|
|
(4 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 08/17/2017 | | | issue date = 08/17/2017 |
| | title = NRC Emergency Preparedness Inspection Report 05000280/2017502 and 05000281/2017502 (Public) | | | title = NRC Emergency Preparedness Inspection Report 05000280/2017502 and 05000281/2017502 (Public) |
| | author name = Bonser B R | | | author name = Bonser B |
| | author affiliation = NRC/RGN-II/DRS/PSB1 | | | author affiliation = NRC/RGN-II/DRS/PSB1 |
| | addressee name = Stoddard D | | | addressee name = Stoddard D |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 17, 2017 Mr. Daniel Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SUBJECT: SURRY POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000280/2017502 AND 05000281/2017502 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ust 17, 2017 |
| | |
| | ==SUBJECT:== |
| | SURRY POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000280/2017502 AND 05000281/2017502 |
|
| |
|
| ==Dear Mr. Stoddard:== | | ==Dear Mr. Stoddard:== |
| On July 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station, Units 1 and 2. On July 27, 2017, the NRC inspectors, discussed the results of this inspection with Mr. F. Mladen and other members of your sta ff. The results of this inspection are documented in the enclosed report. | | On July 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station, Units 1 and 2. On July 27, 2017, the NRC inspectors, discussed the results of this inspection with Mr. F. Mladen and other members of your staff. The results of this inspection are documented in the enclosed report. |
|
| |
|
| The NRC inspectors did not identify any findings or violations of more than minor significance. | | The NRC inspectors did not identify any findings or violations of more than minor significance. |
|
| |
|
| This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA: Adam Nielson for/ | | /RA: Adam Nielson for/ |
| Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Enclosure: IR 05000280, 281/2017502 w/Attachment: Supplemental Information cc: Distribution via Listserve | | Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 |
|
| |
|
| SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 RII:DRS/PSB1RIV:DRS/PSB2 NSIR:DPR/POBRII:DRP/RPB5 RII:DRS/PSB1 SIGNATURE SPS CAF2 JDH9 PJE EPS1 ADM2 AND for BRB1 NAME S. Sanchez C. Fontana J. Hickman P. Elkmann E. Schrader A Masters B. Bonser DATE 8/15/2017 8/16/2017 8/ 15/2017 8/ 15 /2017 8/ 15 /2017 8/17 /2017 8/17 /2017 EMAIL COPY YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos: 05000280 and 05000281
| | ===Enclosure:=== |
| | IR 05000280, 281/2017502 w/Attachment: Supplemental Information |
|
| |
|
| License Nos: DPR-32 and DPR-37 Report Nos: 05000280/2017502 and 05000281/2017502 Licensee: Virginia Electric and Power Company (VEPCO) | | REGION II== |
| Facility: Surry Power Station, Units 1 and 2 Location: Surry, VA Dates: July 24-27 , 2017 Inspectors: Steven Sanchez, Senior Emergency Preparedness Inspector Paul Elkmann, Senior Emergency Preparedness Inspector (R-IV) | | Docket Nos: 05000280 and 05000281 License Nos: DPR-32 and DPR-37 Report Nos: 05000280/2017502 and 05000281/2017502 Licensee: Virginia Electric and Power Company (VEPCO) |
| | Facility: Surry Power Station, Units 1 and 2 Location: Surry, VA Dates: July 24-27, 2017 Inspectors: Steven Sanchez, Senior Emergency Preparedness Inspector Paul Elkmann, Senior Emergency Preparedness Inspector (R-IV) |
| Christopher Fontana, Emergency Preparedness Inspector John Hickman, Emergency Preparedness Inspector Eric Schrader, Emergency Preparedness Specialist (NSIR) | | Christopher Fontana, Emergency Preparedness Inspector John Hickman, Emergency Preparedness Inspector Eric Schrader, Emergency Preparedness Specialist (NSIR) |
| Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety | | Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure |
|
| |
|
| =SUMMARY= | | =SUMMARY= |
| Inspection Report (IR) 05000280/2017502; 05000281/2017502; 07/24/2017-07/27/2017; Surry Power Station, Units 1 and 2; Emergency Preparedness Exercise and Baseline Inspection. | | Inspection Report (IR) 05000280/2017502; 05000281/2017502; 07/24/2017-07/27/2017; Surry |
| | |
| | Power Station, Units 1 and 2; Emergency Preparedness Exercise and Baseline Inspection. |
|
| |
|
| This report covers an announced inspection by four emergency preparedness inspectors and one emergency preparedness specialist. The U.S. Nuclear Regulatory Commission's (NRC) program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 6. | | This report covers an announced inspection by four emergency preparedness inspectors and one emergency preparedness specialist. The U.S. Nuclear Regulatory Commissions (NRC)program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 6. |
|
| |
|
| The NRC inspectors did not identify any findings or violations of more than minor significance. | | The NRC inspectors did not identify any findings or violations of more than minor significance. |
Line 49: |
Line 56: |
| ==REACTOR SAFETY== | | ==REACTOR SAFETY== |
|
| |
|
| ===Cornerstone: Emergency Preparedness=== | | ===Cornerstone: Emergency Preparedness=== |
|
| |
|
| 1EP1 Exercise Evaluation | | 1EP1 Exercise Evaluation |
Line 55: |
Line 62: |
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The onsite inspection consisted of the following review and assessment: | | The onsite inspection consisted of the following review and assessment: |
| * The adequacy of the licensee's performance in the biennial exercise, conducted on July 25, 2017, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10); which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively. | | * The adequacy of the licensees performance in the biennial exercise, conducted on July 25, 2017, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10); which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively. |
| * The overall adequacy of the licensee's emergency response facilities were assessed against the licensee's Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center, Operations Support Center, and the local Emergency Operations Facility. | | * The overall adequacy of the licensees emergency response facilities were assessed against the licensees Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center, Operations Support Center, and the local Emergency Operations Facility. |
| * Other performance areas, such as the emergency response organization's (ERO) recognition of abnormal plant conditions; command and control, intra- and inter- facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures. | | * Other performance areas, such as the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures. |
| * Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14). | | * Past performance issues from NRC inspection reports and Federal Emergency Management Agency (FEMA)/Department of Homeland Security (DHS) exercise reports to determine the effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14). |
| * The post-exercise critique process and the presentation to the licensee's senior management conducted on July 27, 2017, to evaluate the licensee's self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g. | | * The post-exercise critique process and the presentation to the licensee's senior management conducted on July 27, 2017, to evaluate the licensees self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g. |
|
| |
|
| The inspectors reviewed various documents, which are listed in the Attachment. The inspectors also attended the FEMA-sponsored public meeting on July 28, 2017. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. | | The inspectors reviewed various documents, which are listed in the Attachment. The inspectors also attended the FEMA-sponsored public meeting on July 28, 2017. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. |
Line 65: |
Line 72: |
| ====b. Findings==== | | ====b. Findings==== |
| No findings were identified. | | No findings were identified. |
|
| |
| 1EP4 Emergency Action Level and Emergency Plan Changes | | 1EP4 Emergency Action Level and Emergency Plan Changes |
|
| |
|
Line 71: |
Line 77: |
| Since the last NRC inspection of this program area, one revision to the emergency plan and several revisions to emergency plan implementing procedures had been made. The licensee determined that, in accordance with 10 CFR 50.54(q), the emergency plan continued to meet the requirements of 10 CFR 50.47(b), and Appendix E to 10 CFR Part 50. The inspectors reviewed the revisions, and sampled implementing procedure changes to evaluate potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety. | | Since the last NRC inspection of this program area, one revision to the emergency plan and several revisions to emergency plan implementing procedures had been made. The licensee determined that, in accordance with 10 CFR 50.54(q), the emergency plan continued to meet the requirements of 10 CFR 50.47(b), and Appendix E to 10 CFR Part 50. The inspectors reviewed the revisions, and sampled implementing procedure changes to evaluate potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety. |
|
| |
|
| The inspection was conducted in accordanc e with NRC Inspection Procedure (IP) 71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria. The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis. | | The inspection was conducted in accordance with NRC Inspection Procedure (IP)71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria. The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings were identified. | | No findings were identified. |
|
| |
| 1EP8 Exercise Evaluation - Scenario Review | | 1EP8 Exercise Evaluation - Scenario Review |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, "Exercise Evaluation - Scenario Review," to determine if the exercise would test major elements of the emergency plan, as required by 10 CFR 50.47(b)(14). The inspectors reviewed various documents, which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. | | Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the emergency plan, as required by 10 CFR 50.47(b)(14). The inspectors reviewed various documents, which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
Line 89: |
Line 94: |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors sampled licensee submittals relative to the performance indicators (PIs)listed below for the period July 1, 2016, through March 31, 2017. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, was used to confirm the reporting basis for each data element. Emergency Preparedness Cornerstone | | The inspectors sampled licensee submittals relative to the performance indicators (PIs)listed below for the period July 1, 2016, through March 31, 2017. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, was used to confirm the reporting basis for each data element. |
| | |
| | Emergency Preparedness Cornerstone |
| * Drill/Exercise Performance (DEP) | | * Drill/Exercise Performance (DEP) |
| * Emergency Response Organization (ERO) Readiness | | * Emergency Response Organization (ERO) Readiness |
| * Alert and Notification System (ANS) Reliability For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors evaluated the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors evaluated the accuracy of the PI for ANS reliability through review of a sample of the licensee's records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the | | * Alert and Notification System (ANS) Reliability For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors evaluated the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors evaluated the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data. |
| . This inspection satisfied three inspection samples for PI verification on an annual basis. | | |
| | Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment. This inspection satisfied three inspection samples for PI verification on an annual basis. |
|
| |
|
| ====b. Findings==== | | ====b. Findings==== |
| No findings were identified. | | No findings were identified. |
| | | {{a|4OA6}} |
| {{a|4OA6}} | |
| ==4OA6 Meetings, Including Exit== | | ==4OA6 Meetings, Including Exit== |
|
| |
|
| On July 27, 2017, the inspection team presented the inspection results to Mr. F. Mladen and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection. | | On July 27, 2017, the inspection team presented the inspection results to Mr. F. Mladen and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection. |
|
| |
|
| ATTACHMENT: | | ATTACHMENT: |
|
| |
|
| =SUPPLEMENTAL INFORMATION= | | =SUPPLEMENTAL INFORMATION= |
Line 110: |
Line 117: |
|
| |
|
| ===Licensee Personnel=== | | ===Licensee Personnel=== |
| : [[contact::L. Black]], Supervisor, Outage & Planning | | : [[contact::L. Black]], Supervisor, Outage & Planning |
| : [[contact::S. Brawl]], Emergency Preparedness Instructor | | : [[contact::S. Brawl]], Emergency Preparedness Instructor |
| : [[contact::E. Collins]], Manager, Fleet Emergency Preparedness | | : [[contact::E. Collins]], Manager, Fleet Emergency Preparedness |
| : [[contact::J. Costello]], Fleet Emergency Preparedness Specialist | | : [[contact::J. Costello]], Fleet Emergency Preparedness Specialist |
| : [[contact::T. Cuthriell]], Licensing Engineer | | : [[contact::T. Cuthriell]], Licensing Engineer |
| : [[contact::B. Garber]], Manager, Station Licensing | | : [[contact::B. Garber]], Manager, Station Licensing |
| : [[contact::D. Godwin]], Manager, Emergency Preparedness | | : [[contact::D. Godwin]], Manager, Emergency Preparedness |
| : [[contact::J. Grau]], Manager, Nuclear Site Services | | : [[contact::J. Grau]], Manager, Nuclear Site Services |
| : [[contact::J. Henderson]], Director, Engineering | | : [[contact::J. Henderson]], Director, Engineering |
| : [[contact::R. Herbert]], Manager, Design Engineering | | : [[contact::R. Herbert]], Manager, Design Engineering |
| : [[contact::J. Holloway]], Manager, Site Engineering | | : [[contact::J. Holloway]], Manager, Site Engineering |
| : [[contact::L. Jones]], Manager, Protection Services | | : [[contact::L. Jones]], Manager, Protection Services |
| : [[contact::K. Longston]], Emergency Preparedness Specialist | | : [[contact::K. Longston]], Emergency Preparedness Specialist |
| : [[contact::F. Mladen]], Site Vice President | | : [[contact::F. Mladen]], Site Vice President |
| : [[contact::L. Ragland]], Manager, Radiological Protection and Chemistry | | : [[contact::L. Ragland]], Manager, Radiological Protection and Chemistry |
| : [[contact::B. Rickert]], Emergency Preparedness Specialist | | : [[contact::B. Rickert]], Emergency Preparedness Specialist |
| : [[contact::J. Rosenberger]], Director, Nuclear Safety & Licensing | | : [[contact::J. Rosenberger]], Director, Nuclear Safety & Licensing |
| : [[contact::J. Shell]], Assistant Operations Manager | | : [[contact::J. Shell]], Assistant Operations Manager |
| : [[contact::R. Simmons]], Plant Manager | | : [[contact::R. Simmons]], Plant Manager |
| : [[contact::T. Swearingen]], Emergency Preparedness Specialist | | : [[contact::T. Swearingen]], Emergency Preparedness Specialist |
| : [[contact::M. True]], Emergency Preparedness Specialist | | : [[contact::M. True]], Emergency Preparedness Specialist |
| : [[contact::D. Wilson]], Manager, Maintenance | | : [[contact::D. Wilson]], Manager, Maintenance |
|
| |
|
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| 1EP1 Exercise Evaluation
| | |
| ===Procedures===
| |
| : Surry Power Station Emergency Plan, Rev. 63
| |
| : CPIP-3.1, CERC and CEOF Activation, Rev. 29
| |
| : CPIP-3.3. Surry LEOF Activation, Rev. 21
| |
| : CPIP-6.0, LEOF Recovery Manager Guidance, Rev. 14
| |
| : CPIP-6.2, Radiological Assessment Coordinator, Rev. 15
| |
| : EP-AA-100, Maintaining Emergency Preparedness, Rev. 6
| |
| : EP-AA-303, Equipment Important to Emergency Response, Rev. 16
| |
| : EP-AA-400, Drill and Exercise Program, Rev. 10
| |
| : EPIP-1.01, Emergency Manager Controlling Procedure, Rev. 58
| |
| : EPIP-1.03, Response to Alert, Rev. 23
| |
| : EPIP-1.04, Response to Site Area Emergency, Rev. 23
| |
| : EPIP-1.05, Response to General Emergency, Rev. 25
| |
| : EPIP-1.06, Protective Action Recommendations, Rev. 12
| |
| : EPIP-2.01, Notification of State & Local Governments, Rev. 44
| |
| : EPIP-2.02, Notification of NRC, Rev. 23
| |
| : EPIP-3.02, Activation of the Technical Support Center, Rev. 35
| |
| : EPIP-3.03, Activation of the Operations Support Center, Rev. 22
| |
| : EPIP-3.05, Augmentation of Emergency Response Organization, Rev. 12
| |
| : EPIP-4.03, Dose Assessment Team Controlling Procedure, Rev. 20
| |
| : EPIP-4.07, Protective Measures, Rev. 18
| |
| : EPIP 4.17, Monitoring of Emergency Response Facilities, Rev. 13
| |
| : PI-AA-200, Corrective Action, Rev. 33
| |
| : Records and Data Surry Power Station Emergency Preparedness 2017 Biennial Exercise Scenario, dated 7/25/17
| |
| : Simulator Control Room, Technical Support Center, Operations Support Center, and the Local Emergency Operations Facility documentation packages (logs, event notification forms, Protective Action Recommendations, Media releases, and Radiological Dose Assessments)
| |
| : EP-AA-400, Drill and Exercise Program Documents, Attach. 3, Drill/Exercise Objectives, Rev. 10 0-OP-VS-007, Technical Support Center Ventilation, Rev. 13
| |
| : 0-OCP-EP-200, 4160 Volt Breaker Operations, Rev. 7
| |
| : Corrective Action Program Documents (Condition Reports)
| |
| : CR 1010345, Impact of
| |
| : CA 300179 primary MET tower instrument height changes on atmospheric dispersion factors
| |
| : CR 1037230, Evaluate required S/G level to ensure fission product scrubbing
| |
| : CR 1041840, TSC AC unit not working
| |
| : CR 1045188, TSC AC unit not running
| |
| : CR 1049158, Emergency Accountability System failed test
| |
| : CR 1053729, TSC Local Area RM in alarm
| |
| : CR 1055786, Drill confidential material distributed to key ERO members prior to drill
| |
| : CR 1059708, Meteorological monitoring panel delta-T indication has failed
| |
| : CR 1060458, Discrepancy in the minimum staffing requirements of E-plan and
| |
| : OP-AA-100
| |
| : CR 1061082, Inaccurate information identified in EPIP 5.09 and the Emergency Personnel
| |
| : Notification List (EPNL)
| |
| : CR 1071654, Primary MET tower A/C not working
| |
| : CR 1072477, Objective 8 met with problems overall
| |
| : CR 1074320, Some pagers did not activate during the EP Exercise on 7/25/17
| |
| : CR 1074324, Some batteries appeared dead for ERO radios in OSC
| |
| : CR 1074327, TSC communication equipment issues
| |
| : CR 1074331, TSC NRC ENS cordless phone issues
| |
| : CR 1074336, LEOF instaphone not functioning properly
| |
| : CR 1074339, ARCOS activation notifications received 12 minutes after declaration of Alert
| |
| : CR 1074372, RP instrumentation issues during 7/25/17 drill exercise
| |
| : CR 1074433, Offsite responders arrived at the LEOF after the NEDS communicated habitability requirements
| |
| : CR 1074436, ERDS data from simulator not visible to NRC
| |
| : CR 1074468, VDEM observations from LEOF during Exercise
| |
| : CR 1074472, Question on habitability
| |
| : CR 1074484, Potential challenges for VDEM with making PADs
| |
| : CR 1074531, Objective 20 was graded as NOT MET overall for the Exercise
| |
| : CR 1074534, Lessons learned from Exercise
| |
| : CR 1074537, 50.72 reporting when in continuous NRC communications (NRC-identified)
| |
| : CR 1074790, NRC comments for 2017 inspection (NRC-identified)
| |
| : CR 1074753, Exercise scenario package did not contain demonstration criteria for Semi-Annual
| |
| : Radiological Monitoring Drill (NRC-identified)
| |
| : 1EP4 Emergency Action Levels and Emergency Plan Changes
| |
| ===Procedures===
| |
| : Surry Power Station (SPS) Emergency Plan, Rev. 62 & 63
| |
| : EP-AA-101, 10
| |
| : CFR 50.54(q) Change Evaluation, Rev. 7
| |
| : EP-AA-102, Revision & Control of Emergency Plan, Emergency Action Levels (Technical Basis and Matrix) & Reference Manual, Rev. 8
| |
| : EPIP-1.06, Protective Action Recommendations, Rev. 11 & 12
| |
| : EPIP-4.03, Dose Assessment Team Controlling Procedure, Rev. 19 & 20
| |
| : EPIP 4.07, Protective Measures, Rev. 17 & 18
| |
| : Change Packages
| |
| : SU-14-021, 50.54(q)(3) Screening/Evaluation of
| |
| : EPIP-2.01 "Notification of State and Local Governments," Rev. 44
| |
| : SU-14-022, 50.54(q)(3) Screening/Evaluation of
| |
| : EPIP-2.01 "Notification of State and Local Governments," Rev. 44
| |
| : SU-16-001, 50.54(q)(3) Screening/Evaluation for
| |
| : EPIP-1.06 Rev. 12, dated 10/6/16
| |
| : SU-16-002, 50.54(q)(3) Screening/Evaluation for
| |
| : EPIP-1.06 Rev. 12, dated 10/6/16
| |
| : SU-16-003, 50.54(q)(3) Screening/Evaluation for
| |
| : EPIP-1.06 Rev. 12, dated 10/6/16
| |
| : SU-16-01, 50.54(q)(3) Screening/Evaluation for EPIP -4.07 Rev. 18, dated 10/6/16
| |
| : SU-16-05, 50.54(q)(3) Screening/Evaluation for EPIP -4.07 Rev. 18, dated 10/6/16
| |
| : SU-16-09, 50.54(q)(3) Screening/Evaluation for EPIP -4.07 Rev. 18, dated 10/6/16
| |
| : SU-16-10, 50.54(q)(3) Screening/Evaluation for EPIP -4.07 Rev. 18, dated 10/6/16
| |
| : SU-16-11, 50.54(q)(3) Screening/Evaluation for EPIP -4.07 Rev. 18, dated 10/6/16
| |
| : SU-16-12, 50.54(q)(3) Screening/Evaluation for EPIP -4.07 Rev. 18, dated 10/6/16
| |
| : SU-16-01, 50.54(q)(3) Screening/Evaluation for SPS Emergency Plan Rev. 63, dated 1/12/17
| |
| : SU-16-02, 50.54(q)(3) Screening/Evaluation for App. 10.1, Letters of Agreement, dated 1/12/17
| |
| : SU-16-03, 50.54(q)(3) Screening/Evaluation for Section 6.4.2, dated 1/12/17
| |
| : SU-16-04, 50.54(q)(3) Screening/Evaluation for Section 6.4.1, dated 1/12/17
| |
| : SU-16-05, 50.54(q)(3) Screening/Evaluation for Section 6.3.3.3, dated 1/12/17
| |
| : SU-16-08, 50.54(q)(3) Screening/Evaluation for Title Changes, dated 1/12/17
| |
| : SU-16-09, 50.54(q)(3) Screening/Evaluation for Sections 6.3.2 & 6.4.1.1, dated 1/12/17
| |
| : SU-16-10, 50.54(q)(3) Screening/Evaluation for Sections 5.3.1, 5.3.3, 6.1, 6.3.1, 6.4.2, 7.2, &
| |
| : 9.0, dated 1/12/17
| |
| : SU-16-11, 50.54(q)(3) Screening/Evaluation for Sections 5.2.1.1, 5.2.1.17, 5.2.1.18, 5.3.1,
| |
| : 5.3.1.5, & 7.3.3, dated 1/12/17
| |
| : SU-16-12, 50.54(q)(3) Screening/Evaluation for Sections 7.2.1.1, dated 1/12/17
| |
| : Corrective Action Program Documents
| |
| : CR 1027899, EAL review was not signed by Commonwealth of Virginia representative
| |
| : CR 1028317, Approver was not qualified to approve 10
| |
| : CFR 50.54(q) Evaluations
| |
| : CR 1028735, EP organization changes were made without performing a 50.54(a) evaluation
| |
| : CR 1031616, EP documentation discrepancies identified
| |
| : CR 1038104, EP did not follow the SAT process when implementing a change
| |
| : CR 1061820, Current posted/available versions of
| |
| : EPIP-4.16 & 4.34 have inconsistent information contained in
| |
| : EPIP-4.03 & 4.07
| |
| : CR 1064316, Initiating condition limit for RA1 & RU1a do not match EAL criteria for
| |
| : RA1.1 &
| |
| : RU1.1
| |
| : CR 1074400, Wrong revision numbers referenced in procedure package (NRC-identified)
| |
| : 1EP8 Exercise Evaluation - Scenario Review
| |
| ===Procedures===
| |
| : EP-AA-400, Drill & Exercise Program, Rev. 10
| |
| : Records and Data Completed Scenario Review Checklist FEMA After Action Report/Improvement Plan, dated 4/27/15
| |
| : SJUN16FS Management Critique for SPS Full Scale Drill, dated 7/2016
| |
| : SMAR17FS Management Critique for SPS
| |
| : Full Scale Drill, dated 4/19/17 SDEC16FS Management Critique for SPS Full Scale Drill, dated 1/5/17 SJUN16FS Management Critique for SPS Full Scale Drill, dated 7/20/16
| |
| : SMAY16FS Management Critique for SPS
| |
| : Full Scale Drill, dated 6/9/16 SFEB16FS Management Critique for SPS Full Scale Drill, dated 3/29/16
| |
| : Surry 8-Year EAL Matrix Corrective Action Program Documents
| |
| : CR 1028053, TSC primary MIDAS computer failed during EP drill training exercise
| |
| : CR 1028679, Inappropriate controller coaching was observed in two instances in the OSC
| |
| : CR 1035040, EP baseline inspection NRC observations
| |
| : CR 1037165, Objective 4, Criterion 3, offsite notification not met
| |
| : CR 1040589, CERC dose assessment did not adequately compare field data to MIDAS during drill
| |
| : CR 1042754, SJUN16FS - Objective 20 met with problems
| |
| : CR 1069966, MIDAS not working properly
| |
| : 4OA1 Performance Indicator Verification
| |
| ===Procedures===
| |
| : EP-AA-103, Emergency Preparedness Performance Indicators, Rev. 4 0-LSP-EW-002, Early Warning System Siren Activation Monitoring, Rev. 11, 12, & 13
| |
| : PI-AA-200, Corrective Action, Rev. 33
| |
| : Records and Data DEP opportunities documentation for first, second, third, and fourth quarters 2016;
| |
| and first quarter 2017 Siren test data for first, second, third, and fourth quarters 2016; and first quarter 2017 Drill and exercise participation records of ERO personnel for first, second, third, and fourth quarters 2016;
| |
| and first quarter 2017
| |
| : Corrective Action Program Documents
| |
| : CR 0569153, Corp ERO availability 2-deep standard not met
| |
| : CR 1022666, 0-LSP-EW-001 was not completed within grace
| |
| : CR 1034931, EP ANS KPI values inaccurate for August 2015
| |
| : CR 1035025, Potential trend for SPS EWS #51
| |
| : CR 1037901, Minimum qualification guidance for damage control team members in Electrical &
| |
| : Mechanical maintenance
| |
| : CR 1043941, SPS EWS Siren Polling Test
| |
| : CR 1047402, Corporate ERO availability 2-deep minimum standard not met 9/18-10/1/16
| |
| : CR 1047822, Adverse trend in corporate ERO availability
| |
| : CR 1055371, Siren 41 did not respond as expected during conduct of 0-LS-EW-007
| |
| : CR 1061531, Corp ERO availability 2-deep standard not met
| |
| : CR 1061887, Siren 42 did not activate
| |
| : CR 1072399, Potential for ERO PAR variability based on
| |
| : EPIP-4.03, NE-GL-0035S
| |
| ==LIST OF ACRONYMS==
| |
| : [[USED]] [[]]
| |
| : [[ANS]] [[Alert and Notification System]]
| |
| : [[CAP]] [[Corrective Action Program]]
| |
| : [[CFR]] [[Code of Federal Regulations]]
| |
| : [[CR]] [[Condition Reports]]
| |
| : [[DEP]] [[Drill and Exercise Performance]]
| |
| : [[DHS]] [[Department of Homeland Security]]
| |
| : [[EAL]] [[Emergency Action Level]]
| |
| : [[EITER]] [[Equipment Important to Emergency Preparedness]]
| |
| : [[EOF]] [[Emergency Operations Facility]]
| |
| : [[EP]] [[Emergency Preparedness]]
| |
| : [[ERO]] [[Emergency Response Organization]]
| |
| : [[FEMA]] [[Federal Emergency Management Agency]]
| |
| : [[IP]] [[Inspection Procedure]]
| |
| : [[IR]] [[Inspection Report]]
| |
| : [[NEI]] [[Nuclear Energy Institute]]
| |
| : [[NRC]] [[Nuclear Regulatory Commission]]
| |
| : [[OSC]] [[Operations Support Center]]
| |
| : [[PI]] [[Performance Indicators]]
| |
| : [[ROP]] [[Reactor Oversight Program]]
| |
| : [[RSPS]] [[Risk Significant Planning Standard]]
| |
| : [[TSC]] [[Technical Support Center]]
| |
| }} | | }} |
Similar Documents at Surry |
---|
Category:Inspection Report
MONTHYEARIR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 IR 05000280/20233012023-12-28028 December 2023 – NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 IR 05000280/20230012023-05-0505 May 2023 Integrated Inspection Report 05000280/2023001 and 05000281/2023001 IR 05000280/20234012023-04-21021 April 2023 Security Baseline Inspection Report 05000280 2023401 and 05000281 2023401 ML23086B9172023-03-24024 March 2023 Steam Generator Tube Inspection Report for the Fall 2022 Refueling Outage IR 05000280/20220062023-03-0101 March 2023 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2022006 and 05000281/2022006 ML23041A0232023-02-13013 February 2023 Integrated Inspection Report 05000280/2022004 and 05000281/2022004 IR 05000280/20220032022-11-0707 November 2022 Integrated Inspection Report 05000280/2022003 and 05000281/2022003, Operation of an Independent Spent Fuel Storage Installation Report 07200055/2022001, and Exercise of Enforcement Discretion IR 05000281/20224022022-10-21021 October 2022 Security Baseline Inspection Report 05000280/ 2022402 and 05000281/2022402 IR 05000280/20224042022-10-19019 October 2022 Security Baseline Inspection Report 05000280/2022404 and 05000281/2022404 IR 05000280/20224032022-09-0808 September 2022 Security Baseline Inspection Report 05000280/2022403 and 05000281/2022403 IR 05000280/20220052022-08-24024 August 2022 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Reports 05000280/2022005 and 05000281/2022005) IR 05000280/20220022022-08-0404 August 2022 Integrated Inspection Report 05000280/2022002 and 05000281/2022002 Final IR 05000280/20220112022-07-0606 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000280/2022011 and 05000281/2022011 IR 05000280/20220012022-05-11011 May 2022 Integrated Inspection Report 05000280/2022001 and 05000281/2022001 IR 05000280/20224012022-03-29029 March 2022 Security Baseline Inspection Report 05000280/2022401 and 05000281/2022401 IR 05000280/20224052022-03-22022 March 2022 Material Control and Accounting Program Inspection Report 05000280/2022405 and 05000281/2022405 IR 05000280/20220102022-03-15015 March 2022 NRC Inspection Report 05000280/2022010 and 05000281/2022010 IR 05000280/20210062022-03-0202 March 2022 Annual Assessment Letter for Surry Power Station, Units 1 and 2 (Reports No. 05000280/2021006 and 05000281/2021006) IR 05000280/20210042022-02-11011 February 2022 Integrated Inspection Report 05000280/2021004 and 05000281/2021004 IR 05000280/20210032021-11-24024 November 2021 Integrated Inspection Report 05000280/2021003 and 05000281/2021003 IR 05000280/20213012021-11-10010 November 2021 NRC Operator License Examination Report 05000280/2021301 and 05000281/2021301 IR 05000280/20210112021-11-0101 November 2021 Triennial Fire Protection Team Inspection Report 05000280/2021011 and 05000281/2021011 ML21265A4532021-10-0505 October 2021 Inspection Report 2021 FOF (IP92707) IR 05000280/20210052021-08-31031 August 2021 Mid-Cycle Letter Revised Updated Inspection Plan for Surry Power Station, Units 1 and 2 (05000280/2021005 and 05000281/2021005) IR 05000280/20210012021-08-26026 August 2021 Updated Inspection Plan for Surry Power Station, Units 1 and 2 -(05000280/2021001 and 05000281/2021001) IR 05000280/20210102021-08-16016 August 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000280/2021010 and 05000281/2021010 IR 05000280/20210022021-08-12012 August 2021 Integrated Inspection Report 05000280/2021002 and 05000281/2021002 IR 05000280/20214022021-06-14014 June 2021 Security Baseline Inspection Report 05000280/2021402, 05000281/2021402 and 07200002/2021401 ML21120A1552021-04-30030 April 2021 Integrated Inspection Report 05000280/2021001 and 05000281/2021001 IR 05000280/20200062021-03-0303 March 2021 Annual Assessment Letter for Surry Power Station, Units 1 and 2 NRC Inspection Reports 05000280/2020006 and 05000281/2020006 IR 05000280/20214012021-02-0909 February 2021 Security Baseline Inspection Report 05000280/2021401 and 05000281/2021401 IR 05000280/20200042021-02-0202 February 2021 Integrated Inspection 05000280/2020004 and 05000281/2020004; and 07200055/2020003 IR 05000281/20200402020-12-30030 December 2020 95001 Supplemental Inspection Supplemental Report 05000281/2020040 2024-08-26
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ust 17, 2017
SUBJECT:
SURRY POWER STATION - U.S. NUCLEAR REGULATORY COMMISSION EMERGENCY PREPAREDNESS INSPECTION REPORT 05000280/2017502 AND 05000281/2017502
Dear Mr. Stoddard:
On July 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station, Units 1 and 2. On July 27, 2017, the NRC inspectors, discussed the results of this inspection with Mr. F. Mladen and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any findings or violations of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA: Adam Nielson for/
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37
Enclosure:
IR 05000280, 281/2017502 w/Attachment: Supplemental Information
REGION II==
Docket Nos: 05000280 and 05000281 License Nos: DPR-32 and DPR-37 Report Nos: 05000280/2017502 and 05000281/2017502 Licensee: Virginia Electric and Power Company (VEPCO)
Facility: Surry Power Station, Units 1 and 2 Location: Surry, VA Dates: July 24-27, 2017 Inspectors: Steven Sanchez, Senior Emergency Preparedness Inspector Paul Elkmann, Senior Emergency Preparedness Inspector (R-IV)
Christopher Fontana, Emergency Preparedness Inspector John Hickman, Emergency Preparedness Inspector Eric Schrader, Emergency Preparedness Specialist (NSIR)
Approved by: Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure
SUMMARY
Inspection Report (IR) 05000280/2017502; 05000281/2017502; 07/24/2017-07/27/2017; Surry
Power Station, Units 1 and 2; Emergency Preparedness Exercise and Baseline Inspection.
This report covers an announced inspection by four emergency preparedness inspectors and one emergency preparedness specialist. The U.S. Nuclear Regulatory Commissions (NRC)program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 6.
The NRC inspectors did not identify any findings or violations of more than minor significance.
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation
a. Inspection Scope
The onsite inspection consisted of the following review and assessment:
- The adequacy of the licensees performance in the biennial exercise, conducted on July 25, 2017, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards in 10 CFR 50.47(b)(4), (5), (9), and (10); which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
- The overall adequacy of the licensees emergency response facilities were assessed against the licensees Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center, Operations Support Center, and the local Emergency Operations Facility.
- Other performance areas, such as the emergency response organizations (ERO)recognition of abnormal plant conditions; command and control, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies; and the overall implementation of the emergency plan and its implementing procedures.
- The post-exercise critique process and the presentation to the licensee's senior management conducted on July 27, 2017, to evaluate the licensees self-assessment of its ERO performance during the exercise, and to ensure compliance with 10 CFR Part 50, Appendix E, Subsection IV.F.2.g.
The inspectors reviewed various documents, which are listed in the Attachment. The inspectors also attended the FEMA-sponsored public meeting on July 28, 2017. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
b. Findings
No findings were identified.
1EP4 Emergency Action Level and Emergency Plan Changes
a. Inspection Scope
Since the last NRC inspection of this program area, one revision to the emergency plan and several revisions to emergency plan implementing procedures had been made. The licensee determined that, in accordance with 10 CFR 50.54(q), the emergency plan continued to meet the requirements of 10 CFR 50.47(b), and Appendix E to 10 CFR Part 50. The inspectors reviewed the revisions, and sampled implementing procedure changes to evaluate potential reductions in the effectiveness of the Plan. As this review was not documented in a Safety Evaluation Report, and does not constitute formal NRC approval of the changes, these changes remain subject to future NRC inspection in their entirety.
The inspection was conducted in accordance with NRC Inspection Procedure (IP)71114, Attachment 04, Emergency Action Level and Emergency Plan Changes. The applicable planning standards of 10 CFR 50.47(b), and its related requirements in 10 CFR Part 50, Appendix E, were used as reference criteria. The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the emergency action level and emergency plan changes on an annual basis.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
a. Inspection Scope
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the emergency plan, as required by 10 CFR 50.47(b)(14). The inspectors reviewed various documents, which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
b. Findings
No findings were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator Verification
a. Inspection Scope
The inspectors sampled licensee submittals relative to the performance indicators (PIs)listed below for the period July 1, 2016, through March 31, 2017. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in Nuclear Energy Institute 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, was used to confirm the reporting basis for each data element.
Emergency Preparedness Cornerstone
- Drill/Exercise Performance (DEP)
- Emergency Response Organization (ERO) Readiness
- Alert and Notification System (ANS) Reliability For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors evaluated the accuracy of the PIs for ERO and DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the PI for ERO drill participation for personnel assigned to key positions in the ERO. The inspectors evaluated the accuracy of the PI for ANS reliability through review of a sample of the licensees records of periodic system tests. The inspectors also interviewed the licensee personnel who were responsible for collecting and evaluating the PI data.
Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment. This inspection satisfied three inspection samples for PI verification on an annual basis.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
On July 27, 2017, the inspection team presented the inspection results to Mr. F. Mladen and other members of the plant staff. The inspectors confirmed that no proprietary information was provided during the inspection.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- L. Black, Supervisor, Outage & Planning
- S. Brawl, Emergency Preparedness Instructor
- E. Collins, Manager, Fleet Emergency Preparedness
- J. Costello, Fleet Emergency Preparedness Specialist
- T. Cuthriell, Licensing Engineer
- B. Garber, Manager, Station Licensing
- D. Godwin, Manager, Emergency Preparedness
- J. Grau, Manager, Nuclear Site Services
- J. Henderson, Director, Engineering
- R. Herbert, Manager, Design Engineering
- J. Holloway, Manager, Site Engineering
- L. Jones, Manager, Protection Services
- K. Longston, Emergency Preparedness Specialist
- F. Mladen, Site Vice President
- L. Ragland, Manager, Radiological Protection and Chemistry
- B. Rickert, Emergency Preparedness Specialist
- J. Rosenberger, Director, Nuclear Safety & Licensing
- J. Shell, Assistant Operations Manager
- R. Simmons, Plant Manager
- T. Swearingen, Emergency Preparedness Specialist
- M. True, Emergency Preparedness Specialist
- D. Wilson, Manager, Maintenance
LIST OF DOCUMENTS REVIEWED