ML053630341: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML053630341
| number = ML053630341
| issue date = 12/31/2005
| issue date = 12/31/2005
| title = 12/31/05 Waterford 3 - Conforming Amendment Letter to G. Taylor
| title = Conforming Amendment Letter to G. Taylor
| author name = Fields M B
| author name = Fields M
| author affiliation = NRC/NRR/ADRO/DORL/LPLG
| author affiliation = NRC/NRR/ADRO/DORL/LPLG
| addressee name = Taylor G J
| addressee name = Taylor G
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| docket = 05000382
| license number = NPF-038
| license number = NPF-038
| contact person = Fields M B , NRR/ADPT,415-3062
| contact person = Fields M , NRR/ADPT,415-3062
| case reference number = TAC MC7974
| case reference number = TAC MC7974
| package number = ML053630345
| package number = ML053630345
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:December 31, 2005Mr. Gary Taylor Chief Executive Officer Entergy Operations, Inc.
{{#Wiki_filter:December 31, 2005 Mr. Gary Taylor Chief Executive Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995
P. O. Box 31995 Jackson, MS 39286-1995


==SUBJECT:==
==SUBJECT:==
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - ISSUANCE OFCONFORMING AMENDMENT RE: TRANSFER OF THE FACILITY OPERATING LICENSE FROM ENTERGY LOUISIANA, INC. TO ENTERGY LOUISIANA, LLC (TAC NO. MC7974)
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - ISSUANCE OF CONFORMING AMENDMENT RE: TRANSFER OF THE FACILITY OPERATING LICENSE FROM ENTERGY LOUISIANA, INC. TO ENTERGY LOUISIANA, LLC (TAC NO. MC7974)


==Dear Mr. Taylor:==
==Dear Mr. Taylor:==


By Order dated December 2, 2005, the Nuclear Regulatory Commission (NRC) approved thetransfer of Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3 (Waterford 3), held by Entergy Louisiana, Inc. (ELI) and Entergy Operations, Inc. (EOI),
By Order dated December 2, 2005, the Nuclear Regulatory Commission (NRC) approved the transfer of Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3 (Waterford 3), held by Entergy Louisiana, Inc. (ELI) and Entergy Operations, Inc. (EOI),
and approved a conforming amendment, pursuant to Title 10 of the Code of FederalRegulations, Sections 50.80 and 50.90. The transfer is associated with the restructuring of ELIfrom a Louisiana corporation to a Texas limited liability company, Entergy Louisiana, LLC (ELL). EOI will continue to operate Waterford 3, and the proposed restructuring will not affect thetechnical or financial qualifications of ELL or EOI. The Order was published in the FederalRegister on December 13, 2005 (70 FR 73800). By letter dated December 8, 2005, EOI notified the NRC that 1) all required regulatoryapprovals of the transfer have been received, 2) the Waterford 3 decommissioning trust agreements will be amended at the time of the closing of the transfer of ownership ofWaterford 3 to reflect ELL as the owner of all the decommissioning trust funds accumulated as of the date of the closing, and 3) the closing of the transfer would occur on December 31, 2005,and also provided proof that the required insurance had been obtained. EOI's December 8letter satisfied the required conditions of the Order.Accordingly, the Commission has issued the enclosed Amendment No. 203 to FacilityOperating License No. NPF-38 for Waterford 3 (Enclosure 1). This conforming amendment reflects the transfer of the license to ELL and includes any changes made to the license pages by amendments issued subsequent to December 2, 2005. The safety evaluation supporting the conforming amendment was attached to the above mentioned Order, issued on December 2, 2005. Enclosure 2 contains a signed original of Amendment No. 7 to Indemnity Agreement No. B-92for Waterford 3, which is required in connection with the transfer of the license. Please keep this original for your records. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.Sincerely, /RA/Mel B. Fields, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-382
and approved a conforming amendment, pursuant to Title 10 of the Code of Federal Regulations, Sections 50.80 and 50.90. The transfer is associated with the restructuring of ELI from a Louisiana corporation to a Texas limited liability company, Entergy Louisiana, LLC (ELL).
EOI will continue to operate Waterford 3, and the proposed restructuring will not affect the technical or financial qualifications of ELL or EOI. The Order was published in the Federal Register on December 13, 2005 (70 FR 73800).
By letter dated December 8, 2005, EOI notified the NRC that 1) all required regulatory approvals of the transfer have been received, 2) the Waterford 3 decommissioning trust agreements will be amended at the time of the closing of the transfer of ownership of Waterford 3 to reflect ELL as the owner of all the decommissioning trust funds accumulated as of the date of the closing, and 3) the closing of the transfer would occur on December 31, 2005, and also provided proof that the required insurance had been obtained. EOI's December 8 letter satisfied the required conditions of the Order.
Accordingly, the Commission has issued the enclosed Amendment No. 203 to Facility Operating License No. NPF-38 for Waterford 3 (Enclosure 1). This conforming amendment reflects the transfer of the license to ELL and includes any changes made to the license pages by amendments issued subsequent to December 2, 2005. The safety evaluation supporting the conforming amendment was attached to the above mentioned Order, issued on December 2, 2005. contains a signed original of Amendment No. 7 to Indemnity Agreement No. B-92 for Waterford 3, which is required in connection with the transfer of the license. Please keep this original for your records.
 
The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
                                                            /RA/
Mel B. Fields, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 203 to NPF-38                     2. Indemnity Agreementcc w/encls: See next page The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.Sincerely, /RA/Mel B. Fields, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-382
: 1. Amendment No. 203 to NPF-38
: 2. Indemnity Agreement cc w/encls: See next page
 
The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
                                                    /RA/
Mel B. Fields, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 203 to NPF-38                     2. Indemnity Agreementcc w/encls: See next page DISTRIBUTION
: 1. Amendment No. 203 to NPF-38
:PUBLICRidsNrrDprPfpb (EMcKenna)
: 2. Indemnity Agreement cc w/encls: See next page DISTRIBUTION:
LPLIV r/fRidsNrrDirsIolb (DTrimble)
PUBLIC                              RidsNrrDprPfpb (EMcKenna)
GHill (2)RidsAcrsAcnwMailCenter RidsNrrOd (JDyer)RidsOgcRp RidsNrrDorl (CHaney)RidsRgn4MailCenter (TPruett)RidsNrrDorlLplg (DTerao) RidsNrrDorlDpr (BKS1)
LPLIV r/f                            RidsNrrDirsIolb (DTrimble)
RidsNrrPMMFieldsMDusaniwskyj (MAD1)
GHill (2)                           RidsAcrsAcnwMailCenter RidsNrrOd (JDyer)                   RidsOgcRp RidsNrrDorl (CHaney)                 RidsRgn4MailCenter (TPruett)
RidsNrrLADJohnsonRPelton (RMP1)
RidsNrrDorlLplg (DTerao)             RidsNrrDorlDpr (BKS1)
IDinitzPackage No.: ML053630345AMD. 203 License Pages: ML053410249Enclosure 2 Indemnity Agreement: ML053630248Adams Accession No. ML053630341NRR-058 OFFICENRR/LPL4/PMNRR/LPL4/LANRR/LPL4/BCNAMEMFieldsDJohnsonDTerao DATE12/29/0512/29/0512/30/05 DOCUMENT NAME: E:\Filenet\ML053630341.wpdOFFICIAL RECORD COPY ENTERGY OPERATIONS, INC.DOCKET NO. 50-382WATERFORD STEAM ELECTRIC STATION, UNIT 3AMENDMENT TO FACILITY OPERATING LICENSEAmendment No. 203License No. NPF-381.The Nuclear Regulatory Commission (the Commission) has found that:A.The application for amendment by Entergy Operations, Inc. dated July 20, 2005,as supplemented by letter dated September 14, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the rules and regulations of the Commission;C.There is reasonable assurance (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with theCommission's regulations;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; andE.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the license is hereby amended as indicated in the attachment to thislicense amendment. 3.This license amendment is effective as of its date of issuance and shall be implementedwithin 30 days.FOR THE NUCLEAR REGULATORY COMMISSION/RA/J. E. Dyer, DirectorOffice of Nuclear Reactor Regulation
RidsNrrPMMFields                    MDusaniwskyj (MAD1)
RidsNrrLADJohnson                    RPelton (RMP1)
IDinitz Package No.: ML053630345            AMD. 203 License Pages: ML053410249 Enclosure 2 Indemnity Agreement: ML053630248 Adams Accession No. ML053630341                            NRR-058 OFFICE    NRR/LPL4/PM      NRR/LPL4/LA        NRR/LPL4/BC NAME      MFields          DJohnson          DTerao DATE      12/29/05          12/29/05          12/30/05 DOCUMENT NAME: E:\Filenet\ML053630341.wpd OFFICIAL RECORD COPY
 
ENTERGY OPERATIONS, INC.
DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 203 License No. NPF-38
: 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. dated July 20, 2005, as supplemented by letter dated September 14, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the license is hereby amended as indicated in the attachment to this license amendment.
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
                                            /RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the Operating License Date of Issuance: December 31, 2005 ATTACHMENT TO LICENSE AMENDMENT NO. 203TO FACILITY OPERATING LICENSE NO. NPF-38DOCKET NO. 50-382Replace the following pages of Operating License No. NPF-38 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.REMOVE INSERT 11 22 33 44 55 88 May 2005Waterford Steam Electric Station, Unit 3 cc:
Changes to the Operating License Date of Issuance: December 31, 2005
Mr. Michael E. Henry, State Liaison OfficerDepartment of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana  70821-4313Vice President Operations Support Entergy Operations, Inc.
 
P. O. Box 31995 Jackson, MS  39286-1995DirectorNuclear Safety Assurance Entergy Operations, Inc.
ATTACHMENT TO LICENSE AMENDMENT NO. 203 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50-382 Replace the following pages of Operating License No. NPF-38 with the attached revised pages.
17265 River Road Killona, LA  70066-0751Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS  39205 General Manager Plant OperationsWaterford 3 SES Entergy Operations, Inc.
The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
17265 River Road Killona, LA  70066-0751Licensing ManagerEntergy Operations, Inc.
REMOVE                           INSERT 1                                1 2                                2 3                               3 4                                4 5                                5 8                                8
17265 River Road Killona, LA  70066-0751Winston & Strawn 1700 K Street, N.W.
Washington, DC  20006-3817Resident Inspector/Waterford NPSP. O. Box 822 Killona, LA  70066-0751Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX  76011Parish President Council St. Charles Parish


P. O. Box 302 Hahnville, LA 70057Executive Vice President & Chief Operating Officer Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 cc:
P. O. Box 31995 Jackson, MS 39286-1995Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA 70825-1697Mr. Joseph E. VenableVice President Operations Entergy Operations, Inc.
Mr. Michael E. Henry, State Liaison Officer Regional Administrator, Region IV Department of Environmental Quality        U.S. Nuclear Regulatory Commission Permits Division                            611 Ryan Plaza Drive, Suite 400 P.O. Box 4313                              Arlington, TX 76011 Baton Rouge, Louisiana 70821-4313 Parish President Council Vice President Operations Support          St. Charles Parish Entergy Operations, Inc.                    P. O. Box 302 P. O. Box 31995                            Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice President Director                                    & Chief Operating Officer Nuclear Safety Assurance                    Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751}}
Entergy Operations, Inc.                    P. O. Box 31995 17265 River Road                            Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway              Louisiana Public Services Commission P. O. Box 651                              P. O. Box 91154 Jackson, MS 39205                          Baton Rouge, LA 70825-1697 General Manager Plant Operations            Mr. Joseph E. Venable Waterford 3 SES                            Vice President Operations Entergy Operations, Inc.                    Entergy Operations, Inc.
17265 River Road                           17265 River Road Killona, LA 70066-0751                      Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Winston & Strawn 1700 K Street, N.W.
Washington, DC 20006-3817 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 May 2005}}

Latest revision as of 22:29, 7 December 2019

Conforming Amendment Letter to G. Taylor
ML053630341
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/31/2005
From: Fields M
NRC/NRR/ADRO/DORL/LPLG
To: Gabe Taylor
Entergy Operations
Fields M , NRR/ADPT,415-3062
Shared Package
ML053630345 List:
References
TAC MC7974
Download: ML053630341 (7)


Text

December 31, 2005 Mr. Gary Taylor Chief Executive Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - ISSUANCE OF CONFORMING AMENDMENT RE: TRANSFER OF THE FACILITY OPERATING LICENSE FROM ENTERGY LOUISIANA, INC. TO ENTERGY LOUISIANA, LLC (TAC NO. MC7974)

Dear Mr. Taylor:

By Order dated December 2, 2005, the Nuclear Regulatory Commission (NRC) approved the transfer of Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3 (Waterford 3), held by Entergy Louisiana, Inc. (ELI) and Entergy Operations, Inc. (EOI),

and approved a conforming amendment, pursuant to Title 10 of the Code of Federal Regulations, Sections 50.80 and 50.90. The transfer is associated with the restructuring of ELI from a Louisiana corporation to a Texas limited liability company, Entergy Louisiana, LLC (ELL).

EOI will continue to operate Waterford 3, and the proposed restructuring will not affect the technical or financial qualifications of ELL or EOI. The Order was published in the Federal Register on December 13, 2005 (70 FR 73800).

By letter dated December 8, 2005, EOI notified the NRC that 1) all required regulatory approvals of the transfer have been received, 2) the Waterford 3 decommissioning trust agreements will be amended at the time of the closing of the transfer of ownership of Waterford 3 to reflect ELL as the owner of all the decommissioning trust funds accumulated as of the date of the closing, and 3) the closing of the transfer would occur on December 31, 2005, and also provided proof that the required insurance had been obtained. EOI's December 8 letter satisfied the required conditions of the Order.

Accordingly, the Commission has issued the enclosed Amendment No. 203 to Facility Operating License No. NPF-38 for Waterford 3 (Enclosure 1). This conforming amendment reflects the transfer of the license to ELL and includes any changes made to the license pages by amendments issued subsequent to December 2, 2005. The safety evaluation supporting the conforming amendment was attached to the above mentioned Order, issued on December 2, 2005. contains a signed original of Amendment No. 7 to Indemnity Agreement No. B-92 for Waterford 3, which is required in connection with the transfer of the license. Please keep this original for your records.

The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/RA/

Mel B. Fields, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosures:

1. Amendment No. 203 to NPF-38
2. Indemnity Agreement cc w/encls: See next page

The Notice of Issuance will be included in the Commissions biweekly Federal Register notice.

Sincerely,

/RA/

Mel B. Fields, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382

Enclosures:

1. Amendment No. 203 to NPF-38
2. Indemnity Agreement cc w/encls: See next page DISTRIBUTION:

PUBLIC RidsNrrDprPfpb (EMcKenna)

LPLIV r/f RidsNrrDirsIolb (DTrimble)

GHill (2) RidsAcrsAcnwMailCenter RidsNrrOd (JDyer) RidsOgcRp RidsNrrDorl (CHaney) RidsRgn4MailCenter (TPruett)

RidsNrrDorlLplg (DTerao) RidsNrrDorlDpr (BKS1)

RidsNrrPMMFields MDusaniwskyj (MAD1)

RidsNrrLADJohnson RPelton (RMP1)

IDinitz Package No.: ML053630345 AMD. 203 License Pages: ML053410249 Enclosure 2 Indemnity Agreement: ML053630248 Adams Accession No. ML053630341 NRR-058 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME MFields DJohnson DTerao DATE 12/29/05 12/29/05 12/30/05 DOCUMENT NAME: E:\Filenet\ML053630341.wpd OFFICIAL RECORD COPY

ENTERGY OPERATIONS, INC.

DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 203 License No. NPF-38

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Entergy Operations, Inc. dated July 20, 2005, as supplemented by letter dated September 14, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is hereby amended as indicated in the attachment to this license amendment.
3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

J. E. Dyer, Director Office of Nuclear Reactor Regulation

Attachment:

Changes to the Operating License Date of Issuance: December 31, 2005

ATTACHMENT TO LICENSE AMENDMENT NO. 203 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50-382 Replace the following pages of Operating License No. NPF-38 with the attached revised pages.

The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE INSERT 1 1 2 2 3 3 4 4 5 5 8 8

Waterford Steam Electric Station, Unit 3 cc:

Mr. Michael E. Henry, State Liaison Officer Regional Administrator, Region IV Department of Environmental Quality U.S. Nuclear Regulatory Commission Permits Division 611 Ryan Plaza Drive, Suite 400 P.O. Box 4313 Arlington, TX 76011 Baton Rouge, Louisiana 70821-4313 Parish President Council Vice President Operations Support St. Charles Parish Entergy Operations, Inc. P. O. Box 302 P. O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice President Director & Chief Operating Officer Nuclear Safety Assurance Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway Louisiana Public Services Commission P. O. Box 651 P. O. Box 91154 Jackson, MS 39205 Baton Rouge, LA 70825-1697 General Manager Plant Operations Mr. Joseph E. Venable Waterford 3 SES Vice President Operations Entergy Operations, Inc. Entergy Operations, Inc.

17265 River Road 17265 River Road Killona, LA 70066-0751 Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1700 K Street, N.W.

Washington, DC 20006-3817 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 May 2005