| issue date = 07/25/1979
| issue date = 07/25/1979
| title = Responds to NRC 790216 Ltr Re Violations Noted in IE Insp Rept 50-311/79-03.Corrective Actions:Rescheduling of Completion Date for Technical Document Room to 790830 & Microfilming of Engineering Records to 791231
| title = Responds to NRC 790216 Ltr Re Violations Noted in IE Insp Rept 50-311/79-03.Corrective Actions:Rescheduling of Completion Date for Technical Document Room to 790830 & Microfilming of Engineering Records to 791231
| author name = MARTIN T J
| author name = Martin T
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name = BRUNNER E J
| addressee name = Brunner E
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000311
| docket = 05000311
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
See also: [[followed by::IR 05000311/1979003]]


=Text=
=Text=
{{#Wiki_filter:* Thomas J. Martin Pub I ic Service Electric and Gas Company 80 Park Place Newark, N .J. 07101 201 /430-8316  
{{#Wiki_filter:*
Vice President
Thomas J. Martin Vice President Engineering and Construction Pub I ic Service Electric and Gas Company 80 Park Place Newark, N .J. 07101 201 /430-8316 July 25,1979 Mr. Eldon J. Brunner, Chief Off ice of Inspection and Enforcement Reactor Operations and Nuclear Support Branch U.S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Engineering
 
and Construction
==Dear Mr. Brunner:==
July 25,1979 Mr. Eldon J. Brunner, Chief Off ice of Inspection  
 
and Enforcement  
OFFICE OF INSPECTION AND ENFORCEMENT INSPECTION REPORT NUMBER.50-311/79-03 STATUS OF OPEN ITEMS NO. 2 UNIT SALEM GENERATING STATION The above Inspection Report identified twenty-five (25) open items associated with the proposed quality assurance program's implementing procedures which Public Service Electric and Gas Company intends to use upon receipt of the operating license.
Reactor Operations  
These items, including committed actions and commitment dates, were discussed in the "b" section of paragraphs 2 through 11 of Inspection Report Number 50-311/79-03.
and Nuclear Support Branch U.S. Nuclear Regulatory  
This is to advise you that we are in compliance with all of the committed actions and dates, except for the items described below.
Commission  
In each case, the revised completion date has been shown.
Region 1 631 Park Avenue King of Prussia, Pennsylvania  
Item 311/79-03-13: The Technical Document Room, originally scheduled for completion by August 1,1979 has been rescheduled for completion prior to August 30,1979 .
19406 Dear Mr. Brunner: OFFICE OF INSPECTION  
 
AND ENFORCEMENT  
Mr. Eldon J. Brunner                     7/25/79 Item 311/79-03-25:   The increased workload brought about by the influx of recent NRC Bulletins, and the impact of Three Mile Island has required the completion date for the micro-filming of engineering records to be revised from August 1,1979 to December 31,1979.
INSPECTION  
Should additional information be desired, we shall be pleased to discuss i t further with you.
REPORT NUMBER.50-311/79-03  
Sincerely,}}
STATUS OF OPEN ITEMS NO. 2 UNIT SALEM GENERATING  
STATION The above Inspection  
Report identified  
twenty-five  
(25) open items associated  
with the proposed quality assurance  
program's  
implementing  
procedures  
which Public Service Electric and Gas Company intends to use upon receipt of the operating  
license. These items, including  
committed  
actions and commitment  
dates, were discussed  
in the "b" section of paragraphs  
2 through 11 of Inspection  
Report Number 50-311/79-03.  
This is to advise you that we are in compliance  
with all of the committed  
actions and dates, except for the items described  
below. In each case, the revised completion  
date has been shown. Item 311/79-03-13:  
The Technical  
Document Room, originally  
scheduled  
for completion  
by August 1,1979 has been rescheduled  
for completion  
prior to August 30,1979 .
Mr. Eldon J. Brunner -2-7/25/79 Item 311/79-03-25:  
The increased  
workload brought about by the influx of recent NRC Bulletins, and the impact of Three Mile Island has required the completion  
date for the filming of engineering  
records to be revised from August 1,1979 to December 31,1979. Should additional  
information  
be desired, we shall be pleased to discuss it further with you. Sincerely,
}}

Latest revision as of 10:14, 3 February 2020

Responds to NRC 790216 Ltr Re Violations Noted in IE Insp Rept 50-311/79-03.Corrective Actions:Rescheduling of Completion Date for Technical Document Room to 790830 & Microfilming of Engineering Records to 791231
ML18079B059
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/25/1979
From: Martin T
Public Service Enterprise Group
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18079B058 List:
References
790925, NUDOCS 7910090025
Download: ML18079B059 (2)


Text

Thomas J. Martin Vice President Engineering and Construction Pub I ic Service Electric and Gas Company 80 Park Place Newark, N .J. 07101 201 /430-8316 July 25,1979 Mr. Eldon J. Brunner, Chief Off ice of Inspection and Enforcement Reactor Operations and Nuclear Support Branch U.S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Brunner:

OFFICE OF INSPECTION AND ENFORCEMENT INSPECTION REPORT NUMBER.50-311/79-03 STATUS OF OPEN ITEMS NO. 2 UNIT SALEM GENERATING STATION The above Inspection Report identified twenty-five (25) open items associated with the proposed quality assurance program's implementing procedures which Public Service Electric and Gas Company intends to use upon receipt of the operating license.

These items, including committed actions and commitment dates, were discussed in the "b" section of paragraphs 2 through 11 of Inspection Report Number 50-311/79-03.

This is to advise you that we are in compliance with all of the committed actions and dates, except for the items described below.

In each case, the revised completion date has been shown.

Item 311/79-03-13: The Technical Document Room, originally scheduled for completion by August 1,1979 has been rescheduled for completion prior to August 30,1979 .

Mr. Eldon J. Brunner 7/25/79 Item 311/79-03-25: The increased workload brought about by the influx of recent NRC Bulletins, and the impact of Three Mile Island has required the completion date for the micro-filming of engineering records to be revised from August 1,1979 to December 31,1979.

Should additional information be desired, we shall be pleased to discuss i t further with you.

Sincerely,