ML063200367: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML063200367 | | number = ML063200367 | ||
| issue date = 12/11/2006 | | issue date = 12/11/2006 | ||
| title = | | title = Slides, Improved Technical Specification Conversion from Category 1 Pre-submittal Meeting with Fenco to Discuss Davis-Besse's' Proposed Conversion to Improved Technical Specifications | ||
| author name = | | author name = | ||
| author affiliation = FirstEnergy Nuclear Operating Co | | author affiliation = FirstEnergy Nuclear Operating Co | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Sale Plant Operalions Rleliable Cost-Elledliw Plant Pla., operations Operallons People a smcongc safeiy fc~cris delivelinc | {{#Wiki_filter:Sale Plant Operalions Rleliable Cost-Elledliw Plant Pla., | ||
operations Operallons People a smcongc safeiy fc~cris delivelinc tuopfiý z (qoo.ertil pefformtiace. | |||
IMPRi<OVED TECHNICAL SPECIFICATION CON'VERSION 1 | IMPRi<OVED TECHNICAL SPECIFICATION CON'VERSION 1 | ||
Overview* Introduction | |||
# Describe the project-2 year project with 4 phases-SITE Project* Core Team° Designated Reviewers* PORC and CNRB approvals-NRC Approval and Implementation in parallel during the last year* Discussion Topics, to include:-Anticipated RAI process-BSI Definition | Overview | ||
/ Disposition | * Introduction | ||
-Approach on Travelers-CTS LAR Incorporation | # Describe the project | ||
-NRC Resources and 2007 Schedule Support 2 Introduction SDavis-Besse/ | - 2 year project with 4 phases | ||
FENOC /EXCEL Personnel-Robert Schrauder, Director Site Performance Improvement-Greg Dunn, Manager Fleet Licensing-William Bentley, Project Manager Improved Tech Spec Conversion-Ray Schiele, Project Manager EXCEL 3 Introduction | - SITE Project | ||
* Desired Outcome is a mutual. understanding on the following items:-Importance of the project-Maintaining consistency with best industry practices-Engagement | * Core Team | ||
& Commitment to the process* Take full advantage of the accelerated review process Expectations for the review process Participants in the process 4 | ° Designated Reviewers | ||
* Scope of the ITS project-Prepare a License Amendment Request (LAR) to convert the Davis-Besse Current Technical Specifications (CTS) to the Improved Standard Technical Specifications (ISTS), NUREG 1430, Revision 3.1-Obtain NRC approval of the plant-specific Improved Technical Specifications | * PORC and CNRB approvals | ||
-Complete all project phases in accordance with the project schedule and within the authorized project budget-Develop and implement an effective Change Management Plan which reinforces the need for change and fosters line organization ownership of the ITS-Assure event free implementation of the ITS 5 Introduction | - NRC Approval and Implementation in parallel during the last year | ||
* Improved Technical Specifications (ITS)-One of Six Key Station priorities for the next 2 years-Significant Fleet Capital Expenditure | * Discussion Topics, to include: | ||
-Supports License Renewal-Key Benefits°imnproved Safety / Operational Performance Eased Admin Burdens , Inproved Regulatory Performance Consistency with other fleet sites 6 ITS Conversion Conversion to the ITS is Accomplished in Four Phases:+ Initial Planning Stage* License Amendment Request (LAR)Development | - Anticipated RAI process | ||
* Support of NRC Review and Approval* Implementation Initial Planning Stage Phase 1 Consists of the Following: | - BSI Definition / Disposition | ||
+ Develop Project Plan+ Develop Project Schedule* Identify the Project CORE TEAM* Train CORE TEAM+ Develop Tracking Mechanisms 8 | - Approach on Travelers | ||
Initial Planning Stage -Phase 1 Project Plan:* Detailed plan and schedule in place-General approach, roles and responsibilities, guidance documents, deliverables, performance indicators | - CTS LAR Incorporation | ||
+ Core Team-Experienced in required technical disciplines | - NRC Resources and 2007 Schedule Support 2 | ||
-Knowledgeable in plant operation, change management, procedure control, regulatory control, and document control-Members from Operations, Engineering, Maintenance and Licensing 9 Initial Planning Stage -Phase 1 TEAM Initial Training+ CORE TEAM personnel* Other key personnel (Subject Matter Experts)+ Training covers-Conversion process-how to use ITS conventions and ground rules-philosophies and concepts incorporated in ITS-major technical issues-Writers Guide and License Requirements 10 Initial Planning Stage -Phase 1 Phase I Deliverables (Completed July 2006)+ Project Plan+ Interface Agreements with line organizations | |||
+ Detailed Schedule* Communications Plan+ Performance Indicators | Introduction SDavis-Besse/ FENOC /EXCEL Personnel | ||
+ Project Team Training 11 LAR Development | -Robert Schrauder, Director Site Performance Improvement | ||
-Phase 2 The Development of the ITS includes three elements (July 2006 -July 2007): 1. Evaluation of the Screening Criteria 2. Individual and Integrated Review Packages 3. Technical Requirements Manual 12 LAR Development -Phase 2 Evaluation of the Screening Criteria* A Split Report has been developed+ Confirms application of the Technical Specification Screening Criteria of 10 CFR 50.36 (c) (2) (ii)+ Line item comparison to the ITS NUREG* Initial draft and finalized at the end of the development phase.13 LAR Development-Phase 2 Evaluation of the Screening Criteria* Draft Split Report will be utilized to identify-Which LCOs and which portions of LCOs meet the criteria for being retained in the ITS-Which are candidates for relocation to licensee controlled documents. | -Greg Dunn, Manager Fleet Licensing | ||
+ Includes a summary listing / matrix ** Used to set the scope of each ITS chapter* Handout of matrix from split report 14 LAR Development | - William Bentley, Project Manager Improved Tech Spec Conversion | ||
-Phase 2 Review Package Preparation/Review/Approval | -Ray Schiele, Project Manager EXCEL 3 | ||
* ITS Chapters-Developed into plant specific Technical Specifications | |||
-Format consistent with NUREG 1430, Rev 3.1 Applicable Travelers incorporated | Introduction | ||
* Individual packages assembled-NEI Conversion Guidance Document (NEI 01-03)-Project Plan 15 LAR Development | * Desired Outcome is a mutual. understanding on the following items: | ||
-Phase 2 Review Package Preparation/Review/Approval Licensing Package sections:-Current Tech Spec markup-Discussion of Changes-ISTS and ISTS Bases markup-Justification for Deviation from the ISTS-No Significant Hazard Consideration | - Importance of the project | ||
-Supporting Information 16 LAR Development | - Maintaining consistency with best industry practices | ||
-Phase 2 Review Package Preparation/Review/Approval | - Engagement & Commitment to the process | ||
* Pre-meeting for each package-Core Team and Subject Matter Experts-Engage reviewers early on the split report, travelers, and any known issues or concerns* Each package reviewed by core team and subject matter experts* Post comment resolution meetings-Core Team and Subject Matter Experts-Ensure comments appropriately resolved-Consensus on global questions | * Take full advantage of the accelerated review process Expectations for the review process Participants in the process 4 | ||
/ issues* PORC and CNRB review and approval* 8 packages plus an integrated review 17 Davis-Besse ITS Development 18 LAR Development | |||
-Phase 2 Review Package Preparation/Review/Approval | Introduction | ||
* Integrated review performed of entire submittal package upon completion of all individual package reviews-Ensure appropriate disposition of comments-System interface requirements between individual chapters are consistent | * Scope of the ITS project | ||
-All open items identified during the development process are closed 19 LAR Development | - Prepare a License Amendment Request (LAR) to convert the Davis-Besse Current Technical Specifications (CTS) to the Improved Standard Technical Specifications (ISTS), NUREG 1430, Revision 3.1 | ||
-Phase 2 Technical Requirements Manual STRM already in place.and in ISTS format* Location for SSC/LCO and associated details that are removed from CTS* New chapters / sections-Created, reviewed and approved in accordance with site requirements 20 LAR Development Phase 2 Phase 2 Deliverables (July 2007)+ Split report* Plant Specific ITS and Bases* Discussion of Change (DOC) Tables* ITS LAR with all supporting documentation | - Obtain NRC approval of the plant-specific Improved Technical Specifications | ||
* Submittal to NRC at completion of Phase 2-July 2007 21 Support of NRC Review and Approval -Phase 3 Accelerated Licensing Review Process Objectives: | - Complete all project phases in accordance with the project schedule and within the authorized project budget | ||
+ 6-8 month review process* Single supplement prior to issuance of the SER* Reduce licensee cost* Reduce required NRC resources* Reduce required amount of formal correspondence 22 Support of NRC Review and Approval -Phase 3 Accelerated Licensing Review Process Open Item Database-Piloted at DC Cook.-Used at Beaver Valley and Monticello. | - Develop and implement an effective Change Management Plan which reinforces the need for change and fosters line organization ownership of the ITS | ||
23 Support of NRC Review and Approval-Phase 3 Accelerated Licensing Review Process* Open Item Database-Tracks all formal and informal issues-Positively track issues to closure-Establishment of issue ownership and schedule expectations | - Assure event free implementation of the ITS 5 | ||
-Supports timely'issue resolution | |||
/ closure 24 | Introduction | ||
.Implementation-Phase 4 The Implementation Plan has Two Major Elements (July 2007 -August 2008): 1. Project Scope 2. Project Execution 25 Implementation -Phase 4 Project Scope+ Define the processes+ Establish control mechanisms | * Improved Technical Specifications (ITS) | ||
* Site documentation impact+ Establish training requirements | - One of Six Key Station priorities for the next 2 years | ||
+ Establish the schedule 26 Implementation Phase 4 Project Execution+ Writing and Revising+ Training+ Procedure conformance | - Significant Fleet Capital Expenditure | ||
-New-More Restrictive 27 Implementation Phase 4 Phase 4 Deliverables (August 2008)# Detailed. | - Supports License Renewal | ||
Implementation Plan* Database with details on:-Scope-Impacted documents-Relocated Items / New Location-ITS requirement number and the implementing procedure or program number* Approved procedures as needed to implement improved work processes* ITS Training for all necessary personnel based on the needs of their position-Support Organization and SRO requal lesson plans-Training of Operators and Station Instructors | - Key Benefits | ||
-Revised exam bank questions and simulator scenarios-Training material for the ITS programs and procedure revisions 28 Implementation | °imnproved Safety / Operational Performance Eased Admin Burdens | ||
-Phase 4 Phase 4 Deliverables (August 2008)+ Project level procedures | , Inproved Regulatory Performance Consistency with other fleet sites 6 | ||
/ instructions | |||
/ guidelines needed to perform the work* Revisions as needed to existing program documents and procedures | ITS Conversion Conversion to the ITS is Accomplished in Four Phases: | ||
+ Revision to ODCM as needed* Commitment tracking annotations | + Initial Planning Stage | ||
/dispositions as a result of ITS+ UFSAR changes as needed* Project Control Documentation | * License Amendment Request (LAR) | ||
-Detailed Schedule-Performance Indicators | Development | ||
-Monthly Progress Report-Project Closeout Checklist 29 Lessons Learned* Core Team and Subject Matter Experts-Strategy and Planning meetings Correct skill sets and qualifications | * Support of NRC Review and Approval | ||
* Development Open Items-Assigned to owners, scheduled, aggressively tracked to closure.* Conversion Ground Rules-Establish with the NRC (today's discussion topics)* Implementation-Numerous for procedures/programs/training | * Implementation | ||
-Incorporated into the project plan 30 Discussion Items /NRC Feedback+ Review Time for RAIs /Process* Beyond Scope Items (BSI)-Definition and Schedule Impact-Reviewer Support / Project Training-Communication | |||
/ Project Expectation | Initial Planning Stage Phase 1 Consists of the Following: | ||
+ ISTS Traveler Approach (Approved and Pending)* More Restrictive Change Justification | + Develop Project Plan | ||
+ Develop Project Schedule | |||
* Identify the Project CORE TEAM | |||
* Train CORE TEAM | |||
+ Develop Tracking Mechanisms 8 | |||
Initial Planning Stage - Phase 1 Project Plan: | |||
* Detailed plan and schedule in place | |||
- General approach, roles and responsibilities, guidance documents, deliverables, performance indicators | |||
+ Core Team | |||
- Experienced in required technical disciplines | |||
- Knowledgeable in plant operation, change management, procedure control, regulatory control, and document control | |||
- Members from Operations, Engineering, Maintenance and Licensing 9 | |||
Initial Planning Stage - Phase 1 TEAM Initial Training | |||
+ CORE TEAM personnel | |||
* Other key personnel (Subject Matter Experts) | |||
+ Training covers | |||
- Conversion process | |||
- how to use ITS conventions and ground rules | |||
- philosophies and concepts incorporated in ITS | |||
- major technical issues | |||
- Writers Guide and License Requirements 10 | |||
Initial Planning Stage - Phase 1 Phase I Deliverables (Completed July 2006) | |||
+ Project Plan | |||
+ Interface Agreements with line organizations | |||
+ Detailed Schedule | |||
* Communications Plan | |||
+ Performance Indicators | |||
+ Project Team Training 11 | |||
LAR Development - Phase 2 The Development of the ITS includes three elements (July 2006 - July 2007): | |||
: 1. Evaluation of the Screening Criteria | |||
: 2. Individual and Integrated Review Packages | |||
: 3. Technical Requirements Manual 12 | |||
LAR Development -Phase 2 Evaluation of the Screening Criteria | |||
* A Split Report has been developed | |||
+ Confirms application of the Technical Specification Screening Criteria of 10 CFR 50.36 (c) (2) (ii) | |||
+ Line item comparison to the ITS NUREG | |||
* Initial draft and finalized at the end of the development phase. | |||
13 | |||
LAR Development- Phase 2 Evaluation of the Screening Criteria | |||
* Draft Split Report will be utilized to identify | |||
- Which LCOs and which portions of LCOs meet the criteria for being retained in the ITS | |||
- Which are candidates for relocation to licensee controlled documents. | |||
+ Includes a summary listing / matrix * | |||
* Used to set the scope of each ITS chapter | |||
* Handout of matrix from split report 14 | |||
LAR Development - Phase 2 Review Package Preparation/Review/Approval | |||
* ITS Chapters | |||
- Developed into plant specific Technical Specifications | |||
- Format consistent with NUREG 1430, Rev 3.1 Applicable Travelers incorporated | |||
* Individual packages assembled | |||
- NEI Conversion Guidance Document (NEI 01-03) | |||
- Project Plan 15 | |||
LAR Development - Phase 2 Review Package Preparation/Review/Approval Licensing Package sections: | |||
- Current Tech Spec markup | |||
- Discussion of Changes | |||
- ISTS and ISTS Bases markup | |||
- Justification for Deviation from the ISTS | |||
- No Significant Hazard Consideration | |||
- Supporting Information 16 | |||
LAR Development - Phase 2 Review Package Preparation/Review/Approval | |||
* Pre-meeting for each package | |||
- Core Team and Subject Matter Experts | |||
- Engage reviewers early on the split report, travelers, and any known issues or concerns | |||
* Each package reviewed by core team and subject matter experts | |||
* Post comment resolution meetings | |||
- Core Team and Subject Matter Experts | |||
- Ensure comments appropriately resolved | |||
- Consensus on global questions / issues | |||
* PORC and CNRB review and approval | |||
* 8 packages plus an integrated review 17 | |||
Davis-Besse ITS Development 18 | |||
LAR Development - Phase 2 Review Package Preparation/Review/Approval | |||
* Integrated review performed of entire submittal package upon completion of all individual package reviews | |||
- Ensure appropriate disposition of comments | |||
- System interface requirements between individual chapters are consistent | |||
- All open items identified during the development process are closed 19 | |||
LAR Development - Phase 2 Technical Requirements Manual STRM already in place.and in ISTS format | |||
* Location for SSC/LCO and associated details that are removed from CTS | |||
* New chapters / sections | |||
- Created, reviewed and approved in accordance with site requirements 20 | |||
LAR Development Phase 2 Phase 2 Deliverables (July 2007) | |||
+ Split report | |||
* Plant Specific ITS and Bases | |||
* Discussion of Change (DOC) Tables | |||
* ITS LAR with all supporting documentation | |||
* Submittal to NRC at completion of Phase 2 | |||
- July 2007 21 | |||
Support of NRC Review and Approval - Phase 3 Accelerated Licensing Review Process Objectives: | |||
+ 6-8 month review process | |||
* Single supplement prior to issuance of the SER | |||
* Reduce licensee cost | |||
* Reduce required NRC resources | |||
* Reduce required amount of formal correspondence 22 | |||
Support of NRC Review and Approval - Phase 3 Accelerated Licensing Review Process Open Item Database | |||
- Piloted at DC Cook. | |||
- Used at Beaver Valley and Monticello. | |||
23 | |||
Support of NRC Review and Approval- Phase 3 Accelerated Licensing Review Process | |||
* Open Item Database | |||
- Tracks all formal and informal issues | |||
- Positively track issues to closure | |||
- Establishment of issue ownership and schedule expectations | |||
- Supports timely'issue resolution / closure 24 | |||
.Implementation- Phase 4 The Implementation Plan has Two Major Elements (July 2007 - August 2008): | |||
: 1. Project Scope | |||
: 2. Project Execution 25 | |||
Implementation -Phase 4 Project Scope | |||
+ Define the processes | |||
+ Establish control mechanisms | |||
* Site documentation impact | |||
+ Establish training requirements | |||
+ Establish the schedule 26 | |||
Implementation Phase 4 Project Execution | |||
+ Writing and Revising | |||
+ Training | |||
+ Procedure conformance | |||
- New | |||
- More Restrictive 27 | |||
Implementation Phase 4 Phase 4 Deliverables (August 2008) | |||
# Detailed. Implementation Plan | |||
* Database with details on: | |||
- Scope | |||
- Impacted documents | |||
- Relocated Items / New Location | |||
- ITS requirement number and the implementing procedure or program number | |||
* Approved procedures as needed to implement improved work processes | |||
* ITS Training for all necessary personnel based on the needs of their position | |||
- Support Organization and SRO requal lesson plans | |||
- Training of Operators and Station Instructors | |||
- Revised exam bank questions and simulator scenarios | |||
- Training material for the ITS programs and procedure revisions 28 | |||
Implementation - Phase 4 Phase 4 Deliverables (August 2008) | |||
+ Project level procedures / instructions / guidelines needed to perform the work | |||
* Revisions as needed to existing program documents and procedures | |||
+ Revision to ODCM as needed | |||
* Commitment tracking annotations /dispositions as a result of ITS | |||
+ UFSAR changes as needed | |||
* Project Control Documentation | |||
- Detailed Schedule | |||
- Performance Indicators | |||
- Monthly Progress Report | |||
- Project Closeout Checklist 29 | |||
Lessons Learned | |||
* Core Team and Subject Matter Experts | |||
- Strategy and Planning meetings Correct skill sets and qualifications | |||
* Development Open Items | |||
- Assigned to owners, scheduled, aggressively tracked to closure | |||
.* Conversion Ground Rules | |||
-Establish with the NRC (today's discussion topics) | |||
* Implementation | |||
-Numerous for procedures/programs/training | |||
- Incorporated into the project plan 30 | |||
Discussion Items /NRC Feedback | |||
+ Review Time for RAIs /Process | |||
* Beyond Scope Items (BSI) | |||
- Definition and Schedule Impact | |||
- Reviewer Support / Project Training | |||
- Communication / Project Expectation | |||
+ ISTS Traveler Approach (Approved and Pending) | |||
* More Restrictive Change Justification | |||
* Removal of Brackets Justification | * Removal of Brackets Justification | ||
* CTS LAR Incorporation | * CTS LAR Incorporation | ||
* Value of Current Licensing Basis* Weekly Management Calls / Communication | * Value of Current Licensing Basis | ||
* NRC Resources and 2007- Schedule Support 31 Summary* 2 year project with 4 Phases (July 2006 -August 2008)* Core Team of Ops, Maint, Eng, Licensing* Subject Matter Experts from various disciplines | * Weekly Management Calls / Communication | ||
* PORC and CNRB approval* Submittal planned for July 2007* Desire to use the same Accelerated Licensing Review Process used at 3 other sites 32 TSTFs planned for Davis-Besse ITS Conversion Number Description Status TSTF 402T Clarification of "Required Features" in 3.8.1 Approved for Use Actions TSTF 471T Eliminate use of term CORE ALTERATIONS in Approved for Use ACTIONS and Notes TSTF 494T Correct Bases Discussion of Figure B3.0-1 Approved for Use TSTF 427A Allowance for Non Technical Specification NRC Approves Barrier Degradation on Supported System OPERABILITY TSTF 497A Limit Inservice Testing Program SR 3.0.2 NRC Approves Application to Frequencies of 2 Years or Less TSTF 412 Provide Actions for One Steam Supply to Under NRC Turbine Driven AFW/EFW Pump Inoperable Consideration TSTF 468 Follow Supported Systems Actions Due to an Under NRC Inoperable MCC or Distribution Panel in lieu of Consideration ITS 3.8.9 TSTF 491 Removal of Main Steam and Main Feedwater Under NRC Valve Isolation Times From Technical Consideration Specifications TSTF 493 Clarify Application of Setpoint Methodology for Under NRC LSSS Functions Consideration}} | * NRC Resources and 2007- Schedule Support 31 | ||
Summary | |||
* 2 year project with 4 Phases (July 2006 - August 2008) | |||
* Core Team of Ops, Maint, Eng, Licensing | |||
* Subject Matter Experts from various disciplines | |||
* PORC and CNRB approval | |||
* Submittal planned for July 2007 | |||
* Desire to use the same Accelerated Licensing Review Process used at 3 other sites 32 | |||
TSTFs planned for Davis-Besse ITS Conversion Number Description Status TSTF 402T Clarification of "Required Features" in 3.8.1 Approved for Use Actions TSTF 471T Eliminate use of term CORE ALTERATIONS in Approved for Use ACTIONS and Notes TSTF 494T Correct Bases Discussion of Figure B3.0-1 Approved for Use TSTF 427A Allowance for Non Technical Specification NRC Approves Barrier Degradation on Supported System OPERABILITY TSTF 497A Limit Inservice Testing Program SR 3.0.2 NRC Approves Application to Frequencies of 2 Years or Less TSTF 412 Provide Actions for One Steam Supply to Under NRC Turbine Driven AFW/EFW Pump Inoperable Consideration TSTF 468 Follow Supported Systems Actions Due to an Under NRC Inoperable MCC or Distribution Panel in lieu of Consideration ITS 3.8.9 TSTF 491 Removal of Main Steam and Main Feedwater Under NRC Valve Isolation Times From Technical Consideration Specifications TSTF 493 Clarify Application of Setpoint Methodology for Under NRC LSSS Functions Consideration}} |
Latest revision as of 15:35, 7 December 2019
ML063200367 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 12/11/2006 |
From: | FirstEnergy Nuclear Operating Co |
To: | Office of Nuclear Reactor Regulation |
Wengert, Thomas | |
Shared Package | |
ML063200134 | List: |
References | |
TAC MD3229 | |
Download: ML063200367 (33) | |
Text
Sale Plant Operalions Rleliable Cost-Elledliw Plant Pla.,
operations Operallons People a smcongc safeiy fc~cris delivelinc tuopfiý z (qoo.ertil pefformtiace.
IMPRi<OVED TECHNICAL SPECIFICATION CON'VERSION 1
Overview
- Introduction
- Describe the project
- 2 year project with 4 phases
- SITE Project
- Core Team
° Designated Reviewers
- PORC and CNRB approvals
- NRC Approval and Implementation in parallel during the last year
- Discussion Topics, to include:
- Anticipated RAI process
- BSI Definition / Disposition
- Approach on Travelers
- NRC Resources and 2007 Schedule Support 2
Introduction SDavis-Besse/ FENOC /EXCEL Personnel
-Robert Schrauder, Director Site Performance Improvement
-Greg Dunn, Manager Fleet Licensing
- William Bentley, Project Manager Improved Tech Spec Conversion
-Ray Schiele, Project Manager EXCEL 3
Introduction
- Desired Outcome is a mutual. understanding on the following items:
- Importance of the project
- Maintaining consistency with best industry practices
- Engagement & Commitment to the process
- Take full advantage of the accelerated review process Expectations for the review process Participants in the process 4
Introduction
- Scope of the ITS project
- Prepare a License Amendment Request (LAR) to convert the Davis-Besse Current Technical Specifications (CTS) to the Improved Standard Technical Specifications (ISTS), NUREG 1430, Revision 3.1
- Obtain NRC approval of the plant-specific Improved Technical Specifications
- Complete all project phases in accordance with the project schedule and within the authorized project budget
- Develop and implement an effective Change Management Plan which reinforces the need for change and fosters line organization ownership of the ITS
- Assure event free implementation of the ITS 5
Introduction
- Improved Technical Specifications (ITS)
- One of Six Key Station priorities for the next 2 years
- Significant Fleet Capital Expenditure
- Supports License Renewal
- Key Benefits
°imnproved Safety / Operational Performance Eased Admin Burdens
, Inproved Regulatory Performance Consistency with other fleet sites 6
ITS Conversion Conversion to the ITS is Accomplished in Four Phases:
+ Initial Planning Stage
- License Amendment Request (LAR)
Development
- Support of NRC Review and Approval
- Implementation
Initial Planning Stage Phase 1 Consists of the Following:
+ Develop Project Plan
+ Develop Project Schedule
- Identify the Project CORE TEAM
- Train CORE TEAM
+ Develop Tracking Mechanisms 8
Initial Planning Stage - Phase 1 Project Plan:
- Detailed plan and schedule in place
- General approach, roles and responsibilities, guidance documents, deliverables, performance indicators
+ Core Team
- Experienced in required technical disciplines
- Knowledgeable in plant operation, change management, procedure control, regulatory control, and document control
- Members from Operations, Engineering, Maintenance and Licensing 9
Initial Planning Stage - Phase 1 TEAM Initial Training
+ CORE TEAM personnel
- Other key personnel (Subject Matter Experts)
+ Training covers
- Conversion process
- how to use ITS conventions and ground rules
- philosophies and concepts incorporated in ITS
- major technical issues
- Writers Guide and License Requirements 10
Initial Planning Stage - Phase 1 Phase I Deliverables (Completed July 2006)
+ Project Plan
+ Interface Agreements with line organizations
+ Detailed Schedule
- Communications Plan
+ Performance Indicators
+ Project Team Training 11
LAR Development - Phase 2 The Development of the ITS includes three elements (July 2006 - July 2007):
- 1. Evaluation of the Screening Criteria
- 2. Individual and Integrated Review Packages
- 3. Technical Requirements Manual 12
LAR Development -Phase 2 Evaluation of the Screening Criteria
- A Split Report has been developed
+ Confirms application of the Technical Specification Screening Criteria of 10 CFR 50.36 (c) (2) (ii)
+ Line item comparison to the ITS NUREG
- Initial draft and finalized at the end of the development phase.
13
LAR Development- Phase 2 Evaluation of the Screening Criteria
- Draft Split Report will be utilized to identify
- Which LCOs and which portions of LCOs meet the criteria for being retained in the ITS
- Which are candidates for relocation to licensee controlled documents.
+ Includes a summary listing / matrix *
- Used to set the scope of each ITS chapter
- Handout of matrix from split report 14
LAR Development - Phase 2 Review Package Preparation/Review/Approval
- ITS Chapters
- Developed into plant specific Technical Specifications
- Format consistent with NUREG 1430, Rev 3.1 Applicable Travelers incorporated
- Individual packages assembled
- NEI Conversion Guidance Document (NEI 01-03)
- Project Plan 15
LAR Development - Phase 2 Review Package Preparation/Review/Approval Licensing Package sections:
- Current Tech Spec markup
- Discussion of Changes
- Justification for Deviation from the ISTS
- No Significant Hazard Consideration
- Supporting Information 16
LAR Development - Phase 2 Review Package Preparation/Review/Approval
- Pre-meeting for each package
- Core Team and Subject Matter Experts
- Engage reviewers early on the split report, travelers, and any known issues or concerns
- Each package reviewed by core team and subject matter experts
- Post comment resolution meetings
- Core Team and Subject Matter Experts
- Ensure comments appropriately resolved
- Consensus on global questions / issues
- PORC and CNRB review and approval
- 8 packages plus an integrated review 17
Davis-Besse ITS Development 18
LAR Development - Phase 2 Review Package Preparation/Review/Approval
- Integrated review performed of entire submittal package upon completion of all individual package reviews
- Ensure appropriate disposition of comments
- System interface requirements between individual chapters are consistent
- All open items identified during the development process are closed 19
LAR Development - Phase 2 Technical Requirements Manual STRM already in place.and in ISTS format
- Location for SSC/LCO and associated details that are removed from CTS
- New chapters / sections
- Created, reviewed and approved in accordance with site requirements 20
LAR Development Phase 2 Phase 2 Deliverables (July 2007)
+ Split report
- Plant Specific ITS and Bases
- Discussion of Change (DOC) Tables
- Submittal to NRC at completion of Phase 2
- July 2007 21
Support of NRC Review and Approval - Phase 3 Accelerated Licensing Review Process Objectives:
+ 6-8 month review process
- Single supplement prior to issuance of the SER
- Reduce licensee cost
- Reduce required NRC resources
- Reduce required amount of formal correspondence 22
Support of NRC Review and Approval - Phase 3 Accelerated Licensing Review Process Open Item Database
- Piloted at DC Cook.
- Used at Beaver Valley and Monticello.
23
Support of NRC Review and Approval- Phase 3 Accelerated Licensing Review Process
- Open Item Database
- Tracks all formal and informal issues
- Positively track issues to closure
- Establishment of issue ownership and schedule expectations
- Supports timely'issue resolution / closure 24
.Implementation- Phase 4 The Implementation Plan has Two Major Elements (July 2007 - August 2008):
- 1. Project Scope
- 2. Project Execution 25
Implementation -Phase 4 Project Scope
+ Define the processes
+ Establish control mechanisms
- Site documentation impact
+ Establish training requirements
+ Establish the schedule 26
Implementation Phase 4 Project Execution
+ Writing and Revising
+ Training
+ Procedure conformance
- New
- More Restrictive 27
Implementation Phase 4 Phase 4 Deliverables (August 2008)
- Detailed. Implementation Plan
- Database with details on:
- Scope
- Impacted documents
- Relocated Items / New Location
- ITS requirement number and the implementing procedure or program number
- Approved procedures as needed to implement improved work processes
- ITS Training for all necessary personnel based on the needs of their position
- Support Organization and SRO requal lesson plans
- Training of Operators and Station Instructors
- Revised exam bank questions and simulator scenarios
- Training material for the ITS programs and procedure revisions 28
Implementation - Phase 4 Phase 4 Deliverables (August 2008)
+ Project level procedures / instructions / guidelines needed to perform the work
- Revisions as needed to existing program documents and procedures
+ Revision to ODCM as needed
- Commitment tracking annotations /dispositions as a result of ITS
+ UFSAR changes as needed
- Project Control Documentation
- Detailed Schedule
- Performance Indicators
- Monthly Progress Report
- Project Closeout Checklist 29
Lessons Learned
- Core Team and Subject Matter Experts
- Strategy and Planning meetings Correct skill sets and qualifications
- Development Open Items
- Assigned to owners, scheduled, aggressively tracked to closure
.* Conversion Ground Rules
-Establish with the NRC (today's discussion topics)
- Implementation
-Numerous for procedures/programs/training
- Incorporated into the project plan 30
Discussion Items /NRC Feedback
+ Review Time for RAIs /Process
- Beyond Scope Items (BSI)
- Definition and Schedule Impact
- Reviewer Support / Project Training
- Communication / Project Expectation
+ ISTS Traveler Approach (Approved and Pending)
- More Restrictive Change Justification
- Removal of Brackets Justification
- Value of Current Licensing Basis
- Weekly Management Calls / Communication
- NRC Resources and 2007- Schedule Support 31
Summary
- 2 year project with 4 Phases (July 2006 - August 2008)
- Core Team of Ops, Maint, Eng, Licensing
- Subject Matter Experts from various disciplines
- PORC and CNRB approval
- Submittal planned for July 2007
- Desire to use the same Accelerated Licensing Review Process used at 3 other sites 32
TSTFs planned for Davis-Besse ITS Conversion Number Description Status TSTF 402T Clarification of "Required Features" in 3.8.1 Approved for Use Actions TSTF 471T Eliminate use of term CORE ALTERATIONS in Approved for Use ACTIONS and Notes TSTF 494T Correct Bases Discussion of Figure B3.0-1 Approved for Use TSTF 427A Allowance for Non Technical Specification NRC Approves Barrier Degradation on Supported System OPERABILITY TSTF 497A Limit Inservice Testing Program SR 3.0.2 NRC Approves Application to Frequencies of 2 Years or Less TSTF 412 Provide Actions for One Steam Supply to Under NRC Turbine Driven AFW/EFW Pump Inoperable Consideration TSTF 468 Follow Supported Systems Actions Due to an Under NRC Inoperable MCC or Distribution Panel in lieu of Consideration ITS 3.8.9 TSTF 491 Removal of Main Steam and Main Feedwater Under NRC Valve Isolation Times From Technical Consideration Specifications TSTF 493 Clarify Application of Setpoint Methodology for Under NRC LSSS Functions Consideration