| | issue date = 08/17/1990 | | | issue date = 08/17/1990 |
| | title = Forwards Addl Info in Support of NRC Development of SER for full-term OL for Plant,Including Date of SER Providing Provisional OL to Plant & Summary of Valid Exemptions from 10CFR Regulations,Per Telcon | | | title = Forwards Addl Info in Support of NRC Development of SER for full-term OL for Plant,Including Date of SER Providing Provisional OL to Plant & Summary of Valid Exemptions from 10CFR Regulations,Per Telcon |
| | author name = SLADE G B | | | author name = Slade G |
| | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), |
| | addressee name = | | | addressee name = |
Line 20: |
Line 20: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:. ' consumers Power POWERINli MICHlliAN'S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memqrial Highway, Covert, Ml 49043 August 17, 1990 Nuclear Regulatory Commission Docwnent Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES ADDITIONAL INFORMATION | | {{#Wiki_filter:.' |
| -FULL TERM OPERATING LICENSE G BSlade General Manager During a telephone call between the NRC Project Manager and Consumers Power Company staff, the NRC requested additional information to assist the NRC staff in developing the Safety Evaluation Report (SER) for the Full Term Operating License for the Palisades Plant. The additional information requested as follows: 1. The date of the SER providing the provisional operating license to the Palisades Plant*. 2. A summary of exemptions from lOCFR that are still valid. 3. A verification that all TM! (NUREG-0737) items are complete. | | consumers Power G BSlade General Manager POWERINli MICHlliAN'S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memqrial Highway, Covert, Ml 49043 August 17, 1990 Nuclear Regulatory Commission Docwnent Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES ADDITIONAL INFORMATION - FULL TERM OPERATING LICENSE During a telephone call between the NRC Project Manager and Consumers Power Company staff, the NRC requested additional information to assist the NRC staff in developing the Safety Evaluation Report (SER) for the Full Term Operating License for the Palisades Plant. The additional information requested ~as as follows: |
| | : 1. The date of the SER providing the provisional operating license to the Palisades Plant*. |
| | : 2. A summary of exemptions from 10CFR that are still valid. |
| | : 3. A verification that all TM! (NUREG-0737) items are complete. |
| : 4. A list of license conditions that are still applicable. | | : 4. A list of license conditions that are still applicable. |
| : 5. Submittal dates of letters between Power Company and the NRG regarding the Palisades spent fuel po,ol re-racking project. The following material supplies the requested information. | | : 5. Submittal dates of letters between Con~umers Power Company and the NRG regarding the Palisades spent fuel po,ol re-racking project. |
| Also, where noted, copies of the relevant docketed correspondence between the NRC and CPCo are attached. | | The following material supplies the requested information. Also, where noted, copies of the relevant docketed correspondence between the NRC and CPCo are attached. |
| : 1. The SER providing the initial Interim Provisional Operating License for the Palisades Plant was issued by the Atomic Energy Commission on March 24, 1971. This license permitted initial fuel loading and low power | | : 1. The SER providing the initial Interim Provisional Operating License for the Palisades Plant was issued by the Atomic Energy Commission on March 24, 1971. This license permitted initial fuel loading and low power |
| ! | | ,..--*~o<?,:::::240 ! G=~: o;;:ioo:::: 17 |
| o;;:ioo:::: 1 7 ..... , Q Q \ | | ~DR ADU~K 05000255 |
| 05000255 PDC \ \ \_ A CM5 */VERGY COMPANY
| | . . ., ~ QQ \ |
| . ' testing of the Palisades Plant. A copy of that letter is enclosed as Attachment A. 2. Our review has identified one exemption from 10CFR50 Appendix J, four approved exemptions from the requirements of 10CFR50 Appendix R, and one schedular exemption request to Appendix R that is still pending NRC approval.
| | PDC \ \ \_ |
| This review does not include exemptions that were granted as part of a Technical Specification change request, nor does it list one time or schedular exemptions that have been closed. A. Exemption from 10CFR50 Appendix J -SER dated December 6, 1989 -This exemption-provides partial relief-from the requirement-to test the containment airlocks at or above the calculated design basis accident peak containment pressure and permits the substitution of a between-the-seals leak test at a reduced pressure. | | A CM5 /VERGY COMPANY |
| B. Exemptions from 10CRF50 Appendix R -1. Section III.G.3 -Engineered Safeguards Panel Room. Exemption to requirement for fire detection and fixed fire suppression. | | |
| Original CPCo submittal dated July 25, 1983 Revised July 16, 1984 Approved by NRC SER dated July 12, 1985 2. Section III.G.3 Corridor between Charging Pump Room and Switchgear Room lC -Exemption to requirement for fire detection and fixed fire suppression. | | testing of the Palisades Plant. A copy of that letter is enclosed as Attachment A. |
| Original CPCo submittal July 25, 1983 Revised July 16, 1984 Approved by.NRG SER dated July 12, 1985 3. Section III.G.3 -Control Room -Exemption to requirement for fire detection and fixed fire suppression. | | : 2. Our review has identified one exemption from 10CFR50 Appendix J, four approved exemptions from the requirements of 10CFR50 Appendix R, and one schedular exemption request to Appendix R that is still pending NRC approval. |
| Original CPCo submittal July 1, 1982 Approved by NRC SER dated February 8, 1983 4. Section III.G.2 -Cable Separation Inside Containment | | This review does not include exemptions that were granted as part of a Technical Specification change request, nor does it list one time or schedular exemptions that have been closed. |
| -Exemption to the requirement concerning intervening combustibles installed between redundant instrumentation cable trays. Original CPCo submittal July 20, 1984 Additional information submitted December 28, 1984 Approved by NRC SER dated July 23, 1985
| | A. Exemption from 10CFR50 Appendix J - SER dated December 6, 1989 - |
| : 5. Original CPCo submittal March 13, 1990 Section III.G.2 -Cable Separation In Containment Air Room Additional information submitted August 8, 1990 (pending NRC approval) | | This exemption-provides partial relief-from the requirement-to test the containment airlocks at or above the calculated design basis accident peak containment pressure and permits the substitution of a between-the-seals leak test at a reduced pressure. |
| The relevant documents are contained in Attachment B to this letter. 3. By a letter dated April 14, 1989, the NRC requested Consumers Power Company to review the status of all TM! (NUREG-0737) items. Consumers Power Company replied by letter dated April 18, 1989 that all TMI action plan items for the Palisades Plant were closed with the exception of item II.D.1.3, "Block Valve Testing" and item multi-plant action number ___ MPA-:S083, | | B. Exemptions from 10CRF50 Appendix R - |
| _Specifications Covered-by Generic Letten 83-26-& 83-37". Item II.D.1.3 has been closed by Consumers Power Company during the Fall 1989 maintenance outage by the installation of new PORV block valves. Item.MPA-B083 is covered in Consumers Power Company's Restructured Technical Specification program. The Restructured Technical Specifications are currently expected to be submitted in early 1991 pending completion of NRG review of the Restructured Standard Technical Specifications. | | : 1. Section III.G.3 - Engineered Safeguards Panel Room. |
| The relevant documents are contained in Attachment C to this letter. 4. The current Palisades Provisional Operating License contains seven Orders from the Commission that modify or establish conditions to the license. It is Consumers Power Company's opinion that the requirements contained in these Orders have been completed and that all of these Orders should be removed from the Full Term Operating License. The date of each of the Orders, their subject, and the dates of the documents that confirm the completion of the requirements contained in the Order are listed below. A. Order dated August 29, 1980 (Revised September 19, 1980) | | Exemption to requirement for fire detection and fixed fire suppression. |
| | Original CPCo submittal dated July 25, 1983 Revised July 16, 1984 Approved by NRC SER dated July 12, 1985 |
| | : 2. Section III.G.3 Corridor between Charging Pump Room and Switchgear Room lC - |
| | Exemption to requirement for fire detection and fixed fire suppression. |
| | Original CPCo submittal July 25, 1983 Revised July 16, 1984 Approved by.NRG SER dated July 12, 1985 |
| | : 3. Section III.G.3 - Control Room - |
| | Exemption to requirement for fire detection and fixed fire suppression. |
| | Original CPCo submittal July 1, 1982 Approved by NRC SER dated February 8, 1983 |
| | : 4. Section III.G.2 - Cable Separation Inside Containment - |
| | Exemption to the requirement concerning intervening combustibles installed between redundant instrumentation cable trays. |
| | Original CPCo submittal July 20, 1984 Additional information submitted December 28, 1984 Approved by NRC SER dated July 23, 1985 |
| | : 5. Original CPCo submittal March 13, 1990 Section III.G.2 - Cable Separation In Containment Air Room Additional information submitted August 8, 1990 (pending NRC approval) |
| | The relevant documents are contained in Attachment B to this letter. |
| | : 3. By a letter dated April 14, 1989, the NRC requested Consumers Power Company to review the status of all TM! (NUREG-0737) items. Consumers Power Company replied by letter dated April 18, 1989 that all TMI action plan items for the Palisades Plant were closed with the exception of item II.D.1.3, "Block Valve Testing" and item multi-plant action number |
| | ___ MPA-:S083, --~Technical _Specifications Covered-by Generic Letten 83 & 83-37". Item II.D.1.3 has been closed by Consumers Power Company during the Fall 1989 maintenance outage by the installation of new PORV block valves. Item.MPA-B083 is covered in Consumers Power Company's Restructured Technical Specification program. The Restructured Technical Specifications are currently expected to be submitted in early 1991 pending completion of NRG review of the Restructured Standard Technical Specifications. |
| | The relevant documents are contained in Attachment C to this letter. |
| | : 4. The current Palisades Provisional Operating License contains seven Orders from the Commission that modify or establish conditions to the license. It is Consumers Power Company's opinion that the requirements contained in these Orders have been completed and that all of these Orders should be removed from the Full Term Operating License. |
| | The date of each of the Orders, their subject, and the dates of the documents that confirm the completion of the requirements contained in the Order are listed below. |
| | A. Order dated August 29, 1980 (Revised September 19, 1980) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Qualification of Electrical Equipment (EEQ). This Order required that " ... Information which fully and completely responds to the staff's request as specified in NRC's letters dated March 6, 1980, and March 28, 1980, shall be submitted to the Director, Division of Licensing by the Licensee not later than November 1, 1980. Closure Documents: | | Qualification of Electrical Equipment (EEQ). This Order required that " ... Information which fully and completely responds to the staff's request as specified in NRC's letters dated March 6, 1980, and March 28, 1980, shall be submitted to the Director, Division of Licensing by the Licensee not later than November 1, 1980. |
| Draft Technical Evaluation Report dated June 19, 1980 SER dated February 10, 1981 Technical Evaluation Report dated June 1, 1981 SER dated April 25, 1983 Final SER dated January 31, 1985 B. Order dated October 24, 1980 | | Closure Documents: |
| | Draft Technical Evaluation Report dated June 19, 1980 SER dated February 10, 1981 Technical Evaluation Report dated June 1, 1981 SER dated April 25, 1983 Final SER dated January 31, 1985 B. Order dated October 24, 1980 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Qualification of Electrical Equipment. | | Qualification of Electrical Equipment. This Order required that a central file location be established for the maintenance of all equipment qualification !ecords. |
| This Order required that a central file location be established for the maintenance of all equipment qualification | | |
| !ecords. | | Closure Documents: |
| '* Closure Documents:
| | See Item A in this section. |
| See Item A in this section. C. Order Dated March 25, 1983 | | C. Order Dated March 25, 1983 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Licensee Actions to Upgrade Facility Performance, Partial Rescission of March 9, 1981 Order. This order removed all arising from the March 9, 1981 Order with the exception of the limitations imposed on operator work hours. Closure Document: | | Licensee Actions to Upgrade Facility Performance, Partial Rescission of March 9, 1981 Order. This order removed all requireme~ts arising from the March 9, 1981 Order with the exception of the limitations imposed on operator work hours. |
| Amendment No. 108 to POL No. DPR-20 dated October 21, 1987. D. Order dated April 20, 1981 | | Closure Document: |
| | Amendment No. 108 to POL No. DPR-20 dated October 21, 1987. |
| | D. Order dated April 20, 1981 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Implement Technical Specifications which require periodic surveillance over the life of the plant and which specify limiting conditions of operation for PCS pressure isolation valves. Closure Document: | | Implement Technical Specifications which require periodic surveillance over the life of the plant and which specify limiting conditions of operation for PCS pressure isolation valves. |
| Palisades Technical Specifications pages 3-30 and 4-17 E. Order Dated March 14, 1983 | | Closure Document: |
| | Palisades Technical Specifications pages 3-30 and 4-17 E. Order Dated March 14, 1983 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| NUREG-0737 Requirements (Generic Letter 82-10). This Order required that Consumers Power Company implement and maintain the items described in the attachment to the Order in the manner described in.previous submittals Closure Document: | | NUREG-0737 Requirements (Generic Letter 82-10). This Order required that Consumers Power Company implement and maintain the items described in the attachment to the Order in the manner described in.previous submittals Closure Document: |
| See Item 3 above F. Order Dated J.une 12, 1984 | | See Item 3 above F. Order Dated J.une 12, 1984 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Confirming Commitments on Emergency Response Capability (Generic Letter 82-33). This Order revised the dates by which specific items from NUREG-0737 were to be completed by Consumers Power Company. Closure Document: | | Confirming Commitments on Emergency Response Capability (Generic Letter 82-33). This Order revised the dates by which specific items from NUREG-0737 were to be completed by Consumers Power Company. |
| See Item 3 above G. Order Dated July 1, 1985 | | Closure Document: |
| | See Item 3 above G. Order Dated July 1, 1985 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Modifying .License to Confirm Additional Commitments on Emergency Response Capability (Supplement 1 to NUREG-0737). | | Modifying .License to Confirm Additional Commitments on Emergency Response Capability (Supplement 1 to NUREG-0737). This Order provided completion schedules for: 1) Safety Parameter Display System, 2) Detailed Control Room Design Review, and 3) Upgrade Emergency Operating Procedures. |
| This Order provided completion schedules for: 1) Safety Parameter Display System, 2) Detailed Control Room Design Review, and 3) Upgrade Emergency Operating Procedures. | |
| Closure Document: | | Closure Document: |
| See Item 3 above 5. The NRC requested the submittal dates of all letters regarding the re-racking of the Palisades Spent Fuel Pool. Those dates and the titles of the submittals are listed below. Copies of these documents are contained in Attachment D to this letter. | | See Item 3 above |
| . . I 1. February 20, 1986 Technical Specification Change Request Expansion of the Spent Fuel Pool Storage Capacity 2. April 16, 1986 -Expansion of the Spent Fuel Pool Storage Capacity -Supplemental Information
| | : 5. The NRC requested the submittal dates of all letters regarding the re-racking of the Palisades Spent Fuel Pool. Those dates and the titles of the submittals are listed below. Copies of these documents are contained in Attachment D to this letter. |
| : 3. April 24, 1986 -Expansion of the Spent Fuel Pool Storage Capacity -Supplemental Information | | |
| : 4. April 25, 1986 -Expansion of the Spent Fuel Storage Capacity at Palisades Plant (Request for Additional Information) | | . I |
| : 5. July 24, 1986 -Expansion of the Spent Fuel Pool Storage Capacity -Response to Request for Additional Information | | : 1. February 20, 1986 Technical Specification Change Request Expansion of the Spent Fuel Pool Storage Capacity |
| : 6. December 19, 1986 -Expansion of Spent Fuel Pool Storage Capacity -Technical Specification Change Request -Additional Information | | : 2. April 16, 1986 - Expansion of the Spent Fuel Pool Storage Capacity - |
| : 7. October 16, 1986 -Expansion of Spent Fuel Pool Storage Capacity -Technical Specification Change Request -Revision 1 8. April 23, 1987 -Expansion of the Spent Fuel Pool Storage Capacity -Technical Specifications Change Request -Supplemental Information | | Supplemental Information |
| : 9. July 24, 1987 -Amendment No. 105. Authorized CPCo to increase the storage capacity of the spent fuel pool from 798 to 892 fuel assemblies 4A Gerald B Slade General Manager CC Administrator, Region III, USNRC NRG Resident Inspector | | : 3. April 24, 1986 - Expansion of the Spent Fuel Pool Storage Capacity - |
| -Palisades}} | | Supplemental Information |
| | : 4. April 25, 1986 - Expansion of the Spent Fuel Storage Capacity at Palisades Plant (Request for Additional Information) |
| | : 5. July 24, 1986 - Expansion of the Spent Fuel Pool Storage Capacity - |
| | Response to Request for Additional Information |
| | : 6. December 19, 1986 - Expansion of Spent Fuel Pool Storage Capacity - |
| | Technical Specification Change Request - Additional Information |
| | : 7. October 16, 1986 - Expansion of Spent Fuel Pool Storage Capacity - |
| | Technical Specification Change Request - Revision 1 |
| | : 8. April 23, 1987 - Expansion of the Spent Fuel Pool Storage Capacity - |
| | Technical Specifications Change Request - Supplemental Information |
| | : 9. July 24, 1987 - Amendment No. 105. Authorized CPCo to increase the storage capacity of the spent fuel pool from 798 to 892 fuel assemblies 4A Gerald B Slade General Manager CC Administrator, Region III, USNRC NRG Resident Inspector - Palisades}} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML18066A4051999-02-10010 February 1999 Requests Copy of Consumers Energy (Palisades) Formal Response to RAI Dtd 990512 (USI A-46) ML18066A3921999-01-29029 January 1999 Forwards Licensee Interpretation of TS Requirements for Performance of SRs as Applied to Instrumentation Channel Calibr.Ltr Established No New Commitments ML18066A3891999-01-28028 January 1999 Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML18057A4811990-09-17017 September 1990 Confirms 900718 Telcon Notification Re Westinghouse Agreement to Join Utils as Equity Investor in Plant ML18057A4551990-09-0606 September 1990 Forwards Proprietary Info Re Dept of Labor Decision on Discharge of Former Employee of Util,Per NRC 900809 Request. No 10CFR50.7 Violation Occurred Since Job Performance Was Reason for Discharge.Encl Withheld (Ref 10CFR2.790(a)(6)) ML18057A4521990-09-0404 September 1990 Submits Addl Info Re Circuit & Raceway Schedule Enhancement Project,Per Insp Rept 50-255/90-10.Electrical Cable Separation & Channelization Anomalies Identified During Review of Physical Raceway Installations Will Be Evaluated IR 05000255/19900101990-09-0404 September 1990 Submits Addl Info Re Circuit & Raceway Schedule Enhancement Project,Per Insp Rept 50-255/90-10.Electrical Cable Separation & Channelization Anomalies Identified During Review of Physical Raceway Installations Will Be Evaluated ML18057A4371990-08-31031 August 1990 Forwards Analysis Concluding That Plant Reactor Beltline Matl Upper Shelf Energy Will Remain Greater than 50ft-lbs Until Yr 2032,per 900716 Commitment ML18057A4381990-08-31031 August 1990 Forwards Info Re Contamination of South Radwaste Area,Per 10CFR20.302,in Response to NRC 900112 Request.Approval Requested to Dispose of Low Level Radwaste in Place ML20059E0001990-08-29029 August 1990 Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1990 ML18057A4201990-08-24024 August 1990 Forwards Revised Application for Amend to License DPR-20, Changing Tech Specs Re Incore Analysis Program.Request Revised Per NRC Comments During 900709 Meeting ML18057A4021990-08-22022 August 1990 Forwards Missing Pages from Decommissioning Funding Rept, Consisting of Pages 25 & 26 of Attachment a to Exhibit E ML18057A4241990-08-21021 August 1990 Forwards Application for Amend to License DPR-20,changing Tech Spec 4.5.1 Re Statement on Integrated Leak Rate Test ML18057A4071990-08-21021 August 1990 Forwards Tech Specs Change Request to License DPR-20,to Remove Redundant Requirements & Change Basis Statements No Longer Applicable ML18057A4121990-08-21021 August 1990 Forwards Application for Amend to License DPR-20,changing Tech Specs to Revise Wording for Reactor Protective Sys Trip Setting Limits for Steam Generator Low Water Level ML18057A4181990-08-21021 August 1990 Forwards Description of Changes Being Made to Plant Site Emergency Plan & Emergency Plan Changes.Change Allows Reduction in Shift Staffing During Cold Shutdown for Stated Staff ML18057A3911990-08-17017 August 1990 Forwards Replacement Pages,To Palisades Second 10-Yr Interval Inservice Insp Program. ML18057A3851990-08-17017 August 1990 Forwards Addl Info in Support of NRC Development of SER for full-term OL for Plant,Including Date of SER Providing Provisional OL to Plant & Summary of Valid Exemptions from 10CFR Regulations,Per Telcon ML18057A3841990-08-17017 August 1990 Provides Addl Info Re Transfer of Plant Ownership to Palisades Generating Co,Per NRC 900725 Ltr ML18057A3821990-08-14014 August 1990 Requests That Bechtel-KWU Rept 128901/MJS, Full Flow Testing of Motor-Operated Valve MO-1042A, Be Withheld (Ref 10CFR2.790(b)(1)) ML18057A3721990-08-0808 August 1990 Forwards Addl Info Re Util Request for Exemption from Separation Criteria of 10CFR50,App R,Section III.G.2 Re Containment Air Room ML20055J1421990-07-26026 July 1990 Responds to Commitment Oversight Issue Resulting from Insp Rept 50-255/90-08.Commitment Mgt Seminar Training Will Be Complete Prior to 901001 ML18057A3561990-07-26026 July 1990 Forwards Certification of Financial Assurance for Decommissioning ML18057A3411990-07-18018 July 1990 Forwards Revised Proposed Tech Spec Page 6-3,now Designated as Page 6-1b,adding Section 6.3.4,now Designated as Section 6.3.5 to Remove Organization Charts,Per Generic Ltr 88-06 ML18057A3381990-07-16016 July 1990 Advises That Util Does Not Foresee Need to Rely on Section V.C of App G to Remain in Compliance W/Upper Shelf Energy (Use) Requirements Re Use of Matl in Reactor Beltline ML18057A3281990-07-13013 July 1990 Responds to Request for Addl Info Re Second 10-yr Interval Insp Program,Per 900418 Telcon.Util 900329 Response Revised to Reflect That Certain Components in Class 2 Sys Should Not Be Exempted,Per IWC-1220 of 1974 ASME Code Section XI ML18057A3191990-07-0909 July 1990 Forwards Performance Indicator Trend Graphs for Jan 1989 - May 1990 ML18057A3201990-07-0606 July 1990 Discusses Reassessment of Control Room Temp Following Station Blackout Event.Results of Analysis Indicate That Control Room Temp Will Remain Below 112 F for 4 H After Onset of Blackout ML18057A3171990-07-0303 July 1990 Provides Summary of Upgrades Made to Plant Electrical Distribution Sys,Per 870714 Loss of Offsite Power Event When Inadvertent Actuation of Water Deluge Spray Sys for 1-2 Startup Transformer Resulted in Bus to Ground Fault ML20058K3771990-07-0202 July 1990 Forwards Rev 26 to Security Plan.Rev Withheld (Ref 10CFR73.21(c)) ML18057A3111990-06-25025 June 1990 Forwards Endorsements 116 & 117 to Nelia Policy NF-179 & Endorsements 102 & 103 to Maelu Policy MF-50 ML18057A3101990-06-25025 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements on Corrective Actions. ML18057A3031990-06-22022 June 1990 Provides Addl Info Re Environ Qualification of Instrument Circuit Associated W/Steam Generator Pressure Channel PT-0752D,per Insp Rept 50-255/90-05.Circuits Spliced Directly to Pigtail from Electrical Penetration Connector ML18057A3001990-06-21021 June 1990 Concurs W/Nrc Change in Terminology & Submits Revised Proposed Section 4.14 of Tech Specs ML18057A2771990-06-15015 June 1990 Forwards Corrected NRC Form 474 Re Simulation Facility Certification,Indicating Exceptions to Ansi/Ans 3.5 ML18057A2901990-06-13013 June 1990 Forwards Application for Amend to License DPR-20,revising Tech Spec 3.3.1.b Re Safety Injection Tank Min Level ML18057A2941990-06-12012 June 1990 Advises That Submittal of Second Interval Inservice Insp Program Delayed from 900615 to 900715,per 900418 Telcon ML18057A2711990-06-11011 June 1990 Requests Temporary Waiver of Compliance from Tech Spec 3.1.1i in Order to Maintain Plant in Hot Shutdown While Repair Made to Pressurizer Heater Power Supply.Request Based on 900608 Failure of Heater Transformer 15 ML18057A2641990-06-11011 June 1990 Provides Response to NRC Requalification Exam Rept Dtd 900410 on NRC Concerns Re Facility & Training Ctr Staffing. Adequate Staffing Will Be Maintained to Ensure Operator Requalification Program Successful ML18057A2591990-06-11011 June 1990 Forwards Palisades Simulator Certification Submittal. ML18057A2631990-06-10010 June 1990 Requests Temporary Waiver of Compliance from Tech Spec 3.1.1i to Enable Plant to Be Maintained in Hot Shutdown While Repair Made to Pressurizer Heater Power Supply.Waiver Requested for 900611-18 ML18057A2571990-06-0808 June 1990 Responds to NRC 900509 Ltr Re Violations Noted in Insp Rept 50-255/90-12.Corrective Actions:Continuing Training Program Will Be Developed for Supervisors That Will Discuss Fire Protection Program Implementation Topics ML20043D0601990-06-0404 June 1990 Forwards Rev 25 to Security Plan,Including Changes to Security Plan Drawings to Clarify Protected Area Boundary within Plant Security Bldg & Vital Area Boundaries in Other Specific Vital Areas of Plant.Rev Withheld (Ref 10CFR73.21) ML18057A2581990-06-0101 June 1990 Forwards Revised Response to Violations Noted in Insp Rept 50-255/89-26.Concurs That Tests Performed Using Instrumented Insp Technique During 1988 Refueling Outage Considered Invalid ML18057A2561990-05-31031 May 1990 Advises That No NPDES Notifications Required Nor Any Repts of Oil or Salt Occurred During Nov 1989 - Apr 1990 ML18057A2541990-05-30030 May 1990 Forwards Response to Technical Evaluation Rept EGG-NTA-8333 Which Evaluated Plant Compliance w/NUREG-0737,Item II.D.1 & Requested Addl Info Re New PORVs & Block Valves No Later than Jan 1990 ML18057A2511990-05-30030 May 1990 Forwards Final Response to Concerns Re Porv/Block Valve Mod, Per 900308 Meeting.Bechtel Technical Rept Withheld ML18057A2501990-05-29029 May 1990 Forwards Investigation Rept Re Unsatisfactory Performance Testing of Fitness for Duty Program Blind Performance Test Samples ML18057A2411990-05-24024 May 1990 Forwards Revised Application to Amend License DPR-20, Consisting of Revised Attachments 1 & 5 to 890227 Amend Request,Reflecting Transfer of Plant Ownership ML18057A2311990-05-17017 May 1990 Forwards Analysis of Reactor Pressure Vessel Fast Neutron Fluence & PTS Ref Temps for Palisades Nuclear Plant. Rept Concludes That PTS Screening Criteria Will Be Exceeded at Axial Welds in Sept 2001 as Opposed to Mar 2002 ML18054B5861990-05-0707 May 1990 Forwards Monthly Trend Graph Rept for Jan 1989 - Mar 1990 Covering Safety Status Performance Indicators for HPSI, Auxiliary Feedwater,Emergency Ac Power,Lpsi,Containment Spray & Svc Water Sys ML18054B5801990-04-30030 April 1990 Responds to Request for Addl Info on Proposed Administrative Changes to Tech Spec Section 3.0.4,per Generic Ltr 87-09. Licensee Will Implement Program to Assure Appropriate Level of Mgt Approval Required When Operating Conditions Changed ML18054B5741990-04-25025 April 1990 Requests That Correspondence Re 890227 Application for Amend to License DPR-20 to Permit Transfer of Ownership of Plant Be Sent to Listed Address 1990-09-06
[Table view] |
Text
.'
consumers Power G BSlade General Manager POWERINli MICHlliAN'S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memqrial Highway, Covert, Ml 49043 August 17, 1990 Nuclear Regulatory Commission Docwnent Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES ADDITIONAL INFORMATION - FULL TERM OPERATING LICENSE During a telephone call between the NRC Project Manager and Consumers Power Company staff, the NRC requested additional information to assist the NRC staff in developing the Safety Evaluation Report (SER) for the Full Term Operating License for the Palisades Plant. The additional information requested ~as as follows:
- 1. The date of the SER providing the provisional operating license to the Palisades Plant*.
- 2. A summary of exemptions from 10CFR that are still valid.
- 3. A verification that all TM! (NUREG-0737) items are complete.
- 4. A list of license conditions that are still applicable.
- 5. Submittal dates of letters between Con~umers Power Company and the NRG regarding the Palisades spent fuel po,ol re-racking project.
The following material supplies the requested information. Also, where noted, copies of the relevant docketed correspondence between the NRC and CPCo are attached.
- 1. The SER providing the initial Interim Provisional Operating License for the Palisades Plant was issued by the Atomic Energy Commission on March 24, 1971. This license permitted initial fuel loading and low power
,..--*~o<?,:::::240 ! G=~: o;;:ioo:::: 17
~DR ADU~K 05000255
. . ., ~ QQ \
PDC \ \ \_
A CM5 /VERGY COMPANY
testing of the Palisades Plant. A copy of that letter is enclosed as Attachment A.
- 2. Our review has identified one exemption from 10CFR50 Appendix J, four approved exemptions from the requirements of 10CFR50 Appendix R, and one schedular exemption request to Appendix R that is still pending NRC approval.
This review does not include exemptions that were granted as part of a Technical Specification change request, nor does it list one time or schedular exemptions that have been closed.
A. Exemption from 10CFR50 Appendix J - SER dated December 6, 1989 -
This exemption-provides partial relief-from the requirement-to test the containment airlocks at or above the calculated design basis accident peak containment pressure and permits the substitution of a between-the-seals leak test at a reduced pressure.
B. Exemptions from 10CRF50 Appendix R -
- 1.Section III.G.3 - Engineered Safeguards Panel Room.
Exemption to requirement for fire detection and fixed fire suppression.
Original CPCo submittal dated July 25, 1983 Revised July 16, 1984 Approved by NRC SER dated July 12, 1985
- 2.Section III.G.3 Corridor between Charging Pump Room and Switchgear Room lC -
Exemption to requirement for fire detection and fixed fire suppression.
Original CPCo submittal July 25, 1983 Revised July 16, 1984 Approved by.NRG SER dated July 12, 1985
- 3.Section III.G.3 - Control Room -
Exemption to requirement for fire detection and fixed fire suppression.
Original CPCo submittal July 1, 1982 Approved by NRC SER dated February 8, 1983
- 4.Section III.G.2 - Cable Separation Inside Containment -
Exemption to the requirement concerning intervening combustibles installed between redundant instrumentation cable trays.
Original CPCo submittal July 20, 1984 Additional information submitted December 28, 1984 Approved by NRC SER dated July 23, 1985
- 5. Original CPCo submittal March 13, 1990 Section III.G.2 - Cable Separation In Containment Air Room Additional information submitted August 8, 1990 (pending NRC approval)
The relevant documents are contained in Attachment B to this letter.
- 3. By a letter dated April 14, 1989, the NRC requested Consumers Power Company to review the status of all TM! (NUREG-0737) items. Consumers Power Company replied by letter dated April 18, 1989 that all TMI action plan items for the Palisades Plant were closed with the exception of item II.D.1.3, "Block Valve Testing" and item multi-plant action number
___ MPA-:S083, --~Technical _Specifications Covered-by Generic Letten 83 & 83-37". Item II.D.1.3 has been closed by Consumers Power Company during the Fall 1989 maintenance outage by the installation of new PORV block valves. Item.MPA-B083 is covered in Consumers Power Company's Restructured Technical Specification program. The Restructured Technical Specifications are currently expected to be submitted in early 1991 pending completion of NRG review of the Restructured Standard Technical Specifications.
The relevant documents are contained in Attachment C to this letter.
- 4. The current Palisades Provisional Operating License contains seven Orders from the Commission that modify or establish conditions to the license. It is Consumers Power Company's opinion that the requirements contained in these Orders have been completed and that all of these Orders should be removed from the Full Term Operating License.
The date of each of the Orders, their subject, and the dates of the documents that confirm the completion of the requirements contained in the Order are listed below.
A. Order dated August 29, 1980 (Revised September 19, 1980)
Subject:
Qualification of Electrical Equipment (EEQ). This Order required that " ... Information which fully and completely responds to the staff's request as specified in NRC's letters dated March 6, 1980, and March 28, 1980, shall be submitted to the Director, Division of Licensing by the Licensee not later than November 1, 1980.
Closure Documents:
Draft Technical Evaluation Report dated June 19, 1980 SER dated February 10, 1981 Technical Evaluation Report dated June 1, 1981 SER dated April 25, 1983 Final SER dated January 31, 1985 B. Order dated October 24, 1980
Subject:
Qualification of Electrical Equipment. This Order required that a central file location be established for the maintenance of all equipment qualification !ecords.
Closure Documents:
See Item A in this section.
C. Order Dated March 25, 1983
Subject:
Licensee Actions to Upgrade Facility Performance, Partial Rescission of March 9, 1981 Order. This order removed all requireme~ts arising from the March 9, 1981 Order with the exception of the limitations imposed on operator work hours.
Closure Document:
Amendment No. 108 to POL No. DPR-20 dated October 21, 1987.
D. Order dated April 20, 1981
Subject:
Implement Technical Specifications which require periodic surveillance over the life of the plant and which specify limiting conditions of operation for PCS pressure isolation valves.
Closure Document:
Palisades Technical Specifications pages 3-30 and 4-17 E. Order Dated March 14, 1983
Subject:
NUREG-0737 Requirements (Generic Letter 82-10). This Order required that Consumers Power Company implement and maintain the items described in the attachment to the Order in the manner described in.previous submittals Closure Document:
See Item 3 above F. Order Dated J.une 12, 1984
Subject:
Confirming Commitments on Emergency Response Capability (Generic Letter 82-33). This Order revised the dates by which specific items from NUREG-0737 were to be completed by Consumers Power Company.
Closure Document:
See Item 3 above G. Order Dated July 1, 1985
Subject:
Modifying .License to Confirm Additional Commitments on Emergency Response Capability (Supplement 1 to NUREG-0737). This Order provided completion schedules for: 1) Safety Parameter Display System, 2) Detailed Control Room Design Review, and 3) Upgrade Emergency Operating Procedures.
Closure Document:
See Item 3 above
- 5. The NRC requested the submittal dates of all letters regarding the re-racking of the Palisades Spent Fuel Pool. Those dates and the titles of the submittals are listed below. Copies of these documents are contained in Attachment D to this letter.
. I
- 1. February 20, 1986 Technical Specification Change Request Expansion of the Spent Fuel Pool Storage Capacity
- 2. April 16, 1986 - Expansion of the Spent Fuel Pool Storage Capacity -
Supplemental Information
- 3. April 24, 1986 - Expansion of the Spent Fuel Pool Storage Capacity -
Supplemental Information
- 4. April 25, 1986 - Expansion of the Spent Fuel Storage Capacity at Palisades Plant (Request for Additional Information)
- 5. July 24, 1986 - Expansion of the Spent Fuel Pool Storage Capacity -
Response to Request for Additional Information
- 6. December 19, 1986 - Expansion of Spent Fuel Pool Storage Capacity -
Technical Specification Change Request - Additional Information
- 7. October 16, 1986 - Expansion of Spent Fuel Pool Storage Capacity -
Technical Specification Change Request - Revision 1
- 8. April 23, 1987 - Expansion of the Spent Fuel Pool Storage Capacity -
Technical Specifications Change Request - Supplemental Information
- 9. July 24, 1987 - Amendment No. 105. Authorized CPCo to increase the storage capacity of the spent fuel pool from 798 to 892 fuel assemblies 4A Gerald B Slade General Manager CC Administrator, Region III, USNRC NRG Resident Inspector - Palisades