction of an RHR system component.

4,8 An abnormal variation of the RHR pump discharge temperatures and/or the heat exchanger outlet temperatures recorded on temp. recorder TR-*-604, vertical panel B, when no operating changes have been made on the system, is "an indication of the malfunction of an RHR system component or an interruption

.of, or change in, component cooling water flow to the RHR heat exchangers.

4.9 A high level alarm on the component cooling water surge tank and/or a high activity radiation alarm in the component cooling water system is an indication of a possible RCS leak to the component cooling system which may be from the RHR heat exchangers, or the RHR pump seal water coolers.

Wl V

'I>

h ~

3/28/86 OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 4 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 4.10 RCS leakage from the RHR system to the atmosphere may be detected by; 4.10.1 Plant Vent Radiation Monitor R-14.

4.10.2 Containment Radioactive Gas Monitor and Air Particulate Monitor Rll and R12.

4.10.3 Visual, observation.

4.11 Cavitation of an RHR pump is an indication of either low suction head, or air/steam binding in either the pump or Heat Exchanger.

5.0 Instructions

5.1 Immediate Automatic Action:

5.1.1 RCS leakage to containment from RHR Containment purge supply and exhaust duct valves and pressure relief line valves are closed on actuation of the high containment air particulate monitor alarm or the high radioactive gas monitor alarm due to leakage from the RCS.

5.1.2 RCS leakage to CC. through RHR component.

Component cooling water surge tank vent valve RCV*609 closes on high activity alarm from the component cooling loop radiation monitor R-17A and 8 due to leakage from the RCS.

5.2 Immediate Operator Action:

5.2.1 Upon receiving indication of RCS leak through the RHR system, the operator will immediately take steps to verify that the correct automatic actions occurred as listed in Section 5. 1. If these actions are required, but have not occurred, the operator will take steps to manua11y execute the actions required. J P1ant Supervisor

-~nuclear shall be notified immediateiy.

NOTE: RHR malfunctions may require notification of a significant event to the NRCOC.

.5.2.2 If the indication of the RHR malfunction is such that no automatic actions are required, the operator must evaluate the available information on the condition of the system in order to perform the necessary actions to assure the safety of personnel and equipment.

5.2.3 If TR-*-604 indicates an increasing temperature on the outlet of the RHR heat exchanger, verify the following:

1. RHR flow exists as indicated by FI-*-685.

~ ~ h 11/18/86 OFF-NO L OPERATING PROCEDURE 3208.1, 5 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM

2. Veri ea er f component and cool ing water flow FI-*-6138 ("B" CCW Header).

on FI-*-613A ("A" CCW NOTE: Wi th "A" RHR heat exchanger in servi ce, fl ow on "A" header should be greater than 4,500 gpm.. With "B" RHR heat exchanger in service flow on "B" header should be greater than 9,000 gpm.

3. Verify MOV-*-749A and MOV-*-7498 are open, Vertical Panel B.

CAUTION: The position of valves *-748A and B is preset as determined by the CCW System flow testing. If the position of these valves is changed; the Technical Department Supervisor shall be notified immediately.

Notify the Nuclear Operator to visually verify *-748A and *-7488 heat exchanger outlet butterfly valves, in the pipe and valve

'room, are throttled to the required preset positions *-748A approx 35% and *-7488 approx 38% and RHR heat exchanger, CCW, Inlet Valves *-746A and +-746B open. (Reach Rods)

NOTE: If malfunction exists in the component cooling water system, refer to 3/4-0NOP-030, Loss of Component Cooling Water System.

5.2.4 If an RHR pump exhibits signs of cavitation immediately stop the pump and take the following actions:

Verify proper CCW System Operation per 5.2.3 above.

2 ~ Increase pumps suction head by cycling open, then closed, MOV-872 (RWST to RCS) to increase the RCS inventory 500 gallons. Repeat as necessary.

3. Start the pump and throt tl e the bypass flow around the heat exchangers via FCV-605.

Re-establish normal cooling rates.

5.3 Subsequent Operator Action:

5.3.1 If both MOV-*-744 A and B, RHR to RCS cold legs,,fails to open, an alternate path may be provided as follows:

Close valve *-887 (normally locked approximately 3(5 open)

2. Unit 4 only) - Throttle the applicable RHR Pump Discharge Valve
  • -754A or *-7548 to 95 turns from full open.

NOTE: MOV-*-872 has been set at 2 lp inches of valve travel to prevent pump runout during alternate RHR line use with a single pump operating.

3. Open MOV-*-872 Open MOV-*-863A and MOV-*-8638

~ ~ 'e ~ ~ 11/18/86 OFF-N AL OPERATING PROCEDURE 3208.1, E 6 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM

~Close HCV-*-758 and FCY-*-605 NOTE: MOV-*-872 has been set at 2 1/2 inches valve travel to prevent pump runout during alternate RHR line use with a single pump operating. This should maintain the required differential pressure without throttling the discharge valves. If the discharge valves (*754A or B) are throttled to obtain proper pressure, the Technical.

Department is to be notified to investigate throttle position of MOV-*-872.

6. Ensure that the differential pressure across the RHR- pump is being maintained at 105 to 115 psig. Throttle the applicable RHR Pump Discharge valve *-754A or *-754B as required to maintain differential pressure.

CAUTION: By not closely monitoring the differential pressure across an RHR pump in a range of 105 to 115 psig, RHR pump damage may occur.

CAUTION: The position of valves *-748A and B is preset as determined by the CCW System flow testing.

position of these. valves is changed, the Technical If the Department Supervisor shall be notified immediately.

7. Cooldown rate must now be controlled by throttling the component cooling water outlet valves on the RHR heat exchanger,'valves No.
  • -748A and/or *-7488.

CAUTION: 1) Caution must be used so as not to reduce CC flow to a point that CC will generate steam in RHR HX.

Return the above valves to their original position when MOV-*-744A and B are operable and are required to be put back in service.

2) Maintain a close watch on RWST level in case valve
  • -887 leaks.

5.3.2 If there is a leak in the line between MOV-*-751 and V-*-752 A and B, RHR pump suction valves, 741B and MOV-~-862B, RWST to RHR:

1. Shutdown RHR pumps.
2. Close MOV-*-750 and MOV-*-751 C (Unit 3), A (Unit 4) hot leg to RHR.
3. Close MOV-*-744A .and B RHR to cold legs.
4. Verify closed MOV-*-862A and B RWST to RHR.
5. Verify closed MOV-*-863A and B'HR rec. and alt. SIS
6. Close HCV-*-758 RHR HX Outlet control ~valve.

~ ~ e ~

11/18/86 OFF-NO AL OPERATING PROCEDURE 3208.1, E 7 MALFUNCTION OF RESIDUAL HEAT REMOYAL SYSTEM

7. JC1ose FCV-*-605 RHR HX bypass.
8. Close V-*-752A and B,RHR pump suction (locked open).
9. Close V-*-741A and 8 RHR rec. (locked open).
10. If continued cooldown is required then fully isolate RHR and use charging and letdown to bring pressure up so a RCP can be put in service in accordance with 3/4-0P-041.1, Reactor Coolant Pump.

Then use steam dump to complete cooldown.

NOTE: When starting a RCP, it may be necessary to manually

'perate the PROV's for pressure control if they do not respond automatically. A pressure spike may result when starting a RCP, if a 4T exists between the steam generators and primary system temperature.

5.3.3 If there is a leak in the C (Unit 3), A (Unit 4) loop hot leg line between MOV-*-750 and MOY-*-751.

\

1. Shutdown RHR pumps.
2. Close both MOV-*-750 and MOV-*-751 immediately.
3. If continued cooldown is required, then fully isolate the RHR system and bring RCS pressure to 400 - 450 psig; put one RCP in service according to 3/4-0P-041.1, Reactor Coolant Pump; and use steam dump for cooldown.

NOTE: When starting a RCP, it may be necessary to manually operate the PROV's for pressure control if they do not respond automatically. A pressure spike may result when starting a RCP, if a hT exists between the steam generators and primary system temperature.

5.3.4 If there is a leak in the RHR pump suction line, pump casing, and/or pump discharge line, including instrument lines, between valves

  • -752A and *-754A and 861A for A pump and *-7528 and *-7548 and 8618 for 8 pump:
1. Stop the RHR pump involved.
2. Isolate the pump and its suction and discharge lines by closing V-*752A and (8), *-861A and (8), and V-*754A and (8).

5.3.5 If there is a leak in the RHR cold leg line between the following valves: MOV's-*-744A and 8, and HCV-*-758, and FCV-*-605, V-*-734 and -*-741A.

1. Shutdown both RHR pumps.
2. Close MOV-*-750 and MOV-*-751 C (Unit 3), A (Unit 4} hot leg to RHR.
3. Close MOV-*-744A and 8, check to be closed V-*-734 RHR to refueling ~cana'I.

E

~ I

11/18/86 OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 8 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM

4. (Close *-757 C and 0 RHR HX bypass
5. Close *-760 RHR to CVCS.
6. Close *-741A and B (locked open) RHR recirculating line.

CAUTION: The position of valves *-748A and B is preset as determined by the CCW System flow testing. If the position of these valves is changed, the Technical .

Department Supervisor shall be notified immediately.

7. RHR system is now shutdown. Use alternate path if RHR system operation is still required For cooldown purposes..
8. Close valves *-759A and B (normally locked open).
9. Open MOV's *-750 and *-751.
10. Close valve *-887. (normally locked approximately open 30% open)
11. Throttle the applicable RHR Pump Discharge valve *-754A or *-7548 to 95 turns from full open.

I NOTE: HOY-*-872 has been set at 2 I/2 inches of valve travel to prevent pump runout during alternate RHR line use with a single pump operating.

12. Open MOV-+-872.
13. Open MOV-*-863A and MOV-*-863B
14. Verify close HCV-*-758 and Close FCV-*-605
15. Start RHR pump or pumps
16. -

Ensure that the differential pressure across the RHR pump is being maintained at 105 to 115 psig. Throttle the applicable RHR Pump Discharge valve *-754A or *-7548 as required to maintain differential pressure.

CAUTION: By not closely monitoring the differential pressure across on RHR pump in a range of 105 to 115 pi sg, RHR pump damage may occur.

CAUTION: The position of valves *-748A and 8 is preset as determined by the CCW System flow testing.

position of these valves is changed, the Technical If the Department Supervisor shall be notified immediately.

17. Cooldown rate must now be controlled by throttling the component cooling water discharge valves from the RHR heat exchangers, valves *-748A and/or B. Caution must be used so as not to reduce CC flow to a point that CC will generate steam in ~RHR HX.

11/18/86 OFF-NOR L OPERATING PROCEDURE 3208.1, P E 9 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 5.3.6 J If there is a leak in any line, or in the heat exchanger, between t e following valves: A side (B side) heat exchanger inlet valve *-

757A (*-757B), heat exchanger outlet valve *-759A (*-7598) and alternate low head SIS MOV-*-863B (MOV-*-863A):

1. Stop RHR pumps.
2. If the failure is in the A side (B side) equipment or lines, close valves *-757A (*-757B), *-759A (*-759B), and MOV-*-8638 (MOV-"-863A) to isolate the equipment and lines.
3. If the failure is a RHR HX, close the component cooling water inlet valve *-746A, (*-746B) and outlet valve *-748A (*-7488),

MOV-*-749A (MOV-*-749B) on RHR heat exchanger where failure occurred.

5.3.7 If there is a leak in the RHR heat exchanger bypass line, between valves *-757 C and D and FCV-*-605.

1. Close valves *-757C and D and FCV-*-605.
2. RHR heat exchanger bypass line is now out of service.

CAUTION: The position of valves *-748A and B is preset as determined by the CCW System flow testing.

position of these valves is changed, the Technical If the Department Supervisor shall be notified immediately.

3. Cooldown rate must now be controlled by throttling the component cooling water discharge valves *-748A and B at the RHR heat exchangers. Caution must be used'o as not to reduce CC f'low to a point that CC will generate steam in RHR HX.

NOTE: MOV-*-872 has been set at 2 I/2 inches valve travel to maintain the required differential pressure across the pumps during single pump operation when utilizing the alternate RHR line. The pump discharge valves (*-754A or B) should not require throttling when using the alternate RHR line. If valve throttling during single pump operation is requi red the Technical Department is to be notified to investigate the throttle position of MOV-*-

872.

4. If FCV-*-605 fails to hold, the alternate RHR line must be used via MOV-*-872 with MOV-*-759A and B (normally locked open) closed.

5.3.8 If a sump pump fails in RHR A pump room sump, B pump room sump or heat exchanger room sump, and room is flooding:.

1. If possible, locate source of leak and stop it.
2. Obtain portable sump pump, route its discharge to the waste holdup tank, via nearest floor drain and pump out the flooded area.

6.0

References:

6.1 Technical Specifications Section ~3.4.

C

~ ~

11/18/86 OFF-NORMAL OPERATING PROCEDURE 3208.1, PAGE 10 MALFUNCTION OF RESIDUAL HEAT REMOVAL SYSTEM 6.2 Westin house System Description FPL-200/C/4, Aux. Coolant System, RHR.

6.3 FSAR, Figures 6.2-1 and 9.3-2.

6.4 3/4-0P-041.1, Reactor Coolant Pump 6.5 JPES-PTP-85-076, Turkey Point Plant Alternate Low Head Safety Injection Line Isolation Valve, *-872, January 29, 1985.

7.0 Records Re orts and Notification:

7.1 The date, time and section started and the date, time and section completed shall be logged in the Reactor Control Operator (RCO) and the Plant Supervisor-Nuclear (PSN) logbook. Also, any problems encountered while performing the procedure should be logged, i.e;, malfunctioning equipment, delays due to a change in plant conditions, etc.

7.2 Completed copies of the below listed section(s) enclosure(s), and/or attachment(s) constitute guality Assurance Records, and therefore, shall be transmitted to Document Control and be retained for a minimum of 5 years in accordance with guality Assurance Record Requirements:

None 7.3 Ensure all notifications are made in accordance with the following procedures:

7.3.1 Reporting Reportable Events to NRC 7.3.2 Reports Required Technical Specifications and 10 CFR 7.3.3 Notification of Significant Event to ~NRC